Phase I_Q. Project Information Summary Matrix.xls
XLS spreadsheet 207 KB Posted
- Attached to
- General Services Administration (GSA) seeks to Lease the Following Space: Solicitation No. 8KY2130
- Solicitation number
- 8KY2130
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Info Summary Matrix
| Offeror Name: | Project: 8KY2130, Louisville, KY | ||||||||
| This form will summarize the submitted, similar projects. Please complete the form in its entirety. | |||||||||
| Project Name | Name of (key) personnel involved | Role played in project (i.e. Offeror, Offeror PM, Arch LD, etc.) | Similar Type Project | Completed when? | Delivery Appproach?Design Build? Design-Bid-Build? Other? | Secure Facility | 70% Size of Requirement | Green Globes or LEED Certification Level, if any | |
| Yes | No |
&C&"Arial,Bold"&11PROJECT INFORMATION
SUMMARY MATRIX
Version 1.1 FY 2008 &LSFO No. ________ Dated ________ &C&P of &N&RInitials:______Lessor _______ Gov't
Non-Eval Personnel
| Offeror Name: | Project: 8KY2130, Louisville, KY | ||||||||
| This form will summarize the submitted, similar projects. Please complete the form in its entirety. | |||||||||
| Project Name | Name of Non-Evaluated Personnel Involved | Role played in project (i.e. GC's Super, Structural, Mechanical, Electrical, Security and Blast Engineers, Sustainability Professional) | Similar Type Project | Completed When? | Delivery Appproach?Design Build? Design-Bid-Build? Other? | Secure Facility | 70% Size of Requirement? | Green Globes or LEED Certification Level, if any | |
| Yes | No |
&CProject Summary Non-Evaluated Personnel
Offeror
| Project 1 | ||||
| Gov't Use Only | ||||
| Project Name | ||||
| Project Address | ||||
| City and State | ||||
| Design Build | Yes | No | ||
| Key Team Members Names and Phone Numbers for Referenced Project | ||||
| Owner/Developer | ||||
| Principal-In-Charge (PIC) | ||||
| Project Manager (PM) | ||||
| Architectural or Architectural/Engineering Firm | ||||
| Lead Designer (LD) | ||||
| Project Architect (PA) | ||||
| General Contractor (GC) | ||||
| GC Project Manager (GCPM) | ||||
| Quality Control Manager (QCM) | ||||
| Size of Project | Square Footage | Dollar Amount | ||
| Type of Project | ||||
| Number of Stories | ||||
| Date Design Started | ||||
| Date Design Completed | ||||
| Date Construction Started | ||||
| Date Construction Completed | ||||
| Do you still own this property | Yes | No | ||
| Client/User Initial Construction Budget | ||||
| Construction Award Amount | ||||
| Number of Owner-Initiated Change Orders | ||||
| Number of Contractor-Initiated Change Orders | ||||
| Final Construction Cost | ||||
| NOTE: THE REFERENCES PROVIDED BELOW SHALL MATCH THE REFERENCES RECEIVED BY GOVERNMENT | ||||
| Reference 1 | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| Reference 2 | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| Financial Reference for the project | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| *PROPOSED TEAM MEMBERS FOR THIS RLP CANNOT BE REFERENCES FOR THE ABOVE PROJECT. | ||||
| NOTE: RESPONDENTS MAY EXPAND THIS FORMAT TO INCLUDE ROOM FOR LENGTHIER RESPONSES, BUT THE FORMAT MUST FOLLOW THE ISSUES IN THE NUMERIC ORDER LISTED BELOW. FAILURE TO PROVIDE THE INFORMATION IN THE FORMAT BELOW WILL RESULT IN A LOWER TECHNICAL SCORE ON THE EXPERIENCE EVALUATION. DUPLICATE THESE PAGES AS NECESSARY FOR EACH PROJECT. | ||||
| The Offeror shall address the following issues on each referenced project: | ||||
| 1. Provide a brief summary of primary responsibilities for the referenced project. | ||||
| 2. Describe how the reference project was similar in scope to the project description for this requirement. | ||||
| 3. Describe the type of building occupancy of this project. | ||||
| 4. Describe unanticipated problems among project team members or during project delivery and explain how they were resolved. | ||||
| 5. Were there any problems regarding project costs, milestones or overall schedule? | ||||
| 6. Discuss the type of financing of the referenced project. | ||||
| 7. Describe problems associated with change orders. | ||||
| 8. Describe any claims or liens filed in connection with the project, including basis and result. | ||||
| 9. Identify what went wrong during design and construction for the project under consideration, what could have been done to avoid it, and what could have been done or was done to mitigate problems that resulted. | ||||
| 10. Has this building received any awards or recognition? | ||||
| 11. Is this a Green Globes or LEED project? If yes, provide the level of certification. Explain key sustainability features. | ||||
| Up to three 8" x10" illustrations (photographs, drawings, computer generated art) may be used to illustrate each project. These can be before-and after shots, interiors, elevations, sections, or other visual descriptions of project quality. | ||||
| Project 2 | ||||
| Gov't Use Only | ||||
| Project Name | ||||
| Project Address | ||||
| City and State | ||||
| Design Build | Yes | No | ||
| Key Team Members Names and Phone Numbers for Referenced Project | ||||
| Owner/Developer | ||||
| Principal-In-Charge (PIC) | ||||
| Project Manager (PM) | ||||
| Architectural or Architectural/Engineering Firm | ||||
| Lead Designer (LD) | ||||
| Project Architect (PA) | ||||
| General Contractor (GC) | ||||
| GC Project Manager (GCPM) | ||||
| Quality Control Manager (QCM) | ||||
| Size of Project | Square Footage | Dollar Amount | ||
| Type of Project | ||||
| Number of Stories | ||||
| Date Design Started | ||||
| Date Design Completed | ||||
| Date Construction Started | ||||
| Date Construction Completed | ||||
| Do you still own this property | Yes | No | ||
| Client/User Initial Construction Budget | ||||
| Construction Award Amount | ||||
| Number of Owner-Initiated Change Orders | ||||
| Number of Contractor-Initiated Change Orders | ||||
| Final Construction Cost | ||||
| NOTE: THE REFERENCES PROVIDED BELOW SHALL MATCH THE REFERENCES RECEIVED BY GOVERNMENT | ||||
| Reference 1 | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| Reference 2 | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| Financial Reference for the project | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| *PROPOSED TEAM MEMBERS FOR THIS RLP CANNOT BE REFERENCES FOR THE ABOVE PROJECT. | ||||
| NOTE: RESPONDENTS MAY EXPAND THIS FORMAT TO INCLUDE ROOM FOR LENGTHIER RESPONSES, BUT THE FORMAT MUST FOLLOW THE ISSUES IN THE NUMERIC ORDER LISTED BELOW. FAILURE TO PROVIDE THE INFORMATION IN THE FORMAT BELOW WILL RESULT IN A LOWER TECHNICAL SCORE ON THE EXPERIENCE EVALUATION. DUPLICATE THESE PAGES AS NECESSARY FOR EACH PROJECT. | ||||
| The Offeror shall address the following issues on each referenced project: | ||||
| 1. Provide a brief summary of primary responsibilities for the referenced project. | ||||
| 2. Describe how the reference project was similar in scope to the project description for this requirement. | ||||
| 3. Describe the type of building occupancy of this project. | ||||
| 4. Describe unanticipated problems among project team members or during project delivery and explain how they were resolved. | ||||
| 5. Were there any problems regarding project costs, milestones or overall schedule? | ||||
| 6. Discuss the type of financing of the referenced project. | ||||
| 7. Describe problems associated with change orders. | ||||
| 8. Describe any claims or liens filed in connection with the project, including basis and result. | ||||
| 9. Identify what went wrong during design and construction for the project under consideration, what could have been done to avoid it, and what could have been done or was done to mitigate problems that resulted. | ||||
| 10. Has this building received any awards or recognition? | ||||
| 11. Is this a Green Globes or LEED project? If yes, provide the level of certification. Explain key sustainability features. | ||||
| Up to three 8" x10" illustrations (photographs, drawings, computer generated art) may be used to illustrate each project. These can be before-and after shots, interiors, elevations, sections, or other visual descriptions of project quality. |
&CProject Information Developer
PIC
| Project 1 | Gov't Use Only | |||
| Project Name | ||||
| Project Address | ||||
| City and State | ||||
| Design Build | Yes | No | ||
| Key Team Members Names and Phone Numbers for Referenced Project | ||||
| Owner/Developer | ||||
| Principal-In-Charge (PIC) | ||||
| Project Manager (PM) | ||||
| Architectural or Architectural/Engineering Firm | ||||
| Lead Designer (LD) | ||||
| Project Architect (PA) | ||||
| General Contractor (GC) | ||||
| GC Project Manager (GCPM) | ||||
| Quality Control Manager (QCM) | ||||
| Size of Project | Square Footage | Dollar Amount | ||
| Type of Project | ||||
| Number of Stories | ||||
| Date Design Started | ||||
| Date Design Completed | ||||
| Date Construction Started | ||||
| Date Construction Completed | ||||
| Do you still own this property | Yes | No | ||
| Client/User Initial Construction Budget | ||||
| Construction Award Amount | ||||
| Number of Owner-Initiated Change Orders | ||||
| Number of Contractor-Initiated Change Orders | ||||
| Final Construction Cost | ||||
| NOTE: THE REFERENCES PROVIDED BELOW SHALL MATCH THE REFERENCES RECEIVED BY GOVERNMENT | ||||
| Reference 1 | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| Reference 2 | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| Financial Reference for the project | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| *PROPOSED TEAM MEMBERS FOR THIS RLP CANNOT BE REFERENCES FOR THE ABOVE PROJECT. | ||||
| NOTE: RESPONDENTS MAY EXPAND THIS FORMAT TO INCLUDE ROOM FOR LENGTHIER RESPONSES, BUT THE FORMAT MUST FOLLOW THE ISSUES IN THE NUMERIC ORDER LISTED BELOW. FAILURE TO PROVIDE THE INFORMATION IN THE FORMAT BELOW WILL RESULT IN A LOWER TECHNICAL SCORE ON THE EXPERIENCE EVALUATION. DUPLICATE THESE PAGES AS NECESSARY FOR EACH PROJECT. | ||||
| The Principle-in-Charge shall address the following issues on each referenced project: | ||||
| 1. Provide a brief summary of primary responsibilities for the referenced project. | ||||
| 2. Describe how the reference project was similar in scope to the project description for this requirement. | ||||
| 3. Describe the type of building occupancy of this project. | ||||
| 4. Describe unanticipated problems among project team members or during project delivery and explain how they were resolved. | ||||
| 5. Were there any problems regarding project costs, milestones or overall schedule? | ||||
| 6. Discuss the type of financing of the referenced project. | ||||
| 7. Describe problems associated with change orders. | ||||
| 8. Describe any claims or liens filed in connection with the project, including basis and result. | ||||
| 9. Identify what went wrong during design and construction for the project under consideration, what could have been done to avoid it, and what could have been done or was done to mitigate problems that resulted. | ||||
| 10. Has this building received any awards or recognition? | ||||
| 11. Is this a Green Globes or LEED project? If yes, provide the level of certification. Explain key sustainability features. | ||||
| Up to three 8" x10" illustrations (photographs, drawings, computer generated art) may be used to illustrate each project. These can be before-and after shots, interiors, elevations, sections, or other visual descriptions of project quality. | ||||
| Project 2 | Gov't Use Only | |||
| Project Name | ||||
| Project Address | ||||
| City and State | ||||
| Design Build | Yes | No | ||
| Key Team Members Names and Phone Numbers for Referenced Project | ||||
| Owner/Developer | ||||
| Principal-In-Charge (PIC) | ||||
| Project Manager (PM) | ||||
| Architectural or Architectural/Engineering Firm | ||||
| Lead Designer (LD) | ||||
| Project Architect (PA) | ||||
| General Contractor (GC) | ||||
| GC Project Manager (GCPM) | ||||
| Quality Control Manager (QCM) | ||||
| Size of Project | Square Footage | Dollar Amount | ||
| Type of Project | ||||
| Number of Stories | ||||
| Date Design Started | ||||
| Date Design Completed | ||||
| Date Construction Started | ||||
| Date Construction Completed | ||||
| Do you still own this property | Yes | No | ||
| Client/User Initial Construction Budget | ||||
| Construction Award Amount | ||||
| Number of Owner-Initiated Change Orders | ||||
| Number of Contractor-Initiated Change Orders | ||||
| Final Construction Cost | ||||
| NOTE: THE REFERENCES PROVIDED BELOW SHALL MATCH THE REFERENCES RECEIVED BY GOVERNMENT | ||||
| Reference 1 | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| Reference 2 | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| Financial Reference for the project | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| *PROPOSED TEAM MEMBERS FOR THIS RLP CANNOT BE REFERENCES FOR THE ABOVE PROJECT. | ||||
| NOTE: RESPONDENTS MAY EXPAND THIS FORMAT TO INCLUDE ROOM FOR LENGTHIER RESPONSES, BUT THE FORMAT MUST FOLLOW THE ISSUES IN THE NUMERIC ORDER LISTED BELOW. FAILURE TO PROVIDE THE INFORMATION IN THE FORMAT BELOW WILL RESULT IN A LOWER TECHNICAL SCORE ON THE EXPERIENCE EVALUATION. DUPLICATE THESE PAGES AS NECESSARY FOR EACH PROJECT. | ||||
| The Principle-in-Charge shall address the following issues on each referenced project: | ||||
| 1. Provide a brief summary of primary responsibilities for the referenced project. | ||||
| 2. Describe how the reference project was similar in scope to the project description for this requirement. | ||||
| 3. Describe the type of building occupancy of this project. | ||||
| 4. Describe unanticipated problems among project team members or during project delivery and explain how they were resolved. | ||||
| 5. Were there any problems regarding project costs, milestones or overall schedule? | ||||
| 6. Discuss the type of financing of the referenced project. | ||||
| 7. Describe problems associated with change orders. | ||||
| 8. Describe any claims or liens filed in connection with the project, including basis and result. | ||||
| 9. Identify what went wrong during design and construction for the project under consideration, what could have been done to avoid it, and what could have been done or was done to mitigate problems that resulted. | ||||
| 10. Has this building received any awards or recognition? | ||||
| 11. Is this a Green Globes or LEED project? If yes, provide the level of certification. Explain key sustainability features. | ||||
| Up to three 8" x10" illustrations (photographs, drawings, computer generated art) may be used to illustrate each project. These can be before-and after shots, interiors, elevations, sections, or other visual descriptions of project quality. |
&C&"Arial,Bold"&11PROJECT INFORMATION
OFFEROR/DEVELOPER
(Principle-in-Charge) &LInitials: __________ & __________ Lessor Gov't&C&P of &N
PM
| Project 1 | Gov't Use Only | |||
| Project Name | ||||
| Project Address | ||||
| City and State | ||||
| Design Build | Yes | No | ||
| Key Team Members Names and Phone Numbers for Referenced Project | ||||
| Owner/Developer | ||||
| Principal-In-Charge (PIC) | ||||
| Project Manager (PM) | ||||
| Architectural or Architectural/Engineering Firm | ||||
| Lead Designer (LD) | ||||
| Project Architect (PA) | ||||
| General Contractor (GC) | ||||
| GC Project Manager (GCPM) | ||||
| Quality Control Manager (QCM) | ||||
| Size of Project | Square Footage | Dollar Amount | ||
| Type of Project | ||||
| Number of Stories | ||||
| Date Design Started | ||||
| Date Design Completed | ||||
| Date Construction Started | ||||
| Date Construction Completed | ||||
| Client/User Initial Construction Budget | ||||
| Construction Award Amount | ||||
| Number of Owner-Initiated Change Orders | ||||
| Number of Contractor-Initiated Change Orders | ||||
| Final Construction Cost | ||||
| NOTE: THE REFERENCES PROVIDED BELOW SHALL MATCH THE REFERENCES RECEIVED THE GOVERNMENT | ||||
| Reference 1 | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| Reference 2 | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| Financial Reference for the project | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| *PROPOSED TEAM MEMBERS FOR THIS RLP CANNOT BE REFERENCES FOR THE ABOVE PROJECT. | ||||
| NOTE: RESPONDENTS MAY EXPAND THIS FORMAT TO INCLUDE ROOM FOR LENGTHIER RESPONSES, BUT THE FORMAT MUST FOLLOW THE ISSUES IN THE NUMERIC ORDER LISTED BELOW. FAILURE TO PROVIDE THE INFORMATION IN THE FORMAT BELOW WILL RESULT IN A LOWER TECHNICAL SCORE ON THE EXPERIENCE EVALUATION. DUPLICATE THESE PAGES AS NECESSARY FOR EACH PROJECT. | ||||
| The Project Manager shall address the following issues on each referenced project: | ||||
| 1. Provide a brief summary of primary responsibilities for the referenced project. | ||||
| 2. Describe how the reference project was similar in scope to the project description for this requirement. | ||||
| 3. Describe the type of building occupancy of this project. | ||||
| 4. Describe unanticipated problems among project team members or during project delivery and explain how they were resolved. | ||||
| 5. Describe problems associated with change orders. | ||||
| 6. Were there any problems regarding project costs, milestones or overall schedule? | ||||
| 7. Describe any claims or liens filed in connection with the project, including basis and result. | ||||
| 9. Identify what went wrong during design and construction for the project under consideration, what could have been done to avoid it, and what could have been done or was done to mitigate problems that resulted. | ||||
| 9. Has this building received any awards or recognition? | ||||
| 10. Is this a Green Globes or LEED project? If yes, provide the level of certification. Explain key sustainability features. | ||||
| Up to three 8" x10" illustrations (photographs, drawings, computer generated art) may be used to illustrate each project. These can be before-and after shots, interiors, elevations, sections, or other visual descriptions of project quality. | ||||
| Project 2 | Gov't Use Only | |||
| Project Name | ||||
| Project Address | ||||
| City and State | ||||
| Design Build | Yes | No | ||
| Key Team Members Names and Phone Numbers for Referenced Project | ||||
| Owner/Developer | ||||
| Principal-In-Charge (PIC) | ||||
| Project Manager (PM) | ||||
| Architectural or Architectural/Engineering Firm | ||||
| Lead Designer (LD) | ||||
| Project Architect (PA) | ||||
| General Contractor (GC) | ||||
| GC Project Manager (GCPM) | ||||
| Quality Control Manager (QCM) | ||||
| Size of Project | Square Footage | Dollar Amount | ||
| Type of Project | ||||
| Number of Stories | ||||
| Date Design Started | ||||
| Date Design Completed | ||||
| Date Construction Started | ||||
| Date Construction Completed | ||||
| Client/User Initial Construction Budget | ||||
| Construction Award Amount | ||||
| Number of Owner-Initiated Change Orders | ||||
| Number of Contractor-Initiated Change Orders | ||||
| Final Construction Cost | ||||
| NOTE: THE REFERENCES PROVIDED BELOW SHALL MATCH THE REFERENCES RECEIVED THE GOVERNMENT | ||||
| Reference 1 | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| Reference 2 | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| Financial Reference for the project | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| *PROPOSED TEAM MEMBERS FOR THIS RLP CANNOT BE REFERENCES FOR THE ABOVE PROJECT. | ||||
| NOTE: RESPONDENTS MAY EXPAND THIS FORMAT TO INCLUDE ROOM FOR LENGTHIER RESPONSES, BUT THE FORMAT MUST FOLLOW THE ISSUES IN THE NUMERIC ORDER LISTED BELOW. FAILURE TO PROVIDE THE INFORMATION IN THE FORMAT BELOW WILL RESULT IN A LOWER TECHNICAL SCORE ON THE EXPERIENCE EVALUATION. DUPLICATE THESE PAGES AS NECESSARY FOR EACH PROJECT. | ||||
| The Project Manager shall address the following issues on each referenced project: | ||||
| 1. Provide a brief summary of primary responsibilities for the referenced project. | ||||
| 2. Describe how the reference project was similar in scope to the project description for this requirement. | ||||
| 3. Describe the type of building occupancy of this project. | ||||
| 4. Describe unanticipated problems among project team members or during project delivery and explain how they were resolved. | ||||
| 5. Describe problems associated with change orders. | ||||
| 6. Were there any problems regarding project costs, milestones or overall schedule? | ||||
| 7. Describe any claims or liens filed in connection with the project, including basis and result. | ||||
| 9. Identify what went wrong during design and construction for the project under consideration, what could have been done to avoid it, and what could have been done or was done to mitigate problems that resulted. | ||||
| 9. Has this building received any awards or recognition? | ||||
| 10. Is this a Green Globes or LEED project? If yes, provide the level of certification. Explain key sustainability features. | ||||
| Up to three 8" x10" illustrations (photographs, drawings, computer generated art) may be used to illustrate each project. These can be before-and after shots, interiors, elevations, sections, or other visual descriptions of project quality. |
&C&"Arial,Bold"&11PROJECT INFORMATION
PROJECT MANAGER
&LInitials: __________ & __________ Lessor Gov't&C&P of &N
Arch or AE Firm
| THE PROJECT DISCUSSED BELOW MUST BE DIRECTLY ATTRIBUTIBLE TO THE ARCHITECTURAL or ARCHITECTURAL/ENGINEERING FIRM. | ||||
| Project 1 | Gov't Use Only | |||
| Project Name | ||||
| Project Address | ||||
| City and State | ||||
| Design Build | Yes | No | ||
| Key Team Members Names and Phone Numbers for Referenced Project | ||||
| Owner/Developer | ||||
| Principal-In-Charge (PIC) | ||||
| Project Manager (PM) | ||||
| Architectural or Architectural/Engineering Firm | ||||
| Lead Designer (LD) | ||||
| Project Architect (PA) | ||||
| General Contractor (GC) | ||||
| GC Project Manager (GCPM) | ||||
| Quality Control Manager (QCM) | ||||
| Size of Project | Square Footage | Dollar Amount | ||
| Type of Project | ||||
| Number of Stories | ||||
| Date Design Started | ||||
| Date Design Completed | ||||
| Date Construction Started | ||||
| Date Construction Completed | ||||
| Client/User Initial Construction Budget | ||||
| Construction Award Amount | ||||
| Number of Owner-Initiated Change Orders | ||||
| Number of Contractor-Initiated Change Orders | ||||
| Number of Architectural Drawings Change Orders | ||||
| Final Construction Cost | ||||
| NOTE: THE REFERENCES PROVIDED BELOW SHALL MATCH THE REFERENCES RECEIVED THE GOVERNMENT | ||||
| Reference 1 | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| Reference 2 | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| *PROPOSED TEAM MEMBERS FOR THIS RLP CANNOT BE REFERENCES FOR THE ABOVE PROJECT. | ||||
| NOTE: RESPONDENTS MAY EXPAND THIS FORMAT TO INCLUDE ROOM FOR LENGTHIER RESPONSES, BUT THE FORMAT MUST FOLLOW THE ISSUES IN THE NUMERIC ORDER LISTED BELOW. FAILURE TO PROVIDE THE INFORMATION IN THE FORMAT BELOW WILL RESULT IN A LOWER TECHNICAL SCORE ON THE EXPERIENCE EVALUATION. DUPLICATE THESE PAGES AS NECESSARY FOR EACH PROJECT. | ||||
| The Architectural or A/E Firm shall address the following issues on the above referenced project: | ||||
| 1. Provide a brief summary of primary responsibilities for the referenced project. | ||||
| 2. Describe the design philosophy used to meet the goals and objectives of the client and how you met the clients requirements and needs. Were the clients' objectives accomplished? | ||||
| 3. Describe how the referenced project was similar in scope to the project description for this requirement. | ||||
| 4. Discuss any impacts to the design caused by design changes. How did these changes impact the design or construction schedule? | ||||
| 5. Describe how you assured that designs for all disciplines were coordinated. | ||||
| 6. How frequently did you visit the site and what were the results of site visits? | ||||
| 7. Is this a Green Globes or LEED project? If yes, provide the level of certification. Explain key sustainability features. | ||||
| 8. Identify what went wrong during design and construction for the project under consideration, what could have been done to avoid it, and what could have been done or was done to mitigate problems that resulted. | ||||
| Up to three 8"x10" illustrations (photographs, drawings, computer generated art) may be used to illustrate each project. These can be before-and after shots, interiors, elevations, sections, or other visual descriptions of project quality. | ||||
| THE PROJECT DISCUSSED BELOW MUST BE DIRECTLY ATTRIBUTIBLE TO THE ARCHITECTURAL or ARCHITECTURAL/ENGINEERING FIRM. | ||||
| Project 2 | Gov't Use Only | |||
| Project Name | ||||
| Project Address | ||||
| City and State | ||||
| Design Build | Yes | No | ||
| Key Team Members Names and Phone Numbers for Referenced Project | ||||
| Owner/Developer | ||||
| Principal-In-Charge (PIC) | ||||
| Project Manager (PM) | ||||
| Architectural or Architectural/Engineering Firm | ||||
| Lead Designer (LD) | ||||
| Project Architect (PA) | ||||
| General Contractor (GC) | ||||
| GC Project Manager (GCPM) | ||||
| Quality Control Manager (QCM) | ||||
| Size of Project | Square Footage | Dollar Amount | ||
| Type of Project | ||||
| Number of Stories | ||||
| Date Design Started | ||||
| Date Design Completed | ||||
| Date Construction Started | ||||
| Date Construction Completed | ||||
| Client/User Initial Construction Budget | ||||
| Construction Award Amount | ||||
| Number of Owner-Initiated Change Orders | ||||
| Number of Contractor-Initiated Change Orders | ||||
| Number of Architectural Drawings Change Orders | ||||
| Final Construction Cost | ||||
| NOTE: THE REFERENCES PROVIDED BELOW SHALL MATCH THE REFERENCES RECEIVED THE GOVERNMENT | ||||
| Reference 1 | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| Reference 2 | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| *PROPOSED TEAM MEMBERS FOR THIS RLP CANNOT BE REFERENCES FOR THE ABOVE PROJECT. | ||||
| NOTE: RESPONDENTS MAY EXPAND THIS FORMAT TO INCLUDE ROOM FOR LENGTHIER RESPONSES, BUT THE FORMAT MUST FOLLOW THE ISSUES IN THE NUMERIC ORDER LISTED BELOW. FAILURE TO PROVIDE THE INFORMATION IN THE FORMAT BELOW WILL RESULT IN A LOWER TECHNICAL SCORE ON THE EXPERIENCE EVALUATION. DUPLICATE THESE PAGES AS NECESSARY FOR EACH PROJECT. | ||||
| The Architectural or A/E Firm shall address the following issues on the above referenced project: | ||||
| 1. Provide a brief summary of primary responsibilities for the referenced project. | ||||
| 2. Describe the design philosophy used to meet the goals and objectives of the client and how you met the clients requirements and needs. Were the clients' objectives accomplished? | ||||
| 3. Describe how the referenced project was similar in scope to the project description for this requirement. | ||||
| 4. Discuss any impacts to the design caused by design changes. How did these changes impact the design or construction schedule? | ||||
| 5. Describe how you assured that designs for all disciplines were coordinated. | ||||
| 6. How frequently did you visit the site and what were the results of site visits? | ||||
| 7. Is this a Green Globes or LEED project? If yes, provide the level of certification. Explain key sustainability features. | ||||
| 8. Identify what went wrong during design and construction for the project under consideration, what could have been done to avoid it, and what could have been done or was done to mitigate problems that resulted. | ||||
| Up to three 8"x10" illustrations (photographs, drawings, computer generated art) may be used to illustrate each project. These can be before-and after shots, interiors, elevations, sections, or other visual descriptions of project quality. |
&CProject Information Architectural/Engineering Firm
LD
| THE PROJECT DISCUSSED BELOW MUST BE DIRECTLY ATTRIBUTIBLE TO THE PROPOSED LEAD DESIGNER. | ||||
| Project 1 | Gov't Use Only | |||
| Project Name | ||||
| Project Address | ||||
| City and State | ||||
| Design Build | Yes | No | ||
| Key Team Members Names and Phone Numbers for Referenced Project | ||||
| Owner/Developer | ||||
| Principal-In-Charge (PIC) | ||||
| Project Manager (PM) | ||||
| Architectural or Architectural/Engineering Firm | ||||
| Lead Designer (LD) | ||||
| Project Architect (PA) | ||||
| General Contractor (GC) | ||||
| GC Project Manager (GCPM) | ||||
| Quality Control Manager (QCM) | ||||
| Size of Project | Square Footage | Dollar Amount | ||
| Type of Project | ||||
| Number of Stories | ||||
| Date Design Started | ||||
| Date Design Completed | ||||
| Date Construction Started | ||||
| Date Construction Completed | ||||
| Client/User Initial Construction Budget | ||||
| Construction Award Amount | ||||
| Number of Owner-Initiated Change Orders | ||||
| Number of Contractor-Initiated Change Orders | ||||
| Number of Architectural Drawings Change Orders | ||||
| Final Construction Cost | ||||
| NOTE: THE REFERENCES PROVIDED BELOW SHALL MATCH THE REFERENCES RECEIVED THE GOVERNMENT | ||||
| Reference 1 | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| Reference 2 | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| *PROPOSED TEAM MEMBERS FOR THIS RLP CANNOT BE REFERENCES FOR THE ABOVE PROJECT. | ||||
| NOTE: RESPONDENTS MAY EXPAND THIS FORMAT TO INCLUDE ROOM FOR LENGTHIER RESPONSES, BUT THE FORMAT MUST FOLLOW THE ISSUES IN THE NUMERIC ORDER LISTED BELOW. FAILURE TO PROVIDE THE INFORMATION IN THE FORMAT BELOW WILL RESULT IN A LOWER TECHNICAL SCORE ON THE EXPERIENCE EVALUATION. DUPLICATE THESE PAGES AS NECESSARY FOR EACH PROJECT. | ||||
| The Lead Designer shall address the following issues on the above referenced project: | ||||
| 1. Provide a clear statement of the Lead Designer's duties and responsibilities on the referenced project. | ||||
| 2. Describe the design philosophy used to meet the goals and objectives of the client and how you met the clients requirements and needs. Were the clients' objectives accomplished? | ||||
| 3. Describe how the referenced project was similar in scope to the project description for this requirement. | ||||
| 4. Discuss any impacts to the design caused by design changes. How did these changes impact the design or construction schedule? | ||||
| 5. Describe how you assured that designs for all disciplines were coordinated. | ||||
| 6. How frequently did you visit the site and what were the results of site visits? | ||||
| 7. Is this a Green Globes or LEED project? If yes, provide the level of certification. Explain key sustainability features. | ||||
| 8. Identify what went wrong during design and construction for the project under consideration, what could have been done to avoid it, and what could have been done or was done to mitigate problems that resulted. | ||||
| Up to three 8"x10" illustrations (photographs, drawings, computer generated art) may be used to illustrate each project. These can be before-and after shots, interiors, elevations, sections, or other visual descriptions of project quality. | ||||
| THE PROJECT DISCUSSED BELOW MUST BE DIRECTLY ATTRIBUTIBLE TO THE PROPOSED LEAD DESIGNER. | ||||
| Project 2 | Gov't Use Only | |||
| Project Name | ||||
| Project Address | ||||
| City and State | ||||
| Design Build | Yes | No | ||
| Key Team Members Names and Phone Numbers for Referenced Project | ||||
| Owner/Developer | ||||
| Principal-In-Charge (PIC) | ||||
| Project Manager (PM) | ||||
| Architectural or Architectural/Engineering Firm | ||||
| Lead Designer (LD) | ||||
| Project Architect (PA) | ||||
| General Contractor (GC) | ||||
| GC Project Manager (GCPM) | ||||
| Quality Control Manager (QCM) | ||||
| Size of Project | Square Footage | Dollar Amount | ||
| Type of Project | ||||
| Number of Stories | ||||
| Date Design Started | ||||
| Date Design Completed | ||||
| Date Construction Started | ||||
| Date Construction Completed | ||||
| Client/User Initial Construction Budget | ||||
| Construction Award Amount | ||||
| Number of Owner-Initiated Change Orders | ||||
| Number of Contractor-Initiated Change Orders | ||||
| Number of Architectural Drawings Change Orders | ||||
| Final Construction Cost | ||||
| NOTE: THE REFERENCES PROVIDED BELOW SHALL MATCH THE REFERENCES RECEIVED THE GOVERNMENT | ||||
| Reference 1 | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| Reference 2 | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| *PROPOSED TEAM MEMBERS FOR THIS RLP CANNOT BE REFERENCES FOR THE ABOVE PROJECT. | ||||
| NOTE: RESPONDENTS MAY EXPAND THIS FORMAT TO INCLUDE ROOM FOR LENGTHIER RESPONSES, BUT THE FORMAT MUST FOLLOW THE ISSUES IN THE NUMERIC ORDER LISTED BELOW. FAILURE TO PROVIDE THE INFORMATION IN THE FORMAT BELOW WILL RESULT IN A LOWER TECHNICAL SCORE ON THE EXPERIENCE EVALUATION. DUPLICATE THESE PAGES AS NECESSARY FOR EACH PROJECT. | ||||
| The Lead Designer shall address the following issues on the above referenced project: | ||||
| 1. Provide a clear statement of the Lead Designer's duties and responsibilities on the referenced project. | ||||
| 2. Describe the design philosophy used to meet the goals and objectives of the client and how you met the clients requirements and needs. Were the clients' objectives accomplished? | ||||
| 3. Describe how the referenced project was similar in scope to the project description for this requirement. | ||||
| 4. Discuss any impacts to the design caused by design changes. How did these changes impact the design or construction schedule? | ||||
| 5. Describe how you assured that designs for all disciplines were coordinated. | ||||
| 6. How frequently did you visit the site and what were the results of site visits? | ||||
| 7. Is this a Green Globes or LEED project? If yes, provide the level of certification. Explain key sustainability features. | ||||
| 8. Identify what went wrong during design and construction for the project under consideration, what could have been done to avoid it, and what could have been done or was done to mitigate problems that resulted. | ||||
| Up to three 8"x10" illustrations (photographs, drawings, computer generated art) may be used to illustrate each project. These can be before-and after shots, interiors, elevations, sections, or other visual descriptions of project quality. |
&C&"Arial,Bold"&11PROJECT INFORMATION
LEAD DESIGNER
&LInitials: __________ & __________ Lessor Gov't&C&P of &N
PA
| THE PROJECT DISCUSSED BELOW MUST BE DIRECTLY ATTRIBUTIBLE TO THE PROPOSED PROJECT ARCHITECT | ||||
| Project 1 | Gov't Use Only | |||
| Project Name | ||||
| Project Address | ||||
| City and State | ||||
| Design Build | Yes | No | ||
| Key Team Members Names and Phone Numbers for Referenced Project | ||||
| Owner/Developer | ||||
| Principal-In-Charge (PIC) | ||||
| Project Manager (PM) | ||||
| Architectural or Architectural/Engineering Firm | ||||
| Lead Designer (LD) | ||||
| Project Architect (PA) | ||||
| General Contractor (GC) | ||||
| GC Project Manager (GCPM) | ||||
| Quality Control Manager (QCM) | ||||
| Size of Project | Square Footage | Dollar Amount | ||
| Type of Project | ||||
| Number of Stories | ||||
| Date Design Started | ||||
| Date Design Completed | ||||
| Date Construction Started | ||||
| Date Construction Completed | ||||
| Client/User Initial Construction Budget | ||||
| Construction Award Amount | ||||
| Number of Owner-Initiated Change Orders | ||||
| Number of Contractor-Initiated Change Orders | ||||
| Number of Architectural Drawings Change Orders | ||||
| Final Construction Cost | ||||
| NOTE: THE REFERENCES PROVIDED BELOW SHALL MATCH THE REFERENCES RECEIVED THE GOVERNMENT | ||||
| Reference 1 | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| Reference 2 | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| *PROPOSED TEAM MEMBERS FOR THIS RLP CANNOT BE REFERENCES FOR THE ABOVE PROJECT. | ||||
| NOTE: RESPONDENTS MAY EXPAND THIS FORMAT TO INCLUDE ROOM FOR LENGTHIER RESPONSES, BUT THE FORMAT MUST FOLLOW THE ISSUES IN THE NUMERIC ORDER LISTED BELOW. FAILURE TO PROVIDE THE INFORMATION IN THE FORMAT BELOW WILL RESULT IN A LOWER TECHNICAL SCORE ON THE EXPERIENCE EVALUATION. DUPLICATE THESE PAGES AS NECESSARY FOR EACH PROJECT. | ||||
| The Project Architect shall address the following issues on the above referenced project: | ||||
| 1. Provide a clear statement of the Project Architect's duties and responsibilities on the referenced project. | ||||
| 2. Describe the project management philosophy used to meet the goals and objectives of the client and how you met the clients requirements and needs. Were the clients' objectives accomplished? | ||||
| 3. Describe how the referenced project was similar in scope to the project description for this requirement. | ||||
| 4. Discuss any impacts to the design caused by design changes. How did these changes impact the design or construction schedule? | ||||
| 5. Describe how you assured that designs for all disciplines were coordinated. | ||||
| 6. How frequently did you visit the site and what were the results of site visits? | ||||
| 7. Is this a Green Globes or LEED project? If yes, provide the level of certification. Explain key sustainability features. | ||||
| 8. Identify what went wrong during design and construction for the project under consideration, what could have been done to avoid it, and what could have been done or was done to mitigate problems that resulted. | ||||
| Up to three 8"x10" illustrations (photographs, drawings, computer generated art) may be used to illustrate each project. These can be before-and after shots, interiors, elevations, sections, or other visual descriptions of project quality. | ||||
| THE PROJECT DISCUSSED BELOW MUST BE DIRECTLY ATTRIBUTIBLE TO THE PROPOSED PROJECT ARCHITECT | ||||
| Project 2 | Gov't Use Only | |||
| Project Name | ||||
| Project Address | ||||
| City and State | ||||
| Design Build | Yes | No | ||
| Key Team Members Names and Phone Numbers for Referenced Project | ||||
| Owner/Developer | ||||
| Principal-In-Charge (PIC) | ||||
| Project Manager (PM) | ||||
| Architectural or Architectural/Engineering Firm | ||||
| Lead Designer (LD) | ||||
| Project Architect (PA) | ||||
| General Contractor (GC) | ||||
| GC Project Manager (GCPM) | ||||
| Quality Control Manager (QCM) | ||||
| Size of Project | Square Footage | Dollar Amount | ||
| Type of Project | ||||
| Number of Stories | ||||
| Date Design Started | ||||
| Date Design Completed | ||||
| Date Construction Started | ||||
| Date Construction Completed | ||||
| Client/User Initial Construction Budget | ||||
| Construction Award Amount | ||||
| Number of Owner-Initiated Change Orders | ||||
| Number of Contractor-Initiated Change Orders | ||||
| Number of Architectural Drawings Change Orders | ||||
| Final Construction Cost | ||||
| NOTE: THE REFERENCES PROVIDED BELOW SHALL MATCH THE REFERENCES RECEIVED THE GOVERNMENT | ||||
| Reference 1 | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| Reference 2 | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| *PROPOSED TEAM MEMBERS FOR THIS RLP CANNOT BE REFERENCES FOR THE ABOVE PROJECT. | ||||
| NOTE: RESPONDENTS MAY EXPAND THIS FORMAT TO INCLUDE ROOM FOR LENGTHIER RESPONSES, BUT THE FORMAT MUST FOLLOW THE ISSUES IN THE NUMERIC ORDER LISTED BELOW. FAILURE TO PROVIDE THE INFORMATION IN THE FORMAT BELOW WILL RESULT IN A LOWER TECHNICAL SCORE ON THE EXPERIENCE EVALUATION. DUPLICATE THESE PAGES AS NECESSARY FOR EACH PROJECT. | ||||
| The Project Architect shall address the following issues on the above referenced project: | ||||
| 1. Provide a clear statement of the Project Architect's duties and responsibilities on the referenced project. | ||||
| 2. Describe the project management philosophy used to meet the goals and objectives of the client and how you met the clients requirements and needs. Were the clients' objectives accomplished? | ||||
| 3. Describe how the referenced project was similar in scope to the project description for this requirement. | ||||
| 4. Discuss any impacts to the design caused by design changes. How did these changes impact the design or construction schedule? | ||||
| 5. Describe how you assured that designs for all disciplines were coordinated. | ||||
| 6. How frequently did you visit the site and what were the results of site visits? | ||||
| 7. Is this a Green Globes or LEED project? If yes, provide the level of certification. Explain key sustainability features. | ||||
| 8. Identify what went wrong during design and construction for the project under consideration, what could have been done to avoid it, and what could have been done or was done to mitigate problems that resulted. | ||||
| Up to three 8"x10" illustrations (photographs, drawings, computer generated art) may be used to illustrate each project. These can be before-and after shots, interiors, elevations, sections, or other visual descriptions of project quality. |
GC
| Project 1 | Gov't Use Only | |||
| Project Name | ||||
| Project Address | ||||
| City and State | ||||
| Design Build | Yes | No | ||
| Key Team Members Names and Phone Numbers for Referenced Project | ||||
| Owner/Developer | ||||
| Principal-In-Charge (PIC) | ||||
| Project Manager (PM) | ||||
| Architectural or Architectural/Engineering Firm | ||||
| Lead Designer (LD) | ||||
| Project Architect (PA) | ||||
| General Contractor (GC) | ||||
| GC Project Manager (GCPM) | ||||
| Quality Control Manager (QCM) | ||||
| Size of Project | Square Footage | Dollar Amount | ||
| Type of Project | ||||
| Number of Stories | ||||
| Planned Construction Start Date | ||||
| Planned Construction Completed Date | ||||
| Actual Construction Start Date | ||||
| Substantial Completion Date | ||||
| Number of Punchlist Items | ||||
| Actual Construction Completion Date (Punched Out) | ||||
| Client/User Initial Construction Budget | ||||
| Construction Award Amount | ||||
| Number of Owner-Initiated Change Orders | ||||
| Number of Contractor-Initiated Change Orders | ||||
| Number of Architectural Drawings Change Orders | ||||
| Final Construction Cost | ||||
| NOTE: THE REFERENCES PROVIDED BELOW SHALL MATCH THE REFERENCES RECEIVED THE GOVERNMENT | ||||
| Reference 1 | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| Reference 2 | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| *PROPOSED TEAM MEMBERS FOR THIS RLP CANNOT BE REFERENCES FOR THE ABOVE PROJECT. | ||||
| NOTE: RESPONDENTS MAY EXPAND THIS FORMAT TO INCLUDE ROOM FOR LENGTHIER RESPONSES, BUT THE FORMAT MUST FOLLOW THE ISSUES IN THE NUMERIC ORDER LISTED BELOW. FAILURE TO PROVIDE THE INFORMATION IN THE FORMAT BELOW WILL RESULT IN A LOWER TECHNICAL SCORE ON THE EXPERIENCE EVALUATION. DUPLICATE THESE PAGES AS NECESSARY FOR EACH PROJECT. | ||||
| The General Contractor shall address the following issues on the above referenced project: | ||||
| 1. Provide a brief summary of primary responsibilities for the referenced project. | ||||
| 2. Describe how the reference project was similar in scope to the project description for this requirement. | ||||
| 3. Describe unanticipated problems and explain how they were resolved. | ||||
| 4. Describe problems associated with change orders. | ||||
| 5. Describe any claims or mechanics liens filed in connection with the project, including basis and result. | ||||
| 6. Identify what went wrong during design and construction for the project under consideration, what could have been done to avoid it, and what could have been done or was done to mitigate problems that resulted. | ||||
| 7. Is this a Green Globes or LEED project? If yes, provide the level of certification. Explain key sustainability features. | ||||
| Up to three 8"x10" illustrations (photographs, drawings, computer generated art) may be used to illustrate each project. These can be before-and after shots, interiors, elevations, sections, or other visual descriptions of project quality. | ||||
| Project 2 | Gov't Use Only | |||
| Project Name | ||||
| Project Address | ||||
| City and State | ||||
| Design Build | Yes | No | ||
| Key Team Members Names and Phone Numbers for Referenced Project | ||||
| Owner/Developer | ||||
| Principal-In-Charge (PIC) | ||||
| Project Manager (PM) | ||||
| Architectural or Architectural/Engineering Firm | ||||
| Lead Designer (LD) | ||||
| Project Architect (PA) | ||||
| General Contractor (GC) | ||||
| GC Project Manager (GCPM) | ||||
| Quality Control Manager (QCM) | ||||
| Size of Project | Square Footage | Dollar Amount | ||
| Type of Project | ||||
| Number of Stories | ||||
| Planned Construction Start Date | ||||
| Planned Construction Completed Date | ||||
| Actual Construction Start Date | ||||
| Substantial Completion Date | ||||
| Number of Punchlist Items | ||||
| Actual Construction Completion Date (Punched Out) | ||||
| Client/User Initial Construction Budget | ||||
| Construction Award Amount | ||||
| Number of Owner-Initiated Change Orders | ||||
| Number of Contractor-Initiated Change Orders | ||||
| Number of Architectural Drawings Change Orders | ||||
| Final Construction Cost | ||||
| NOTE: THE REFERENCES PROVIDED BELOW SHALL MATCH THE REFERENCES RECEIVED THE GOVERNMENT | ||||
| Reference 1 | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| Reference 2 | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| *PROPOSED TEAM MEMBERS FOR THIS RLP CANNOT BE REFERENCES FOR THE ABOVE PROJECT. | ||||
| NOTE: RESPONDENTS MAY EXPAND THIS FORMAT TO INCLUDE ROOM FOR LENGTHIER RESPONSES, BUT THE FORMAT MUST FOLLOW THE ISSUES IN THE NUMERIC ORDER LISTED BELOW. FAILURE TO PROVIDE THE INFORMATION IN THE FORMAT BELOW WILL RESULT IN A LOWER TECHNICAL SCORE ON THE EXPERIENCE EVALUATION. DUPLICATE THESE PAGES AS NECESSARY FOR EACH PROJECT. | ||||
| The General Contractor shall address the following issues on the above referenced project: | ||||
| 1. Provide a brief summary of primary responsibilities for the referenced project. | ||||
| 2. Describe how the reference project was similar in scope to the project description for this requirement. | ||||
| 3. Describe unanticipated problems and explain how they were resolved. | ||||
| 4. Describe problems associated with change orders. | ||||
| 5. Describe any claims or mechanics liens filed in connection with the project, including basis and result. | ||||
| 6. Identify what went wrong during design and construction for the project under consideration, what could have been done to avoid it, and what could have been done or was done to mitigate problems that resulted. | ||||
| 7. Is this a Green Globes or LEED project? If yes, provide the level of certification. Explain key sustainability features. | ||||
| Up to three 8"x10" illustrations (photographs, drawings, computer generated art) may be used to illustrate each project. These can be before-and after shots, interiors, elevations, sections, or other visual descriptions of project quality. |
&CProject Information General Contractor
GCPM
| Project 1 | Gov't Use Only | |||
| Project Name | ||||
| Project Address | ||||
| City and State | ||||
| Design Build | Yes | No | ||
| Key Team Members Names and Phone Numbers for Referenced Project | ||||
| Owner/Developer | ||||
| Principal-In-Charge (PIC) | ||||
| Project Manager (PM) | ||||
| Architectural or Architectural/Engineering Firm | ||||
| Lead Designer (LD) | ||||
| Project Architect (PA) | ||||
| General Contractor (GC) | ||||
| GC Project Manager (GCPM) | ||||
| Quality Control Manager (QCM) | ||||
| Size of Project | Square Footage | Dollar Amount | ||
| Type of Project | ||||
| Number of Stories | ||||
| Planned Construction Start Date | ||||
| Planned Construction Completed Date | ||||
| Actual Construction Start Date | ||||
| Substantial Completion Date | ||||
| Number of Punchlist Items | ||||
| Actual Construction Completion Date (Punched Out) | ||||
| Client/User Initial Construction Budget | ||||
| Construction Award Amount | ||||
| Number of Owner-Initiated Change Orders | ||||
| Number of Contractor-Initiated Change Orders | ||||
| Number of Architectural Drawings Change Orders | ||||
| Final Construction Cost | ||||
| NOTE: THE REFERENCES PROVIDED BELOW SHALL MATCH THE REFERENCES RECEIVED THE GOVERNMENT | ||||
| Reference 1 | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| Reference 2 | ||||
| Name | ||||
| Current address of reference | ||||
| Current phone number of reference | ||||
| Role of the named reference in the project | ||||
| E-mail address of reference | ||||
| *PROPOSED TEAM MEMBERS FOR THIS RLP CANNOT BE REFERENCES FOR THE ABOVE PROJECT. | ||||
| NOTE: RESPONDENTS MAY EXPAND THIS FORMAT TO INCLUDE ROOM FOR LENGTHIER RESPONSES, BUT THE FORMAT MUST FOLLOW THE ISSUES IN THE NUMERIC ORDER LISTED BELOW. FAILURE TO PROVIDE THE INFORMATION IN THE FORMAT BELOW WILL RESULT IN A LOWER TECHNICAL SCORE ON THE EXPERIENCE EVALUATION. DUPLICATE THESE PAGES AS NECESSARY FOR EACH PROJECT. | ||||
| The General Contractor's Project Manager (GCPM) shall address the following issues on the above referenced project: | ||||
| 1. Provide a brief summary of primary responsibilities for the referenced project. | ||||
| 2. Describe how the reference project was similar in scope to the project description for this requirement. | ||||
| 3. Describe unanticipated problems and explain how they were resolved. | ||||
| 4. Describe problems associated with change orders. | ||||
| 5. Describe any claims or mechanics liens filed in connection with the project, including basis and result. | ||||
| 6. Identify what went wrong during design and construction for the project under consideration, what could have been done to avoid it, and what could have been done or was done to mitigate problems that resulted. | ||||
| 7. Is this a Green Globes or LEED project? If yes, provide the level of certification. Explain key sustainability features. | ||||
| Up to three 8"x10" illustrations (photographs, drawings, computer generated art) may be used to illustrate each project. These can be before-and after shots, interiors, elevations, sections, or other visual descriptions of project quality. | ||||
| Project 2 | Gov't Use Only | |||
| Project Name | ||||
| Project Address | ||||
| City and State | ||||
| Design Build | Yes | No | ||
| Key Team Members Names and Phone Numbers for Referenced Project | ||||
| Owner/Developer | ||||
| Principal-In-Charge (PIC) | ||||
| Project Manager (PM) | ||||
| Architectural or Architectural/Engineering Firm | ||||
| Lead Designer (LD) | ||||
| Project Architect (PA) | ||||
| General Contractor (GC) | ||||
| GC Project Manager (GCPM) | ||||
| Quality Control Manager (QCM) | ||||
| Size of Project | Square Footage | Dollar Amount | ||
| Type of Project | ||||
| Number of Stories |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .