This file comprises combined engineering drawings and utility coordination documentation prepared by RETTEW ASSOCIATES, INC. for the Upper Leacock Township Municipal Authority's 2026 Pump Station Improvements project located in Pennsylvania. The project encompasses electrical, mechanical, and site improvements across four pump stations: Bareville, Hertzog, Glenn Brook, and Apricot. Key scope elements include installation of new aeration systems with blower motors and control panels, replacement of emergency generators (50KW capacity), automatic transfer switches, intake louver motorized dampers with controls, new gas piping and fuel systems, flow meter relocation with electrical connections, and associated conduit and power distribution modifications. The utility coordination response deadline was October 1, 2026, with responses received from PPL Electric Utilities Corporation, UGI Utilities Inc., Buckeye Partners, Comcast/Cable Protection Services Inc., Frontier Communication of PA Inc., and Upper Leacock Township Municipal Authority. The project must be substantially completed within 240 calendar days of the Notice to Proceed, with sealed bids due on November 5, 2026 at 10:00 AM online through PennBID. A voluntary pre-bid meeting and site visit is scheduled for October 29, 2026 at 10:00 AM at 161 Newport Road, Leola, PA 17540.

Bidders must submit a certified check or bid bond equivalent to 10% of the total bid amount, with bonds to be issued by a surety licensed in the Commonwealth of Pennsylvania. The successful bidder shall furnish performance and payment bonds in the amount of 100% of the contract price. All bidders must bid on all items listed on the Bid Form, and bids shall remain open for 60 days from the date of opening, or 120 days if award is delayed by required governmental approvals, bond sales, or grant awards. The project is subject to Pennsylvania Prevailing Wage Act conditions, Federal OSHA requirements, Pennsylvania Act 229 of 2002, the Pennsylvania One Call Act (Act 287 of 1974, as amended), and Pennsylvania Human Relations Act provisions. The drawings indicate that coordination of electrical work is required with mechanical contractors, general contractors, and equipment vendors, and the contractor must maintain pump station operations during construction to minimize service outages.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ONE CALL SYSTEM SERIAL NUMBER:

PA ONE CALL UNDERGROUND UTILITY PROTECTION ACT

PURSUANT TO THE PROVISIONS OF ACT NO. 287 OF 1974, AS AMENDED BY ACT

187 OF 1996, ACT 181 OF 2006, ACT 160 OF 2016 AND ACT 50 OF 2017 OF THE

PENNSYLVANIA STATE LEGISLATURE, RETTEW ASSOCIATES, INC. HAS

PERFORMED THE FOLLOWING IN PREPARING THESE DRAWINGS REQUIRING

EXCAVATION OR DEMOLITION WORK AT SITES WITHIN THE POLITICAL

SUBDIVISION(S) SHOWN ON THE DRAWINGS:

1. PURSUANT TO SECTION 4, CLAUSE (2) OF SAID ACT, RETTEW

ASSOCIATES, INC. REQUESTED FROM EACH FACILITY OWNER

DESIGNATED ON SUCH LIST PROVIDED BY THE ONE CALL SYSTEM

NOTIFICATION, THE INFORMATION PRESCRIBED BY SECTION 2, CLAUSE

(4) OF SAID ACT, NOT LESS THAN TEN (10) NOR MORE THAN NINETY (90)

BUSINESS DAYS BEFORE FINAL DESIGN IS TO BE COMPLETED.

2. PURSUANT TO SECTION 4, CLAUSE (5) OF SAID ACT, RETTEW

ASSOCIATES, INC. HAS MET THEIR OBLIGATIONS OF CLAUSE (2) BY

CALLING THE PENNSYLVANIA ONE CALL SYSTEM SERVING THE

LOCATION WHERE THE WORK IS TO BE PERFORMED, AND SHOWING

THE ASSOCIATED SERIAL NUMBER(S) ON THIS/THESE DRAWING(S).

3. PURSUANT TO SECTION 4, CLAUSE (3) OF SAID ACT, RETTEW

ASSOCIATES, INC. HAS SHOWN UPON THIS/THESE DRAWING(S) THE

POSITION AND TYPE OF EACH FACILITY, AS DERIVED PURSUANT TO THE

REQUEST MADE AS REQUIRED BY CLAUSE (2),

4. PURSUANT TO SECTION 4, CLAUSE (5) OF SAID ACT, RETTEW

ASSOCIATES, INC. HAS SHOWN UPON THIS/THESE DRAWING(S) THE

TOLL-FREE NUMBER FOR THE ONE CALL SYSTEM AND THE SERIAL

NUMBER(S) FOR THE ASSOCIATED ONE CALL SYSTEM NOTIFICATION(S),

ADDITIONALLY, RETTEW ASSOCIATES, INC. DOES NOT MAKE ANY

REPRESENTATION, WARRANTY, ASSURANCE OR GUARANTEE THAT THE

INFORMATION RECEIVED PURSUANT TO SAID REQUEST, AND AS REFLECTED ON

THIS/THESE DRAWING(S), IS CORRECT OR ACCURATE. INFORMATION REFLECTED

ON THIS/THESE DRAWING(S) IS SHOWN AS REQUIRED BY SAID ACT NO. 160 OF

2016, AND AS PROVIDED BY THE FACILITY OWNER PURSUANT TO SECTION 2,

CLAUSE (4) OF SAID ACT.

DATE:

CALL BEFORE YOU DIG!

PENNSYLVANIA LAW REQUIRES THREE (3) WORKING

DAYS NOTICE FOR CONSTRUCTION PHASE AND TEN (10)

WORKING DAYS IN DESIGN STAGE - STOP CALL1-800-242-1776

IT IS THE CLIENT'S RESPONSIBILITY TO NOTIFY RETTEW NO LESS THAN 10 DAYS AND NO

MORE THAN 90 DAYS PRIOR TO THE CONSTRUCTION BEGIN DATE. THIS NOTIFICATION

WILL ALLOW US TO UPDATE THE PA811 ONE CALL TICKETS ASSOCIATED WITH THIS

PROJECT, WHICH IS A REQUIREMENT UNDER ACT 287.

Response Due Date: 10/01/26 Survey Review Completed by: Date:

UTILITY/COMPANY

RESPONSE RCVD

(select one) TICKET #

RETTEW ACTION

Map/No Map

CONTACT

NAME

CONTACT

EMAIL

CONTACT

PHONE

KARL Auto Response

Electric PPL Elecdtric Utilities Corporation 20262603608 Pamela Seitzer pdseitzer@pplweb.com (570) 368-5394

20262603704 20262603749 20262603806

Gas

UGI Utilities Inc 9/24/26 20262603608 Geoffrey Ferguson gferguson@ugi.com (610) 807-3118

9/24/26 20262603704 Luke MacNair macnairl@ugi.com (717) 413-1080

20262603749

20262603806

Buckeye Partners 9/17/26 Clear 20262603704 Brian Barr bbarr@buckeye.com (610) 904-4156

Communication Comcast/Cable Protection Servcies Inc 9/17/26 Clear 20262603608 Debbie King debbie_king@cableps.com (804) 562-3409

9/17/26 20262603704 9/17/26 20262603749 9/17/26 20262603806

Frontier Communication of PA Inc 20262603608 Michael Navich Michael.Navich@FTR.com (570) 208-3375

20262603749 20262603806

Water/Sewer Upper Leacock Twp Municipal Authority/Upper Leacock Twp 20262603608 Robert Fricke rfricke@ultwp.com (717) 656-9755

20262603704 ext. 532 20262603749 20262603806

Upper Leacock TMA/Upper Leacock Twp 20262603608 Derek Martin dmartin@ultwp.com (717) 656-9755

20262603704 ext. 554 20262603749 20262603806

S

12FS

CF

S

FM

SS

E

E

PIPING TRENCH DETAIL

ELECTRICAL SYMBOL LEGEND

2x2 LED LAY-IN FIXTURE WITH

NORMAL/EMERGENCY SINGLE RECEPTACLE

2x4 LED LAY-IN FIXTURE

WITH NORMAL/EMERGENCY SPECIAL PURPOSE RECEPTACLE

INDUSTRIAL LED FIXTURE DUPLEX RECEPTACLE

LINEAR INDUSTRIAL LED WITH

NORMAL/EMERGENCY

DUPLEX RECEPTACLE WITH

WEATHER PROOF COVER, GFCI

EXTERIOR LED WALL PACK DUPLEX RECEPTACLE, ABOVE

COUNTER BACKSPLASH MOUNTED

EXTERIOR LED AREA FIXTURE DUPLEX RECEPTACLE, GFCI

DOWNLIGHT DUPLEX RECEPTACLE WITH

USB PORTS

EMERGENCY BATTERY UNIT DUPLEX RECEPTACLE, GFCI, ABOVE

COUNTER BACKSPLASH MOUNTED

EMERGENCY REMOTE HEADS DUPLEX RECEPTACLE TAMPER

RESISTANT

EXIT SIGN DIRECTIONAL

ARROW AS REQUIRED QUADRUPLEX RECEPTACLE

EXIT SIGN DIRECTIONAL

ARROW AS REQUIRED

DUPLEX RECEPTACLE CEILING

MOUNTED

EXIT SIGN WITH HEADS DUPLEX RECEPTACLE FLOOR

MOUNTED

120/208V PANELBOARD

480/277V PANELBOARD

DUPLEX RECEPTACLE FLOOR

MOUNTED WITH DATA OUTLET

FIRE ALARM CONTROL PANEL DATA OUTLET - (#) DENOTES NUMBER

OF CABLE DROPS/OUTLET JACKS

WIRELESS ACCESS POINT VARIABLE FREQUENCY DRIVE

MOTION DETECTOR - CEILING

MOUNTED/WALL MOUNTED GROUND ROD/TEST WELL

CALL SWITCH MOTOR OPERATED DAMPER

CHECK-IN CALL SWITCH PUSHBUTTON CONTROL FOR

OVERHEAD DOOR

PUBLIC ANNOUNCEMENT HORN SECURITY CAMERA

HEAT TRACE DOOR CONTACT

POWER POLE FIRE ALARM/SECURITY KEYPAD

JUNCTION BOX/CONNECTIONS FIRE ALARM KNOX BOX

OCCUPANCY SENSOR POWER PACK FIRE ALARM PULL STATION

MOTOR FIRE ALARM HORN/STROBE

CEILING/WALL MOUNTED

DISCONNECT SWITCH FIRE ALARM STROBE

CEILING/WALL MOUNTED

MOTOR STARTER WITH

DISCONNECT SWITCH

FIRE ALARM SPEAKER

CEILING/WALL MOUNTED

LIGHTNING PROTECTION FIRE ALARM SMOKE DETECTOR

CEILING/WALL MOUNTED

MOTOR RATED SWITCH

CARD READER FIRE ALARM SMOKE/CO DETECTOR

CEILING/WALL MOUNTED

CEILING CORD DROP HEAT DETECTOR

NOT ALL SYMBOL UTILIZED ON PROJECTS

WP

GFCI

C

GFCI

USB

C

GFCI

TR

FACP #

W VFD

M M

CS M

CCS

PA

HT DC

PP K

J K

P F

FF

F FF

S S

L S S

S M

CR S S

CO CO

CD H

ELECTRICAL GENERAL NOTES

· COORDINATE INSTALLATION OF NEW ITEMS AND EQUIPMENT WITH THE OWNER'S REPRESENTATIVE, MAINTENANCE

STAFF, AND THE WORK OF OTHER CONTRACTORS. THE CONTRACTOR SHALL INCUR ALL COSTS ASSOCIATED WITH THE RELOCATION OF EQUIPMENT CONFLICTING WITH NEW WORK OF OTHER DISCIPLINES THAT HAS NOT BEEN

COORDINATED.

· FIELD VERIFY ALL DIMENSIONS. DRAWINGS ARE ILLUSTRATIVE AND MAY NOT REFLECT EXACT CONDITIONS OR

DIMENSIONS.

· DO NOT SCALE THE DRAWINGS. DRAWINGS ARE DIAGRAMMATIC AND SHOW THE GENERAL ARRANGEMENT OF EQUIPMENT AND SYSTEMS. THEY ARE NOT INTENDED TO SHOW EVERY OFFSET, FITTING, AND COMPONENT. DO NOT USE THE PLANS FOR EXACT LOCATIONS OF EQUIPMENT, FIXTURES, OR ARCHITECTURAL ITEMS SUCH AS WALLS, WINDOWS, SOFFITS, AND PILASTERS. SPECIFIC LOCATIONS,MOUNTING HEIGHTS AND OVERALL DIMENSIONS OF DEVICES AND FIXTURES ARE TO BE OBTAINED FROM THE ARCHITECTURAL DRAWINGS AND DETAIL WHEN AVAILABLE.

· DRAWINGS SPECIFIC TO THIS TRADE DO NOT LIMIT THE RESPONSIBILITY OR WORK REQUIRED BY THE CONTRACT DOCUMENTS. REFER TO DRAWINGS AND SPECIFICATIONS OF OTHER TRADES FOR COMPLETE INFORMATION PRIOR TO BID. COORDINATE FINAL ELECTRICAL AND CONTROL CONNECTIONS WITH APPROVED VENDOR EQUIPMENT

SUBMITTALS BEFORE COMPLETING WORK.

· WHERE CONFLICTS EXIST AMONG DRAWINGS, SPECIFICATIONS, AND EQUIPMENT SCHEDULES, THE MOST STRINGENT SHALL APPLY. NOTIFY THE ENGINEER/ARCHITECT OF ALL CONFLICTS FOR RESOLUTION OR INTERPRETATION.

· NOTIFY THE OWNER IN WRITING AND FIELD VERIFY CONDITIONS BEFORE PERFORMING ANY SAWCUTTING, TRENCHING, CORING, OR ANY OTHER STRUCTURAL MODIFICATIONS. ENSURE THAT NO ADVERSE EFFECT TO THE BUILDING'S

STRUCTURAL INTEGRITY WILL OCCUR.

· ALL FLOOR MOUNTED ELECTRICAL EQUIPMENT SHALL BE MOUNTED ON A CONCRETE PAD BY THE EC. THE PAD SHALL

BE 3" HIGH WITH CHAMFERED EDGES AND SHALL EXTEND 2" BEYOND EDGES OF EQUIPMENT.

· BRANCH CIRCUIT SIZING FROM DISCONNECT, STARTER OR VFD, OR CONTROL PANEL TO MOTOR/EQUIPMENT SHALL MATCH WHAT IS SHOWN FROM MCC/PANELBOARD TO DISCONNECT, STARTER OR VFD, OR CONTROL PANEL UNO.

MOTOR BRANCH CIRCUITS FED FROM VFD SHALL BE VFD CABLE IN APPROPRIATELY SIZED CONDUIT.

· ALL EQUIPMENT INSTALLED WITHIN AREAS THAT ARE LISTED AS CLASSIFIED AREAS SHALL BE UL LISTED AND LABELED FOR INSTALLATION IN THAT AREA. ALL CONDUIT TRANSITIONING FROM CLASSIFIED AREAS TO UNCLASSIFIED AREAS

SHALL HAVE PROPER SEAL-OFF FITTINGS.

· ALL WORK SHOWN IN BOLD IS NEW WORK OR MODIFICATION OF EXISTING INSTALLATIONS TO BE COMPLETED BY THE CONTRACTOR UNDER THIS PROJECT. SEE PROJECT SPECIFICATIONS AND SEQUENCE/PHASING OF WORK FOR THIS PROJECT. CONTRACTORS SHALL READ AND UNDERSTAND THE REQUIREMENTS BEFORE SUBMITTING BID OR

COMPLETING CONTRACTOR WORK.

EXHAUST OR RELIEF AIR DUCT RISER

SUPPLY AIR DUCT RISER

RETURN AIR DUCT RISER

ROOFTOP EXHAUSTER

ROOFTOP INTAKE HOOD

ROOFTOP RELIEF HOOD

EXHAUST GRILLE OR REGISTER

RETURN GRILLE OR REGISTER

4-WAY CEILING DIFFUSER OR REGISTER

2-WAY CEILING DIFFUSER

2-WAY CORNER CEILING DIFFUSER

3-WAY CEILING DIFFUSER

MITERED ELBOW W/ TURNING VANES

FLEXIBLE CONNECTION

FIRE DAMPER (FD)

MANUAL VOLUME DAMPER

THERMOSTAT

EMERGENCY BURNER SHUT-OFF SWITCH

HUMIDISTAT

MOTOR OPERATED DAMPER

CONTROL SWITCH

DUCT SMOKE DETECTOR

CARBON MONOXIDE SENSOR

NITROGEN DIOXIDE SENSOR

DOOR LOUVER, SEE ARCH. DWGS.

DOOR UNDERCUT, SEE ARCH. DWGS.

EXISTING WORK

DEMOLITION WORK

NEW WORK

CONNECT TO EXISTING

DISCONNECT FROM EXISTING

HVAC SYMBOL LEGEND

12x20

UP

T

S B

H

M

S

D

DL

DU

S R

CO

NO

DUCT (1ST FIGURE, SIDE SHOWN;

2ND FIGURE, SIDE NOT SHOWN)

INCLINED RISE (UP) OR DROP (DN) ARROW

IN DIRECTION OF AIR FLOW

STANDARD BRANCH FOR SUPPLY &

RETURN (NO SPLITTER)

MITERED ELBOW W/O TURNING VANES

(USE ONLY WHERE SHOWN)

FIRE SMOKE DAMPER (FSD)

SMOKE DAMPER (SD)

E UNDERGROUND ELECTRICAL CONDUIT

ELECTRICAL ABBREVIATIONS

A AMPERES

AC ALTERNATING CURRENT

AB ABOVE

AFF ABOVE FINISH FLOOR

AFG ABOVE FINISH GRADE

AHJ AUTHORITY HAVING JURISDICTION

AL ALUMINUM

ARCH ARCHITECTURAL

BEL BELOW

BFF BELOW FINISH FLOOR

BFG BELOW FINISH GRADE

BLDG BUILDING

C CONDUIT

CLG CEILING

DC DIRECT CURRENT

DEG,° DEGREE

DIA., ∅ DIAMETER

DISC DISCONNECT

DN DOWN

DWG DRAWING

EC ELECTRICAL CONTRACTOR

EF EXHAUST FAN

ETR EXISTING TO REMAIN

EX, (E) EXISTING

F FUSE

FLA FULL LOAD AMPERES

GC GENERAL CONTRACTOR

GFCI GROUND FAULT CIRCUIT INTERRUPTER

GRD GROUND

H HIGH

HP HORSEPOWER

IN, " INCHES

INS INSULATION

KW KILOWATTS

LB, # POUNDS

MAX MAXIMUM

MC MECHANICAL CONTRACTOR

MCA MINIMUM CIRCUIT AMPACITY

MCC MOTOR CONTROL CENTER

MH MANHOLE

MOD MOTOR OPERATED DAMPER

MFR MANUFACTURER

MIN MINIMUM

MTD, MTG MOUNTED, MOUNTING

NIC NOT IN CONTRACT

NL NIGHT LIGHT

NO NUMBER

OC ON CENTER

P POLE

PC PLUMBING CONTRACTOR

PH PHASE

PWR POWER

SCH SCHEDULE

SEC SECONDARY

SHLD SHIELDED

S&C STUB AND CAP

SF SQUARE FEET

SPEC SPECIFICATIONS

SN SOLID NEUTRAL

SS STAINLESS STEEL

SW SWITCH

T TOE SPACE MOUNTED

TEMP TEMPERATURE

THRU THROUGH

TYP TYPICAL

UNO UNLESS NOTED OTHERWISE

V VOLTS

VFD VARIABLE FREQUENCY DRIVE

W WATTS, WIRE

WL WET LOCATION

WP WEATHERPROOF

XFMR TRANSFORMER

-0

5-

SS

(E) MOTOR OPERATED INTAKE LOUVER

(E) A

(E) A

(E) GENERATOR LINE BREAKER

(E) TELEMETERING ALARM EQUIPMENT

(E) WP

GFCI

(E)(E)

(E) GRAVITY OPERATED

EXHAUST LOUVER

(E) ODOR CONTROL MOTOR

(E) EXHAUST DUCT

(E) A

(E) A

(E) 55KW EMERGENCY

GENERATOR

(E) PUMP CONTROL PANEL

(E) PANEL "L"

(E) UNIT HEATER 5KW,

240V - 1Ø

(E) TRANSFER SWITCH

(E) MAIN BREAKER

(E) BATTERY CHARGER

(E) TL

(E) B

GENERATOR BUILDING PLAN - BAREVILLE

SCALE: NONE

E

1. CONTRACTOR SHALL EXTEND 1"C AND CONDUCTORS FROM NEW AERATION SYSTEM CONTROL PANEL TO EXISTING JUNCTION BOX AND EXISTING 2" CONDUIT FOR PATHWAY BACK TO GENERATOR BUILDING AND PANEL. PROVIDE SEAL OFF FITTINGS AT EACH VERTICAL CONDUIT RUN FROM UNDERGROUND PATHWAY. CONTRACTOR SHALL ROUTE POWER AND CONTROL CIRCUITS IN SEPARATE SHIELDED CABLE CONSTRUCTION AS SHOWN IN NEW AND EXISTING 2" C.

2. CONTRACTORS SHALL EXTEND 3/4"C AND CONDUCTORS FROM EACH AERATION SYSTEM CP TO AERATION SYSTEM BLOWER MOTOR. PROVIDE RATED FLEXIBLE WHIP CONDUIT AT BLOWER AND SEAL OFF FITTING AT CONDUIT VERTICAL RUN BELOW CP. COORDINATE CONDUIT ROUTE TO AERATOR EQUIPMENT AND MAINTENANCE POINTS ON UNIT.

3. CONTRACTOR SHALL ROUTE (4) #14 CU CONDUCTORS FROM AERATION BLOWER CP TO EXISTING DUPLEX PUMP CONTROL PANEL FOR "PUMP RUN" INTERLOCK TO CONTROL PANEL. CONTRACTOR SHALL PROVIDE 1" C FROM CONTROL PANEL TO

EXISTING J-BOX AS PATHWAY.

PLAN NOTES

SCALE: 1/8" = 1'-0"

LP-15,17

ELECTRICAL SITE PLAN - BAREVILLE PUMP STATION

NOTE 3

NOTE 1

NOTE 2

-0

5-

FRONT VIEW

FINISHED GRADE

NO SCALE

A

E-03

(E) PUMP STATION CONTROL PANEL

NOTES:

1. ADD 2P 15 240V ENCLOSED CIRCUIT BREAKER TO INTERIOR OF EXISTING

CABINET FOR AERATION BLOWER CONTROL PANEL. CONNECT ECB LINE

SIDE TO POWER TERMINAL BLOCK WITH (2) #12 AND #12 GROUND. EXTEND (2)

#12 AND #12G IN 3/4"C FROM EWB TO AERATION CONTROL PANEL.

NO SCALE

B

E-03

INTERIOR PHOTO - (E) PUMP STATION CONTROL PANEL

1. CONTRACTOR SHALL EXTEND 1"C AND CONDUCTORS FROM NEW AERATION SYSTEM CONTROL PANEL TO NEW ENCLOSED CIRCUIT BREAKER AT PUMP STATION CONTROL PANEL. PROVIDE SEAL OFF FITTINGS AT EACH VERTICAL

RUN FROM UNDERGROUND PATHWAY.

2. CONTRACTORS SHALL EXTEND 3/4"C AND CONDUCTORS FROM EACH AERATION SYSTEM CP TO AERATION SYSTEM BLOWER MOTOR. PROVIDE RATED FLEXIBLE WHIP CONDUIT AT BLOWER AND SEAL OFF FITTING AT CONDUIT VERTICAL RUN BELOW CP. COORDINATE CONDUIT ROUTE TO AERATOR EQUIPMENT AND MAINTENANCE POINTS ON UNIT.

3. CONTRACTOR SHALL EXTEND 1"C AND FLOW METER CABLE FROM NEW VALVE/METER VAULT FOR RELOCATED FLOW.

FLOW METER TO PUMP STATION CONTROL PANEL REMOTE FLOW METER INDICATING TRANSMITTER. PROVIDE SEAL OFF FITTINGS AT EACH VERTICAL RUN FROM UNDER GROUND PATHWAY. THE CONTRACTOR SHALL ELECTRICALLY DISCONNECT EXISTING FLOW FLOW METER AT EXISTING VAULT FOR RELOCATION BY GC. RECONNECT ELECTRICALLY AT

NEW VALVE/METER VAULT.

4. CONTRACTOR SHALL ROUTE (4) #14 CU CONDUCTORS IN 3/4" C FROM AERATION BLOWER CP TO EXISTING DUPLEX PUMP

CONTROL PANEL FOR "PUMP RUN: INTERLOCK TO CP.

PLAN NOTES

SCALE: 1/8" = 1'-0"

UE

UE

UE

NOTE 2

NOTE 3

NOTE 1

ELECTRICAL SITE PLAN - HERTZOG PUMP STATION

NOTE 4

-0

5-

(E) A

S (E) FOR TYPE 'A' LIGHTS

(E) FOR TYPE 'B' LIGHTS

(E) WP

GFCI

(E) TIME SWITCH AND STARTER

(E) B

(E)

(E) PANEL 'L'

(E) TELEMETERING

ALARM EQUIPMENT

(E) DUPLEX PUMP CONTROL PANEL

M

(E) PUMP CONTROL PANEL CIRCUIT BREAKER

(E) 200 AMP, SELF-CONTAINED RATE METER

(E)

(E) TL

(E)

(E) MOTOR OPERATED INTAKE LOUVER

AND CONTROLS. SEE SCHEMATIC

(E) BATTERY CHARGER

(E) GRAVITY OPERATED

EXHAUST LOUVER

ELECTRICAL FLOOR PLAN - GLENN BROOK

SCALE: 1/4" = 1'-0"

(E) 5 KW UNIT HEATER

240V, 1Ø WITH CORD

AND CORD ASSEMBLY

S

AUTOMATIC TRANSFER SWITCH

50KW GENERATOR

L-21,23

WET WELL AERATION

BLOWER CP

(E) MAGMETER INDICATING

TRANSMITTER

ENVIREP PRO-AIR WET WELL

AERATION SYSTEM (2 H.P.)

MOUNTED ON CONCRETE PAD

(E) MAIN CIRCUIT BREAKER

(E) ODOR CONTROL

(E) GRAVITY OPERATED

EXHAUST LOUVER

EMERGENCY GENERATOR

MECHANICAL FLOOR PLAN - GLENN BROOK

SCALE: 1/4" = 1'-0"

(E) 5 KW UNIT HEATER 240V, 1Ø

WITH CORD AND CORD ASSEMBLY

(E) WATER CLOSET TO REMAIN

(E) MOP SINK TO REMAIN

(E) EYEWASH AND SHOWER TO REMAIN

1 1/2" FROM METER TO

APPLIANCE REGULATOR

REPLACE (E) METER FOR NEW

CONNECTED LOAD. COORDINATE

INSTALLATION WITH UGI. (6'-8" W.C.,

919 MBH CONNECTED LOAD, 25'-0"

DEVELOPED LENGTH)

(E) GAS UP TO UNIT HEATER

PROVIDE NEW MAXITROL

325-9 APPLIANCE REGULATOR

ANCHOR BOLTS

(TYPICAL)

FLEXIBLE FUEL LINES

GAS CONTROL VALVE

PRIMARY REGULATOR

MANUAL SHUT-OFF

VALVE

2'-0"

FINISHED GRADE

VENT LINE WITH INSECT

SCREEN ON OPEN END

FLEXIBLE EXHAUST CONNECTOR

ALUMINUM EXHAUST DUCT

GRAVITY EXHAUST LOUVER

16" MAX.

BLACK IRON EXHAUST PIPE

NATURAL GAS EMERGENCY

GENERATOR

CONDENSATION TRAP

WITH PETCOCK DRAIN

PIPE ENLARGER

(IF REQIURED)

GAS CARBURETOR

SEAMLESS FLEXIBLE

EXHAUST TUBING

1/2" PETCOCK

DRAIN

" M

IN

SLOPE 1/4" PER FEET

30°

PIPE SLEEVE AND GUARD

METAL PIPE HANGER (TYPICAL)

2"x2"x1/4" ANGLE (TYPICAL)

2x6 (TYPICAL)

1200° INSULATION WRAPPED

AROUND MUFFLER AND PIPING

EXHAUST MUFFLER

NO SCALE

A

E-04

FUEL AND EXHAUST SYSTEM DETAIL GAS GENERATOR

HINGED ACCESS PANEL

FROM GAS METER

FU

6A

FU

6A

INTAKE DAMPER

LIMIT SWITCH

120V FROM A.T.S.

EMERG. SOURCEL-9

TD

TIME DELAY RELAY ADJ.

0-45 SEC. ON DELAY

CONTROL RELAY

D.P.D.T., 10 AMP

CONTACTS

INTAKE LOUVER

DAMPER MOTOR

(POWER OPEN,

SPRING CLOSE)

CR

CR

OPEN CLOSE

XO

THERMOSTAT

CLOSES ON

RISE IN TEMP.

70°-140° RANGE

- TERMINAL POINTS

CR

N

TD

TO ALARM PANEL

"GENERATOR LOUVER FAILURE"

SCALE: 3/4" = 1'-0"

B

E-04

EXISTING INTAKE LOUVER CONTROL SCHEMATIC

(E) DUPLEX

PUMP PANEL

PROVIDE

4#1/0, #6 GND

IN 1 1/2" C

4#14 IN 3/4" C FROM

AUXILLIARY CONTACTS ON

ATS TO ALARM PANEL FOR

POWER FAILURE ALARM

PROVIDE NEW 260A AUTOMATIC

TRANSFER SWITCH

(E) PANEL L

G2

NEW 50KW, 63KVA, 120/240V,

3PH, 4W GENERATOR AND

200A CIRCUIT BREAKERM

(E) 120/240V, 3PH,

4W SERVICE BY PPL

(E) 225AF/200AT 3P MAIN

CIRCUIT BREAKER TO REMAIN

EXTEND

EXISTING

WIRE/CONDUIT

3#4 + #8 GND IN

1 1/2" C

NEW PULL BOX

SIZED FOR TAP

(E) PPL METER

NO SCALE

C

E-04

ONE-LINE DIAGRAM

(E) CONDUCTOR CONDUIT

PROVIDE 4, #3/0,

#6 GND IN 2" C

SPD

(E)20HP

CP

AERATION

3#10, #10 GRD IN 3/4"C

2#10, #10 GRD

IN 3/4"C

NEW 30A

ECB

4#3/0, #6 GRD IN 2"C

(E) LOUVER

CONTROL PANEL

15A ECB

CP

2#14 IN 3/4"C FROM CP CTRL RELAY

TO INTAKE LOUVER CTRL "OPEN"

2#14 IN 3/4"C FROM CP CTRL RELAY

TO ALARM PANEL FOR GENERATOR

COMMON ALARM

(E)20HP

KEYED NOTES

1 CONTRACTOR SHALL DISCONNECT AND REMOVE EXISTING GENERATOR AND REPLACE WITH NEW GENERATOR AS SHOWN.

CONTRACTOR SHALL REVIEW EXISTING CONDITIONS WITH CONCRETE PAD, ELECTRICAL CONNECTIONS, AND CONDUIT ROUTES FOR COORDINATION WITH NEW GENERATOR AND ATS SWITCH REPLACEMENT IN SAME LOCATIONS. REUSE/REWORK EXISTING CONCRETE PAD FOR NEW GENERATOR OR REPLACE. COORDINATE ALL WORK WITH OWNER DURING CONSTRUCTION TO MINIMIZE OUTAGES AS PUMP STATION MUST REMAIN ONLINE DURING CONSTRUCTION.

2 CONTRACTOR SHALL DISCONNECT EXISTING EXHAUST DUCT SHEET METAL AND NATURAL GAS CONNECTIONS TO FACILITATE THE INSTALLATION OF THE NEW GENERATOR. PROVIDE NEW EXHAUST DUCT SHEET METAL AND FLEXIBLE CONNECTOR FROM NEW GENERATOR AS REQUIRED. PROVIDE NEW GAS PIPING AND CONNECTIONS AS SHOWN. PROVIDE

GENERATOR ENGINE EXHAUST PIPING AND INSULATION.

3 CONTRACTOR SHALL DISCONNECT AND REWORK EXISTING BATTERY CHARGING LEADS FROM FROM EXISTING GENERATOR

BATTERY CONNECTIONS AND RECONNECT TO NEW BATTERY ON NEW GENERATOR

4 CONTRACTORS SHALL EXTEND 3/4"C AND CONDUCTORS FROM EACH AERATION SYSTEM CP TO AERATION SYSTEM BLOWER MOTOR. PROVIDE RATED FLEXIBLE WHIP CONDUIT AT BLOWER AND SEAL OFF FITTING AT CONDUIT VERTICAL RUN BELOW CP. COORDINATE CONDUIT ROUTE TO AERATOR EQUIPMENT AND MAINTENANCE POINTS ON UNIT.

5 CONTRACTOR SHALL ROUTE (4) #14 CU CONDUCTORS IN 3/4" C FROM AERATION BLOWER CP TO EXISTING DUPLEX PUMP

CONTROL PANEL FOR "PUMP RUN: INTERLOCK TO CP.

6 CONTRACTOR SHALL DISCONNECT ELECTRICAL OPERATOR AT EXISTING MOTOR OPERATED LOUVER ACTIVATOR FROM MOTORIZED LOUVER/DAMPER REPLACEMENT BY GC. CONTRACTOR SHALL RECONNECT NEW MOTOR OPERATED LOUVER

ACTIVATOR TO EXISTING CONTROL CIRCUIT. TEST ACTIVATION WITH EXISTING CONTROLS.

7 GC TO REPLACE EXISTING MOTOR OPERATED INTAKE LOUVER, RUSKIN ELF375DX 47x57 OR EQUAL, WITH 120V MOTOR OPERATED DAMPER. VERIFY EXACT SIZE IN FIELD. EC TO PROVIDE CONTROLS TO INTERLOCK INTAKE LOUVER OPEN WHEN

GENERATOR IS ENERGIZED.

8 CONTRACTOR SHALL DISCONNECT EXISTING SPD AND REMOVE CONDUIT/WIRE BACK TO SOURCE. PROVIDE AND CONNECT

NEW SPD AS SHOWN.

-0

5-

1. CONTRACTOR SHALL EXTEND 1"C AND CONDUCTORS FROM NEW AERATION SYSTEM CONTROL PANEL TO PANEL L AND NEW CIRCUIT BREAKER AT PANEL. PROVIDE SEAL OFF FITTINGS AT EACH AT EACH VERTICAL RUN FROM UNDERGROUND PATHWAY.

2. CONTRACTORS SHALL EXTEND 3/4"C AND CONDUCTORS FROM EACH AERATION SYSTEM CP TO AERATION SYSTEM BLOWER MOTOR. PROVIDE RATED FLEXIBLE WHIP CONDUIT AT BLOWER AND SEAL OFF FITTING AT CONDUIT VERTICAL RUN BELOW CP.

COORDINATE CONDUIT ROUTE TO AERATOR EQUIPMENT AND MAINTENANCE POINTS ON UNIT.

PLAN NOTES

SCALE: 1/8" = 1'-0"

NOTE 1

NOTE 2

ELECTRICAL SITE PLAN - GLENN BROOK PUMP STATION

-0

5-

(E) B

ELECTRICAL FLOOR PLAN - APRICOT

SCALE: 1/4" = 1'-0"

S (E) FOR TYPE 'A' LIGHTS

(E) FOR TYPE 'B' LIGHTS

(E) WP

GFCI

(E)

(E) PANEL 'L'

(E) TELEMETERING

ALARM EQUIPMENT

(E) DUPLEX PUMP CONTROL PANEL

M

(E) PUMP CONTROL PANEL CIRCUIT BREAKER

AUTOMATIC TRANSFER

SWITCH TO REPLACE EXISTING

(E) 200 AMP, SELF-CONTAINED RATE METER

(E)

(E) TL

(E)

(E) MOTOR OPERATED INTAKE LOUVER

AND CONTROLS. SEE SCHEMATIC

(E) BATTERY CHARGER

(E) GRAVITY OPERATED

EXHAUST LOUVER

(E) 7.5 KW UNIT HEATER

240V, 1Ø WITH CORD

AND CORD ASSEMBLY S

(E) ODOR CONTROL UNIT (BY GEN. CONT.)

(E) TIME SWITCH AND STARTER

50KW GENERATOR

L-17,19WET WELL AERATION

BLOWER CP

(E) MAGMETER INDICATING

TRANSMITTER3

(E) MAIN CIRCUIT BREAKER

MECHANICAL FLOOR PLAN - APRICOT

SCALE: 1/4" = 1'-0"

(E) GRAVITY OPERATED EXHAUST LOUVER

(E) 5 KW UNIT HEATER 240V, 1Ø WITH CORD

AND CORD ASSEMBLY

(E) TIME SWITCH AND STARTER

(E) MOP SINK TO REMAIN

(E) EMERGENCY EYEWASH

AND SHOWER TO REMAIN

(E) 30MBH UNIT HEATER TO REMAIN

(E) GAS UP TO UNIT HEATER

REPLACE (E) METER FOR NEW CONNECTED

LOAD. COORDINATE INSTALLATION WITH

UGI. (6"-8" W.C., 830 MBH CONNECTED LOAD,

25'-0" DEVELOPED LENGTH)

1 1/4" FROM METER TO

APPLIANCE REGULATOR

PROVIDE NEW MAXITROL 325-9

APPLIANCE REGULATOR

2 EMERGENCY GENERATOR

ANCHOR BOLTS

(TYPICAL)

FLEXIBLE FUEL LINES

GAS CONTROL VALVE

PRIMARY REGULATOR

MANUAL SHUT-OFF

VALVE

2'-0"

FINISHED GRADE

VENT LINE WITH INSECT

SCREEN ON OPEN END

FLEXIBLE EXHAUST CONNECTOR

ALUMINUM EXHAUST DUCT

GRAVITY EXHAUST LOUVER

16" MAX.

BLACK IRON EXHAUST PIPE

NATURAL GAS EMERGENCY

GENERATOR

CONDENSATION TRAP

WITH PETCOCK DRAIN

PIPE ENLARGER

(IF REQIURED)

GAS CARBURETOR

SEAMLESS FLEXIBLE

EXHAUST TUBING

1/2" PETCOCK

DRAIN

" M

IN

SLOPE 1/4" PER FEET

30°

PIPE SLEEVE AND GUARD

METAL PIPE HANGER (TYPICAL)

2"x2"x1/4" ANGLE (TYPICAL)

2x6 (TYPICAL)

1200° INSULATION WRAPPED

AROUND MUFFLER AND PIPING

EXHAUST MUFFLER

NO SCALE

A

E-04

FUEL AND EXHAUST SYSTEM DETAIL GAS GENERATOR

HINGED ACCESS PANEL

FROM GAS METER

FU

6A

FU

6A

INTAKE DAMPER

LIMIT SWITCH

120V FROM A.T.S.

EMERG. SOURCEL-9

TD

TIME DELAY RELAY ADJ.

0-45 SEC. ON DELAY

CONTROL RELAY

D.P.D.T., 10 AMP

CONTACTS

INTAKE LOUVER

DAMPER MOTOR

(POWER OPEN,

SPRING CLOSE)

CR

CR

OPEN CLOSE

XO

THERMOSTAT

CLOSES ON

RISE IN TEMP.

70°-140° RANGE

- TERMINAL POINTS

CR

N

TD

TO ALARM PANEL

"GENERATOR LOUVER FAILURE"

SCALE: 3/4" = 1'-0"

B

E101

EXISTING INTAKE LOUVER CONTROL SCHEMATIC

(E) DUPLEX

PUMP PANEL

PROVIDE 4#1/0,

#6 GND IN 1 1/2"C

4#14 IN 3/4" C FROM

AUXILLIARY CONTACTS ON

ATS TO ALARM PANEL FOR

POWER FAILURE ALARM

PROVIDE NEW 260A

AUTOMATIC TRANSFER

SWITCH

(E) PANEL L

G1

NEW 50KW, 63KVA, 120/240V, 3PH, 4W

GENERATOR WITH CONTROLLER

PANEL AND 200A CIRCUIT BREAKERM

(E) 120/240V, 3PH,

4W SERVICE BY PPL

(E) 225AF/200AT 3P MAIN

CIRCUIT BREAKER TO REMAIN

EXTEND EXISTING

WIRE/CONDUIT 3#4 +

#8 GND IN 1 1/2" C

(E) PPL METER

(E) WIREWAY AND SURGE

PROTECTION DEVICE

NO SCALE

C

E101

ONE-LINE DIAGRAM

15HP15HP

(E) LOUVER

CONTROL

PANEL

15A ECB

SPD

30A ECB

CP

2#14 IN 3/4"C FROM CP CONTROL RELAY

TO INTAKE LOUVER CONTROL "OPEN"

2#14 IN 3/4"C FROM CP CONTROL RELAY TO

ALARM PANEL FOR GENERATOR COMMON ALARM

CP

AERATION

2#10, #10 GRD

IN 3/4"C

4#3/0, #6 GRD

IN 2"C

3 #10, #10 GRD

IN 3/4"C

4#3/0, #6 GRD IN 2"C

KEYED NOTES

1 CONTRACTOR SHALL DISCONNECT AND REMOVE EXISTING GENERATOR AND REPLACE WITH NEW GENERATOR AS SHOWN.

CONTRACTOR SHALL REVIEW EXISTING CONDITIONS WITH CONCRETE PAD, ELECTRICAL CONNECTIONS, AND CONDUIT ROUTES FOR COORDINATION WITH NEW GENERATOR AND ATS SWITCH REPLACEMENT IN SAME LOCATIONS. REUSE/REWORK EXISTING CONCRETE PAD FOR NEW GENERATOR OR REPLACE. COORDINATE ALL WORK WITH OWNER DURING CONSTRUCTION TO MINIMIZE OUTAGES AS PUMP STATION MUST REMAIN ONLINE DURING CONSTRUCTION.

2 CONTRACTOR SHALL DISCONNECT EXISTING EXHAUST DUCT SHEET METAL AND NATURAL GAS CONNECTIONS TO FACILITATE THE INSTALLATION OF THE NEW GENERATOR. PROVIDE NEW EXHAUST DUCT SHEET METAL AND FLEXIBLE CONNECTOR FROM NEW GENERATOR AS REQUIRED. PROVIDE NEW GAS PIPING AND CONNECTIONS AS SHOWN. PROVIDE

GENERATOR ENGINE EXHAUST PIPING AND INSULATION.

3 CONTRACTOR SHALL DISCONNECT AND REMOVE EXISTING MAG METER INDICATING TRANSMITTER AND INSTALL NEW

TRANSMITTER AND CONNECT AS PER MANUFACTURER'S DIRECTIONS

4 CONTRACTOR SHALL DISCONNECT AND REWORK EXISTING BATTERY CHARGER LEADS FROM EXISTING GENERATOR

BATTERY CONNECTIONS AND RECONNECT TO NEW BATTERY ON NEW GENERATOR

5 CONTRACTORS SHALL EXTEND 3/4"C AND CONDUCTORS FROM EACH AERATION SYSTEM CP TO AERATION SYSTEM BLOWER MOTOR. PROVIDE RATED FLEXIBLE WHIP CONDUIT BLOWER AND SEAL OFF FITTING AT CONDUIT VERTICAL RUN BELOW CP.

COORDINATE CONDUIT ROUTE TO AERATOR EQUIPMENT AND MAINTENANCE POINTS ON UNIT.

6 CONTRACTOR SHALL ROUTE (4) #14 CU CONDUCTORS IN 3/4" C FROM AERATION BLOWER CP TO EXISTING DUPLEX PUMP

CONTROL PANEL FOR "PUMP RUN: INTERLOCK TO CP.

7 CONTRACTOR SHALL DISCONNECT ELECTRICAL OPERATOR AT EXISTING MOTOR OPERATED LOUVER ACTIVATOR FROM MOTORIZED LOUVER/DAMPER REPLACEMENT BY GC. CONTRACTOR SHALL RECONNECT NEW MOTOR OPERATED LOUVER

ACTIVATOR TO EXISTING CONTROL CIRCUIT. TEST ACTIVATION WITH EXISTING CONTROLS.

8 GC TO REPLACE EXISTING MOTOR OPERATED INTAKE LOUVER, RUSKIN ELF375DX 47x51 OR EQUAL, WITH 120V MOTOR OPERATED DAMPER. VERIFY EXACT SIZE IN FIELD. EC TO PROVIDE CONTROLS TO INTERLOCK INTAKE LOUVER OPEN WHEN

GENERATOR IS ENERGIZED.

9 CONTRACTOR SHALL DISCONNECT EXISTING SPD AND REMOVE CONDUIT/WIRE BACK TO SOURCE. PROVIDE AND CONNECT

NEW SPD AS SHOWN.

-0

5-

RELINE INFLUENT

MANHOLE ACCORDING

TO SECTION 099000

(BID ALT. #3)

1. CONTRACTOR SHALL EXTEND 1"C AND CONDUCTORS FROM NEW AERATION SYSTEM CONTROL PANEL TO PANEL L AND NEW CIRCUIT BREAKER AT PANEL. PROVIDE SEAL OFF FITTINGS AT EACH AT EACH VERTICAL RUN FROM UNDERGROUND PATHWAY.

2. CONTRACTORS SHALL EXTEND 3/4"C AND CONDUCTORS FROM EACH AERATION SYSTEM CP TO AERATION SYSTEM BLOWER MOTOR. PROVIDE RATED FLEXIBLE WHIP CONDUIT BLOWER AND SEAL OFF FITTING AT CONDUIT VERTICAL RUN BELOW CP.

COORDINATE CONDUIT ROUTE TO AERATOR EQUIPMENT AND MAINTENANCE POINTS ON UNIT.

PLAN NOTES

SCALE: 1/8" = 1'-0"

NOTE 2

NOTE 1

ELECTRICAL SITE PLAN - APRICOT PUMP STATION

-0

5-

Sheets and Views
00G-01
00G-02
00G-03-IndexPLAN
01C-01
01C-02
01C-03
01C-04
01C-05
01C-06
99D-01
E-01
E-02
E-03
E-04
E-05
E-06
E-07