SEPA PACS Refresh_site vist presentation.pdf

PDF 255 KB Posted

Attached to
PACS Refresh 2026 for Southeastern Power Administration
Solicitation number
89503508142026
Issued by

About this file

This document is a presolicitation/project overview for the Southeastern Power Administration (SEPA), a component of the U.S. Department of Energy, describing a Physical Access Control Systems (PACS) Refresh 2026 contract opportunity. The project involves upgrading and replacing all PACS infrastructure at SEPA's Main Site and Remote Operations Site in compliance with FIPS 201 and the Secure Networks Act Section 2. Key deliverables include updated PACS hardware and software, door access control systems, intercom and camera systems, Category 6 cabling, and training materials with compliance documentation. Specific components specified include HID Signo 40 PIV Readers, HID pivCLASS Modules, HID EDGE EVO Controllers, Grandstream Intercoms and Control Stations, Bosch Cameras (various models), Genetec Streamvault Servers, and software platforms including HID PIVClass and Genetec Security Center.

The project is structured in four phases from Q1 2026 through Q2 2026: Phase 1 covers assessment and selection; Phase 2 addresses installation and configuration; Phase 3 includes testing and integration; and Phase 4 encompasses training and deployment. Performance standards require FIPS 201 and Secure Networks Act compliance, high-resolution cameras with 24/7 monitoring and 30-day storage capability, Genetec Security Center compatibility, and training achieving 95% proficiency. The contract will be Firm-Fixed-Price with milestone-based payments and acceptance contingent upon security tests and operational proficiency verification. The site visit is scheduled for February 5, 2026, with a bid deadline of February 27, 2026, and award decision by March 5, 2026. The contractor must begin work within 30 days of award and complete project close-out within three months of start. Contracting Officer Juvonna Mattox (juvonna.mattox@sepa.doe.gov) and Contract Officers Representative Hector Santiago (hector.santiago@sepa.doe.gov) are the primary government contacts.

View the file

Other files

File Type Posted
QandA 2.23.26.pdf PDF
PACS SOW_1.22.26_updated.pdf PDF
QandA 2.19.26.pdf PDF
PACS SOW_1.22.26.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Southeastern Power Administration

PACS Refresh 2026

Administration Hector Santiago

Information Technology Specialist Contract Officers Representative

Upgrade and replace all Physical Access Control Systems (PACS) Sites: SEPA Main Site & Remote Operations Site Compliance: FIPS 201 & Secure Networks Act Section 2

Scope of Work

Updated PACS hardware & software Door access control, intercom, camera systems Cat 6 cabling Training materials & compliance documentation

Deliverables

HID® Signo® 40 PIV Readers HID® pivCLASS® Modules HID® EDGE EVO® Controllers Grandstream Intercoms & Control Stations Bosch Cameras (various models) Genetec Streamvault Servers Software: HID PIVClass, Genetec Security Center

Key Components

Phase 1 (Q1 2026): Assessment & selection Phase 2 (Q2 2026): Installation & configuration Phase 3 (Q2 2026): Testing & integration Phase 4 (Q2 2026): Training & deployment

Timeline & Milestones

Compliance with FIPS 201 & Secure Networks Act High-resolution cameras with 24/7 monitoring, 30-day storage Must be compatible with Genetec Security Center Training: 95% proficiency

Performance Standards

Contract Officer: Budget & procurement:

Juvonna Mattox Contractor: Installation, testing, training COR Security Teams: Compliance & integration: Hector Santiago, Frank Drose, James Hall

Roles & Responsibilities

Infrastructure modifications may be needed Vendor lead times may affect schedule Mandatory compliance with regulations

Assumptions & Constraints

Milestone-based payments Firm-Fixed-Price contract Acceptance: Security tests & operational proficiency

Payment & Acceptance

Site Visit: Feb 5, 2026 Bid Deadline: Feb 27, 2026 Decision Date: Mar 5, 2026 Vendor Start: Within 30 days of award Close-out: NLT 3 months from start

Submission Timeline

Contracting Officer: Juvonna Mattox (juvonna.mattox@sepa.doe.gov) COR: Hector Santiago (hector.santiago@sepa.doe.gov)

Contact Information

Administration

Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6
Slide Number 7
Slide Number 8
Slide Number 9
Slide Number 10
Slide Number 11
Slide Number 12
Slide Number 13

File details come from the government source that posted it. Updated .