About this file

This Addendum No. 01 to the 2026 Pump Station Improvements Project, issued October 16, 2026, by RETTEW Associates, Inc. on behalf of Upper Leacock Township Municipal Authority, provides critical clarifications and modifications to the project manual and contract drawings for general construction (Contract 2026-02) and electrical construction (Contract 2026-03). The project involves improvements to four pump stations—Hertzog, Apricot, Bareville, and Glenbrook—with work including demolition, flow maintenance, wet well aeration system installation, discharge piping replacement, valve vault construction, and site restoration. The addendum supersedes conflicting instructions in the original contract documents and comprises three pages of modifications plus attachments including revised specification sections (012200 Measurement and Payment, 099000 Painting and Coating, 333100 Sanitary Utility Piping and Accessories, and 465100 Aeration and Gas Diffusion Equipment), technical drawings (sheets 00G-01, 01C-01 through 01C-06, and 99D-01), three photographs, and one information sheet. All prospective bidders must acknowledge receipt of this addendum on their bid form to avoid disqualification, with bids due by 10:00 AM on November 5, 2026, and project completion required within 240 calendar days of the Notice to Proceed.

The addendum provides detailed measurement and payment criteria on a lump-sum basis for each pump station, with specific delineation of general contractor and electrical contractor responsibilities to avoid duplication or gaps in work. Unit prices include all labor, materials, equipment, overhead, profit, and applicable permits and inspections, with payment structured as 75 percent upon pipe installation, 15 percent upon testing and acceptance, and 10 percent upon restoration completion. Stainless steel piping requires flanged end connections and Type 316 material, while PVC forcemain utilizes rubber gasket push-on joints with mechanical seals at concrete penetrations. The aeration systems consist of either 2-horsepower or 3-horsepower Pro-Air blowers supplied by a single manufacturer with associated fiberglass enclosures, control panels, and retrievable diffuser assemblies; all equipment must be supplied by the same aeration system manufacturer per Quality Assurance requirements. Coating work includes 100 percent solids epoxy (SW Duraplate 6100 or approved equal) for interior concrete and ductile iron piping surfaces at specified locations. A 10 percent bid bond is required, with performance and payment bonds at 100 percent of contract price mandated for the successful bidder, and the project is subject to Pennsylvania Prevailing Wage Act, OSHA, Act 229 of 2002, One Call Act 287 of 1974, and non-discrimination requirements.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3020 Columbia Avenue, Lancaster, PA 17603 ● Phone: (800) 738-8395 E-mail: rettew@rettew.com ● Web site: rettew.com

ADDENDUM NO. 01

October 16, 2026

To: All Prospective Bidders

RE: Upper Leacock Township Municipal Authority 2026 Pump Station Improvements Project Contract 2026-02: General Construction Contract 2026-03: Electrical Construction RETTEW Project No. 0571405975

Dear Bidders:

The following Addendum No. 01 is hereby made to the contract documents for the above-referenced project. Any additions, clarifications or deletions described in this Addendum take precedence over any instructions at conflict herein. All items in this Addendum shall be considered in preparation of your proposal for the referenced project.

Receipt of this Addendum shall be acknowledged by inserting this number and date in the space provided on the Bid Form. Failure to do so may result in disqualification of the Bidder. The addendum consists of 3 pages and the following attachments:

Section 012200 (7 pages) Section 099000 (8 pages) Section 333100 (11 pages) Section 465100 (4 pages) Photograph 1 - Pump Guide Rail Mounting Bracket at Bareville (1 page) Photograph 2 - Secondary Pump Guide Rail Bracket at Hertzog (1 page) Photograph 3 - Endress Hauser 4” Promag 50 Head Unit at Apricot Pump Station (1 page) Information Sheet 1 - Hertzog Discharge and Rail Support Casing (“pump base”) Information Sheet

(1 page) Sheet 00G-01 (1 page) Sheets 01C-01 through 01C-06 (6 sheets) Sheet 99D-01 (1 sheet)

Notes:

1. Electrical drawings will not be re-issued as part of Addendum 1. Changes to the drawings re-issued herein will be reflected in future addendums for the Electrical Plans, respectively.

PROJECT MANUAL MODIFICATIONS

The Project Manual shall be modified as follows:

SECTION 012200 – MEASUREMENT AND PAYMENT

Addendum No. 01 Upper Leacock Township Municipal Authority/2026 Pump Station Improvements Project

RETTEW Project No. 0571405975

1. Updates were made to more clearly delineate the scope of work associated with each Contract.

Updates were made to maintain consistency with the plans revised in Addendum 1. Additional information was provided on items that lacked detail, as identified in the bidder clarifications.

SECTION 099000 – PAINTING AND COATING

1. The coatings schedule in Section 3 was updated to better define the limits of painting and coating work. Additionally, details were added indicating the particular locations where each specified coating/lining is to be used.

SECTION 333100 – SANITARY UTILITY PIPING AND ACCESSORIES

1. The products section was updated to improve inconsistencies and missing details identified in bidder clarifications.

a. Flanged end types were specified for all stainless steel piping.

b. ASME and ASTM specification references were corrected.

c. Joints requirements for PVC forcemain were modified.

d. Requirements for pipe penetrations through concrete walls were updated to call for mechanical seals.

SECTION 465100 – AERATION AND GAS DIFFUSION EQUIPMENT

1. Line B was added to Section 1.3 to require that all equipment specified for proposed aeration systems should be supplied by a single manufacturer.

DRAWING MODIFICATIONS

SHEET NO. 00G-01

1. One Call Matrix has been updated with utility responses and signatures.

SHEET NO. 01C-01 (BAREVILLE PUMP STATION)

1. Sheet callouts were modified to more clearly delineate contract separation and identify responsibilities of each contractor.

SHEET NO. 01C-02 (HERTZOG PUMP STATION)

1. Note added to Lower Station Demolition Plan to more clearly detail work associated with the custom fabricated secondary pump rail bracket. Reference bidder clarifications and photographs attached to Addendum 1 for additional information.

2. Proposed discharge piping was modified to include flanged connections only. Additional notes were added to fittings and piping to more accurately detail proposed work.

3. Callouts were modified to more clearly delineate contract separation and identify responsibilities of each contractor.

SHEET NO. 01C-03 (HERTZOG PUMP STATION)

Addendum No. 01 Upper Leacock Township Municipal Authority/2026 Pump Station Improvements Project

RETTEW Project No. 0571405975

1. Hatch was fixed on the demolition section to accurately show extent of discharge piping to be removed.

2. Demo shading removed from guide rails.

3. Notes added to more clearly identify requirements for pump base replacement. Contractors to see Addendum attachments for additional information on pump bases.

4. Extra ball valve removed from 3” bypass pumping connection in valve vault.

5. Note calling for SST flanged coupling was modified to call for flange adapter for connection to valve.

6. All piping modified to show flanged end connections. Notes and callouts modified accordingly.

7. Callouts were modified to more clearly identify responsibilities of contractor.

SHEET NO. 01C-04 (GLENBROOK PUMP STATION)

1. Size of existing access hatch added to plan.

2. Callouts were modified to more clearly delineate contract separation and identify responsibilities of each contractor.

3. Notes added to clarify HVAC work. Callouts pointing to incorrect louvers removed.

SHEET NO. 01C-05 (APRICOT PUMP STATION)

1. Callouts were modified to more clearly delineate contract separation and identify responsibilities of each contractor.

2. Notes added and modified for HVAC work.

3. Material of existing discharge piping in wet well was added to plans.

4. Notes added to more clearly detail requirements for replacement of discharge piping and relining of pipe to remain.

SHEET NO. 01C-06 (APRICOT PUMP STATION)

1. Notes modified to remove incorrect information on HVAC work and scope of each multi-prime contractor.

SHEET NO. 99D-01 (MISC. DETAILS)

1. Note added to electric utility backboard to detail responsibilities of general contractor for aeration system control panel installation.

END OF ADDENDUM

Z:\Shared\Projects\05714\0571405975 - 2026 Pumping Station Improvements Project\MUN\05 Bidding\Addenda\01\0_Addendum 01_ULTMA_2026 PS_2026-10-16.docx

ADDENDUM NO. 1 – ISSUED 10/16/2026

Upper Leacock Township Municipal Authority October 2026

2026 Pump Station Improvements Project

MEASUREMENT AND PAYMENT 012200 - 1

RETTEW Project No.: 0147106642 All Contracts

DIVISION 01 – GENERAL REQUIREMENTS

SECTION 012200 – MEASUREMENT AND PAYMENT

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. Measurement and payment criteria applicable to the Work performed under a unit price payment method.

B. Non-conformance assessment and non-payment for rejected Work.

1.2 AUTHORITY

A. Measurement methods delineated in the individual specification section(s) are intended to complement the criteria of this section. In the event of conflict, the requirements of the individual specifications shall govern.

B. Take all measurements and compute quantities. The ENGINEER will verify measurements and quantities.

C. Assist by providing necessary equipment, workers, and survey personnel as required.

1.3 QUANTITIES SPECIFIED

A. The General Construction Contracts will be performed on a unit price basis.

1.4 MEASUREMENT AND QUANTITIES

A. Measurement by Volume: measured by cubic dimension using mean length, width and height of thickness.

B. Measurement by Area: Measured by square dimension using mean length and width or radius.

C. Linear Measurement: Measured by horizontal linear dimension at the item centerline or mean chord, and on the basis of the horizontal in-place measurements of the constructed pipe lines, not including pipe through manholes.

D. Stipulated Price Measurement: Items measured by weight, volume, area, or linear means or combination, as appropriate, as completed item or unit of the Work.

Upper Leacock Township Municipal Authority October 2026

MEASUREMENT AND PAYMENT 012200 - 2

1.5 PAYMENT

A. The unit prices in the bid form are intended to include all work described on the drawings and in the project manual. Compensation for any work described on the drawings or in the project manual but not specifically listed as a payment item shall be included in one or more of the listed bid items. The total bid price shall include compensation for all work required by the drawings and project manual.

B. Payment includes: Full compensation for all required labor, products, tools, equipment, plant, transportation, successful testing of piping and appurtenances, services and incidentals; erection, application or installation of an item of the Work; overhead and profit.

C. Payment for Permits and Inspections: Include the cost of all permits and inspections required to complete the Work covered under this Contract. No separate or extra payment will be made for permits, filing fees or inspections. All necessary permits shall be secured from Quarryville

Borough, Lancaster County prior to any construction.

D. Sales and other Taxes: The CONTRACTOR shall take notice of, and shall be responsible for, any local or state taxes levied and applicable, and the costs for the same shall be included as part of this bid. The Quarryville Borough Authority is tax exempt.

E. Unless otherwise specified in this section, payment for the bid items will be made as follows:

75% of unit price per foot upon installation of pipe, the remaining 15% upon testing and acceptance of the pipe, and 10% upon completion of restoration.

1.6 NON-CONFORMANCE ASSESSMENT

A. Replace the Work, or portions of the Work, not conforming to specified requirements as directed by the ENGINEER.

B. If, in the opinion of the ENGINEER, it is not practical to remove and replace the Work, the

ENGINEER will direct one of the following remedies:

1. The defective Work may remain, but the unit price will be adjusted to a new price reduced

50% at the discretion of the ENGINEER.

2. The defective Work will be partially repaired to the instructions of the ENGINEER, and the unit price will be reduced 30% at the discretion of the ENGINEER.

C. The individual specification sections may modify these options or may identify a specific formula or percentage price reduction.

D. The authority of the ENGINEER to assess the defect and identify payment adjustment is final.

1.7 NO-PAYMENT FOR NON-CONFORMING PRODUCTS

A. Payment will not be made for any of the following:

1. Products wasted or disposed of in a manner that is not acceptable.

2. Products determined as unacceptable before or after placement.

Upper Leacock Township Municipal Authority October 2026

MEASUREMENT AND PAYMENT 012200 - 3

3. Products not completely unloaded from the transporting vehicle.

4. Products placed beyond the lines and levels of the required Work.

5. Products remaining on-hand after completion of the Work.

6. Loading, hauling and disposing of non-conforming products.

7. Stored materials.

1.8 DESCRIPTION OF UNIT PRICES

1. Note that the following description of lump sum (LS) items are intended to be a general guide to the contractor to identify the work associated with each station. It is the

Contractor’s responsibility for Lump Sum items to review the Contract Drawings and

Specifications to ensure that all required labor, materials, and construction activities are included.

B. CONTRACT 2026-02 GENERAL CONSTRUCTION

1. Item No. 1: Mobilization, Demobilization, and General Conditions

a. Includes all costs involving equipment transportation, set up, and removal for project sites throughout the course of the Project. Include costs of bonding, insurance, and submittal coordination, and pre-construction photographs, and as-built drawings.

2. Item No. 2: Hertzog Pump Station.

a. Measurement

1) Measurement for payment of pump station upgrades shall be on a lump sum basis.

b. Payment – This price shall provide full compensation for furnishing all equipment, labor, and materials necessary to complete the work as identified in Plan Drawings and Contract Documents.

Demolition and Flow Maintenance

1) Demolition and disposal of items identified in the Contract Drawings including but not limited to wet well lid, valve vault, meter pit, and process piping.

2) Bypass pumping and maintenance of flows during construction.

Valve Vault and Discharge Piping

3) Replacement of the existing discharge piping and valves.

4) Furnishing and installation of precast concrete valve vault, including but not limited to excavation, backfill, vault base, access hatch and ladder, antiflotation, pipe penetrations, camlock bypass connection, gooseneck vent, PVC drain piping, and all other items identified in the Plan Drawings and

Specifications.

5) Relocation of the existing magnetic flow meter to the new valve vault.

Relocation and installation of the meter will be completed by the GC.

Electrical power and final electrical connections between the meter and the head unit will be completed by the EC.

Wet Well & Aeration System

6) Furnish and Install wet well aeration system including process piping, base preparation and concrete pad installation, and all items necessary for complete installation of the aeration system. GC work shall include mounting and installing all equipment including control panel to be furnished as part of aeration package. EC shall be responsible for all final electrical connections.

Upper Leacock Township Municipal Authority October 2026

MEASUREMENT AND PAYMENT 012200 - 4

7) Furnish and installation of the new precast concrete wet well lid, complete in place with access hatch, safety grating, replacement of custom fabricated secondary guide rail support bracket if determined necessary by contractor with new access hatch configuration.

8) Replacement of Discharge and Rail Support Casing.

Site Improvements

9) Re-installation of the existing manual slide and swing gates that are currently installed incorrectly.

10) Full depth pavement replacement of areas disturbed during construction. (Full site mill and overlay excluded from Base Bid)

3. Item No. 3 – Apricot Pump Station

a. Measurement

1) Measurement for payment of pump station upgrades shall be on a lump sum basis.

b. Payment – This price shall provide full compensation for furnishing all equipment, labor, and materials necessary to complete the work as identified in Plan Drawings and Contract Documents.

Demolition and Flow Maintenance

1) Demolition and disposal of items as identified in the plan drawings, including but not limited to select discharge piping and wet well ladder. Demolition associated with HVAC and electrical work is excluded from the GC contract.

2) Bypass pumping and maintenance of flows during construction

Wet Well & Aeration System

3) Surface preparation and relining of wet well discharge lines at interior wall penetrations.

4) Surface Preparation and relining of wet well interior.

5) Installation of new pump discharge piping.

6) Furnish and Install wet well aeration system including process piping, base preparation and concrete pad installation, and all items necessary for complete installation of the aeration system. GC work shall include mounting and installing all equipment including control panel to be furnished as part of aeration package. EC shall be responsible for all final electrical connections.

7) Installation of Safety Grates in Primary Wet Well.

Pump Station & Generator Building

8) Installation of new motor actuated louver assembly. Electrical connections will be completed by the EC.

Site Improvements/Restoration

9) Full depth pavement replacement of disturbed areas.

10) Other restoration items as necessary to restore disturbed areas to existing conditions.

4. Item No. 4 – Bareville Pump Station

a. Measurement

1) Measurement for payment of pump station upgrades shall be on a lump sum basis.

b. Payment – This price shall provide full compensation for furnishing all equipment, labor, and materials necessary to complete the work as identified in Plan Drawings and Contract Documents.

Demolition and Flow Maintenance

Upper Leacock Township Municipal Authority October 2026

MEASUREMENT AND PAYMENT 012200 - 5

1) Demolition and disposal of items as identified in the plan drawings, including but not limited to wet well ladder, existing wet well lid, and all other items as identified in the Plan Drawings or necessary for completion of work.

2) Bypass pumping and maintenance of flows during construction. Note that the

Bareville secondary wet well and pumps may be used to assist with bypass pumping, but should not be considered a reliable bypass pumping method.

Wet Well & Aeration System

3) Furnish and Install wet well aeration system including process piping, base preparation and concrete pad installation, and all items necessary for complete installation of the aeration system. GC work shall include mounting and installing all equipment including control panel to be furnished as part of aeration package. EC shall be responsible for all final electrical connections.

4) Furnish and install new pump bracket for pump rails.

5) Furnish and install safety grates in the primary wet well.

6) Furnish and installation of the new precast concrete wet well lid, complete in place with access hatch, safety grating, and all items as identified in Plan

Drawings.

Site Improvements

7) Full depth pavement restoration of disturbed areas (full site mill and overlay excluded from base bid).

8) Other restoration items necessary to improve site to existing conditions.

5. Item No. 5 – Glenbrook Pump Station

a. Measurement

1) Measurement for payment of pump station upgrades shall be on a lump sum basis.

b. Payment – This price shall provide full compensation for furnishing all equipment, labor, and materials necessary to complete the work as identified in Plan Drawings and Contract Documents.

Demolition and Flow Maintenance

1) Demolition and disposal of items as identified in the plan drawings, including all items as identified in the Plan Drawings or necessary for completion of work. Note that demolition of the generator, HVAC equipment and associated electrical items will be completed by the EC.

2) Bypass pumping and maintenance of flows during construction.

Wet Well & Aeration System

3) Furnish and Install wet well aeration system including process piping, base preparation and concrete pad installation, and all items necessary for complete installation of the aeration system. GC work shall include mounting and installing all equipment including control panel to be furnished as part of aeration package. EC shall be responsible for all final electrical connections.

Pump Station & Generator Building

4) Installation of new motor actuated louver assembly. Electrical connections will be completed by the EC.

Site Improvements/Restoration

5) Aggregate restoration of disturbed areas. Full depth pavement restoration is not required for trenched areas at Glenbrook. Full site mill and overlay is excluded from base bid.

6) Other restoration items necessary to improve site to existing conditions.

6. Item No. 6 (Bid Alternate #1) – Hertzog Chain Link Fence Replacement

Upper Leacock Township Municipal Authority October 2026

MEASUREMENT AND PAYMENT 012200 - 6

a. Measurement

1) Measurement for payment of item shall be on a lump sum basis.

b. Payment – This price shall provide full compensation for furnishing all equipment, labor, and materials necessary to complete the work as identified in Plan Drawings and Contract Documents.

1) Description of Work: Replacement of the existing fence around the Hertzog

Pump Station with new 6’ high galvanized chain link fence with privacy slats as specified in the Plan Drawings and Contract Documents.

7. Item No. 7 (Bid Alternate #2) – Glenbrook Chain Link Fence Replacement

a. Measurement

1) Measurement for payment of item shall be on a lump sum basis.

b. Payment – This price shall provide full compensation for furnishing all equipment, labor, and materials necessary to complete the work as identified in Plan Drawings and Contract Documents.

1) Description of Work: Replacement of the existing fence around the

Glenbrook Pump Station with new 6’ high galvanized chain link fence with privacy slats as specified in the Plan Drawings and Contract Documents.

8. Item No. 8 (Bid Alternate #3) – Apricot Influent Manhole Surface Prep and Relining

a. Measurement

1) Measurement for payment of item shall be on a lump sum basis.

b. Payment – This price shall provide full compensation for furnishing all equipment, labor, and materials necessary to complete the work as identified in Plan Drawings and Contract Documents.

1) Description of Work: Includes surface preparation and relining of the influent manhole at the Apricot Pump Station according to the Plan Drawings and

Section 099000 of the specifications.

9. Item No. 9 (Bid Alternate #4) – Bareville Secondary Wet Well Surface Prep, Relining, Ladder Removal

a. Measurement

1) Measurement for payment of item shall be on a lump sum basis.

b. Payment – This price shall provide full compensation for furnishing all equipment, labor, and materials necessary to complete the work as identified in Plan Drawings and Contract Documents.

1) Description of Work: Includes surface preparation and relining of the secondary wet well at the Bareville Pump Station. Scope includes removal of the existing ladder in the secondary wet well (not to be replaced).

10. Item No. 10 (Bid Alternate #5) – Bareville Mill and Overlay Existing Pavement in

Fence

a. Measurement

1) Measurement for payment of item shall be on a lump sum basis.

b. Payment – This price shall provide full compensation for furnishing all equipment, labor, and materials necessary to complete the work as identified in Plan Drawings and Contract Documents.

1) Description of Work: Mill and overlay of the existing pavement at the

Bareville Pump Station as denoted in the Plan Drawings. This item includes new pavement at the existing unpaved area around the pump station building inside the fence. Item excludes the area of full depth pavement restoration as identified in the base bid.

Upper Leacock Township Municipal Authority October 2026

MEASUREMENT AND PAYMENT 012200 - 7

11. Item No. 11 (Bid Alternate #6) – Glenbrook – Mill and Overlay Existing Pavement in

Fence.

a. Measurement

1) Measurement for payment of item shall be on a lump sum basis.

b. Payment – This price shall provide full compensation for furnishing all equipment, labor, and materials necessary to complete the work as identified in Plan Drawings and Contract Documents.

1) Description of Work: Mill and overlay of the existing pavement at the

Glenbrook Pump Station as denoted in the Plan Drawings.

12. Item No. 12 (Bid Alternate #7) – Hertzog Mill and Overlay Existing Pavement in

Fence

a. Measurement

1) Measurement for payment of item shall be on a lump sum basis.

b. Payment – This price shall provide full compensation for furnishing all equipment, labor, and materials necessary to complete the work as identified in Plan Drawings and Contract Documents.

1) Description of Work: Mill and overlay of the existing pavement at the Hertzog

Pump Station as denoted in the Plan Drawings. Item excludes the area of full depth pavement restoration as identified in the base bid.

13. Item No. 13 (Bid Alternate #8) – Hertzog Propane Tank Relocation

a. Measurement

1) Measurement for payment of item shall be on a lump sum basis.

b. Payment – This price shall provide full compensation for furnishing all equipment, labor, and materials necessary to complete the work as identified in Plan Drawings and Contract Documents.

1) Description of Work: Item includes all work and materials necessary to complete the propane tank relocation at the Hertzog Pump Station as denoted in the Plan Drawings. Item includes installation of a new propane line between the existing emergency generator and the new propane tank relocation, as well as any necessary piping connections. Existing concrete tank supports may be re-used for new tank location unless field determination of the supports after removing the tank indicates that replacement is necessary. Should new base support be required for the propane tank it will be handled via Change Order.

PART 2 - PRODUCTS

Not used.

PART 3 - EXECUTION

Not used.

END OF SECTION

Upper Leacock Township Municipal Authority October 2026

PAINTING AND COATING 099000 - 1

RETTEW Project No.: 0571405975 Contract No. 2026-02

DIVISION 09 - FINISHES

SECTION 099000 – PAINTING AND COATING

PART 1 - GENERAL

1.1 RELATED REFERENCES

A. Drawings and general provisions of this Contract, including the General and Supplementary

Conditions and Division 1 specification sections, apply to this section.

1.2 DESCRIPTION OF WORK

A. This section includes surface preparation, painting, and finishing of exposed interior and exterior items and surfaces.

B. "Paint" includes coating systems materials, primers, emulsions, enamels, stains, sealers, fillers, and other applied materials whether used as prime, intermediate, or finish coats.

C. Surface preparation, priming, and finish coats specified in this section are in addition to shop priming and surface treatment specified under other sections.

D. Paint exposed surfaces whether or not colors are designated in the corresponding schedules, except where a surface or material is specifically indicated not to be painted or is to remain natural. Where an item or surface is not specifically mentioned, paint the same as similar adjacent materials or surfaces. If color or finish is not designated, the OWNER will select from standard colors or finishes available.

E. Painting includes field painting exposed bare and covered pipes and ducts (including color coding), hangers, exposed steel and iron work, and primed metal surfaces of mechanical and electrical equipment.

F. Finished metal surfaces not to be painted include:

1. Anodized aluminum

2. Chromium plate

3. Copper

4. Bronze

5. Brass

G. Operating parts not to be painted include moving parts of operating equipment such as the following:

1. Valve and damper operators

2. Linkages

3. Sensing devices

4. Motor and fan shafts

PAINTING AND COATING 099000 - 2

RETTEW Project No.: 0571405975 Contract No. 2026-02

H. Labels: Do not paint over Underwriter's Laboratories, Factory Mutual or other code- required labels or equipment name, identification, performance rating, or nomenclature plates.

1.3 SUBMITTALS

A. Product Data: Manufacturer's technical information, label analysis, and application instructions for each material proposed for use.

B. List each material and cross-reference the specific coating and finish system and application.

Identify each material by the manufacturer's catalog number and general classification.

1.4 QUALITY ASSURANCE

A. Referenced standards shall be the following:

1. Structural Steel Painting Council (SSPC)

B. Single-Source Responsibility: Provide primers and undercoat paint produced by the same manufacturer as the finish coats.

C. Coordination of Work: Review other sections in which primers are provided to ensure compatibility of the total systems for various substrates. On request, furnish information on characteristics of finish materials to ensure use of compatible primers.

D. Notify the ENGINEER of problems anticipated using the materials specified.

E. Material Quality: Provide the manufacturer's best quality trade sale paint material of the various coating types specified. Paint material containers not displaying manufacturer's product identification will not be acceptable.

F. Proprietary names used to designate colors or materials are not intended to imply that products named are required or to exclude equivalent products of other manufacturers.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Deliver materials to the job site in the manufacturer's original, unopened packages and containers bearing manufacturer's name and label and the following information:

1. Product name or title of material

2. Product description (generic classification or binder type)

3. Federal Specification number, if applicable

4. Manufacturer's stock number and date of manufacture

5. Contents by volume, for pigment and vehicle constituents

6. Thinning instructions

7. Application instructions

8. Color name and number

PAINTING AND COATING 099000 - 3

RETTEW Project No.: 0571405975 Contract No. 2026-02

B. Store materials not in use in tightly covered containers in a well-ventilated area at a minimum ambient temperature of 45°F (7°C). Maintain containers used in storage in a clean condition, free of foreign materials and residue.

C. Protect from freezing. Keep storage area neat and orderly. Remove oily rags and waste daily.

Take necessary measures to ensure that workers and work areas are protected from fire and health hazards resulting from handling, mixing, and application.

1.6 JOB CONDITIONS

A. Apply water-based paints only when the temperature of surfaces to be painted and surrounding air temperatures are between 50°F (10°C) and 90°F (32°C).

B. Apply solvent-thinned paints only when the temperature of surfaces to be painted and surrounding air temperatures are between 45°F (7°C) and 95°F (35°C).

C. Do not apply paint in snow, rain, fog, or mist, when the relative humidity exceeds 85 percent, at temperatures less than 5°F (3°C) above the dew point, or to damp or wet surfaces.

D. Painting may continue during inclement weather if surfaces and areas to be painted are enclosed and heated within temperature limits specified by the manufacturer during application and drying periods.

1.7 EXTRA STOCK

A. Provide a 1-gallon container of each color and surface texture to OWNER. Label each container with color, texture, room locations, and date, in addition to the manufacturer's label.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Available Manufacturers: Subject to compliance with requirements. Manufacturers offering products that may be incorporated in the Work include but are not limited to the following:

1. Devoe and Raynolds Co. (Devoe)

2. The Glidden Company (Glidden)

3. Benjamin Moore and Co. (Moore)

4. PPG Industries, Pittsburgh Paints (Pittsburgh)

5. Pratt and Lambert (P & L)

6. The Sherwin-Williams Company (S-W)

7. Koppers

2.2 PAINT MATERIAL

A. Interior Relining of Concrete Structures

PAINTING AND COATING 099000 - 4

RETTEW Project No.: 0571405975 Contract No. 2026-02

1. Surface preparation shall be performed in accordance with the coating manufacturer's written recommendations. Remove existing coatings, laitance, deteriorated concrete, contaminants, and other materials that could interfere with adhesion of the lining system.

2. Repair cracks, voids, bugholes, deteriorated concrete, and other surface irregularities as required to provide a sound and suitable substrate for application of the lining. Concrete repair and resurfacing materials shall be compatible with the lining system and installed in accordance with the lining manufacturer's recommendations.

3. Product: SW: Dura-Plate 6100, Or approved equal.

4. Color as selected by Owner

B. Relining of Stainless Steel Piping

1. Surface preparation shall be performed in accordance with the coating manufacturer's written recommendations for stainless steel substrates. Remove existing coatings, corrosion products, contaminants, and other materials that could interfere with adhesion of the lining system. Surface preparation methods and abrasive materials shall be suitable for stainless steel and shall not introduce ferrous contamination.

2. Prepare welds, edges, and other surface irregularities as required by the lining manufacturer.

3. Product: SW: Dura-Plate 6100, Or approved equal.

4. Color as selected by Owner

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates and conditions under which painting will be performed for compliance with requirements for application of paint. Do not begin paint application until unsatisfactory conditions have been corrected.

B. Start of painting will be construed as the applicator's acceptance of surfaces and conditions within a particular area.

3.2 PREPARATION

A. General Procedures: Remove hardware and hardware accessories, plates, machined surfaces, lighting fixtures, and similar in-place items that are not to be painted, or provide surface-applied protection prior to surface preparation and painting. Remove these items if necessary for complete painting of the items and adjacent surfaces. Following completion of painting operations in each space or area, have items reinstalled by craftsmen skilled in the trades involved.

B. Clean surfaces before applying paint or surface treatments. Remove oil and grease prior to cleaning. Schedule cleaning and painting so that dust and other contaminants from the cleaning process will not fall on wet, newly painted surfaces.

C. Surface Preparation: Clean and prepare surfaces to be painted in accordance with the manufacturer's instructions for each particular substrate condition and as specified.

PAINTING AND COATING 099000 - 5

RETTEW Project No.: 0571405975 Contract No. 2026-02

D. Cementitious Materials: Prepare concrete masonry block surfaces to be painted. Remove efflorescence, chalk, dust, dirt, grease, oils, and release agents. Roughen as required to remove glaze. If hardeners or sealers have been used to improve curing, use mechanical methods of surface preparation.

E. Use abrasive blast-cleaning methods if recommended by the paint manufacturer.

F. Determine alkalinity and moisture content of surfaces by performing appropriate tests. If surfaces are sufficiently alkaline to cause blistering and burning of finish paint, correct this condition before application. Do not paint surfaces where moisture content exceeds that permitted in manufacturer's printed directions.

G. Ferrous Metals: Clean non-galvanized ferrous-metal surfaces that have not been shop coated;

remove oil, grease, dirt, loose mill scale, and other foreign substances. Use solvent or mechanical cleaning methods that comply with recommendations of SSPC.

H. Touch-up bare areas and shop-applied prime coats that have been damaged. Wire-brush, clean with solvents recommended by the paint manufacturer, and touch-up with the same primer as the shop coat.

I. Galvanized Surfaces: Clean galvanized surfaces with non-petroleum-based solvents so that the surface is free of oil and surface contaminants.

J. Materials Preparation: Carefully mix and prepare paint materials in accordance with manufacturer's directions.

K. Maintain containers used in mixing and application of paint in a clean condition, free of foreign materials and residue.

L. Stir material before application to produce a mixture of uniform density; stir as required during application. Do not stir surface film into material. Remove film and, if necessary, strain material before using.

M. Use only thinners approved by the paint manufacturer, and only within recommended limits.

3.3 APPLICATION

A. All exposed ferrous metals (interior and exterior) require two (2) finish coats of paint over primer.

B. Apply paint in accordance with manufacturer's directions. Use applicators and techniques best suited for substrate and type of material being applied.

C. Do not paint over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions detrimental to formation of a durable paint film.

D. Paint colors, surface treatments, and finishes are indicated in the corresponding schedules.

E. Provide finish coats that are compatible with primers used.

PAINTING AND COATING 099000 - 6

RETTEW Project No.: 0571405975 Contract No. 2026-02

F. The number of coats and film thickness required is the same regardless of the application method.

Do not apply succeeding coats until the previous coat has cured as recommended by the manufacturer. Sand between applications where sanding is required to produce an even smooth surface in accordance with the manufacturer's directions.

G. Apply additional coats when undercoats, stains, or other conditions show through final coat of paint until paint film is of uniform finish, color, and appearance. Give special attention to ensure that surfaces, including edges, corners, crevices, welds, and exposed fasteners receive a dry film thickness equivalent to that of flat surfaces.

H. The term "exposed surfaces" includes areas visible when permanent or built-in fixtures, convector covers, covers for finned tube radiation, grilles, and similar components are in place. Extend coatings in these areas as required to maintain the system integrity and provide desired protection.

I. Paint surfaces behind movable equipment and furniture same as similar exposed surfaces. Paint surfaces behind permanently fixed equipment or furniture with prime coat only before final installation of equipment.

J. Finish exterior doors on tops, bottoms, and side edges same as exterior faces.

K. Sand lightly between each succeeding enamel or varnish coat.

L. Omit primer on metal surfaces that have been shop-primed and touch-up painted.

M. Scheduling Painting: Apply first coat to surfaces that have been cleaned, pretreated, or otherwise prepared for painting as soon as practicable after preparation and before subsequent surface deterioration.

N. Allow sufficient time between successive coats to permit proper drying. Do not recoat until paint has dried to where it feels firm, and does not deform or feel sticky under moderate thumb pressure and where application of another coat of paint does not cause lifting or loss of adhesion of the undercoat.

O. Minimum Coating Thickness: Apply materials at not less than the manufacturer's recommended spreading rate. Provide a total dry film thickness of the entire system as recommended by the manufacturer.

P. Mechanical and Electrical Work: Painting mechanical and electrical work is limited to items exposed in mechanical equipment rooms and in occupied spaces.

Q. Mechanical items to be painted include but are not limited to:

1. Piping, pipe hangers, and supports

R. Prime Coats: Before application of finish coats, apply a prime coat of material as recommended by the manufacturer to material that is required to be painted or finished and has not been prime coated by others. Recoat primed and sealed surfaces where evidence of suction spots or unsealed areas in first coat appears, to assure a finish coat with no burn through or other defects due to insufficient sealing.

PAINTING AND COATING 099000 - 7

RETTEW Project No.: 0571405975 Contract No. 2026-02

S. Completed Work: Match approved samples for color, texture, and coverage. Remove, refinish, or repaint Work not in compliance with specified requirements.

3.4 FIELD QUALITY CONTROL

A. The OWNER reserves the right to invoke the following test procedure at any time and as often as the OWNER deems necessary during the period when paint is being applied:

B. The OWNER will engage the services of an independent testing laboratory to sample the paint material being used. Samples of material delivered to the Project will be taken, identified, sealed, and certified in the presence of the CONTRACTOR.

C. The testing laboratory will perform appropriate tests for the following characteristics as required by the OWNER:

1. Quantitative materials analysis

2. Abrasion resistance

3. Apparent reflectivity

4. Flexibility

5. Washability

6. Absorption

7. Accelerated weathering

8. Dry opacity

9. Accelerated yellowness

10. Recoating

11. Skinning

12. Color retention

13. Alkali and mildew resistance

D. If test results show material being used does not comply with specified requirements, the

CONTRACTOR may be directed to stop painting, remove non-complying paint, pay for testing, repaint surfaces coated with rejected paint, and remove rejected paint from previously painted surfaces if, upon repainting with specified paint, the two coatings are non-compatible.

3.5 CLEANING

A. Clean-Up: At the end of each work day, remove empty cans, rags, rubbish, and other discarded paint materials from the site.

B. Upon completion of painting, clean glass and paint-spattered surfaces. Remove spattered paint by washing and scraping, using care not to scratch or damage adjacent finished surfaces.

3.6 PROTECTION

A. Protect Work of other trades whether to be painted or not against damage by painting. Correct damage by cleaning, repairing or replacing, and repainting, as acceptable to ENGINEER.

PAINTING AND COATING 099000 - 8

RETTEW Project No.: 0571405975 Contract No. 2026-02

B. Provide "WET PAINT" signs to protect newly painted finishes. Remove temporary protective wrappings provided by others for protection of their work after completion of painting operations.

C. At completion of construction activities of other trades, touch-up and restore damaged or defaced painted surfaces.

3.7 COATINGS SCHEDULE:

A. General: Provide protective lining systems for the following surfaces, as specified herein and indicated on the Drawings:

1. Bareville Pump Station

a. Reline interior concrete surfaces of the secondary wet well (Bid Alt. #4).

b. Relining to be completed with 100% solids epoxy (SW Duraplate 6100, or approved equal.) Reference 2.2A. Surface preparation and application thickness to be in accordance with manufacturer recommendations.

2. Apricot Pump Station

a. Reline interior concrete surfaces of the wet well.

b. Reline exterior of ductile iron pump discharge piping inside the wet well. See revised drawings included in Addendum 1 for limits of relining work.

c. Reline interior concrete surfaces of the influent manhole (Bid Alt. #3)

d. Relining to be completed with 100% solids epoxy (SW Duraplate 6100, or approved equal.) Reference 2.2A. Surface preparation and application thickness to be in accordance with manufacturer recommendations.

3. Include surface preparation required for lining application, curing, and testing as specified herein and as recommended by the lining system manufacturer.

SANITARY UTILITY PIPING AND ACCESSORIES 333100 - 1

RETTEW Project No.: 0571405975 Contract No. 2026-02

DIVISION 33 - UTILITIES

SECTION 333100 – SANITARY UTILITY PIPING AND ACCESSORIES

PART 1 - GENERAL

1.1 RELATED REFERENCES

A. Drawings and general provisions of this Contract, including General and Supplementary

Conditions and Division 1 specification sections, apply to this section.

B. Related Sections:

1. Section 312333 - Trench Excavation and Backfill.

2. Section 330513 – Manholes.

1.2 DESCRIPTION OF WORK

A. The Work within this section includes, but is not limited to, the furnishing of all equipment, labor and materials, and performing all operations to install the force mains and appurtenances, discharge piping, and any other sewage process piping as identified in the Plan Drawings, and furnish all tests required in accordance with the specifications, applicable drawings and Contract

Documents. Section also includes specifications for Schedule 80 PVC aeration piping.

1.3 QUALITY ASSURANCE

A. Referenced standards should be the following:

1. American Association of State Highway and Transportation Officials (AASHTO)

2. American National Standards Institute (ANSI)

3. American Society for Testing and Materials (ASTM)

4. American Water Works Association (AWWA).

1.4 SUBMITTALS

A. Certificates: CONTRACTOR should submit three copies of each manufacturer's certification attesting that the materials specified herein meet or exceed specification requirements.

B. Shop Drawings: Manufacturer's descriptive and technical product data for pressure pipe and fittings should be submitted prior to the start of Work for approval in accordance with Section

01330 (Submittals).

SANITARY UTILITY PIPING AND ACCESSORIES 333100 - 2

RETTEW Project No.: 0571405975 Contract No. 2026-02

PART 2 - MATERIALS

2.1 STAINLESS STEEL PIPING

A. Stainless steel pipe and fittings not including aeration piping shall be Schedule 40, Type 316 stainless steel. Pipe joints shall be flanged. Flanged joints shall utilize Type 316 stainless steel weld neck flanges.

2.2 AERATION PIPING

A. Aeration piping shall be Schedule 80 polyvinyl chloride (PVC) pipe and fittings. Joints shall be solvent-welded unless otherwise indicated or required for equipment connections. Contractor shall provide airtight joints and connections throughout the aeration piping system and shall test the completed piping for air leakage in accordance with the aeration system manufacturer’s instructions and recommendations.

2.3 PVC FORCEMAIN PIPE AND FITTINGS (Forcemain Reconnection at Hertzog Only)

A. Type PSM polyvinyl chloride (PVC) pipe and fittings shall conform to the requirements of ASTM

D 3034 with a maximum SDR of 21. Pipe and fittings shall have bell and spigot ends with O-ring rubber gasketed, compression type joints. Joints shall conform to the requirements of ASTM

Specification D 3212. Reruns of reclaimed materials shall not be accepted. Provide mechanical seals, link seal or approved equal at all concrete penetrations.

B. Standards

1. PVC pipe shall conform to ASTM D2241.

C. Materials

1. Pipe shall be PVC pressure pipe (SDR-21), minimum pressure class 200 psi, with integral bell and spigot joints.

D. Joints

1. Joints shall be rubber gasket push-on type, conforming to ASTM D3139, with gaskets meeting ASTM F477.

2. Joint restraints shall be provided as detailed in the plan drawings, and shall be rated for the full pressure of the pipeline and shall be specifically designed for use with PVC pipe.

E. Fittings

1. Fittings shall be PVC pressure fittings conforming to ASTM D3139 for gasketed push on connections, as applicable. Fittings shall be compatible with ASTM D2241 SDR 21 PVC piping and rated for a minimum working pressure of 200 PSI.

F. Marking

SANITARY UTILITY PIPING AND ACCESSORIES 333100 - 3

RETTEW Project No.: 0571405975 Contract No. 2026-02

1. Pipe shall be clearly marked with manufacturer’s name, size, DR rating, pressure class, and applicable standard.

G. Tracer Wire

1. Provide #12 AWG solid copper tracer wire, insulated, installed continuously along the pipe with access points at all valves and structures. HDPE jacket thickness 30 mil.

2. Tracer wire shall be installed as a continuous conductor without splices between access points. Should a splice be necessary, it shall be made using waterproof, direct-bury rated connectors.

3. Insulator shall be insulated, high molecular weight polyethylene (HMWPE) or equivalent, rated for direct burial.

4. Tracer wire continuity shall be tested after installation and prior to final acceptance.

5. Installation shall allow for continuous electronic tracing of the pipeline.

H. Detectable Warning Tape

1. Provide detectable warning tape above all buried forcemains at the depth specified in the plan drawing details.

2. Warning tape shall be detectable type, consisting of polyethylene plastic tape with an embedded metallic foil or conductive element suitable for electronic detection. Tape shall be resistant to acids, alkalis, and other corrosive soil conditions.

3. Dimensions

a. Tape shall be minimum 6 inches wide

b. Tape shall be minimum 4 mil thickness

c. Manufactured for direct burial applications.

4. Tap shall be green for sewer and shall be continuously printed with “CAUTION – BURIED

FORCE MAIN BELOW”

5. Lettering shall be permanent and not subject to fading or deterioration.

6. Tape shall be installed continuously without breaks for the full length of the pipeline.

2.4 VALVES

A. Ball Valves

1. Reference drawings for ball valve sizes and connection types. Ball valves shall be T316

SS.

a. Valves shall be suitable for corrosive sewer environments including exposure to hydrogen sulfide, moisture, and condensate.

b. Valves shall be full-port, two-piece, or three piece ball valves.

c. End connections shall be flanged ends conforming to ASME B16.5 Class 150. In lieu of weld neck flanges, Contractor may use slip on flanges. Lap joint flanges will not be acceptable.

d. Valves shall be rated for a minimum of 150 PSI working pressure.

e. Materials:

1) Body and End Caps:

a) ASTM A351 Grade CF8M (Type 316 SS)

b) Ball: Type 316 SS, blowout-proof design

c) Seats: Reinforced PTFE (RPTFE), or TFM PTFE, suitable for wastewater service.

d) Seals and Packing: PTFE or equivalent corrosion-resistant materials suitable for sewer gas exposure

SANITARY UTILITY PIPING AND ACCESSORIES 333100 - 4

RETTEW Project No.: 0571405975 Contract No. 2026-02

2) Design Features

a) Full-port design to prevent restriction and clogging.

b) Quarter-turn operation.

c) Blowout-proof stem.

d) Adjustable stem packing.

e) Lockable Handle

f) Valve shall be capable of bubble-tight shutoff.

3) Pressure and Temperature Ratings:

a) Minimum pressure rating: 150 PSIG WOG

b) Temperature Rating: Suitable for 0-250 degrees Fahrenheit.

4) Corrosion Resistance

a) All wetted and exposed components shall be T316 SS or better.

b) Valve shall be suitable for continuous exposure to corrosive sewer atmospheres including H2S and condensate.

c) No carbon steel components shall be permitted unless fully encapsulated and isolated from the environment.

5) Approved Manufacturers

a) Apollo – 76 Series (316 SS)

b) NIBCO – S585/SS Series

c) Milwaukee Valve – 3 piece 316 SS series

d) Sharpe Valves

e) Approved Equal

2.5 HANDLING OF MATERIAL

A. Replacement of Damaged Material: The CONTRACTOR should replace, at his own expense, all material furnished by him and found defective in manufacture or damaged in handling after delivery by the manufacturer. This should include the furnishing of all materials and labor required for replacement of installed material. Any material furnished by the OWNER that becomes damaged after acceptance by the CONTRACTOR should be replaced by the

CONTRACTOR at his own expense.

B. Responsibility for Safe Storage: The CONTRACTOR should be responsible for the safe storage of material furnished by or to him and accepted by him, and intended for the Work, until it has been incorporated in the completed Project. The interior of all pipe, fittings and other accessories should be replaced by the CONTRACTOR at his own expense.

C. Hauling: All materials furnished by the CONTRACTOR should be delivered and distributed at the site by the CONTRACTOR. Materials furnished by the OWNER should be picked up by the

CONTRACTOR at points designated, and hauled to, and distributed at, the site.

D. Pipe, fittings, items of equipment and other materials of construction should be loaded and unloaded by lifting with hoists or skidding to avoid shock or damage and in strict conformance with the manufacturer's recommendations. Under no circumstances should such materials be dropped. Materials handled on skidways should not be skidded or rolled against materials already on the ground.

E. At Site of Work: In distributing the material at the site of the Work, each piece should be unloaded opposite or near the place where it is to be laid in the trench, or as otherwise directed by the