10-Addendum 02 ULTMA 2026 PS 2026-10-28 FINAL.pdf
PDF 3 MB Posted
- Attached to
- 2026 Pump Station Improvements Project
- Solicitation number
- US.256212
- Issued by
- Lancaster County, Pennsylvania
About this file
This is Addendum No. 02 dated October 28, 2026, issued by RETTEW for the Upper Leacock Township Municipal Authority's 2026 Pump Station Improvements Project, addressing modifications to contract documents for General Construction Contract 2026-02 and Electrical Construction Contract 2026-03. The addendum introduces Section 264300—Surge Protective Devices—as a new specification and modifies electrical drawings (Sheets E-02 through E-04, E-06, and E-07) to clarify scope and contract separation per Addendum No. 01. The surge protective device specification establishes requirements for field-installed, externally-mounted units at service entrance and branch panelboard locations, including detailed performance criteria, diagnostic monitoring capabilities, and diagnostic requirements such as protection status indicators, audible alarms, remote monitoring contacts, and surge event counters. Manufacturers approved include ABB, Intermatic, Inc., Schneider Electric, and Surge Suppression, LLC. Installation must comply with NECA 1 standards, NFPA 70 National Electrical Code, UL 1449, and NETA ATS acceptance testing standards. The specification requires a minimum five-year warranty covering defects and explicitly excludes surge protective devices from warranty clauses limiting coverage for acts of nature including lightning.
The addendum specifies service entrance surge protective devices with surge current ratings of not less than 120 kA per mode/240 kA per phase, repetitive surge current capacity of 5,000 impulses, and short-circuit current ratings matching available fault current at installation locations. Branch panelboard surge protective devices require lower ratings of 60 kA per mode/120 kA per phase with 2,000 impulse capacity. All devices must achieve UL 1449 Type 1 or Type 2 listing and maintain voltage protection ratings not exceeding 1,000 volts for line-to-neutral, line-to-ground, and neutral-to-ground modes and 1,200 volts for line-to-line modes on 240/120V systems. Contractors must disconnect surge protective devices prior to high potential testing and replace any units damaged by improper neutral-ground bonding or high potential testing procedures. Field quality control inspection and testing shall be performed by a qualified manufacturer's representative in accordance with NETA ATS Section 7.19.1, with manufacturer reports included in submittals.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3020 Columbia Avenue, Lancaster, PA 17603 ● Phone: (800) 738-8395 E-mail: rettew@rettew.com ● Web site: rettew.com
ADDENDUM NO. 02
October 28, 2026
To: All Prospective Bidders
RE: Upper Leacock Township Municipal Authority 2026 Pump Station Improvements Project Contract 2026-02: General Construction Contract 2026-03: Electrical Construction RETTEW Project No. 0571405975
Dear Bidders:
The following Addendum No. 02 is hereby made to the contract documents for the above-referenced project. Any additions, clarifications or deletions described in this Addendum take precedence over any instructions at conflict herein. All items in this Addendum shall be considered in preparation of your proposal for the referenced project.
Receipt of this Addendum shall be acknowledged by inserting this number and date in the space provided on the Bid Form. Failure to do so may result in disqualification of the Bidder. The addendum consists of 1 page and the following attachments:
▪ Section 264300 (5 pages)
▪ Sheets E-02 through E-04, E-06, and E-07 (5 sheets)
PROJECT MANUAL MODIFICATIONS
The Project Manual shall be modified as follows:
SECTION 264300 – SURGE PROTECTIVE DEVICES
1. Specification added to Project Manual in this Addendum.
DRAWING MODIFICATIONS
SHEET NO. E-02 THROUGH E-04, E-06, AND E-07
1. Sheet callouts, notes, and drawings were modified in accordance with the scope and contract separation clarifications issued in Addendum No. 01.
END OF ADDENDUM
Z:\Shared\Projects\05714\0571405975 - 2026 Pumping Station Improvements Project\MUN\05 Bidding\Addenda\02\0_Addendum 02_ULTMA_2026 PS_2026-10-28.docx
ADDENDUM NO. 2 – ISSUED 10/28/2026
Upper Leacock Township Municipal Authority
2026 Pump Station Improvements Project
October 2026
SURGE PROTECTIVE DEVICES 264300 - 1
RETTEW Project No.: 0571405975
Contract No. 2026-03
SECTION 264300 - SURGE PROTECTIVE DEVICES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Surge protective devices for service entrance locations.
B. Surge protective devices for branch panelboard locations.
1.02 RELATED REQUIREMENTS
A. Section 260526 - Grounding and Bonding for Electrical Systems.
B. Section 262416 - Panelboards.
C. Section 262726 - Wiring Devices - Lutron: Receptacles with integral surge protection.
1.03 ABBREVIATIONS AND ACRONYMS
A. SPD: Surge Protective Device.
1.04 REFERENCE STANDARDS
A. NECA 1 - Standard for Good Workmanship in Electrical Construction; 2023.
B. NEMA EN 10250 - Enclosures for Electrical Equipment (1000 Volts Maximum); 2024.
C. NETA ATS - Standard for Acceptance Testing Specifications for Electrical Power Equipment
And Systems; 2025.
D. NFPA 70 - National Electrical Code; Most Recent Edition Adopted by Authority Having
Jurisdiction, Including All Applicable Amendments and Supplements.
E. UL 1449 - Standard for Surge Protective Devices; Current Edition, Including All Revisions.
1.05 ADMINISTRATIVE REQUIREMENTS
A. Coordination: Coordinate size and location of overcurrent device compatible with the actual surge protective device and location to be installed. Notify Architect of any conflicts or deviations from Contract Documents to obtain direction prior to ordering equipment.
1.06 SUBMITTALS
A. See Section 013000 - Administrative Requirements, for submittal procedures.
B. Product Data: Include detailed component information, voltage, surge current ratings, repetitive surge current capacity, voltage protection rating (VPR) for all protection modes, maximum continuous operating voltage (MCOV), nominal discharge current (I-n), short circuit current rating (SCCR), connection means including any required external overcurrent protection, enclosure ratings, outline and support point dimensions, weight, service condition requirements, and installed features.
C. Shop Drawings: Include wiring diagrams showing all factory and field connections with wire and circuit breaker/fuse sizes.
D. Certificates: Manufacturer's documentation of listing for compliance with the following standards:
1. UL 1449.
2. UL 1283 (for Type 2 SPDs).
E. Field Quality Control Test Reports.
SURGE PROTECTIVE DEVICES 264300 - 2
F. Manufacturer's Installation Instructions: Include application conditions and limitations of use stipulated by product testing agency. Include instructions for storage, handling, protection, examination, preparation, and installation of product.
G. Operation and Maintenance Data: Include information on status indicators and recommended maintenance procedures and intervals.
H. Warranty: Submit sample of manufacturer's warranty and documentation of final executed warranty completed in Owner's name and registered with manufacturer.
I. Project Record Documents: Record actual connections and locations of surge protective devices.
1.07 QUALITY ASSURANCE
A. Comply with requirements of NFPA 70.
B. Manufacturer Qualifications: Company specializing in manufacturing the products specified in this section with minimum three years documented experience.
C. Product Listing Organization Qualifications: An organization recognized by OSHA as a
Nationally Recognized Testing Laboratory (NRTL) and acceptable to authorities having jurisdiction.
1.08 DELIVERY, STORAGE, AND PROTECTION
A. Store in a clean, dry space in accordance with manufacturer's written instructions.
1.09 FIELD CONDITIONS
A. Maintain field conditions within manufacturer's required service conditions during and after installation.
1.10 WARRANTY
A. See Section 017800 - Closeout Submittals, for additional warranty requirements.
B. Manufacturer's Warranty: Provide minimum five year warranty covering repair or replacement of surge protective devices showing evidence of failure due to defective materials or workmanship.
C. Exclude surge protective devices from any clause limiting warranty responsibility for acts of nature, including lightning, stated elsewhere.
PART 2 PRODUCTS
2.01 MANUFACTURERS
A. Field-Installed, Externally Mounted Surge Protective Devices:
1. ABB: www.electrification.us.abb.com/#sle.
2. Intermatic, Inc: www.intermatic.com/#sle.
3. Schneider Electric: www.se.com/#sle.
4. Surge Suppression, LLC (SSI): www.surgesuppression.com/#sle.
5. Units offered by Distribution Equipment Manufacturer's meeting this specification.
B. Substitutions: See Section 016000 - Product Requirements.
C. Source Limitations: Provide surge protective devices produced by single manufacturer and obtained from single supplier.
2.02 SURGE PROTECTIVE DEVICES - GENERAL REQUIREMENTS
SURGE PROTECTIVE DEVICES 264300 - 3
A. Description: Factory-assembled surge protective devices (SPDs) for 60 Hz service; listed, classified, and labeled as suitable for the purpose intended; system voltage as indicated on the drawings.
B. Unless otherwise indicated, provide field-installed, externally-mounted SPDs.
C. List and label as complying with UL 1449, Type 1 when connected on line side of service disconnect overcurrent device and Type 1 or 2 when connected on load side of service disconnect overcurrent device.
D. Protected Modes:
1. High Leg Delta Systems: L-N, L-G, N-G, L-L.
E. UL 1449 Voltage Protection Ratings (VPRs):
1. 240/120V System Voltage: Not more than 1,000 V for L-N, L-G, and N-G modes and
1,200 V for L-L mode.
F. UL 1449 Maximum Continuous Operating Voltage (MCOV): Not less than 115% of nominal system voltage.
G. Enclosure Environment Type per NEMA EN 10250: Unless otherwise indicated, as specified for the following installation locations:
1. Indoor clean, dry locations: Type 1.
2. Outdoor locations: Type 4X.
H. Mounting for Field-installed, Externally Mounted SPDs: Unless otherwise indicated, as specified for the following locations:
1. Provide surface-mounted SPD where mounted in non-public areas or adjacent to surface-mounted equipment.
2.03 SURGE PROTECTIVE DEVICES FOR SERVICE ENTRANCE LOCATIONS
A. Surge Protective Device:
1. Protection Circuits: Field-replaceable modular or non-modular.
2. Surge Current Rating: Not less than 120 kA per mode/240 kA per phase.
3. Repetitive Surge Current Capacity: Not less than 5,000 impulses.
4. UL 1449 Nominal Discharge Current (I-n): 20 kA.
5. UL 1449 Short Circuit Current Rating (SCCR): Not less than the available fault current at the installed location as indicated on the drawings.
6. Diagnostics:
a. Protection Status Monitoring: Provide indicator lights to report the protection for each phase.
b. Alarm Notification: Provide indicator light and audible alarm to report alarm condition. Provide button to manually silence audible alarm.
c. Remote Status Monitoring: Provide Form C dry type contacts (normally open and normally closed) for remote annunciation of status.
d. Surge Counter: Provide surge event counter with manual reset button, surge count retention upon power loss, and six digit LCD display that indicates quantity of surge events.
7. Provide surge rated integral disconnect switch for SPDs not connected to a dedicated circuit breaker or fused switch.
2.04 SURGE PROTECTIVE DEVICES FOR BRANCH PANELBOARD LOCATIONS
SURGE PROTECTIVE DEVICES 264300 - 4
A. Surge Protective Device:
1. Protection Circuits: Field-replaceable modular or non-modular.
2. Surge Current Rating: Not less than 60 kA per mode/120 kA per phase.
3. Repetitive Surge Current Capacity: Not less than 2,000 impulses.
4. UL 1449 Nominal Discharge Current (I-n): 20 kA.
5. UL 1449 Short Circuit Current Rating (SCCR): Not less than the available fault current at the installed location as indicated on the drawings.
6. Diagnostics:
a. Protection Status Monitoring: Provide indicator lights to report the protection status for each phase.
b. Alarm Notification: Provide indicator light and audible alarm to report alarm condition. Provide button to manually silence audible alarm.
c. Surge Counter: Provide surge event counter with manual reset button, surge count retention upon power loss, and six digit LCD display that indicates quantity of surge events.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that field measurements are as indicated.
B. Verify that the service voltage and configuration marked on the SPD are consistent with the service voltage and configuration at the location to be installed.
C. Verify that electrical equipment is ready to accept connection of the SPD and that installed overcurrent device is consistent with requirements of drawings and manufacturer's instructions.
D. Verify system grounding and bonding is in accordance with Section 260526, including bonding of neutral and ground for service entrance and separately derived systems where applicable. Do not energize SPD until deficiencies have been corrected.
E. Verify that conditions are satisfactory for installation prior to starting work.
3.02 INSTALLATION
A. Perform work in accordance with NECA 1 (general workmanship).
B. Install products in accordance with manufacturer's instructions.
C. Arrange equipment to provide minimum clearances in accordance with manufacturer's instructions and NFPA 70.
D. Unless indicated otherwise, connect service entrance surge protective device on load side of service disconnect main overcurrent device.
E. Provide conductors with minimum ampacity as indicated on the drawings, as required by NFPA
70, and not less than manufacturer's recommended minimum conductor size.
F. Install conductors between SPD and equipment terminations as short and straight as possible, not exceeding manufacturer's recommended maximum conductor length. Breaker locations may be reasonably rearranged in order to provide leads as short and straight as possible. Twist conductors together to reduce inductance.
G. Do not energize SPD until bonding of neutral and ground for service entrance and separately derived systems is complete in accordance with Section 260526 where applicable. Replace
SPDs damaged by improper or missing neutral-ground bond.
SURGE PROTECTIVE DEVICES 264300 - 5
H. Disconnect SPD prior to performing any high potential testing. Replace SPDs damaged by performing high potential testing with SPD connected.
3.03 FIELD QUALITY CONTROL
A. See Section 014000 - Quality Requirements, for additional requirements.
B. Inspect and test in accordance with NETA ATS, except Section 4.
C. Perform inspections and tests listed in NETA ATS Section 7.19.1.
D. Procure services of a qualified manufacturer's representative to observe installation and assist in inspection, testing, and adjusting. Include manufacturer's reports with field quality control submittals.
3.04 CLEANING
A. Repair scratched or marred exterior surfaces to match original factory finish.
END OF SECTION
SS
(E) MOTOR OPERATED INTAKE LOUVER
(E) A
(E) A
(E) GENERATOR LINE BREAKER
(E) TELEMETERING ALARM EQUIPMENT
(E) WP
GFCI
(E)(E)
(E) GRAVITY OPERATED
EXHAUST LOUVER
(E) ODOR CONTROL MOTOR
(E) EXHAUST DUCT
(E) A
(E) A
(E) 55KW EMERGENCY
GENERATOR
(E) PUMP CONTROL PANEL
(E) PANEL "L"
(E) UNIT HEATER 5KW,
240V - 1Ø
(E) TRANSFER SWITCH
(E) MAIN BREAKER
(E) BATTERY CHARGER
(E) TL
(E) B
GENERATOR BUILDING PLAN - BAREVILLE
SCALE: NONE
E
1. CONTRACTOR SHALL EXTEND 1"C AND CONDUCTORS FROM NEW AERATION SYSTEM CONTROL PANEL TO EXISTING JUNCTION BOX AND EXISTING 2" CONDUIT FOR PATHWAY BACK TO GENERATOR BUILDING AND PANEL. PROVIDE SEAL OFF FITTINGS AT EACH VERTICAL CONDUIT RUN FROM UNDERGROUND PATHWAY. CONTRACTOR SHALL ROUTE POWER AND CONTROL CIRCUITS IN SEPARATE SHIELDED CABLE CONSTRUCTION AS SHOWN IN NEW AND EXISTING 2" C.
2. CONTRACTORS SHALL EXTEND 3/4"C AND CONDUCTORS FROM EACH AERATION SYSTEM CP TO AERATION SYSTEM BLOWER MOTOR. PROVIDE RATED FLEXIBLE WHIP CONDUIT AT BLOWER AND SEAL OFF FITTING AT CONDUIT VERTICAL RUN BELOW CP. COORDINATE CONDUIT ROUTE TO AERATOR EQUIPMENT AND MAINTENANCE POINTS ON UNIT.
3. CONTRACTOR SHALL ROUTE (4) #14 CU CONDUCTORS FROM AERATION BLOWER CP TO EXISTING DUPLEX PUMP CONTROL PANEL FOR "PUMP RUN" INTERLOCK TO CONTROL PANEL. CONTRACTOR SHALL PROVIDE 1" C FROM CONTROL PANEL TO
EXISTING J-BOX AS PATHWAY.
PLAN NOTES
SCALE: 1/8" = 1'-0"
LP-15,17
ELECTRICAL SITE PLAN - BAREVILLE PUMP STATION
NOTE 3
NOTE 1
NOTE 2
-2
7-
FRONT VIEW
FINISHED GRADE
NO SCALE
A
E-03
(E) PUMP STATION CONTROL PANEL
NOTES:
1. ADD 2P 15 240V ENCLOSED CIRCUIT BREAKER TO INTERIOR OF EXISTING
CABINET FOR AERATION BLOWER CONTROL PANEL. CONNECT ECB LINE
SIDE TO POWER TERMINAL BLOCK WITH (2) #12 AND #12 GROUND. EXTEND (2)
#12 AND #12G IN 3/4"C FROM EWB TO AERATION CONTROL PANEL.
NO SCALE
B
E-03
INTERIOR PHOTO - (E) PUMP STATION CONTROL PANEL
1. CONTRACTOR SHALL EXTEND 1"C AND CONDUCTORS FROM NEW AERATION SYSTEM CONTROL PANEL TO NEW ENCLOSED CIRCUIT BREAKER AT PUMP STATION CONTROL PANEL. PROVIDE SEAL OFF FITTINGS AT EACH VERTICAL
RUN FROM UNDERGROUND PATHWAY.
2. CONTRACTORS SHALL EXTEND 3/4"C AND CONDUCTORS FROM EACH AERATION SYSTEM CP TO AERATION SYSTEM BLOWER MOTOR. PROVIDE RATED FLEXIBLE WHIP CONDUIT AT BLOWER AND SEAL OFF FITTING AT CONDUIT VERTICAL RUN BELOW CP. COORDINATE CONDUIT ROUTE TO AERATOR EQUIPMENT AND MAINTENANCE POINTS ON UNIT.
3. CONTRACTOR SHALL EXTEND 1"C AND FROM NEW VALVE/METER VAULT FOR RELOCATED FLOW METER TO PUMP STATION CONTROL PANEL REMOTE FLOW METER INDICATING TRANSMITTER. PROVIDE SEAL OFF FITTINGS AT EACH VERTICAL RUN FROM UNDER GROUND PATHWAY. THE CONTRACTOR SHALL ELECTRICALLY DISCONNECT EXISTING FLOW METER AT EXISTING VAULT FOR RELOCATION BY GC. RECONNECT ELECTRICALLY AT NEW VALVE/METER VAULT. CONTRACTOR SHALL REMOVE AND REUSE EXISTING FLOW METER CABLE AND INSTALL IN NEW CONDUIT PATHWAY FOR RELOCATED
METER.
4. CONTRACTOR SHALL ROUTE (4) #14 CU CONDUCTORS IN 3/4" C FROM AERATION BLOWER CP TO EXISTING DUPLEX PUMP
CONTROL PANEL FOR "PUMP RUN: INTERLOCK TO CP.
PLAN NOTES
SCALE: 1/8" = 1'-0"
UE
UE
UE
NOTE 2
NOTE 3
NOTE 1
ELECTRICAL SITE PLAN - HERTZOG PUMP STATION
NOTE 4
-2
7-
(E) A
S (E) FOR TYPE 'A' LIGHTS
(E) FOR TYPE 'B' LIGHTS
(E) WP
GFCI
(E) TIME SWITCH AND STARTER
(E) B
(E)
(E) PANEL 'L'
(E) TELEMETERING
ALARM EQUIPMENT
(E) DUPLEX PUMP CONTROL PANEL
M
(E) PUMP CONTROL PANEL CIRCUIT BREAKER
(E) 200 AMP, SELF-CONTAINED RATE METER
(E)
(E) TL
(E)
(E) MOTOR OPERATED INTAKE LOUVER
AND CONTROLS. SEE SCHEMATIC
(E) BATTERY CHARGER
(E) GRAVITY OPERATED
EXHAUST LOUVER
ELECTRICAL FLOOR PLAN - GLENN BROOK
SCALE: 1/4" = 1'-0"
(E) 5 KW UNIT HEATER
240V, 1Ø WITH CORD
AND CORD ASSEMBLY
S
AUTOMATIC TRANSFER SWITCH
50KW GENERATOR
L-21,23
WET WELL AERATION
BLOWER CP
(E) MAGMETER INDICATING
TRANSMITTER
ENVIREP PRO-AIR WET WELL
AERATION SYSTEM (2 H.P.)
MOUNTED ON CONCRETE PAD
(E) MAIN CIRCUIT BREAKER
(E) ODOR CONTROL
(E) GRAVITY OPERATED
EXHAUST LOUVER
EMERGENCY GENERATOR
MECHANICAL FLOOR PLAN - GLENN BROOK
SCALE: 1/4" = 1'-0"
(E) 5 KW UNIT HEATER 240V, 1Ø
WITH CORD AND CORD ASSEMBLY
(E) WATER CLOSET TO REMAIN
(E) MOP SINK TO REMAIN
(E) EYEWASH AND SHOWER TO REMAIN
1 1/2" FROM METER TO
APPLIANCE REGULATOR
REPLACE (E) METER FOR NEW
CONNECTED LOAD. COORDINATE
INSTALLATION WITH UGI. (6'-8" W.C.,
919 MBH CONNECTED LOAD, 25'-0"
DEVELOPED LENGTH)
(E) GAS UP TO UNIT HEATER
PROVIDE NEW MAXITROL
325-9 APPLIANCE REGULATOR
ANCHOR BOLTS
(TYPICAL)
FLEXIBLE FUEL LINES
GAS CONTROL VALVE
PRIMARY REGULATOR
MANUAL SHUT-OFF
VALVE
2'-0"
FINISHED GRADE
VENT LINE WITH INSECT
SCREEN ON OPEN END
FLEXIBLE EXHAUST CONNECTOR
ALUMINUM EXHAUST DUCT
GRAVITY EXHAUST LOUVER (ETR)
16" MAX.
BLACK IRON EXHAUST PIPE
NATURAL GAS EMERGENCY
GENERATOR
CONDENSATION TRAP
WITH PETCOCK DRAIN
PIPE ENLARGER
(IF REQIURED)
GAS CARBURETOR
SEAMLESS FLEXIBLE
EXHAUST TUBING
1/2" PETCOCK
DRAIN
" M
IN
SLOPE 1/4" PER FEET
30°
PIPE SLEEVE AND GUARD
METAL PIPE HANGER (TYPICAL)
2"x2"x1/4" ANGLE (TYPICAL)
2x6 (TYPICAL)
1200° INSULATION WRAPPED
AROUND MUFFLER AND PIPING
EXHAUST MUFFLER
NO SCALE
A
E-04
FUEL AND EXHAUST SYSTEM DETAIL GAS GENERATOR
HINGED ACCESS PANEL
FROM GAS METER
FU
6A
FU
6A
INTAKE DAMPER
LIMIT SWITCH
120V FROM A.T.S.
EMERG. SOURCEL-9
TD
TIME DELAY RELAY ADJ.
0-45 SEC. ON DELAY
CONTROL RELAY
D.P.D.T., 10 AMP
CONTACTS
INTAKE LOUVER
DAMPER MOTOR
(POWER OPEN,
SPRING CLOSE)
CR
CR
OPEN CLOSE
XO
THERMOSTAT
CLOSES ON
RISE IN TEMP.
70°-140° RANGE
- TERMINAL POINTS
CR
N
TD
TO ALARM PANEL
"GENERATOR LOUVER FAILURE"
SCALE: 3/4" = 1'-0"
B
E-04
EXISTING INTAKE LOUVER CONTROL SCHEMATIC
(E) DUPLEX
PUMP PANEL
PROVIDE
4#1/0, #6 GND
IN 1 1/2" C
4#14 IN 3/4" C FROM
AUXILLIARY CONTACTS ON
ATS TO ALARM PANEL FOR
POWER FAILURE ALARM
PROVIDE NEW 260A AUTOMATIC
TRANSFER SWITCH
(E) PANEL L
G2
NEW 50KW, 63KVA, 120/240V,
3PH, 4W GENERATOR AND
200A CIRCUIT BREAKERM
(E) 120/240V, 3PH,
4W SERVICE BY PPL
(E) 225AF/200AT 3P MAIN
CIRCUIT BREAKER TO REMAIN
EXTEND
EXISTING
WIRE/CONDUIT
3#4 + #8 GND IN
1 1/2" C
NEW PULL BOX
SIZED FOR TAP
(E) PPL METER
NO SCALE
C
E-04
ONE-LINE DIAGRAM
(E) CONDUCTOR CONDUIT
PROVIDE 4, #3/0,
#6 GND IN 2" C
SPD
(E)20HP
CP
AERATION
3#10, #10 GRD IN 3/4"C
2#10, #10 GRD
IN 3/4"C
NEW 30A
ECB
4#3/0, #6 GRD IN 2"C
(E) LOUVER
CONTROL PANEL
15A ECB
CP
2#14 IN 3/4"C FROM CP CTRL RELAY
TO INTAKE LOUVER CTRL "OPEN"
2#14 IN 3/4"C FROM CP CTRL RELAY
TO ALARM PANEL FOR GENERATOR
COMMON ALARM
(E)20HP
KEYED NOTES
1 CONTRACTOR SHALL DISCONNECT AND REMOVE EXISTING GENERATOR AND REPLACE WITH NEW GENERATOR AS SHOWN.
CONTRACTOR SHALL REVIEW EXISTING CONDITIONS WITH CONCRETE PAD, ELECTRICAL CONNECTIONS, AND CONDUIT ROUTES FOR COORDINATION WITH NEW GENERATOR AND ATS SWITCH REPLACEMENT IN SAME LOCATIONS. REUSE/REWORK EXISTING CONCRETE PAD FOR NEW GENERATOR OR REPLACE. COORDINATE ALL WORK WITH OWNER DURING CONSTRUCTION TO MINIMIZE OUTAGES AS PUMP STATION MUST REMAIN ONLINE DURING CONSTRUCTION.
2 CONTRACTOR SHALL DISCONNECT EXISTING EXHAUST DUCT SHEET METAL AND NATURAL GAS CONNECTIONS TO FACILITATE THE INSTALLATION OF THE NEW GENERATOR. PROVIDE NEW EXHAUST DUCT SHEET METAL AND FLEXIBLE CONNECTOR FROM NEW GENERATOR AS REQUIRED. PROVIDE NEW GAS PIPING AND CONNECTIONS AS SHOWN. PROVIDE
GENERATOR ENGINE EXHAUST PIPING AND INSULATION.
3 CONTRACTOR SHALL DISCONNECT AND REWORK EXISTING BATTERY CHARGING LEADS FROM FROM EXISTING GENERATOR
BATTERY CONNECTIONS AND RECONNECT TO NEW BATTERY ON NEW GENERATOR
4 CONTRACTORS SHALL EXTEND 3/4"C AND CONDUCTORS FROM EACH AERATION SYSTEM CP TO AERATION SYSTEM BLOWER MOTOR. PROVIDE RATED FLEXIBLE WHIP CONDUIT AT BLOWER AND SEAL OFF FITTING AT CONDUIT VERTICAL RUN BELOW CP. COORDINATE CONDUIT ROUTE TO AERATOR EQUIPMENT AND MAINTENANCE POINTS ON UNIT.
5 CONTRACTOR SHALL ROUTE (4) #14 CU CONDUCTORS IN 3/4" C FROM AERATION BLOWER CP TO EXISTING DUPLEX PUMP CONTROL PANEL FOR PUMP RUN: INTERLOCK TO CUP. AERATION CONTROL PANELS TO BE MOUNTED BY GC AND ALL
ELECTRICAL CONNECTIONS TO BE BY EC.
6 CONTRACTOR SHALL DISCONNECT ELECTRICAL OPERATOR AT EXISTING MOTOR OPERATED LOUVER ACTIVATOR FROM MOTORIZED LOUVER/DAMPER REPLACEMENT. CONTRACTOR SHALL RECONNECT NEW MOTOR OPERATED LOUVER
ACTIVATOR TO EXISTING CONTROL CIRCUIT. TEST ACTIVATION WITH EXISTING CONTROLS.
7 EC SHALL DISCONNECT, REMOVE AND DISPOSE OF THE EXISTING MOTOR OPERATED INTAKE LOUVER. EC SHALL REPLACE EXISTING MOTOR OPERATED INTAKE LOUVER, RUSKIN ELF375DX 47x57 OR EQUAL, WITH 120V MOTOR OPERATED DAMPER.
VERIFY EXACT SIZE IN FIELD. EC TO PROVIDE CONTROLS TO INTERLOCK INTAKE LOUVER OPEN WHEN GENERATOR IS
ENERGIZED.
8 CONTRACTOR SHALL DISCONNECT AND REMOVE AND DISPOSE OF SPD AND ASSOCIATED WIRE/CONDUIT BACK TO SOURCE.
PROVIDE AND CONNECT NEW SPD AS SHOWN.
-2
7-
(E) B
ELECTRICAL FLOOR PLAN - APRICOT
SCALE: 1/4" = 1'-0"
S (E) FOR TYPE 'A' LIGHTS
(E) FOR TYPE 'B' LIGHTS
(E) WP
GFCI
(E)
(E) PANEL 'L'
(E) TELEMETERING
ALARM EQUIPMENT
(E) DUPLEX PUMP CONTROL PANEL
M
(E) PUMP CONTROL PANEL CIRCUIT BREAKER
AUTOMATIC TRANSFER
SWITCH TO REPLACE EXISTING
(E) 200 AMP, SELF-CONTAINED RATE METER
(E)
(E) TL
(E)
(E) MOTOR OPERATED INTAKE LOUVER
AND CONTROLS. SEE SCHEMATIC
(E) BATTERY CHARGER
(E) GRAVITY OPERATED
EXHAUST LOUVER
(E) 7.5 KW UNIT HEATER
240V, 1Ø WITH CORD
AND CORD ASSEMBLY S
(E) ODOR CONTROL UNIT (BY GEN. CONT.)
(E) TIME SWITCH AND STARTER
50KW GENERATOR
L-17,19WET WELL AERATION
BLOWER CP
(E) MAGMETER INDICATING
TRANSMITTER3
(E) MAIN CIRCUIT BREAKER
MECHANICAL FLOOR PLAN - APRICOT
SCALE: 1/4" = 1'-0"
(E) GRAVITY OPERATED EXHAUST LOUVER
(E) 5 KW UNIT HEATER 240V, 1Ø WITH CORD
AND CORD ASSEMBLY
(E) TIME SWITCH AND STARTER
(E) MOP SINK TO REMAIN
(E) EMERGENCY EYEWASH
AND SHOWER TO REMAIN
(E) 30MBH UNIT HEATER TO REMAIN
(E) GAS UP TO UNIT HEATER
REPLACE (E) METER FOR NEW CONNECTED
LOAD. COORDINATE INSTALLATION WITH
UGI. (6"-8" W.C., 830 MBH CONNECTED LOAD,
25'-0" DEVELOPED LENGTH)
1 1/4" FROM METER TO
APPLIANCE REGULATOR
PROVIDE NEW MAXITROL 325-9
APPLIANCE REGULATOR
2 EMERGENCY GENERATOR
ANCHOR BOLTS
(TYPICAL)
FLEXIBLE FUEL LINES
GAS CONTROL VALVE
PRIMARY REGULATOR
MANUAL SHUT-OFF
VALVE
2'-0"
FINISHED GRADE
VENT LINE WITH INSECT
SCREEN ON OPEN END
FLEXIBLE EXHAUST CONNECTOR
ALUMINUM EXHAUST DUCT
GRAVITY EXHAUST LOUVER (ETR)
16" MAX.
BLACK IRON EXHAUST PIPE
NATURAL GAS EMERGENCY
GENERATOR
CONDENSATION TRAP
WITH PETCOCK DRAIN
PIPE ENLARGER
(IF REQIURED)
GAS CARBURETOR
SEAMLESS FLEXIBLE
EXHAUST TUBING
1/2" PETCOCK
DRAIN
" M
IN
SLOPE 1/4" PER FEET
30°
PIPE SLEEVE AND GUARD
METAL PIPE HANGER (TYPICAL)
2"x2"x1/4" ANGLE (TYPICAL)
2x6 (TYPICAL)
1200° INSULATION WRAPPED
AROUND MUFFLER AND PIPING
EXHAUST MUFFLER
NO SCALE
A
E-04
FUEL AND EXHAUST SYSTEM DETAIL GAS GENERATOR
HINGED ACCESS PANEL
FROM GAS METER
FU
6A
FU
6A
INTAKE DAMPER
LIMIT SWITCH
120V FROM A.T.S.
EMERG. SOURCEL-9
TD
TIME DELAY RELAY ADJ.
0-45 SEC. ON DELAY
CONTROL RELAY
D.P.D.T., 10 AMP
CONTACTS
INTAKE LOUVER
DAMPER MOTOR
(POWER OPEN,
SPRING CLOSE)
CR
CR
OPEN CLOSE
XO
THERMOSTAT
CLOSES ON
RISE IN TEMP.
70°-140° RANGE
- TERMINAL POINTS
CR
N
TD
TO ALARM PANEL
"GENERATOR LOUVER FAILURE"
SCALE: 3/4" = 1'-0"
B
E101
EXISTING INTAKE LOUVER CONTROL SCHEMATIC
(E) DUPLEX
PUMP PANEL
PROVIDE 4#1/0,
#6 GND IN 1 1/2"C
4#14 IN 3/4" C FROM
AUXILLIARY CONTACTS ON
ATS TO ALARM PANEL FOR
POWER FAILURE ALARM
PROVIDE NEW 260A
AUTOMATIC TRANSFER
SWITCH
(E) PANEL L
G1
NEW 50KW, 63KVA, 120/240V, 3PH, 4W
GENERATOR WITH CONTROLLER
PANEL AND 200A CIRCUIT BREAKERM
(E) 120/240V, 3PH,
4W SERVICE BY PPL
(E) 225AF/200AT 3P MAIN
CIRCUIT BREAKER TO REMAIN
EXTEND EXISTING
WIRE/CONDUIT 3#4 +
#8 GND IN 1 1/2" C
(E) PPL METER
(E) WIREWAY
NO SCALE
C
E101
ONE-LINE DIAGRAM
15HP15HP
(E) LOUVER
CONTROL
PANEL
15A ECB
SPD
30A ECB
CP
2#14 IN 3/4"C FROM CP CONTROL RELAY
TO INTAKE LOUVER CONTROL "OPEN"
2#14 IN 3/4"C FROM CP CONTROL RELAY TO
ALARM PANEL FOR GENERATOR COMMON ALARM
CP
AERATION
2#10, #10 GRD
IN 3/4"C
4#3/0, #6 GRD
IN 2"C
3 #10, #10 GRD
IN 3/4"C
4#3/0, #6 GRD IN 2"C
KEYED NOTES
1 CONTRACTOR SHALL DISCONNECT AND REMOVE EXISTING GENERATOR AND REPLACE WITH NEW GENERATOR AS SHOWN.
CONTRACTOR SHALL REVIEW EXISTING CONDITIONS WITH CONCRETE PAD, ELECTRICAL CONNECTIONS, AND CONDUIT ROUTES FOR COORDINATION WITH NEW GENERATOR AND ATS SWITCH REPLACEMENT IN SAME LOCATIONS. REUSE/REWORK EXISTING CONCRETE PAD FOR NEW GENERATOR OR REPLACE. COORDINATE ALL WORK WITH OWNER DURING CONSTRUCTION TO MINIMIZE OUTAGES AS PUMP STATION MUST REMAIN ONLINE DURING CONSTRUCTION.
2 CONTRACTOR SHALL DISCONNECT EXISTING EXHAUST DUCT SHEET METAL AND NATURAL GAS CONNECTIONS TO FACILITATE THE INSTALLATION OF THE NEW GENERATOR. PROVIDE NEW EXHAUST DUCT SHEET METAL AND FLEXIBLE CONNECTOR FROM NEW GENERATOR AS REQUIRED. PROVIDE NEW GAS PIPING AND CONNECTIONS AS SHOWN. PROVIDE
GENERATOR ENGINE EXHAUST PIPING AND INSULATION.
3 CONTRACTOR SHALL DISCONNECT AND REMOVE EXISTING MAG METER INDICATING TRANSMITTER AND INSTALL NEW
TRANSMITTER AND CONNECT AS PER MANUFACTURER'S DIRECTIONS
4 CONTRACTOR SHALL DISCONNECT AND REWORK EXISTING BATTERY CHARGER LEADS FROM EXISTING GENERATOR
BATTERY CONNECTIONS AND RECONNECT TO NEW BATTERY ON NEW GENERATOR
5 CONTRACTORS SHALL EXTEND 3/4"C AND CONDUCTORS FROM EACH AERATION SYSTEM CP TO AERATION SYSTEM BLOWER MOTOR. PROVIDE RATED FLEXIBLE WHIP CONDUIT BLOWER AND SEAL OFF FITTING AT CONDUIT VERTICAL RUN BELOW CP.
COORDINATE CONDUIT ROUTE TO AERATOR EQUIPMENT AND MAINTENANCE POINTS ON UNIT.
6 CONTRACTOR SHALL ROUTE (4) #14 CU CONDUCTORS IN 3/4" C FROM AERATION BLOWER CP TO EXISTING DUPLEX PUMP CONTROL PANEL FOR "PUMP RUN: INTERLOCK TO CP. AERATION CONTROL PANELS TO BE MOUNTED BY GC AND ALL
ELECTRICAL CONNECTIONS TO BE BY EC.
7 CONTRACTOR SHALL DISCONNECT ELECTRICAL OPERATOR AT EXISTING MOTOR OPERATED LOUVER ACTIVATOR FROM MOTORIZED LOUVER/DAMPER REPLACEMENT. CONTRACTOR SHALL RECONNECT NEW MOTOR OPERATED LOUVER
ACTIVATOR TO EXISTING CONTROL CIRCUIT. TEST ACTIVATION WITH EXISTING CONTROLS.
8 EC SHALL DISCONNECT, REMOVE AND DISPOSE OF THE EXISTING MOTOR OPERATED INTAKE LOUVER. EC SHALL REPLACE EXISTING MOTOR OPERATED INTAKE LOUVER, RUSKIN ELF375DX 47x51 OR EQUAL, WITH 120V MOTOR OPERATED DAMPER.
VERIFY EXACT SIZE IN FIELD. EC TO PROVIDE CONTROLS TO INTERLOCK INTAKE LOUVER OPEN WHEN GENERATOR IS
ENERGIZED.
9 CONTRACTOR SHALL DISCONNECT AND REMOVE AND DISPOSE OF SPD AND ASSOCIATED WIRE/CONDUIT BACK TO SOURCE.
PROVIDE AND CONNECT NEW SPD AS SHOWN.
-2
7-
1. CONTRACTOR SHALL EXTEND 1"C AND CONDUCTORS FROM NEW AERATION SYSTEM CONTROL PANEL TO PANEL L AND NEW CIRCUIT BREAKER AT PANEL. PROVIDE SEAL OFF FITTINGS AT EACH AT EACH VERTICAL RUN FROM UNDERGROUND PATHWAY.
2. CONTRACTORS SHALL EXTEND 3/4"C AND CONDUCTORS FROM EACH AERATION SYSTEM CP TO AERATION SYSTEM BLOWER MOTOR. PROVIDE RATED FLEXIBLE WHIP CONDUIT BLOWER AND SEAL OFF FITTING AT CONDUIT VERTICAL RUN BELOW CP.
COORDINATE CONDUIT ROUTE TO AERATOR EQUIPMENT AND MAINTENANCE POINTS ON UNIT.
PLAN NOTES
SCALE: 1/8" = 1'-0"
NOTE 2
NOTE 1
ELECTRICAL SITE PLAN - APRICOT PUMP STATION
-2
7-
File details come from the government source that posted it. Updated .