10-Addendum 02 ULTMA 2026 PS 2026-10-28 FINAL.pdf

PDF 3 MB Posted

Attached to
2026 Pump Station Improvements Project
Solicitation number
US.256212
Issued by
Lancaster County, Pennsylvania

About this file

This is Addendum No. 02 dated October 28, 2026, issued by RETTEW for the Upper Leacock Township Municipal Authority's 2026 Pump Station Improvements Project, addressing modifications to contract documents for General Construction Contract 2026-02 and Electrical Construction Contract 2026-03. The addendum introduces Section 264300—Surge Protective Devices—as a new specification and modifies electrical drawings (Sheets E-02 through E-04, E-06, and E-07) to clarify scope and contract separation per Addendum No. 01. The surge protective device specification establishes requirements for field-installed, externally-mounted units at service entrance and branch panelboard locations, including detailed performance criteria, diagnostic monitoring capabilities, and diagnostic requirements such as protection status indicators, audible alarms, remote monitoring contacts, and surge event counters. Manufacturers approved include ABB, Intermatic, Inc., Schneider Electric, and Surge Suppression, LLC. Installation must comply with NECA 1 standards, NFPA 70 National Electrical Code, UL 1449, and NETA ATS acceptance testing standards. The specification requires a minimum five-year warranty covering defects and explicitly excludes surge protective devices from warranty clauses limiting coverage for acts of nature including lightning.

The addendum specifies service entrance surge protective devices with surge current ratings of not less than 120 kA per mode/240 kA per phase, repetitive surge current capacity of 5,000 impulses, and short-circuit current ratings matching available fault current at installation locations. Branch panelboard surge protective devices require lower ratings of 60 kA per mode/120 kA per phase with 2,000 impulse capacity. All devices must achieve UL 1449 Type 1 or Type 2 listing and maintain voltage protection ratings not exceeding 1,000 volts for line-to-neutral, line-to-ground, and neutral-to-ground modes and 1,200 volts for line-to-line modes on 240/120V systems. Contractors must disconnect surge protective devices prior to high potential testing and replace any units damaged by improper neutral-ground bonding or high potential testing procedures. Field quality control inspection and testing shall be performed by a qualified manufacturer's representative in accordance with NETA ATS Section 7.19.1, with manufacturer reports included in submittals.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3020 Columbia Avenue, Lancaster, PA 17603 ● Phone: (800) 738-8395 E-mail: rettew@rettew.com ● Web site: rettew.com

ADDENDUM NO. 02

October 28, 2026

To: All Prospective Bidders

RE: Upper Leacock Township Municipal Authority 2026 Pump Station Improvements Project Contract 2026-02: General Construction Contract 2026-03: Electrical Construction RETTEW Project No. 0571405975

Dear Bidders:

The following Addendum No. 02 is hereby made to the contract documents for the above-referenced project. Any additions, clarifications or deletions described in this Addendum take precedence over any instructions at conflict herein. All items in this Addendum shall be considered in preparation of your proposal for the referenced project.

Receipt of this Addendum shall be acknowledged by inserting this number and date in the space provided on the Bid Form. Failure to do so may result in disqualification of the Bidder. The addendum consists of 1 page and the following attachments:

▪ Section 264300 (5 pages)

▪ Sheets E-02 through E-04, E-06, and E-07 (5 sheets)

PROJECT MANUAL MODIFICATIONS

The Project Manual shall be modified as follows:

SECTION 264300 – SURGE PROTECTIVE DEVICES

1. Specification added to Project Manual in this Addendum.

DRAWING MODIFICATIONS

SHEET NO. E-02 THROUGH E-04, E-06, AND E-07

1. Sheet callouts, notes, and drawings were modified in accordance with the scope and contract separation clarifications issued in Addendum No. 01.

END OF ADDENDUM

Z:\Shared\Projects\05714\0571405975 - 2026 Pumping Station Improvements Project\MUN\05 Bidding\Addenda\02\0_Addendum 02_ULTMA_2026 PS_2026-10-28.docx

ADDENDUM NO. 2 – ISSUED 10/28/2026

Upper Leacock Township Municipal Authority

2026 Pump Station Improvements Project

October 2026

SURGE PROTECTIVE DEVICES 264300 - 1

RETTEW Project No.: 0571405975

Contract No. 2026-03

SECTION 264300 - SURGE PROTECTIVE DEVICES

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Surge protective devices for service entrance locations.

B. Surge protective devices for branch panelboard locations.

1.02 RELATED REQUIREMENTS

A. Section 260526 - Grounding and Bonding for Electrical Systems.

B. Section 262416 - Panelboards.

C. Section 262726 - Wiring Devices - Lutron: Receptacles with integral surge protection.

1.03 ABBREVIATIONS AND ACRONYMS

A. SPD: Surge Protective Device.

1.04 REFERENCE STANDARDS

A. NECA 1 - Standard for Good Workmanship in Electrical Construction; 2023.

B. NEMA EN 10250 - Enclosures for Electrical Equipment (1000 Volts Maximum); 2024.

C. NETA ATS - Standard for Acceptance Testing Specifications for Electrical Power Equipment

And Systems; 2025.

D. NFPA 70 - National Electrical Code; Most Recent Edition Adopted by Authority Having

Jurisdiction, Including All Applicable Amendments and Supplements.

E. UL 1449 - Standard for Surge Protective Devices; Current Edition, Including All Revisions.

1.05 ADMINISTRATIVE REQUIREMENTS

A. Coordination: Coordinate size and location of overcurrent device compatible with the actual surge protective device and location to be installed. Notify Architect of any conflicts or deviations from Contract Documents to obtain direction prior to ordering equipment.

1.06 SUBMITTALS

A. See Section 013000 - Administrative Requirements, for submittal procedures.

B. Product Data: Include detailed component information, voltage, surge current ratings, repetitive surge current capacity, voltage protection rating (VPR) for all protection modes, maximum continuous operating voltage (MCOV), nominal discharge current (I-n), short circuit current rating (SCCR), connection means including any required external overcurrent protection, enclosure ratings, outline and support point dimensions, weight, service condition requirements, and installed features.

C. Shop Drawings: Include wiring diagrams showing all factory and field connections with wire and circuit breaker/fuse sizes.

D. Certificates: Manufacturer's documentation of listing for compliance with the following standards:

1. UL 1449.

2. UL 1283 (for Type 2 SPDs).

E. Field Quality Control Test Reports.

SURGE PROTECTIVE DEVICES 264300 - 2

F. Manufacturer's Installation Instructions: Include application conditions and limitations of use stipulated by product testing agency. Include instructions for storage, handling, protection, examination, preparation, and installation of product.

G. Operation and Maintenance Data: Include information on status indicators and recommended maintenance procedures and intervals.

H. Warranty: Submit sample of manufacturer's warranty and documentation of final executed warranty completed in Owner's name and registered with manufacturer.

I. Project Record Documents: Record actual connections and locations of surge protective devices.

1.07 QUALITY ASSURANCE

A. Comply with requirements of NFPA 70.

B. Manufacturer Qualifications: Company specializing in manufacturing the products specified in this section with minimum three years documented experience.

C. Product Listing Organization Qualifications: An organization recognized by OSHA as a

Nationally Recognized Testing Laboratory (NRTL) and acceptable to authorities having jurisdiction.

1.08 DELIVERY, STORAGE, AND PROTECTION

A. Store in a clean, dry space in accordance with manufacturer's written instructions.

1.09 FIELD CONDITIONS

A. Maintain field conditions within manufacturer's required service conditions during and after installation.

1.10 WARRANTY

A. See Section 017800 - Closeout Submittals, for additional warranty requirements.

B. Manufacturer's Warranty: Provide minimum five year warranty covering repair or replacement of surge protective devices showing evidence of failure due to defective materials or workmanship.

C. Exclude surge protective devices from any clause limiting warranty responsibility for acts of nature, including lightning, stated elsewhere.

PART 2 PRODUCTS

2.01 MANUFACTURERS

A. Field-Installed, Externally Mounted Surge Protective Devices:

1. ABB: www.electrification.us.abb.com/#sle.

2. Intermatic, Inc: www.intermatic.com/#sle.

3. Schneider Electric: www.se.com/#sle.

4. Surge Suppression, LLC (SSI): www.surgesuppression.com/#sle.

5. Units offered by Distribution Equipment Manufacturer's meeting this specification.

B. Substitutions: See Section 016000 - Product Requirements.

C. Source Limitations: Provide surge protective devices produced by single manufacturer and obtained from single supplier.

2.02 SURGE PROTECTIVE DEVICES - GENERAL REQUIREMENTS

SURGE PROTECTIVE DEVICES 264300 - 3

A. Description: Factory-assembled surge protective devices (SPDs) for 60 Hz service; listed, classified, and labeled as suitable for the purpose intended; system voltage as indicated on the drawings.

B. Unless otherwise indicated, provide field-installed, externally-mounted SPDs.

C. List and label as complying with UL 1449, Type 1 when connected on line side of service disconnect overcurrent device and Type 1 or 2 when connected on load side of service disconnect overcurrent device.

D. Protected Modes:

1. High Leg Delta Systems: L-N, L-G, N-G, L-L.

E. UL 1449 Voltage Protection Ratings (VPRs):

1. 240/120V System Voltage: Not more than 1,000 V for L-N, L-G, and N-G modes and

1,200 V for L-L mode.

F. UL 1449 Maximum Continuous Operating Voltage (MCOV): Not less than 115% of nominal system voltage.

G. Enclosure Environment Type per NEMA EN 10250: Unless otherwise indicated, as specified for the following installation locations:

1. Indoor clean, dry locations: Type 1.

2. Outdoor locations: Type 4X.

H. Mounting for Field-installed, Externally Mounted SPDs: Unless otherwise indicated, as specified for the following locations:

1. Provide surface-mounted SPD where mounted in non-public areas or adjacent to surface-mounted equipment.

2.03 SURGE PROTECTIVE DEVICES FOR SERVICE ENTRANCE LOCATIONS

A. Surge Protective Device:

1. Protection Circuits: Field-replaceable modular or non-modular.

2. Surge Current Rating: Not less than 120 kA per mode/240 kA per phase.

3. Repetitive Surge Current Capacity: Not less than 5,000 impulses.

4. UL 1449 Nominal Discharge Current (I-n): 20 kA.

5. UL 1449 Short Circuit Current Rating (SCCR): Not less than the available fault current at the installed location as indicated on the drawings.

6. Diagnostics:

a. Protection Status Monitoring: Provide indicator lights to report the protection for each phase.

b. Alarm Notification: Provide indicator light and audible alarm to report alarm condition. Provide button to manually silence audible alarm.

c. Remote Status Monitoring: Provide Form C dry type contacts (normally open and normally closed) for remote annunciation of status.

d. Surge Counter: Provide surge event counter with manual reset button, surge count retention upon power loss, and six digit LCD display that indicates quantity of surge events.

7. Provide surge rated integral disconnect switch for SPDs not connected to a dedicated circuit breaker or fused switch.

2.04 SURGE PROTECTIVE DEVICES FOR BRANCH PANELBOARD LOCATIONS

SURGE PROTECTIVE DEVICES 264300 - 4

A. Surge Protective Device:

1. Protection Circuits: Field-replaceable modular or non-modular.

2. Surge Current Rating: Not less than 60 kA per mode/120 kA per phase.

3. Repetitive Surge Current Capacity: Not less than 2,000 impulses.

4. UL 1449 Nominal Discharge Current (I-n): 20 kA.

5. UL 1449 Short Circuit Current Rating (SCCR): Not less than the available fault current at the installed location as indicated on the drawings.

6. Diagnostics:

a. Protection Status Monitoring: Provide indicator lights to report the protection status for each phase.

b. Alarm Notification: Provide indicator light and audible alarm to report alarm condition. Provide button to manually silence audible alarm.

c. Surge Counter: Provide surge event counter with manual reset button, surge count retention upon power loss, and six digit LCD display that indicates quantity of surge events.

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify that field measurements are as indicated.

B. Verify that the service voltage and configuration marked on the SPD are consistent with the service voltage and configuration at the location to be installed.

C. Verify that electrical equipment is ready to accept connection of the SPD and that installed overcurrent device is consistent with requirements of drawings and manufacturer's instructions.

D. Verify system grounding and bonding is in accordance with Section 260526, including bonding of neutral and ground for service entrance and separately derived systems where applicable. Do not energize SPD until deficiencies have been corrected.

E. Verify that conditions are satisfactory for installation prior to starting work.

3.02 INSTALLATION

A. Perform work in accordance with NECA 1 (general workmanship).

B. Install products in accordance with manufacturer's instructions.

C. Arrange equipment to provide minimum clearances in accordance with manufacturer's instructions and NFPA 70.

D. Unless indicated otherwise, connect service entrance surge protective device on load side of service disconnect main overcurrent device.

E. Provide conductors with minimum ampacity as indicated on the drawings, as required by NFPA

70, and not less than manufacturer's recommended minimum conductor size.

F. Install conductors between SPD and equipment terminations as short and straight as possible, not exceeding manufacturer's recommended maximum conductor length. Breaker locations may be reasonably rearranged in order to provide leads as short and straight as possible. Twist conductors together to reduce inductance.

G. Do not energize SPD until bonding of neutral and ground for service entrance and separately derived systems is complete in accordance with Section 260526 where applicable. Replace

SPDs damaged by improper or missing neutral-ground bond.

SURGE PROTECTIVE DEVICES 264300 - 5

H. Disconnect SPD prior to performing any high potential testing. Replace SPDs damaged by performing high potential testing with SPD connected.

3.03 FIELD QUALITY CONTROL

A. See Section 014000 - Quality Requirements, for additional requirements.

B. Inspect and test in accordance with NETA ATS, except Section 4.

C. Perform inspections and tests listed in NETA ATS Section 7.19.1.

D. Procure services of a qualified manufacturer's representative to observe installation and assist in inspection, testing, and adjusting. Include manufacturer's reports with field quality control submittals.

3.04 CLEANING

A. Repair scratched or marred exterior surfaces to match original factory finish.

END OF SECTION

SS

(E) MOTOR OPERATED INTAKE LOUVER

(E) A

(E) A

(E) GENERATOR LINE BREAKER

(E) TELEMETERING ALARM EQUIPMENT

(E) WP

GFCI

(E)(E)

(E) GRAVITY OPERATED

EXHAUST LOUVER

(E) ODOR CONTROL MOTOR

(E) EXHAUST DUCT

(E) A

(E) A

(E) 55KW EMERGENCY

GENERATOR

(E) PUMP CONTROL PANEL

(E) PANEL "L"

(E) UNIT HEATER 5KW,

240V - 1Ø

(E) TRANSFER SWITCH

(E) MAIN BREAKER

(E) BATTERY CHARGER

(E) TL

(E) B

GENERATOR BUILDING PLAN - BAREVILLE

SCALE: NONE

E

1. CONTRACTOR SHALL EXTEND 1"C AND CONDUCTORS FROM NEW AERATION SYSTEM CONTROL PANEL TO EXISTING JUNCTION BOX AND EXISTING 2" CONDUIT FOR PATHWAY BACK TO GENERATOR BUILDING AND PANEL. PROVIDE SEAL OFF FITTINGS AT EACH VERTICAL CONDUIT RUN FROM UNDERGROUND PATHWAY. CONTRACTOR SHALL ROUTE POWER AND CONTROL CIRCUITS IN SEPARATE SHIELDED CABLE CONSTRUCTION AS SHOWN IN NEW AND EXISTING 2" C.

2. CONTRACTORS SHALL EXTEND 3/4"C AND CONDUCTORS FROM EACH AERATION SYSTEM CP TO AERATION SYSTEM BLOWER MOTOR. PROVIDE RATED FLEXIBLE WHIP CONDUIT AT BLOWER AND SEAL OFF FITTING AT CONDUIT VERTICAL RUN BELOW CP. COORDINATE CONDUIT ROUTE TO AERATOR EQUIPMENT AND MAINTENANCE POINTS ON UNIT.

3. CONTRACTOR SHALL ROUTE (4) #14 CU CONDUCTORS FROM AERATION BLOWER CP TO EXISTING DUPLEX PUMP CONTROL PANEL FOR "PUMP RUN" INTERLOCK TO CONTROL PANEL. CONTRACTOR SHALL PROVIDE 1" C FROM CONTROL PANEL TO

EXISTING J-BOX AS PATHWAY.

PLAN NOTES

SCALE: 1/8" = 1'-0"

LP-15,17

ELECTRICAL SITE PLAN - BAREVILLE PUMP STATION

NOTE 3

NOTE 1

NOTE 2

-2

7-

FRONT VIEW

FINISHED GRADE

NO SCALE

A

E-03

(E) PUMP STATION CONTROL PANEL

NOTES:

1. ADD 2P 15 240V ENCLOSED CIRCUIT BREAKER TO INTERIOR OF EXISTING

CABINET FOR AERATION BLOWER CONTROL PANEL. CONNECT ECB LINE

SIDE TO POWER TERMINAL BLOCK WITH (2) #12 AND #12 GROUND. EXTEND (2)

#12 AND #12G IN 3/4"C FROM EWB TO AERATION CONTROL PANEL.

NO SCALE

B

E-03

INTERIOR PHOTO - (E) PUMP STATION CONTROL PANEL

1. CONTRACTOR SHALL EXTEND 1"C AND CONDUCTORS FROM NEW AERATION SYSTEM CONTROL PANEL TO NEW ENCLOSED CIRCUIT BREAKER AT PUMP STATION CONTROL PANEL. PROVIDE SEAL OFF FITTINGS AT EACH VERTICAL

RUN FROM UNDERGROUND PATHWAY.

2. CONTRACTORS SHALL EXTEND 3/4"C AND CONDUCTORS FROM EACH AERATION SYSTEM CP TO AERATION SYSTEM BLOWER MOTOR. PROVIDE RATED FLEXIBLE WHIP CONDUIT AT BLOWER AND SEAL OFF FITTING AT CONDUIT VERTICAL RUN BELOW CP. COORDINATE CONDUIT ROUTE TO AERATOR EQUIPMENT AND MAINTENANCE POINTS ON UNIT.

3. CONTRACTOR SHALL EXTEND 1"C AND FROM NEW VALVE/METER VAULT FOR RELOCATED FLOW METER TO PUMP STATION CONTROL PANEL REMOTE FLOW METER INDICATING TRANSMITTER. PROVIDE SEAL OFF FITTINGS AT EACH VERTICAL RUN FROM UNDER GROUND PATHWAY. THE CONTRACTOR SHALL ELECTRICALLY DISCONNECT EXISTING FLOW METER AT EXISTING VAULT FOR RELOCATION BY GC. RECONNECT ELECTRICALLY AT NEW VALVE/METER VAULT. CONTRACTOR SHALL REMOVE AND REUSE EXISTING FLOW METER CABLE AND INSTALL IN NEW CONDUIT PATHWAY FOR RELOCATED

METER.

4. CONTRACTOR SHALL ROUTE (4) #14 CU CONDUCTORS IN 3/4" C FROM AERATION BLOWER CP TO EXISTING DUPLEX PUMP

CONTROL PANEL FOR "PUMP RUN: INTERLOCK TO CP.

PLAN NOTES

SCALE: 1/8" = 1'-0"

UE

UE

UE

NOTE 2

NOTE 3

NOTE 1

ELECTRICAL SITE PLAN - HERTZOG PUMP STATION

NOTE 4

-2

7-

(E) A

S (E) FOR TYPE 'A' LIGHTS

(E) FOR TYPE 'B' LIGHTS

(E) WP

GFCI

(E) TIME SWITCH AND STARTER

(E) B

(E)

(E) PANEL 'L'

(E) TELEMETERING

ALARM EQUIPMENT

(E) DUPLEX PUMP CONTROL PANEL

M

(E) PUMP CONTROL PANEL CIRCUIT BREAKER

(E) 200 AMP, SELF-CONTAINED RATE METER

(E)

(E) TL

(E)

(E) MOTOR OPERATED INTAKE LOUVER

AND CONTROLS. SEE SCHEMATIC

(E) BATTERY CHARGER

(E) GRAVITY OPERATED

EXHAUST LOUVER

ELECTRICAL FLOOR PLAN - GLENN BROOK

SCALE: 1/4" = 1'-0"

(E) 5 KW UNIT HEATER

240V, 1Ø WITH CORD

AND CORD ASSEMBLY

S

AUTOMATIC TRANSFER SWITCH

50KW GENERATOR

L-21,23

WET WELL AERATION

BLOWER CP

(E) MAGMETER INDICATING

TRANSMITTER

ENVIREP PRO-AIR WET WELL

AERATION SYSTEM (2 H.P.)

MOUNTED ON CONCRETE PAD

(E) MAIN CIRCUIT BREAKER

(E) ODOR CONTROL

(E) GRAVITY OPERATED

EXHAUST LOUVER

EMERGENCY GENERATOR

MECHANICAL FLOOR PLAN - GLENN BROOK

SCALE: 1/4" = 1'-0"

(E) 5 KW UNIT HEATER 240V, 1Ø

WITH CORD AND CORD ASSEMBLY

(E) WATER CLOSET TO REMAIN

(E) MOP SINK TO REMAIN

(E) EYEWASH AND SHOWER TO REMAIN

1 1/2" FROM METER TO

APPLIANCE REGULATOR

REPLACE (E) METER FOR NEW

CONNECTED LOAD. COORDINATE

INSTALLATION WITH UGI. (6'-8" W.C.,

919 MBH CONNECTED LOAD, 25'-0"

DEVELOPED LENGTH)

(E) GAS UP TO UNIT HEATER

PROVIDE NEW MAXITROL

325-9 APPLIANCE REGULATOR

ANCHOR BOLTS

(TYPICAL)

FLEXIBLE FUEL LINES

GAS CONTROL VALVE

PRIMARY REGULATOR

MANUAL SHUT-OFF

VALVE

2'-0"

FINISHED GRADE

VENT LINE WITH INSECT

SCREEN ON OPEN END

FLEXIBLE EXHAUST CONNECTOR

ALUMINUM EXHAUST DUCT

GRAVITY EXHAUST LOUVER (ETR)

16" MAX.

BLACK IRON EXHAUST PIPE

NATURAL GAS EMERGENCY

GENERATOR

CONDENSATION TRAP

WITH PETCOCK DRAIN

PIPE ENLARGER

(IF REQIURED)

GAS CARBURETOR

SEAMLESS FLEXIBLE

EXHAUST TUBING

1/2" PETCOCK

DRAIN

" M

IN

SLOPE 1/4" PER FEET

30°

PIPE SLEEVE AND GUARD

METAL PIPE HANGER (TYPICAL)

2"x2"x1/4" ANGLE (TYPICAL)

2x6 (TYPICAL)

1200° INSULATION WRAPPED

AROUND MUFFLER AND PIPING

EXHAUST MUFFLER

NO SCALE

A

E-04

FUEL AND EXHAUST SYSTEM DETAIL GAS GENERATOR

HINGED ACCESS PANEL

FROM GAS METER

FU

6A

FU

6A

INTAKE DAMPER

LIMIT SWITCH

120V FROM A.T.S.

EMERG. SOURCEL-9

TD

TIME DELAY RELAY ADJ.

0-45 SEC. ON DELAY

CONTROL RELAY

D.P.D.T., 10 AMP

CONTACTS

INTAKE LOUVER

DAMPER MOTOR

(POWER OPEN,

SPRING CLOSE)

CR

CR

OPEN CLOSE

XO

THERMOSTAT

CLOSES ON

RISE IN TEMP.

70°-140° RANGE

- TERMINAL POINTS

CR

N

TD

TO ALARM PANEL

"GENERATOR LOUVER FAILURE"

SCALE: 3/4" = 1'-0"

B

E-04

EXISTING INTAKE LOUVER CONTROL SCHEMATIC

(E) DUPLEX

PUMP PANEL

PROVIDE

4#1/0, #6 GND

IN 1 1/2" C

4#14 IN 3/4" C FROM

AUXILLIARY CONTACTS ON

ATS TO ALARM PANEL FOR

POWER FAILURE ALARM

PROVIDE NEW 260A AUTOMATIC

TRANSFER SWITCH

(E) PANEL L

G2

NEW 50KW, 63KVA, 120/240V,

3PH, 4W GENERATOR AND

200A CIRCUIT BREAKERM

(E) 120/240V, 3PH,

4W SERVICE BY PPL

(E) 225AF/200AT 3P MAIN

CIRCUIT BREAKER TO REMAIN

EXTEND

EXISTING

WIRE/CONDUIT

3#4 + #8 GND IN

1 1/2" C

NEW PULL BOX

SIZED FOR TAP

(E) PPL METER

NO SCALE

C

E-04

ONE-LINE DIAGRAM

(E) CONDUCTOR CONDUIT

PROVIDE 4, #3/0,

#6 GND IN 2" C

SPD

(E)20HP

CP

AERATION

3#10, #10 GRD IN 3/4"C

2#10, #10 GRD

IN 3/4"C

NEW 30A

ECB

4#3/0, #6 GRD IN 2"C

(E) LOUVER

CONTROL PANEL

15A ECB

CP

2#14 IN 3/4"C FROM CP CTRL RELAY

TO INTAKE LOUVER CTRL "OPEN"

2#14 IN 3/4"C FROM CP CTRL RELAY

TO ALARM PANEL FOR GENERATOR

COMMON ALARM

(E)20HP

KEYED NOTES

1 CONTRACTOR SHALL DISCONNECT AND REMOVE EXISTING GENERATOR AND REPLACE WITH NEW GENERATOR AS SHOWN.

CONTRACTOR SHALL REVIEW EXISTING CONDITIONS WITH CONCRETE PAD, ELECTRICAL CONNECTIONS, AND CONDUIT ROUTES FOR COORDINATION WITH NEW GENERATOR AND ATS SWITCH REPLACEMENT IN SAME LOCATIONS. REUSE/REWORK EXISTING CONCRETE PAD FOR NEW GENERATOR OR REPLACE. COORDINATE ALL WORK WITH OWNER DURING CONSTRUCTION TO MINIMIZE OUTAGES AS PUMP STATION MUST REMAIN ONLINE DURING CONSTRUCTION.

2 CONTRACTOR SHALL DISCONNECT EXISTING EXHAUST DUCT SHEET METAL AND NATURAL GAS CONNECTIONS TO FACILITATE THE INSTALLATION OF THE NEW GENERATOR. PROVIDE NEW EXHAUST DUCT SHEET METAL AND FLEXIBLE CONNECTOR FROM NEW GENERATOR AS REQUIRED. PROVIDE NEW GAS PIPING AND CONNECTIONS AS SHOWN. PROVIDE

GENERATOR ENGINE EXHAUST PIPING AND INSULATION.

3 CONTRACTOR SHALL DISCONNECT AND REWORK EXISTING BATTERY CHARGING LEADS FROM FROM EXISTING GENERATOR

BATTERY CONNECTIONS AND RECONNECT TO NEW BATTERY ON NEW GENERATOR

4 CONTRACTORS SHALL EXTEND 3/4"C AND CONDUCTORS FROM EACH AERATION SYSTEM CP TO AERATION SYSTEM BLOWER MOTOR. PROVIDE RATED FLEXIBLE WHIP CONDUIT AT BLOWER AND SEAL OFF FITTING AT CONDUIT VERTICAL RUN BELOW CP. COORDINATE CONDUIT ROUTE TO AERATOR EQUIPMENT AND MAINTENANCE POINTS ON UNIT.

5 CONTRACTOR SHALL ROUTE (4) #14 CU CONDUCTORS IN 3/4" C FROM AERATION BLOWER CP TO EXISTING DUPLEX PUMP CONTROL PANEL FOR PUMP RUN: INTERLOCK TO CUP. AERATION CONTROL PANELS TO BE MOUNTED BY GC AND ALL

ELECTRICAL CONNECTIONS TO BE BY EC.

6 CONTRACTOR SHALL DISCONNECT ELECTRICAL OPERATOR AT EXISTING MOTOR OPERATED LOUVER ACTIVATOR FROM MOTORIZED LOUVER/DAMPER REPLACEMENT. CONTRACTOR SHALL RECONNECT NEW MOTOR OPERATED LOUVER

ACTIVATOR TO EXISTING CONTROL CIRCUIT. TEST ACTIVATION WITH EXISTING CONTROLS.

7 EC SHALL DISCONNECT, REMOVE AND DISPOSE OF THE EXISTING MOTOR OPERATED INTAKE LOUVER. EC SHALL REPLACE EXISTING MOTOR OPERATED INTAKE LOUVER, RUSKIN ELF375DX 47x57 OR EQUAL, WITH 120V MOTOR OPERATED DAMPER.

VERIFY EXACT SIZE IN FIELD. EC TO PROVIDE CONTROLS TO INTERLOCK INTAKE LOUVER OPEN WHEN GENERATOR IS

ENERGIZED.

8 CONTRACTOR SHALL DISCONNECT AND REMOVE AND DISPOSE OF SPD AND ASSOCIATED WIRE/CONDUIT BACK TO SOURCE.

PROVIDE AND CONNECT NEW SPD AS SHOWN.

-2

7-

(E) B

ELECTRICAL FLOOR PLAN - APRICOT

SCALE: 1/4" = 1'-0"

S (E) FOR TYPE 'A' LIGHTS

(E) FOR TYPE 'B' LIGHTS

(E) WP

GFCI

(E)

(E) PANEL 'L'

(E) TELEMETERING

ALARM EQUIPMENT

(E) DUPLEX PUMP CONTROL PANEL

M

(E) PUMP CONTROL PANEL CIRCUIT BREAKER

AUTOMATIC TRANSFER

SWITCH TO REPLACE EXISTING

(E) 200 AMP, SELF-CONTAINED RATE METER

(E)

(E) TL

(E)

(E) MOTOR OPERATED INTAKE LOUVER

AND CONTROLS. SEE SCHEMATIC

(E) BATTERY CHARGER

(E) GRAVITY OPERATED

EXHAUST LOUVER

(E) 7.5 KW UNIT HEATER

240V, 1Ø WITH CORD

AND CORD ASSEMBLY S

(E) ODOR CONTROL UNIT (BY GEN. CONT.)

(E) TIME SWITCH AND STARTER

50KW GENERATOR

L-17,19WET WELL AERATION

BLOWER CP

(E) MAGMETER INDICATING

TRANSMITTER3

(E) MAIN CIRCUIT BREAKER

MECHANICAL FLOOR PLAN - APRICOT

SCALE: 1/4" = 1'-0"

(E) GRAVITY OPERATED EXHAUST LOUVER

(E) 5 KW UNIT HEATER 240V, 1Ø WITH CORD

AND CORD ASSEMBLY

(E) TIME SWITCH AND STARTER

(E) MOP SINK TO REMAIN

(E) EMERGENCY EYEWASH

AND SHOWER TO REMAIN

(E) 30MBH UNIT HEATER TO REMAIN

(E) GAS UP TO UNIT HEATER

REPLACE (E) METER FOR NEW CONNECTED

LOAD. COORDINATE INSTALLATION WITH

UGI. (6"-8" W.C., 830 MBH CONNECTED LOAD,

25'-0" DEVELOPED LENGTH)

1 1/4" FROM METER TO

APPLIANCE REGULATOR

PROVIDE NEW MAXITROL 325-9

APPLIANCE REGULATOR

2 EMERGENCY GENERATOR

ANCHOR BOLTS

(TYPICAL)

FLEXIBLE FUEL LINES

GAS CONTROL VALVE

PRIMARY REGULATOR

MANUAL SHUT-OFF

VALVE

2'-0"

FINISHED GRADE

VENT LINE WITH INSECT

SCREEN ON OPEN END

FLEXIBLE EXHAUST CONNECTOR

ALUMINUM EXHAUST DUCT

GRAVITY EXHAUST LOUVER (ETR)

16" MAX.

BLACK IRON EXHAUST PIPE

NATURAL GAS EMERGENCY

GENERATOR

CONDENSATION TRAP

WITH PETCOCK DRAIN

PIPE ENLARGER

(IF REQIURED)

GAS CARBURETOR

SEAMLESS FLEXIBLE

EXHAUST TUBING

1/2" PETCOCK

DRAIN

" M

IN

SLOPE 1/4" PER FEET

30°

PIPE SLEEVE AND GUARD

METAL PIPE HANGER (TYPICAL)

2"x2"x1/4" ANGLE (TYPICAL)

2x6 (TYPICAL)

1200° INSULATION WRAPPED

AROUND MUFFLER AND PIPING

EXHAUST MUFFLER

NO SCALE

A

E-04

FUEL AND EXHAUST SYSTEM DETAIL GAS GENERATOR

HINGED ACCESS PANEL

FROM GAS METER

FU

6A

FU

6A

INTAKE DAMPER

LIMIT SWITCH

120V FROM A.T.S.

EMERG. SOURCEL-9

TD

TIME DELAY RELAY ADJ.

0-45 SEC. ON DELAY

CONTROL RELAY

D.P.D.T., 10 AMP

CONTACTS

INTAKE LOUVER

DAMPER MOTOR

(POWER OPEN,

SPRING CLOSE)

CR

CR

OPEN CLOSE

XO

THERMOSTAT

CLOSES ON

RISE IN TEMP.

70°-140° RANGE

- TERMINAL POINTS

CR

N

TD

TO ALARM PANEL

"GENERATOR LOUVER FAILURE"

SCALE: 3/4" = 1'-0"

B

E101

EXISTING INTAKE LOUVER CONTROL SCHEMATIC

(E) DUPLEX

PUMP PANEL

PROVIDE 4#1/0,

#6 GND IN 1 1/2"C

4#14 IN 3/4" C FROM

AUXILLIARY CONTACTS ON

ATS TO ALARM PANEL FOR

POWER FAILURE ALARM

PROVIDE NEW 260A

AUTOMATIC TRANSFER

SWITCH

(E) PANEL L

G1

NEW 50KW, 63KVA, 120/240V, 3PH, 4W

GENERATOR WITH CONTROLLER

PANEL AND 200A CIRCUIT BREAKERM

(E) 120/240V, 3PH,

4W SERVICE BY PPL

(E) 225AF/200AT 3P MAIN

CIRCUIT BREAKER TO REMAIN

EXTEND EXISTING

WIRE/CONDUIT 3#4 +

#8 GND IN 1 1/2" C

(E) PPL METER

(E) WIREWAY

NO SCALE

C

E101

ONE-LINE DIAGRAM

15HP15HP

(E) LOUVER

CONTROL

PANEL

15A ECB

SPD

30A ECB

CP

2#14 IN 3/4"C FROM CP CONTROL RELAY

TO INTAKE LOUVER CONTROL "OPEN"

2#14 IN 3/4"C FROM CP CONTROL RELAY TO

ALARM PANEL FOR GENERATOR COMMON ALARM

CP

AERATION

2#10, #10 GRD

IN 3/4"C

4#3/0, #6 GRD

IN 2"C

3 #10, #10 GRD

IN 3/4"C

4#3/0, #6 GRD IN 2"C

KEYED NOTES

1 CONTRACTOR SHALL DISCONNECT AND REMOVE EXISTING GENERATOR AND REPLACE WITH NEW GENERATOR AS SHOWN.

CONTRACTOR SHALL REVIEW EXISTING CONDITIONS WITH CONCRETE PAD, ELECTRICAL CONNECTIONS, AND CONDUIT ROUTES FOR COORDINATION WITH NEW GENERATOR AND ATS SWITCH REPLACEMENT IN SAME LOCATIONS. REUSE/REWORK EXISTING CONCRETE PAD FOR NEW GENERATOR OR REPLACE. COORDINATE ALL WORK WITH OWNER DURING CONSTRUCTION TO MINIMIZE OUTAGES AS PUMP STATION MUST REMAIN ONLINE DURING CONSTRUCTION.

2 CONTRACTOR SHALL DISCONNECT EXISTING EXHAUST DUCT SHEET METAL AND NATURAL GAS CONNECTIONS TO FACILITATE THE INSTALLATION OF THE NEW GENERATOR. PROVIDE NEW EXHAUST DUCT SHEET METAL AND FLEXIBLE CONNECTOR FROM NEW GENERATOR AS REQUIRED. PROVIDE NEW GAS PIPING AND CONNECTIONS AS SHOWN. PROVIDE

GENERATOR ENGINE EXHAUST PIPING AND INSULATION.

3 CONTRACTOR SHALL DISCONNECT AND REMOVE EXISTING MAG METER INDICATING TRANSMITTER AND INSTALL NEW

TRANSMITTER AND CONNECT AS PER MANUFACTURER'S DIRECTIONS

4 CONTRACTOR SHALL DISCONNECT AND REWORK EXISTING BATTERY CHARGER LEADS FROM EXISTING GENERATOR

BATTERY CONNECTIONS AND RECONNECT TO NEW BATTERY ON NEW GENERATOR

5 CONTRACTORS SHALL EXTEND 3/4"C AND CONDUCTORS FROM EACH AERATION SYSTEM CP TO AERATION SYSTEM BLOWER MOTOR. PROVIDE RATED FLEXIBLE WHIP CONDUIT BLOWER AND SEAL OFF FITTING AT CONDUIT VERTICAL RUN BELOW CP.

COORDINATE CONDUIT ROUTE TO AERATOR EQUIPMENT AND MAINTENANCE POINTS ON UNIT.

6 CONTRACTOR SHALL ROUTE (4) #14 CU CONDUCTORS IN 3/4" C FROM AERATION BLOWER CP TO EXISTING DUPLEX PUMP CONTROL PANEL FOR "PUMP RUN: INTERLOCK TO CP. AERATION CONTROL PANELS TO BE MOUNTED BY GC AND ALL

ELECTRICAL CONNECTIONS TO BE BY EC.

7 CONTRACTOR SHALL DISCONNECT ELECTRICAL OPERATOR AT EXISTING MOTOR OPERATED LOUVER ACTIVATOR FROM MOTORIZED LOUVER/DAMPER REPLACEMENT. CONTRACTOR SHALL RECONNECT NEW MOTOR OPERATED LOUVER

ACTIVATOR TO EXISTING CONTROL CIRCUIT. TEST ACTIVATION WITH EXISTING CONTROLS.

8 EC SHALL DISCONNECT, REMOVE AND DISPOSE OF THE EXISTING MOTOR OPERATED INTAKE LOUVER. EC SHALL REPLACE EXISTING MOTOR OPERATED INTAKE LOUVER, RUSKIN ELF375DX 47x51 OR EQUAL, WITH 120V MOTOR OPERATED DAMPER.

VERIFY EXACT SIZE IN FIELD. EC TO PROVIDE CONTROLS TO INTERLOCK INTAKE LOUVER OPEN WHEN GENERATOR IS

ENERGIZED.

9 CONTRACTOR SHALL DISCONNECT AND REMOVE AND DISPOSE OF SPD AND ASSOCIATED WIRE/CONDUIT BACK TO SOURCE.

PROVIDE AND CONNECT NEW SPD AS SHOWN.

-2

7-

1. CONTRACTOR SHALL EXTEND 1"C AND CONDUCTORS FROM NEW AERATION SYSTEM CONTROL PANEL TO PANEL L AND NEW CIRCUIT BREAKER AT PANEL. PROVIDE SEAL OFF FITTINGS AT EACH AT EACH VERTICAL RUN FROM UNDERGROUND PATHWAY.

2. CONTRACTORS SHALL EXTEND 3/4"C AND CONDUCTORS FROM EACH AERATION SYSTEM CP TO AERATION SYSTEM BLOWER MOTOR. PROVIDE RATED FLEXIBLE WHIP CONDUIT BLOWER AND SEAL OFF FITTING AT CONDUIT VERTICAL RUN BELOW CP.

COORDINATE CONDUIT ROUTE TO AERATOR EQUIPMENT AND MAINTENANCE POINTS ON UNIT.

PLAN NOTES

SCALE: 1/8" = 1'-0"

NOTE 2

NOTE 1

ELECTRICAL SITE PLAN - APRICOT PUMP STATION

-2

7-