CLIN Work or Material Estimated Quantity Unit Unit Price Amount

0001 Mobilization and preparatory work ((not to exceed 5% of total for Part A, B and C) See section M.

LS $

TOTAL FOR PART A $

0002 Miscellaneous sitework LS $

0003 Demolition LS $

0004 Standard chain link fence LS $

0005 Concrete foundations 505 CY $ $

0006 Type "C" cable trench LS $

0007 Steel structures, welded (galvanized) 89800 LB $ $

0008 Series capacitor bank, 345-kV, 110.1 MVAR, three phase (Government furnished)

LS $

0009 Power circuit breaker, 345-kV, 2,000 amps, single phase (Government-furnished)

3 EA $ $

0010 Motor operated disconnecting switch, 345-kV, 2,000 amps, three phase

3 EA $ $

0011 Motor operated disconnecting switch with motor operated grounding blades, 345-kV, 2,000 amps, three phase

1 EA $ $

Part B -CAPACITOR BANK REPLACEMENT

SECTION B

SUPPLIES OR SERVICES AND PRICES

BIDDING SCHEDULE

LIBERTY SUBSTATION, STAGE 06

Part A - Mobilization

0012 Coupling capacitor voltage transformer, 345-kV, single phase (Government-furnished)

3 EA $ $

0013 Surge arrester, 345kV, single phase 3 EA $ $

0014 Pad mounted dry type transformer, 240- 120/240V, 50kVA, single phase

1 EA $ $

0015 Outdoor AC distribution board 1 EA $ $

0016 Grounding system LS $

0017 Bus system LS $

0018 Conduit system LS $

0019 Associated outdoor electrical equipment and material

LS $

0020 Existing outdoor electrical equipment and material

LS $

0021 Furnishing 3/c No. 2 AWG control cable 7,100 LF $ $

0022 Installing 3/c No. 2 AWG control cable 7,100 LF $ $

0023 Furnishing 5/c No. 10 AWG control cable 2,400 LF $ $

0024 Installing 5/c No. 10 AWG control cable 2,400 LF $ $

0025 Furnishing 12/c No. 10 AWG control cable 17,500 LF $ $

0026 Installing 12/c No. 10 AWG control cable 17,500 LF $ $

0027 Enclosed switchboard (Government-furnished)

LS $

0028 Electrical testing LS $

TOTAL FOR PART B $

0029 Miscellaneous sitework LS $

0030 Demolition LS $

0031 Concrete foundation 4.8 CY $

0032 Steel structures, welded (galvanized) 1000 LB $ $

0032 Power circuit breaker, 230-kV, 3,000 amps (Government-furnished)

LS $

0033 Conduit system LS $

0034 Associated outdoor electrical equipment and material

LS $

0035 Grounding system LS $

0035 Existing outdoor electrical equipment and material

LS $

0036 Furnishing 5/c No. 10 AWG control cable 2400 LF $ $

0036 Installing 5/c No. 10 AWG control cable 2400 LF $ $

0037 Furnishing 12/c No. 10 AWG control cable 800 LF $ $

0037 Installing 12/c No. 10 AWG control cable 800 LF $ $

0038 Electrical testing LS $

TOTAL FOR PART C $

ABBREVIATIONS

CY = cubic yards EA = each LF = linear feet LS = for the lump sum of LB = pounds

CLIN = contract line item number

Part C - Power Circuit Breaker Addition