Attachment_A_-_Amendment_0002_Bid_Schedule.pdf
PDF 29 KB Posted
- Attached to
- Liberty Substation Stage 06
- Solicitation number
- 89503118BWA000003
About this file
Attch A- Amend. 0002 Bid Schedule
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No.89503118BWA000003 Amendment 0002
CLIN Work or Material Estimated Quantity Unit Unit Price Amount
0001 Mobilization and preparatory work LS $
TOTAL FOR PART A $
0002 Miscellaneous sitework LS $
0003 Demolition LS $
0004 Standard chain link fence LS $
0005 Concrete foundations 505 CY $ $
0006 Type "C" cable trench LS $
0007 Steel structures, welded (galvanized) 89800 LB $ $
0008 Series capacitor bank, 345-kV, 110.1 MVAR, three phase (Government furnished)
LS $
0009 Power circuit breaker, 345-kV, 2,000 amps, single phase (Government-furnished)
3 EA $ $
0010 Motor operated disconnecting switch, 345-kV, 2,000 amps, three phase
3 EA $ $
0011 Motor operated disconnecting switch with motor operated grounding blades, 345-kV, 2,000 amps, three phase
1 EA $ $
0012 Coupling capacitor voltage transformer, 345-kV, single phase (Government-furnished)
3 EA $ $
0013 Surge arrester, 345kV, single phase 3 EA $ $
Part B -CAPACITOR BANK REPLACEMENT
SECTION B
SUPPLIES OR SERVICES AND PRICES
BIDDING SCHEDULE
LIBERTY SUBSTATION, STAGE 06
Part A - MOBILIZATION
0014 Pad mounted dry type transformer, 240- 120/240V, 50kVA, single phase
1 EA $ $
0015 Outdoor AC distribution board 1 EA $ $
0016 Grounding system LS $
0017 Bus system LS $
0018 Conduit system LS $
0019 Associated outdoor electrical equipment and material
LS $
0020 Existing outdoor electrical equipment and material
LS $
0021 Furnishing 3/c No. 2 AWG control cable 7,100 LF $ $
0022 Installing 3/c No. 2 AWG control cable 7,100 LF $ $
0023 Furnishing 5/c No. 10 AWG control cable 2,400 LF $ $
0024 Installing 5/c No. 10 AWG control cable 2,400 LF $ $
0025 Furnishing 12/c No. 10 AWG control cable 17,500 LF $ $
0026 Installing 12/c No. 10 AWG control cable 17,500 LF $ $
0027 Enclosed switchboard (Government-furnished)
LS $
0028 Electrical testing LS $
TOTAL FOR PART B $
0029 Miscellaneous sitework LS $
0030 Demolition LS $
0031 Concrete foundation 4.8 CY $ $
0032 Steel structures, welded (galvanized) 1000 LB $ $
0033 Power circuit breaker, 230-kV, 3,000 amps (Government-furnished)
LS $
0034 Conduit system LS $
0035 Associated outdoor electrical equipment and material
LS $
0036 Grounding system LS $
0037 Existing outdoor electrical equipment and material
LS $
0038 Furnishing 5/c No. 10 AWG control cable 2400 LF $ $
0039 Installing 5/c No. 10 AWG control cable 2400 LF $ $
0040 Furnishing 12/c No. 10 AWG control cable 1800 LF $ $
0041 Installing 12/c No. 10 AWG control cable 1800 LF $ $
0042 Electrical testing LS $
TOTAL FOR PART C $
TOTAL AMOUNT (A, B and C) $
ABBREVIATIONS
CY = cubic yards EA = each LF = linear feet LS = for the lump sum of LB = pounds
CLIN = contract line item number
Part C - POWER CIRCUIT BREAKER ADDITION
Bid Schedule
File details come from the government source that posted it.