9-Addendum 2 EMC Scarlet 4 MG Water Tank-Letter.pdf
PDF 7 KB Posted
- Attached to
- EMC Scarlet 009 4 MG Water Tank
- Solicitation number
- EMC-FY26-01
- Issued by
- Utah County, Utah
About this file
This document is Addendum #2 for the Eagle Mountain 4.0 MG Water Tank project, dated August 28, 2025, issued by Sunrise Engineering, Inc. The addendum modifies the original project documents and specifications, with several key updates including the addition of Detail D to sheet GP5, modification of Detail C on sheet D3, and an update to Bid Item 23 quantity to 180 cubic yards. The document is intended for planholders and bidders, requiring acknowledgment of the addendum in the bid proposal.
The addendum also introduces a new specification document (03 20 00 "Concrete Reinforcing") to the project manual. No clarification items were noted in this addendum. The enclosures include a revised project manual and revised construction drawings. The document maintains the standard format for contract modifications, providing clear and concise information about changes to the original project specifications and drawings.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EAGLE MOUNTAIN
4.0 MG WATER TANK
ADDENDUM #2
August 28, 2025
PLANHOLDER:
This Addendum #2 shall become part of the Plans (Drawings), Contract Documents, Specifications and Special Provisions of the above referenced project, and all provisions of the contract shall apply hereto.
Bidders shall acknowledge receipt of all addenda by number in the space provided in the bid proposal.
CLARIFICATION
1. No clarification items this addendum
CONTRACT DOCUMENTS, SPECIFICATIONS AND SPECIAL PROVISIONS
DRAWINGS
1. Detail D has been added to sheet GP5
2. Detail C on sheet D3 has been modified
EAGLE MOUNTAIN REQUEST FOR PROPOSAL
1. Bid item 23 quantity has been updated to 180CY.
DOCUMENT 03 20 00 “CONCRETE REINFORCING”
1. This specification has been added to the project manual.
Sincerely, CALEB DOTTEN, P.E.
SUNRISE ENGINEERING, INC.
Enclosures:
Revised Project Manual Revised Construction Drawings
END
File details come from the government source that posted it. Updated .