9-Bid Schedule Daybreak Culvert Maintenance Project.pdf

PDF 141 KB Posted

Attached to
RFP - Daybreak Culvert Maintenance Project
Solicitation number
2026-031
Issued by
Salt Lake County, Utah

About this file

This is a bid schedule document for the City of South Jordan's Daybreak Culvert Maintenance Project, which solicits qualified contractors to provide spray-applied structural-grade geopolymer lining services for culvert rehabilitation. The project encompasses approximately 1,680 linear feet of structural-grade geopolymer lining across three chambers, with work to be completed in accordance with manufacturer standards and specifications. The anticipated Notice to Proceed is March 30, 2027, with project completion required by June 1, 2027, including all invoicing. The bid schedule is structured as a base bid covering Chamber 2 (310 linear feet) with two alternative bids: Alternative Bid 1 for Chamber 3 (350 linear feet) and Alternative Bid 2 for Chamber 1 (1,020 linear feet).

The bid schedule itemizes five line items for each chamber: mobilization and temporary facilities, site preparation, traffic control with Locally Designated Project (LDP) and Stormwater Pollution Prevention Plan (SWPPP) requirements, installation of the structural-grade geopolymer lining, and restoration of landscaping. All items are presented with unit prices and total estimated price columns for contractor completion. Performance and Payment Bonds are required from the awarded contractor. Proposals must be submitted online through Bonfire, the State of Utah's procurement website, by the scheduled closing date and time, with all bidding responsibility falling solely on the contractor to submit before the deadline.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Bid: The following schedule constitutes the Base Bid.

Schedule A: Base Bid Chamber 2

SCHEDULE A TOTAL = $ ______________

Alternative Bid 1: The sum of the following Schedule B constitutes the Alternative Bid 1.

Schedule B: Alternative Bid Chamber 3

SCHEDULE B TOTAL = $ ______________

Alternative Bid 2: The sum of the following Schedule C constitutes the Alternative Bid 2.

Schedule C: Alternative Bid Chamber 1

SCHEDULE C TOTAL = $ ______________

Item

No.

Item Unit

Estimated

Quantity Unit Price

Total

Estimated

Price

A-1 Mobilization, Temp Facilities, De-Mobilization LUMP 1 $ $

A-2 Site Preparation LUMP 1 $ $

A-3 Traffic Control, LDP & SWPPP LUMP 1 $ $

A-4 Install Structural-Grade Geopolymer Lining –

Chamber 2

FOOT 310 $ $

A-5 Restoration of Landscaping LUMP 1 $ $

Item

No.

Item Unit

Estimated

Quantity Unit Price

Total

Estimated

Price

B-1 Mobilization, Temp Facilities, De-Mobilization LUMP 1 $ $

B-2 Site Preparation LUMP 1 $ $

B-3 Traffic Control, LDP & SWPPP LUMP 1 $ $

B-4 Install Structural-Grade Geopolymer Lining –

Chamber 3

FOOT 350 $ $

B-5 Restoration of Landscaping LUMP 1 $ $

Item

No.

Item Unit

Estimated

Quantity Unit Price

Total

Estimated

Price

C-1 Mobilization, Temp Facilities, De-Mobilization LUMP 1 $ $

C-2 Site Preparation LUMP 1 $ $

C-3 Traffic Control, LDP & SWPPP LUMP 1 $ $

C-4 Install Structural-Grade Geopolymer Lining –

Chamber 1

FOOT 1,020 $ $

C-5 Restoration of Landscaping LUMP 1 $ $