- Folsom Substation Transformer KV4A Replacement
- Solicitation number
- 89503118BWA000009
About this file
Revised Specification - Spec #936 Rev 01 - Amendment 0002
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOLSOM SUBSTATION
TRANSFORMER KV4A
REPLACEMENT
Spec. No. 936
REV. 001
SECTION C
DESCRIPTION/SPECIFICATIONS
CALIFORNIA
SECTION C
DESCRIPTION/SPECIFICATIONS
FOLSOM SUBSTATION TRANSFORMER KV4A REPLACEMENT
DIVISION 1 – GENERAL REQUIREMENTS
A. CONTRACT REQUIREMENT
B. DESCRIPTION OF WORK
1. The Principal Components of Work
2. Access to the Substation is Controlled by the Bureau of Reclamation
C. DESCRIPTION OF BIDDING SCHEDULE ITEM
1. Bidding Schedule item “Mobilization and preparatory work”
D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
1. Commencement, Prosecution, and Completion of the Work
2. Submittal Approval Time
3. Outage and Construction Schedule Restrictions
4. Protective Ground Leads
5. Maximum Available Fault Current
E. CONSTRUCTION SCHEDULE
1. Submittal Time
2. Format and Detail
F. MATERIAL
1. Points-of-Delivery
G. ELECTRIC POWER FOR CONSTRUCTION PURPOSES
H. WATER FOR CONSTRUCTION PURPOSES
I. EXPLOSIVES AND BLASTING
J. SUBMITTALS
1. General
2. Approval Time
3. Address
4. Project Protocol
DIVISION 4 – SUBSTATION METALWORKS
A. GENERAL
1. Government-Furnished Drawings
2. Measurement
B. DESCRIPTION OF BIDDING SCHEDULE ITEMS
1. Bidding Schedule item “Steel structures, welded (galvanized)”
DIVISION 9 – SUBSTATION - ELECTRICAL
A. GENERAL
1. For All Government-Furnished Bidding Schedule Items
2. For All Contractor-Furnished Bidding Schedule Items,
3. Associated Support Structures Provided for each Electrical Equipment Rated Above 7-kV
4. Installation and Painting of Electrical Equipment and Material
B. DESCRIPTION OF BIDDING SCHEDULE ITEMS
1. Bidding Schedule item “Connections to 230/115-13.8-kV, 120 MVA, three-phase power transformer”
2. Bidding Schedule item “Combination interrupter switch and fuses, 14.4-kV”
3. Bidding Schedule item “Associated electrical equipment and material”
4. Bidding Schedule item “Existing outdoor electrical equipment and material”
5. Bidding Schedule item “Temporary station service diesel generator”
6. Bidding Schedule item “Recycling existing transformer KV4A”
7. Bidding Schedule items “Furnishing 5/c No. 10 AWG control cable” and “Furnishing 12/c
No. 10 AWG control cable”
8. Bidding Schedule items “Installing 5/c No. 10 AWG control cable” and “Installing 12/c
No. 10 AWG control cable”
9. Bidding Schedule item “Duplex switchboard CHA8 (Government-furnished)”
DIVISION 13 – ENVIRONMENTAL QUALITY PROTECTION
A. GENERAL
1. Bidding Schedule does not contain separate items
B. SPECIAL REQUIREMENTS
1. Coordination
2. Special Cultural Resources Requirements
3. Special Biological Requirements
4. Special Compliance Requirements
DIVISION 1 – GENERAL REQUIREMENTS
A. CONTRACT REQUIREMENT:
Construct and complete Folsom Substation Transformer KV4A Replacement in accordance with the Construction Contract (Standard Form 1442); the Contract Clauses; Western’s Construction Standards (September 2016), including Standard 1 – General Requirements, Standard 4 - Substation Metalwork and Transmission Line Lattice Structures, Standard 9 – Substation – Electrical, Standard 13 – Environmental Quality Protection, Standard 15 – Drawings; Standard Drawings; and these Project Specifications and Drawings.
If a conflict occurs between the Project Specifications and the Construction Standards, the Project Specifications shall govern. The Project Specifications and the Drawings are used to take exceptions or provide additions to the Construction Standards. Some paragraphs in the Construction Standards will not apply to this job.
Western’s Construction Standards, Standard Drawings, and Electrical Equipment Standards are available at https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx.
Western Project Specifications and Construction Standards are explained in Standard 1 – General Requirements, Section 1.1.1, “Standards and Project Specifications”.
B. DESCRIPTION OF WORK:
1. THE PRINCIPAL COMPONENTS OF WORK include the following:
a. Removing existing transformer KV4A.
b. Providing all connections to a 230/115-kV, 120 MVA power transformer.
c. Furnishing and installing one, three-phase, 14.4-kV interrupter switch with fuses.
d. Furnishing and installing one switch operating platform, aluminum conductor jumpers, grounding, conduit and insulated power and control cables.
e. Removing and disposing of three, single-pole fuse disconnecting switches, aluminum conductor jumpers, grounding, conduit and insulated power and control cables.
f. Installing one, Government furnished, duplex switchboard including Contractor provided seismic base.
g. Providing a temporary diesel generator
h. Recycling existing transformer KV4A .
2. Access to the substation is controlled by the Bureau of Reclamation in accordance with the following:
a. All Western personnel and contracted personnel as a result of this job will need to gain access into the Bureau of Reclamation area at Folsom Dam to accomplish required work.
The Bureau of Reclamation has a controlled access area with 24/7 guard service protecting the area. All personnel associated with this contract that need access must have an approved Bureau of Reclamation proximity identification card, badge and PIN. This access would be approved by the Bureau of Reclamation, Folsom Dam Safety and Security Manager, through Western approval channels. Workers must be U.S. citizens or have the appropriate approval prior to commencement of work at the site through the proper Western and Bureau of Reclamation channels.
b. Access of contractors will be provided only under escort of a designated Western Federal employee or Western contract inspector. Contractors, subcontractors, will only be allowed access to the job site after approval by Western and the Bureau of Reclamation. Access will obtained by completing the Bureau of Reclamation's form, “Central California Area Office-FOLSOM PROXIMITY/IDENTIFICATION BADGE REQUEST.” This form must be coordinated through the SNR Security Manager and approved by the Bureau of Reclamation Safety and Security Manager. The Contractor will provide to the Western designated oversight inspector, names and information on their employees and any subcontractors for the job and ensure that the proper form (s) have been completed and submitted for approval.
c. Bureau of Reclamation proximity cards are the property of the Bureau of Reclamation and will be accounted for and returned to the Bureau upon completion of the work by the contract employees assigned to the job. Any lost, stolen or misplaced badges will be immediately reported to the Western designated oversight representative for this contract by the Contractor. The Western designated oversight representative will report the lost, stolen or misplaced badge to the Bureau of Reclamation and the Western SNR Security Manager.
Badges are to be safeguarded at all times and only utilized by the authorized personnel.
d. Access into Bureau of Reclamation areas for the purpose of completing work assigned to this contract will be strictly limited to only areas where contract work has been identified via the specifications and job requirements. Access will be obtained only after displaying the appropriate Bureau of Reclamation access cards at the Bureau of Reclamation guard station entrances.
Paragraphs “Description of Bidding Schedule Items” in Divisions – 1, 4, 9 and 13 describe the work to be performed.
The work is located near Folsom, California, as shown on Drawing FOL 0015. In the event WAPA exercises the option to recycle transformer KV4A, work will also be located near Elverta, California, as shown on Drawing ELV 0015.
C. DESCRIPTION OF BIDDING SCHEDULE ITEM:
1. Bidding Schedule item “Mobilization and preparatory work” includes the following:
a. Performing mobilization and preparatory work in accordance with Section H of the contract clauses.
b. Prepare and submit a Construction Schedule and furnish a Safety and Health Program.
c. Providing jobsite office trailer and the items listed below. Prior to any jobsite work, the
Contractor shall provide the office trailer for the exclusive use of WAPA.
(1) Relocation: If the Contractor changes the location of his office during the term of the contract, then the Contractor shall also move the mobile office trailer provided for WAPA, simultaneously with the transportation of his own unit.
(a) Installation: Install anchors and tie-downs for the trailer complying with local, State and Federal regulations. The office trailer shall be grounded. Entry points to the trailer shall be provided with stairways complying with OSHA (29 C.F.R. 1926.1052).
(b) Office Space Requirements:
1) Size and Arrangement: At least 250-square feet (minimum) consisting of two separate rooms (one office and one larger workroom).
2) Heating and Cooling: Heating and cooling unit sized to provide adequate heating and cooling.
3) Lighting and Electrical: Adequate lighting and 110 V electrical outlets.
4) Utilities: Make all arrangements and pay all costs for providing utilities, including potable drinking water, electrical power, and heating and cooling energy.
5) Toilet Facilities: Toilet facilities shall be provided in the immediate vicinity of the office and shall be maintained.
(2) Emergency Equipment: Provide and maintain the following emergency equipment:
(a) First aid kit that meets or exceeds ANSI Z308.1 (latest version) Class B, Type IV. Mount to the wall inside the workroom.
(b) Dry chemical fire extinguishers, classified 4-A:60-B:C, one to be located inside each entrance to the trailer.
(3) Window Coverings: Provide adjustable mini-blinds.
(4) Office Furniture: Provide good quality, fully functional, office furniture as follows:
QUANTITY DESCRIPTION
5 Folding Office Chairs 1 Office Desk (30-inches by 60-inches minimum) 2 Office Tables (30-inches by 60-inches minimum) 1 Five-drawer File Cabinet 1 Bookcase (30-inches by 30-inches by 48-inches) 12 “Plan Hold” Binders No. 1CB-24 (including one (1) plan rack)
D. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK:
1. COMMENCEMENT, PROSECUTION, AND COMPLETION OF THE WORK. See FAR 52.211-10 in Section F of the solicitation/contract.
2. SUBMITTAL APPROVAL TIME: Except as otherwise provided for specific submittals, Western will require 20-calendar days for review of drawings or data submitted for approval.
3. OUTAGE AND CONSTRUCTION SCHEDULE RESTRICTIONS: In addition to the restrictions listed in Construction Standard 1, the following outage and schedule restrictions shall apply:
a. The contractor’s date to complete the new transformer installation is March 31, 2019 to allow testing and commissioning to be completed during the final part of the assigned outage.
b. Outages of the 230kV transformer (KV4A) will be between November 14, 2018 and April 30, 2019.
c. The Contractor shall complete installation of the “Temporary Station Service Diesel Generator” by November 19, 2018.
d. Existing transformer KV4A shall be removed from its foundation by November 30, 2018
e. The new transformer will be delivered between December 6, 2018 and December 13, 2018.
f. Western personnel will dress out the new transformer and remove the existing CHA8 panels between January 7 and 16, 2019. The Contractor shall coordinate his/her work with WAPA. Contact Jim Higgins at higgins@wapa.gov (Tel. 916-646-7330) for coordination.
g. Existing transformer KV4A shall be removed from the site by March 31, 2019
4. PROTECTIVE GROUND LEADS: See Western Construction Standards, Standard 1 “General Requirements”, Section 1.4.14.3(1).
5. MAXIMUM AVAILABLE FAULT CURRENT: When protective ground leads are required, the protective ground leads shall be sized as defined below and shall meet the requirements of Standard 1 – General Requirements, Section 1.4 “Safety and Health” and the following:
a. The maximum available fault current at in the 230-kV area is 21,034 amps, in the 115-kV area is 9,383 amps and in the 13.8-kV area is 23,631 amps.
b. A minimum of two (2) 1/0 grounds is required in the 230-kV area, a minimum of one (1) 1/0 ground is required in the 115kV area and a minimum of two (2) 1/0 grounds is required in the 13.8-kV area
E. CONSTRUCTION SCHEDULE:
1. SUBMITTAL TIME: Prepare and Submit a Construction Schedule to the Contracting Officer’s Representative (COR) within 30-calendar days after date of Notice to Proceed.
2. FORMAT AND DETAIL: Dates for each item of Government-furnished material shall be provided. Do not program dates earlier than the estimated delivery dates shown in the “Material” paragraph.
F. MATERIAL: Furnish all material for completing the work, except material furnished by Western as listed below:
ITEM ESTIMATED
WEIGHT
(LBS)
ESTIMATED
DELIVERY
DATE
ESTIMATED
COST
1. One (1) Duplex switchboard CHA8 1,000 NST 12/11/2018
NLT 1/1/-2019
$100,000
2. One (1) 230/115-13.8 kv, 72/96/120 MVA Hyundai transformer.
Oil: 71,700 Total including oil: 239,700
NST 12/6/2018
NLT 12/13/2018
$813,932
NST – No sooner than.
NLT – No later than.
1. POINTS-OF-DELIVERY: The duplex switchboard will be delivered to Folsom Substation. The
Contractor shall unload and inspect the duplex switchboard and report any damages to the COR.
The new transformer will be delivered to Folsom Substation and off-loaded onto the existing transformer KV4A foundation by the transformer supplier.
G. ELECTRIC POWER FOR CONSTRUCTION PURPOSES:
The Contractor shall furnish power for his operations by his own means.
H. WATER FOR CONSTRUCTION PURPOSES:
The Contractor shall provide water needed for construction purposes and potable water for employees. The contractor shall make arrangements for obtaining and conveying water to points of use.
I. EXPLOSIVES AND BLASTING:
Explosives shall not be used.
J. SUBMITTALS:
1. GENERAL: Submittals shall be provided in accordance with the Construction Standards and Project Specifications. The Contractor shall furnish submittals electronically (i.e. e-mail), unless otherwise specified by the COR. Submittals shall be sent to DSW-G5600- CS@wapa.gov in standard PDF or electronic CAD “*.dwg” (AutoCAD 2010) formats. All submittals shall include WAPA's Contract No., Project Title, Transmittal/Submittal No., and corresponding Item No. as shown in the examples in Division 1.J.6. Refer to the Submittal Log for the list of required submittals. This list may not be all-inclusive, and it remains the Contractor's responsibility to ensure conformance to the individual Specifications for possible additional submittal requirements. All submittals must be submitted with the attached cover sheet “CM-16 Transmittal Form Appendix A” in Microsoft Excel or PDF. Submittals will be rejected if CM-16 Form is not attached.
In addition to required submittals, the Contractor shall submit the following information electronically to DSW-G5600-CS@wapa.gov:
a) Payrolls.
b) Sub-Contractor List/Forms.
c) Citizenship Forms.
d) Erosion Control Plan.
e) Environmental Submittals.
f) Request For Information (RFI).
g) Request for Equitable Adjustment (REA).
h) Any questions, comments, correspondence relevant to this project.
A submittal is required if the item is used in the performance of the contract.
2. APPROVAL TIME: Approval time for submittals shall be in accordance with the
“Commencement, Prosecution, and Completion of Work” paragraph.
3. ADDRESS: The Contractor shall transmit specified non-electronic submittals to the following address:
Western Area Power Administration
ATTN: G5600
P.O. Box 6457 Phoenix, AZ 85005-5313
4. PROJECT PROTOCOL:
a. Electronic Correspondence:
EMAIL SUBMITTAL FORMAT:
mailto:DSW-G5600-CS@wapa.gov mailto:DSW-G5600-CS@wapa.gov
Subject Line in Email Submittal number, Subject, Applicable Standard Number, Project Name/Number, and Contract Number Example: Submittal 017, Steel Compression Dead Heads-Std 10, Substation Stage 06, SD-
17WC120498-878, DE-WA000xxxx
b. Payment Requests:
EMAIL PAYMENT REQUEST FORMAT:
Invoice number and Project Name/Number and Contract Number Example: Invoice 01, Substation Stage 06, SD-17WC120498-878, DE-WA000xxxx
c. Certified Payrolls-Prime and Sub-Contractors:
EMAIL CERTIFIED PAYROLL FORMAT:
Certified Payroll (CP), Contractor’s names, Week ending (WE), and Project Name/Number, and Contract Number Example: CP-(Smith Inc., Bob’s Electrical), WE 09/12/15 & 09/19/15, Substation Stage 06, SD-
17WC120498-878, DE-WA000xxx
d. Request for Information:
EMAIL (REQUEST FOR INFORMATION) FORMAT:
Request for Information (RFI), Project Name/Number, and Contract Number Example: RFI-003, Labeling Info, Substation Stage 06, SD-17WC120498-878, DE-WA000xxxx
DIVISION 4 – SUBSTATION METALWORKS
A. GENERAL:
1. GOVERNMENT-FURNISHED DRAWINGS: Existing shop drawings for steel structures are not available.
2. MEASUREMENT: Measurement for quantities for Bidding Schedule items “Steel structures, welded (galvanized)” will be made on the basis of weights calculated in accordance with LRFD, “AISC Code of Standard Practice for Steel Buildings and Bridges”, except that weights for nonrectangular shapes and plates are to be based on actual detailed dimensions.
a. Steel structure weights, calculated as noted above, shall be shown on the Contractor-furnished final shop drawings, and payment will be based thereon. Steel estimated weights are shown on the specifications drawings for the structures requiring approval drawings as noted in the Bidding Schedule items “Steel structures, welded (galvanized)”.
B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:
1. Bidding Schedule item “Steel structures, welded (galvanized)” includes providing the
a. Three (3) Switch Mounting assemblies and one (1) Channel Bracket Mounting assembly installed on existing Equipment Support - Type III structure as shown on Drawings FOL 2039-1 and 2039-2.
b. One (1) single, switch operating platforms – Type I for the 14.4-kV combination interrupter switch and fuses (WZ4A-FZ4A) per standard drawing 31 2045.
The above material including connection bolts, nuts, washers, and lock nuts shall be galvanized.
DIVISION 9 – SUBSTATION - ELECTRICAL
A. GENERAL: Electrical equipment and material shall be as specified in Western’s “WAPA ES”
Standard Equipment Specifications, as shown on project drawings, and in accordance with NEMA, ANSI, IEEE, ICEA, ASTM, NEC, NESC, UL, and Federal specifications and standards as applicable.
Applicable requirements shall be met under the following service conditions:
Ambient Temperatures:
Maximum ........................................................................................... +50°C Minimum ............................................................................................. -10°C
Elevation:
Above Mean Sea Level ................................................................. 350-Feet
*ASCE-7 Wind Load:
Minimum Basic Wind Speed .......................................................... 90 MPH Importance Factor ................................................................................ 1.15
*IEEE Seismic Qualification .................................................................... Moderate
*Wind and seismic loads are nonsimultaneous.
1. For all Government-furnished Bidding Schedule items, the Contractor shall:
a. Unless otherwise indicated, unload and inspect Government-furnished items.
b. Install associated support structures when furnished.
c. Install Government-furnished items as shown on drawings.
2. For all Contractor-furnished Bidding Schedule items, the Contractor shall:
a. Provide (furnish and install) Bidding Schedule items, equipment, and material not furnished by the Government.
3. Unless otherwise specified, associated support structures provided for each electrical equipment rated above 7-kV shall be 102-inches in height and hot-dip galvanized, if made of steel.
Instrument transformers that are seismically qualified shall be 96-inches in height. If tubular steel supports are furnished, they shall be galvanized internally and externally.
4. Installation and painting of electrical equipment and material shall be provided in accordance with
Standards 9 and 12 respectively.
B. DESCRIPTION OF BIDDING SCHEDULE ITEMS:
1. Bidding Schedule item “Connections to 230/115-13.8-kV, 120 MVA, three-phase power transformer” includes furnishing all equipment and material and performing all work required to connect the power transformer to the substation bus system, and making all control and power cable connections necessary to place the power transformer in service. In addition, the Contractor shall weld the transformer base to existing embedded plates. One (1) 5/16-inches by 12-inches fillet weld is required at each of four embed plates. Western personnel will assemble and fill the transformer with oil.
a. Spare parts furnished for the transformer will include but not be limited to the following:
(1) One (1) bushing of each voltage class including neutral bushing.
(2) One (1) surge arrester of each voltage class.
(3) One (1) complete set of gaskets for the transformer.
(4) Two (2) complete extra relays and contactors of each type and size used for the transformer.
(5) One (1) quart (32-fluid ounces) of touch-up paint which matches the color of the equipment, to be used to correct small areas of paint damage.
2. Bidding Schedule item “Combination interrupter switch and fuses, 14.4-kV” includes providing the combination interrupter switch and fuses in accordance with WAPA ES 8.2 Equipment Standard:
Designation WZ4A-FZ4A
Type
3-pole, single-throw, outdoor, manually group-operated, vertical break, rotating-insulator-type interrupter with single-pole hook-operated, low noise fuses, S&C Electric Company SMD dropout indicating type or equivalent
System Nominal Voltage (kV) 14.4
Rated Maximum Voltage (kV) 17
Basic Impulse Insulation Level (kV) 110
Switch Continuous Current Rating (Amps) 600
Fuse Interrupting Ratings
RMS Symmetrical (Amps) 34,000 SMD type
Asymmetrical (Amps) 1.6 XRMS Symm
Phase Spacing 3’-0”
Approximate Mounting Height Above Ground 20’-0”
Mounting position Vertical
Approximate E Rating* 300 E to 400 E
*Exact E rating will be furnished after the Contractor has submitted to the COR the time-current curves of proposed fuse unit.
a. Operating handle shall be located on the left-hand side.
b. The Contractor shall provide six (6) spare fuses.
3. Bidding Schedule item “Associated electrical equipment and material” includes providing equipment, material, and services required to complete the following substation installations as shown on the Drawings:
a. Electrical Testing: Includes providing electrical testing in accordance with Standard 9, paragraph 9.1.2 Acceptance Tests - Method B, except for the following which will be performed by Western personnel:
(1) Control, Metering and Relaying Equipment Test.
(2) Testing of Protective Relays.
(3) Operational Tests.
(4) Energization Tests.
(5) Infrared Inspection.
b. Substation Grounding System: Includes providing material and services required to complete the substation grounding systems. Unless otherwise specified on the Drawings, splices, crosses, tees, and other fittings used on grounding system may be 360 degree radial swaged type. If swaged type fittings are used, the fittings and installation tooling shall be furnished by the same manufacturer. Informational drawings and data are not required for this item.
c. Electrical Conduit System: Includes providing material and services required to complete the substation conduit systems including embedded and exposed conduit. Conduit entering the cable trench with a 90 degree bend may be Schedule 40 PVC as shown on Drawing 31 1006. All other 90 degree bends shall be rigid metal. Rigid metal conduits in direct contact with earth shall be half-lapped with 10-mil corrosion protection tape. Rigid metal conduit risers shall be so lapped to six inches above finished grade. A detectable warning tape shall be installed directly above each conduit run and located 12-inches below finished grade. All conduits shall have sealing compound installed at both ends. Informational drawings and data are not required for this item.
d. Outdoor Bus System: Includes providing material and services required to complete the outdoor jumper bus and rigid bus installations. Unless otherwise specified on the Drawings, splices, elbows, pad type terminal connectors, and other fittings used on rigid or cable may be 360 degree radial swaged type. If swaged type fittings are used, the fittings and installation tooling shall be furnished by the same manufacturer. Furnish corona shields for all 230-kV pad to pad connections.
e. Insulated Conductors: Includes all insulated conductors and cables except 5/c and 12/c
No. 10 AWG control cables which are covered under separate Bidding Schedule items. The Contractor shall terminate cables to new outdoor equipment only. The Contractor shall coil an additional 10-feet of control cable in the cable trench for each electrical device or outdoor panel. At the indoor location end of the control cables (energized or new control panel locations), the Contractor shall pull the cable as directed by the COR, leaving 30-feet of cable coiled up and left below the panel.
f. At the outdoor equipment locations, the Contractor shall use solderless-type lugs, and connectors for joining or connecting cables to terminal blocks or devices. Terminations of wire shall be made with NON-insulated pressure-crimp-type terminal connectors with ring tongues.
g. Substation signs:
(1) Equipment Identification Signs (31 1000) – Lettering on the sign shall be as follows:
(a) TRANSFORMER
KV4A
(b) STATION SERVICE
FOL 423
INT SW WZ4A 13.8KV
(c) STATION SERVICE
FOL 421
FUSE DISC SW FZ4A 13.8KV
4. Bidding Schedule item “Existing outdoor electrical equipment and material” includes removal and disposal of existing electrical equipment and material.
a. Material to be removed is as follows:
(1) One (1), 230/115-kV, 120-MVA, three-phase power transformer designated KV4A.
The Contractor shall disconnect all conductor jumpers, power and control cables from existing transformer KV4A. The surge arresters, bushings and radiators shall be removed from the transformer and prepared for transport. Existing angle brackets attached to the transformer are not to be removed. The Contractor shall drain the transformer oil into Contractor provided oil tanker trucks and recycle the removed oil. The Contractor shall transport the transformer to a temporary location within Folsom Substation as directed by Western’s construction representative and place the transformer on Contractor-furnished cribbing.
b. Material to be removed and disposed of is as follows:
(1) Three (3), 15-kV single-phase fuse disconnecting switches designated FZ4A.
(2) Aluminum conductor and fittings associated with KV4A and FZ4A.
(3) Substation control and power cables associated with KV4A, and conduit as designated on the Drawings. Cables in conduit, trench, and/or trays shall be removed and disposed of.
5. Bidding Schedule item “Temporary station service diesel generator” includes providing a three-phase, 3.0 MVA, 3 phase diesel generator that will feed Reclamation’s (USBR) UHA 5KV Station Service Switchgear. The generator shall have a 5,000 gallon double wall tank which may be remote or installed on or with the generator.
The voltage delivered to the USBR switchgear shall be 4160 volts, 3 three phase, grounded wye.
The contractor may accomplish this in one of two ways: (1) furnish and install a 4160 volt engine/generator, or, (2) furnish and install a lower voltage engine generator with a step-up transformer to 4160 volts.
The US Bureau of Reclamation will operate the diesel generator on an as-needed basis.
The Contractor shall be responsible for the following items:
a. Obtain all applicable permits, including but not limited to, CARB’s Portable Equipment
Registration Program (PERP) or Sacramento Metropolitan Air Quality Management District
b. Deliver and install the generator
c. Provide a 5,000 gallon double wall diesel tank.
d. Provide training on the use of the generator
e. Install feeder cables from the temporary generator to the USBR switchgear.
f. Perform 5-kV termination work. This work may be required at different times depending on outages.
g. Install secondary CT and PT conductors for protection.
h. Maintain the generator in good working condition, as required.
i. Disconnect and remove the generator when directed.
j. Respond within 4 hours during outages.
6. Bidding Schedule item “Fuel for Temporary diesel generator” includes supplying fuel for the operation of the temporary diesel generator. The Contractor shall be responsible to supply sufficient fuel at all times during the construction performance period.
7. Bidding Schedule item “Recycling existing transformer KV4A” includes removing the core and coils for recycling, transporting the transformer tank, surge arresters, bushings and radiators to the Elverta Maintenance Facility (See Drawing ELV 0015) and reassembling.
a. General: The Contractor shall cut the transformer tank and remove the core and coils and any residual oil. The Contractor shall re-weld the tank and transport the tank, surge arresters, bushings and radiators to the Elverta Maintenance Facility and reassemble. The Contractor shall provide all equipment including cranes, rigging equipment, tractor trailers, truck transport, highway and road certificates as required, and all other material, equipment, or personnel as needed to complete the work.
b. Transformer disassembly, and recycling: The work shall include the following:
(1) Removing any other accessories mounted on the transformer not already removed and preparing them for transport.
(2) Cutting open the transformer tank, removing all internal components, and any residual oil.
(3) Recycling, to the extent possible, the copper coils and steel core.
(4) Disposing of all portions of the core and coil assemblies that are not suitable for recycling.
(5) Re-welding transformer tank and preparing tank for transport.
(6) The Contractor is required to submit a site specific fire safety plan following the WAPA Construction Standard (Section 1.4) at least 14 days prior to the start of construction.
c. Transport of transformer, components and reassembly: The work shall include the
(1) The transformer tank shall be loaded and transported from Folsom Substation to the Elverta Maintenance Facility.
(2) The Contractor shall off load the transformer tank at the Elverta Maintenance Facility onto an existing concrete pad as directed by Western’s construction representative.
The Contractor shall anchor the transformer to the pad by drilling (2) 3/4” holes in the horizontal faces of each of the existing steel angle brackets (as far apart as possible while maintaining 1.5” steel edge distance), and installing 1/2” or 5/8” diameter expansion (or epoxy) anchors into the slab with approximately 6” embedment. The cabinet of the transformer shall be placed towards the North and the radiator shall be placed towards the South.
(3) Transport the transformer accessories from Folsom Substation to the Elverta
Maintenance Facility.
(4) Install surge arresters, bushings, radiators, and other accessories that were removed for disassembly and shipment.
8. Bidding Schedule items “Furnishing 5/c No. 10 AWG control cable” and “Furnishing 12/c
No. 10 AWG control cable” include furnishing 5/c No. 10 and 12/c No. 10 AWG control cable, respectively.
9. Bidding Schedule items “Installing 5/c No. 10 AWG control cable” and “Installing 12/c
No. 10 AWG control cable” include installing 5/c No. 10 and 12/c No. 10 AWG control cable, respectively.
a. The Contractor shall provide sufficient cable to reach the far corner of the control building and allow termination on the highest terminal block in the control cabinet of associated electrical equipment. The Contractor shall terminate the control cables in the transformer KV4A control cabinet. Western will terminate the control cables in panel CHA8.
10. Bidding Schedule item “Duplex switchboard CHA8 (Government-furnished)” includes furnishing materials not furnished by Western, unloading and moving duplex switchboard CHA8 into the control building, and installing the Government-furnished duplex switchboard in the location as shown on Drawing FOL 4002. The installation includes fabricating and installing a seismic switchboard base in accordance with standard Drawing 31 2049-2. Note that the Folsom control room floor is populated with existing control cables.
DIVISION 13 – ENVIRONMENTAL QUALITY PROTECTION
A. GENERAL:
1. Bidding Schedule does not contain separate items for the following. Include these items in applicable Bidding Schedule items:
a. Contractor Furnished Data: Submit quantities of all recycled materials to the COR prior to submittal of final invoice.
b. Environmental Requirements (See Section 13.3 of Standard): Comply with all appropriate Federal, State, and local environmental laws and regulations.
c. Landscape Preservation (See Section 13.4 of Standard).
d. Preservation of Cultural Resources (See Section 13.5 of Standard): Do not remove or alter cultural artifacts or paleontological resources (fossils). Cultural artifacts may be of scientific or cultural importance and includes, but is not limited to bones, pottery, glass, projectile points (arrowheads), other stone or metal tools, historic buildings, and features.
Paleontological resources can be of scientific importance and include mineralized animals and plants or trace fossils such as footprints. Both cultural and paleontological resources are protected by Federal Regulations during Federal construction projects. The Contractor shall restrict all ground disturbing activities to areas that have been surveyed by Western for cultural or paleontological resources.
e. Noxious Weed Control (See Section 13.6 of Standard): Comply with Federal, State, and local noxious weed control regulations. Provide a “clean vehicle policy” while entering and leaving construction areas to prevent transport of noxious weed plants and/or seed.
Transport only construction vehicles that are free of mud and vegetation debris to staging areas and the project right of-way.
f. Recycled Material Quantities (See Section 13.7 of Standard): If the products listed below or other products listed are obtained as part of this project, purchase the items with the highest recovered material content possible unless recovered material products are not available: 1) competitively within a reasonable time frame, 2) meeting reasonable performance standards as defined in the Standards or Project Specifications, or 3) at a reasonable price. All recycling proceeds from the project shall be paid to the Western Area Power Administration in check form from the recycler prior to final submittal of the final invoice.
g. Use of Products Containing Recovered Materials (See Section 13.8 of Standard): If the products listed at: http://www.biobased.oce.usda.gov are obtained as part of this project, purchase the items with the highest biobased content possible and no less than the percent indicated for each product unless biobased material products are not available: 1) competitively within a reasonable time frame, 2) meeting reasonable performance standards as defined in the Standards or Project Specifications, or 3) at a reasonable price.
h. Disposal of Waste Material (See Section 13.9 of Standard): Dispose or recycle waste material in accordance with applicable Federal, State and local regulations and ordinances.
In addition to the requirements of the Contract Clause “Cleaning Up”, remove all waste material from the construction site. No waste shall be left on Western property, right-of-way, or easement. Burning or burying of waste material is not permitted.
i. The Contractor’s Liability for Regulated Material Incidents (See Section 13.10 of Standard):
The Contractor is solely liable for all expenses related to spills, mishandling, or incidents of regulated material attributable to his actions or the actions of his subcontractors. This includes all response, investigation, cleanup, disposal, permitting, reporting, and requirements from applicable environmental regulation agencies. The actions of the Contractor employees, agents, and subcontractors shall be properly managed at all times on Western property or while transporting Western’s (or previously owned by Western) regulated material and equipment.
j. Pollutant Spill Prevention, Notification, and Cleanup (See Section 13.11 of Standard and requirements outlined in section B(4)(d).
k. Pesticides (See Section 13.12 of Standard).
l. Treated Wood Poles and Members Recycling or Disposal (See Section 13.13 of Standard).
m. Prevention of Air Pollution (See Section 13.14 of Standard).
n. Handling and Management of Asbestos Containing Material (See Section 13.15 of Standard): In the event asbestos is encountered during demolition or construction notify the COR. The Contractor is responsible for meeting all Federal, State, or local agency requirements regarding the handling and disposal of asbestos.
o. Materials with Lead-Based Paint (See Section 13.16 of Standard): The Contractor is responsible for meeting all Federal, State, or local agency requirements regarding the handling and disposal of lead-based paint used during construction or removed during demolition.
p. Prevention of Water Pollution (See Section 13.17 of Standard): Ensure that surface and ground water is protected from pollution caused by construction activities and comply with applicable regulations and requirements. Ensure that streams, waterways and other courses are not obstructed or impaired unless the appropriate Federal, State or local permits have been obtained. The Contractor is responsible for development and implementation of a Storm Water Pollution Prevention Plan (SWPPP) for the project, if applicable.
q. Testing, Draining, Removal, and Disposal of Oil-Filled Electrical Equipment
(See Section 13.18 of Standard).
r. Removal of Oil-Contaminated Materials (See Section 13.19 of Standard).
s. Conservation of Biological Resources (See Section 13.20 of Standard): Federal law prohibits the “take” of endangered, threatened, proposed or candidate wildlife and plants, and destruction or adverse modification of designated Critical Habitat. Federal law also prohibits the “take” of birds protected by the Migratory Bird Treaty Act, and the Bald and Golden Eagle Protection Act. “Take” means to pursue, hunt, shoot, wound, kill, trap, capture or collect a protected animal or any part thereof, or attempt to do any of those things without a permit from U.S. Fish and Wildlife Service. The Contractor will take precautions to avoid harming other wildlife species. Contractor shall restrict all ground disturbing activities to areas that have been surveyed by Western for natural resources.
t. Known Occurrence of Protected Species or Habitat: Following issuance of the notice to proceed, and prior to the start of construction, Western will provide training to all Contractor and subcontractor personnel and others involved in the construction activity if there is a known occurrence of protected species or habitat in or around the construction area.
Untrained personnel shall not be allowed in the construction area. Western will provide drawings or maps showing sensitive areas located on or immediately adjacent to the construction area. These sensitive areas shall be considered avoidance areas. Prior to any construction activity, the avoidance areas shall be marked on the ground by Western, if necessary.
u. Unknown Occurrence of Protected Species or Habitat: If evidence of a protected species is found in or around the construction area, the Contractor shall immediately notify the COR and provide the location and nature of the findings. The Contractor shall stop all activity within 200-feet of the protected species or habitat and not proceed until directed to do so by the COR.
v. Fueling Vehicles and Equipment: Fueling operations where the potential exists to contaminate the soil, water, or air (not including commercial or approved gas stations), the Contractor will have a spill plan (to identify fuels and its hazards, safe fueling practices, and the safe handling of such material), emergency response plan (with emergency phone numbers, actions taken by specific individuals, and the phone number of a spill “clean up” team), drip pans below the fueling operation to catch fuel leaks, secondary containment for fuel can storage, a policy of all fuel storage containers are sealed tight (except during fueling) to prevent leaks, and a spill kit adequate to stop potential spills.
w. Petroleum Products used in Engines, Transmissions, and Gear Boxes: The Contractor will inspect daily the equipment engines, transmissions, and gear boxes for oil, transmission fluid, and gear oil leaks. The Contractor will repair the leaks prior to operating the equipment except in the case the equipment is being operated solely to move it offsite to minimize environmental damage.
B. SPECIAL REQUIREMENTS:
1. COORDINATION:
a. The Contractor shall perform work only in locations within the Folsom Substation and Elverta Maintenance Facility as defined by Western Biologists and Archaeologists, and Environmental Protection Specialist in order to ensure avoidance of any potential affected sensitive resources.
b. All Contract employees shall attend the one-time environmental awareness training prior to the start of work. Any persons that do not attend the originally scheduled training shall complete the training and have an understanding of the required minimization measures prior to construction and staging activities.
2. SPECIAL CULTURAL RESOURCES REQUIREMENTS
a. In the event of any inadvertent (unanticipated) discovery of a cultural resource, the
Contractor shall stop work within 100-feet and immediately notify the COR and/or the Western SNR Natural Resources Supervisor. Western will have a qualified archaeologist, who meets the Secretary of the Interior’s Standard, evaluate and assess the find (in consultation with the SHPO and local tribes) if the site is prehistoric in nature.
3. SPECIAL BIOLOGICAL REQUIREMENTS:
a. The following are avoidance measures that the Contractor must adhere to in order to avoid impacts to sensitive plant and animal species in and around the construction area. The Contractor must meet with Westerns environmental team (including Westerns biologist and cultural resources specialist) at least 30-days prior to the start of project activities to review impact and avoidance areas.
b. Prior to the start of project activities, all personnel will participate in environmental awareness training which will inform them of the sensitive habitats within the vicinity of the construction area, species that have the potential to occur in or around the construction area and the avoidance and minimization measures that are to be adhered to during construction activities. Any new crew members that start after project activities have commenced will be given the environmental awareness training prior to working onsite.
(1) MIGRATORY BIRDS AND RAPTORS:
(a) Under the Migratory Bird Treaty Act of 1918, migratory bird species and their nests and eggs are protected from injury or death. Impacts to migratory bird nests shall be avoided during the nesting season (March 1 to August 15). If construction activities occur during the nesting season, Western will survey the construction area for migratory bird nests prior to construction activities and establish appropriate buffers around any nests that may potentially be disturbed. If work must be conducted within these buffers, a Western supplied biological monitor will be on site for construction activities within the buffers. If the biological monitor determines that activities are likely to cause nest impacts or nest abandonment, then construction activities in the area shall be postponed until nestlings have fledged or the nest is no longer active.
(2) BURROWING OWL
(a) From February 1 to August 31 activity will be prohibited within 250 feet of potential burrowing owl nesting dens. From September 1 through January 31, disturbance will be prohibited within 160 feet of potential burrowing owl dens.
Or a qualified biologist will conduct nesting and wintering surveys. If nesting or wintering activity is detected, a qualified biologist will mark and monitor an appropriate non-disturbance buffer in the vicinity of burrows that have been active within the last three years. Within the buffer zone, all activities will be prohibited from February 1 to August 31.
(3) VALLEY ELDERBERRY LONGHORN BEETLE (VELB)
(a) If any activities occur outside the Folsom substation fence, prior to project activities, a qualified biologist will flag elderberry shrubs within 100 feet of the project activities. A minimum buffer zone of 20 feet outside of the dripline of each elderberry plant will be provided during all activities.
(4) SEASONAL WETLAND HABITAT (INCLUDING VERNAL POOLS): Although construction activities will be inside the substation, there are sensitive wetland habitats south and southeast of the Elverta Substation where the transformer shell will be placed. The Contractor will adhere to the following measures:
(a) Vehicle access will only be permitted on well-established roads unless soils are dry. Soils will be considered sufficiently dry for vehicle access when they resist compaction, and after annual plants have set seed (generally June 1 to September 30, or as determined by a qualified biologist based on personal observation of the soils).
(b) When feasible, all maintenance activities will be routed around wet areas while ensuring that the route does not cross sensitive resource areas.
(c) If activities are proposed within 250 feet of a seasonal wetland a biological monitor will be present and/or a qualified biologist will clearly mark the limits of the feature(s) or appropriate buffers. A qualified biologist will clearly flag a 50 foot buffer around all seasonal wetland features if work is proposed during the wet season (generally October 1 to May 31) or flag the feature if work is proposed during the dry season (generally June 1 to September 30).
(d) All equipment will be stored, fueled, and maintained in a vehicle staging area 300-feet or the maximum distance possible from any vernal pool, vernal pool grassland, or seasonal wetland, and no closer than 200-feet unless a bermed (no ground disturbance) and lined refueling area is constructed and hazardous material absorbent pads are available in the event of a spill.
(e) Vehicles will be inspected daily for fluid leaks before leaving the staging area.
4. SPECIAL COMPLIANCE REQUIREMENTS: In addition to items in Section A of this Division 13, the Contractor shall adhere to the following:
a. Prevention of Air Pollution: Folsom Substation is located in Sacramento County, which is under the jurisdiction of the Sacramento Metropolitan Air Quality Management District (SMAQMD). Sacramento County has been designated as non-attainment for Federal ozone and PM 2.5 standards. If an air permit is required, the Contractor is responsible to provide a copy of the Authority to Construct to the COR 14-days prior to the start of work, and to remit a copy of the Permit to Operate to the COR prior to submittal of the final invoice.
For this project, an emergency backup generator will be required to provide power for the substation during the outage. This generator must be permitted by the local air district.
The Contractor will prevent emissions of fugitive dust from becoming airborne and leaving the property during construction operations in accordance with SMAQMD Rule 403, Fugitive Dust by employing Reasonably Available Control Measures to minimize dust. The Contractor will ensure industrial coatings are compliant under SMAQMD Rule 442, Architectural Coatings, and Rule 460, Adhesives and Sealants. All SMAQMD rules may be found here: http://www.airquality.org/businesses/rules-regulations.
Machinery Air Emissions: Diesel and large spark ignition equipment, including machinery, trucks, and all construction equipment used on the project shall be compliant with Federal, State, and local regulations, including those of the California Air Resources Board and SMAQMD. Diesel equipment shall be registered and/or permitted as required. If emissions control devices are required, they shall be installed on the equipment, maintained properly, and used in accordance with the regulations.
b. Waste Management: All materials generated from the project that can be recycled, shall be recycled. Quantities of recycled and waste materials shall be reported to the COR according to the provisions of Western’s Construction Standards document, section 13.7. Manage hazardous, universal (i.e., fluorescent lamps, aerosol cans, etc.), and non-hazardous wastes in accordance with State and Federal regulations, and in accordance with Western’s Construction Standards document, section 13.7 Disposal of Waste Material. Coordinate all disposals with the COR and disposals of hazardous waste, including oil with Environment.
Environment staff must be on-site to sign hazardous waste manifests generated from the project.
c. Prevention of Water Pollution: All projects shall be managed in accordance with Federal, State and local regulations. The Contractor shall utilize best management practices (BMPs) to protect surface and ground water from pollution caused by construction activities. Runoff from excavated areas and piles of excavated material, wastes, or chemical products shall be controlled. Concrete washing shall not be permitted at any source of surface water.
d. The diesel tank fueling the temporary generator must be double walled to provide secondary containment. Placement of the diesel tank must be coordinated and approved in advance by a WAPA representative to ensure any spills are adequately captured by the existing oil detention structures.
e. Spill Prevention Notification and Cleanup Plan: The project involves the use of pollutants including oil, diesel, etc., therefore a spill prevention and notification plan must be submitted to the COR for review and approval at least 14-days prior to the start of work. The plan shall address pollutants including any hazardous or non-hazardous substance, that when spilled, will contaminate soil, surface water or ground water.