9-Bid Schedule Daybreak Culvert Maintenance Project.pdf
PDF 141 KB Posted
- Attached to
- RFP - Daybreak Culvert Maintenance Project
- Solicitation number
- 2026-031
- Issued by
- Salt Lake County, Utah
About this file
This is a bid schedule document for the City of South Jordan's Daybreak Culvert Maintenance Project, which solicits qualified contractors to provide spray-applied structural-grade geopolymer lining services for culvert rehabilitation. The project encompasses approximately 1,680 linear feet of structural-grade geopolymer lining across three chambers, with work to be completed in accordance with manufacturer standards and specifications. The anticipated Notice to Proceed is March 30, 2027, with project completion required by June 1, 2027, including all invoicing. The bid schedule is structured as a base bid covering Chamber 2 (310 linear feet) with two alternative bids: Alternative Bid 1 for Chamber 3 (350 linear feet) and Alternative Bid 2 for Chamber 1 (1,020 linear feet).
The bid schedule itemizes five line items for each chamber: mobilization and temporary facilities, site preparation, traffic control with Locally Designated Project (LDP) and Stormwater Pollution Prevention Plan (SWPPP) requirements, installation of the structural-grade geopolymer lining, and restoration of landscaping. All items are presented with unit prices and total estimated price columns for contractor completion. Performance and Payment Bonds are required from the awarded contractor. Proposals must be submitted online through Bonfire, the State of Utah's procurement website, by the scheduled closing date and time, with all bidding responsibility falling solely on the contractor to submit before the deadline.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Bid: The following schedule constitutes the Base Bid.
Schedule A: Base Bid Chamber 2
SCHEDULE A TOTAL = $ ______________
Alternative Bid 1: The sum of the following Schedule B constitutes the Alternative Bid 1.
Schedule B: Alternative Bid Chamber 3
SCHEDULE B TOTAL = $ ______________
Alternative Bid 2: The sum of the following Schedule C constitutes the Alternative Bid 2.
Schedule C: Alternative Bid Chamber 1
SCHEDULE C TOTAL = $ ______________
Item
No.
Item Unit
Estimated
Quantity Unit Price
Total
Estimated
Price
A-1 Mobilization, Temp Facilities, De-Mobilization LUMP 1 $ $
A-2 Site Preparation LUMP 1 $ $
A-3 Traffic Control, LDP & SWPPP LUMP 1 $ $
A-4 Install Structural-Grade Geopolymer Lining –
Chamber 2
FOOT 310 $ $
A-5 Restoration of Landscaping LUMP 1 $ $
Item
No.
Item Unit
Estimated
Quantity Unit Price
Total
Estimated
Price
B-1 Mobilization, Temp Facilities, De-Mobilization LUMP 1 $ $
B-2 Site Preparation LUMP 1 $ $
B-3 Traffic Control, LDP & SWPPP LUMP 1 $ $
B-4 Install Structural-Grade Geopolymer Lining –
Chamber 3
FOOT 350 $ $
B-5 Restoration of Landscaping LUMP 1 $ $
Item
No.
Item Unit
Estimated
Quantity Unit Price
Total
Estimated
Price
C-1 Mobilization, Temp Facilities, De-Mobilization LUMP 1 $ $
C-2 Site Preparation LUMP 1 $ $
C-3 Traffic Control, LDP & SWPPP LUMP 1 $ $
C-4 Install Structural-Grade Geopolymer Lining –
Chamber 1
FOOT 1,020 $ $
C-5 Restoration of Landscaping LUMP 1 $ $