8763.22_Oak Summit_Final Plans.pdf
PDF 12 MB Posted
- Solicitation number
- 2139927
- Issued by
- Dutchess County, New York
About this file
Summary
This is a final construction plans document for the Oak Summit Road Over Sprout Creek Structure Replacement project located in the Town of Washington, Dutchess County, New York. The project involves the complete replacement of an existing culvert structure spanning Sprout Creek with a new precast concrete structure. The 34-sheet plan set, prepared by Colliers Engineering & Design and stamped by licensed professional engineer Daniel A. Farnan on October 13, 2026, includes comprehensive design specifications for the 153-linear-foot roadway reconstruction from station R1+12.40 to R2+65.00. Key construction elements include demolition of the existing substructure and superstructure, excavation and cofferdam installation, installation of the new precast bridge structure (Bridge Identification Number 2272380), construction of cast-in-place wingwalls with stone armoring, full-depth asphalt pavement replacement, installation of box beam guide railing systems, erosion and sediment control measures, and final site restoration including topsoil and turf establishment. The project requires coordination with multiple utility companies including Central Hudson Gas & Electric, Verizon Communications, and Optimum Communications for overhead line relocations.
The plans specify numerous construction items with detailed quantity estimates, including approximately 438 square yards of turf establishment, 50 cubic yards of topsoil, 117 linear feet of pavement saw cutting, 128 linear feet of box beam guide railing, and 194 linear feet of biodegradable sediment filter logs. Stream protection protocols mandate that all in-water work occur between May 1 and September 30, with cofferdams and water diversions prohibited from October 1 through April 30 to protect trout populations in Sprout Creek (Class C(T) stream). The contractor must comply with environmental regulations including protection of Indiana bats, northern long-eared bats, and tricolored bats, with tree cutting restricted to October 31 through March 31, and a required bridge/structure bat assessment between May 15 and October 31 within two years of work commencement. Right-of-way markers and property acquisitions are identified for multiple property owners including Harrison Dickson and Keegan Goudie. The project maintenance responsibilities fall to the Town of Washington under sections 129, 135, and 140 of the New York Highway Law. Minority and Women Business Enterprise (MWBE) contracting goals are established at 6 percent for MBE and 12 percent for WBE, with a 6 percent Service-Disabled Veteran-Owned Business (SDVOB) goal.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 8763.22_Notice to Bidders.pdf | ||
| 8763.22_Project Proposal (Spec) Book.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IT IS A VIOLATION OF LAW FOR ANY PERSON,
UNLESS THEY ARE ACTING UNDER THE DIRECTION
OF A LICENSED PROFESSIONAL ENGINEER,
ARCHITECT, LANDSCAPE ARCHITECT, OR LAND
SURVEYOR, TO ALTER AN ITEM IN ANY WAY. IF AN
ITEM BEARING THE STAMP OF A LICENSED
PROFESSIONAL IS ALTERED, THE ALTERING
ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT,
OR LAND SURVEYOR SHALL STAMP THE
DOCUMENT AND INCLUDE THE NOTATION
"ALTERED BY" FOLLOWED BY THEIR SIGNATURE,
THE DATE OF SUCH ALTERATION, AND A SPECIFIC
DESCRIPTION OF THE ALTERATION. PRINT DATE:
MANAGER:
PROJECT NUMBER:
DRAWN BY:DESIGNED BY: CHECKED BY:
SHEET No.
S-LGND
DRAWING No.
ALL DIMENSIONS IN US SURVEY FEET UNLESS OTHERWISE NOTED
NOTE: ALL UTILITY LOCATIONS SHOWN ARE QUALITY LEVEL
DOCUMENT NAME: PIN: BIN:
ON:
PREPARED BY:
10/13/2026
STATE OF NEW YORK
AS BUILT REVISIONS
DESCRIPTION OF WORK:
SIGNATURE DATE
Copyright © 2026. Colliers Engineering & Design All Rights Reserved. This drawing and all the information contained herein is authorized for use only by the party for whom the services were contracted or to whom it is certified. This drawing may not be copied, reused, disclosed, distributed or relied upon for any other purpose without the express written consent of Colliers Engineering & Design.
www.colliersengineering.com
Engineering & Design
Phone:
COLLIERS ENGINEERING & DESIGN,
ARCHITECTURE, LANDSCAPE ARCHITECTURE,
SURVEYING CT, P.C.
Engineering & Design
(QLA).
D#:
OAK SUMMIT ROAD OVER SPROUT CREEK
STRUCTURE REPLACEMENT (BIN: 2272380)
OAK SUMMIT ROAD
TOWN OF WASHINGTON
DUTCHESS COUNTY
8763.22 2272380
DAF JWH ASC DAF
23013783G
C
OF 34
ALBANY
18 Corporate Woods Blvd.
Suite 400 Albany, NY 12211
518.459.3252
D041406
DANIEL A. FARNAN
OCTOBER 13, 2026
DA
NIEL A . FA RNAN
No. 092510
STA T E OF NEW Y ORK
L ICENSED PROFESSIONAL ENGIN
EE
R
INDEX & ABBREVIATIONS
INDX-1
ALIGNMENT
ABBR. DESCRIPTION
AH AHEAD
AZ AZIMUTH
BK BACK
b BASELINE
BRG BEARING
c CENTERLINE
CS CURVE TO SPIRAL
e SUPERELEVATION RATE (CROSS SLOPE)
EQ EQUALITY
EXT EXTERNAL
HCL HORIZONTAL CONTROL LINE
HSD HEADLIGHT SIGHT DISTANCE
L LENGTH OF CIRCULAR CURVE
LS LENGTH OF SPIRAL
LVC LENGTH OF VERTICAL CURVE
E CENTER CORRECTION OF VERTICAL CURVE
f MAIN LINE
PC POINT OF CURVATURE
PI POINT OF INTERSECTION
POL POINT ON LINE
PSD PASSING SIGHT DISTANCE
PT POINT OF TANGENT
PVC POINT OF VERTICAL CURVE
PVI POINT OF VERTICAL INTERSECTION
PVT POINT OF VERTICAL TANGENT
R RADIUS
SC SPIRAL TO CURVE
SSD STOPPING SIGHT DISTANCE
ST SPIRAL TO TANGENT
STA STATION
T TANGENT LENGTH
TGL THEORETICAL GRADE LINE
TS TANGENT TO SPIRAL
VC VERTICAL CURVE
TOPOGRAPHY (DRAINAGE)
ABBR. DESCRIPTION
BB BOTTOM OF BANK (STREAM)
BC BOTTOM OF CURB
BO BOTTOM OF OPENING
CAP CORRUGATED ALUMINUM PIPE
CB CATCH BASIN
CIP CAST IRON PIPE
℄STREAM CENTERLINE OF STREAM
CMP CORRUGATED METAL PIPE
CP CONCRETE PIPE
CSP CORRUGATED STEEL PIPE
CULV CULVERT
DIA DIAMETER
DMH DRAINAGE MANHOLE
DS DRAINAGE STRUCTURE PIPE
D'XING DITCH CROSSING
EHW EXTREME HIGH WATER
EL ELEVATION
ELEV ELEVATION
ELW EXTREME LOW WATER
ES END SECTION
HW HEADWALL
INV INVERT
MH MANHOLE
MHW MEAN HIGH WATER
OHW ORDINARY HIGH WATER
OLW ORDINARY LOW WATER
RCP REINFORCED CONCRETE PIPE
SICPP SMOOTH INTERIOR CORRUGATED POLYETHYLENE PIPE
TB TOP OF BANK (STREAM)
TC TOP OF CURB
TG TOP OF GRATE
VCP VITRIFIED CLAY PIPE
TOPOGRAPHY (MISCELLANEOUS)
ABBR. DESCRIPTION
ABUT ABUTMENT
AOBE AS ORDERED BY ENGINEER
ASPH ASPHALT
BDY BOUNDARY
BLDG BUILDING
BM BENCH MARK
CC CENTER TO CENTER
CONC CONCRETE
CONST CONSTRUCTION
CR COUNTY ROAD
D DEED DISTANCE
DM DIRECT MEASUREMENT
DWY DRIVEWAY
EIC ENGINEER-IN-CHARGE
EP EDGE OF PAVEMENT
ES EDGE OF SHOULDER
FEE FEE ACQUISITION
FEE WO/A FEE ACQUISITION WITHOUT ACCESS
FP FENCE POST
FD FOUNDATION
FL FENCE LINE
GAR GARAGE
GR GRAVEL
HO HOUSE
HWY HIGHWAY
IP IRON PIN OR IRON PIPE
MB MAILBOX
MON MONUMENT
N&W NAIL AND WASHER
OG ORIGINAL GROUND
O/H OVERHEAD
P PARCEL
PAV'T PAVEMENT
PE PERMANENT EASEMENT
PED POLE PEDESTRIAN POLE
⅊ PROPERTY LINE
POR POINT OF ROTATION
RR RAILROAD
RTE ROUTE
ROW RIGHT OF WAY
RW RETAINING WALL
SH STATE HIGHWAY
SHLDR SHOULDER
SPK SPIKE
ST STREET
STK STAKE
STY STORY
SW SIDEWALK
TE TEMPORARY EASEMENT
TO TEMPORARY OCCUPANCY
U/G UNDERGROUND
WW WING WALL
UTILITIES
ABBR. DESCRIPTION
E ELECTRIC
EMH ELECTRIC MANHOLE
G GAS
GP GUY POLE
GSB GAS SURFACE BOX (HOUSE LINE)
GV GAS VALVE (MAIN LINE)
HYD HYDRANT
LP LIGHT POLE
LPG LOW PRESSURE GAS
PP POWER POLE
SA SANITARY SEWER
SMH SANITARY MANHOLE
ST STORM SEWER
T TELEPHONE
TCB TRAFFIC CONTROL BOX
TELBOX TELEPHONE BOX
TEL P TELEPHONE POLE
TMH TELEPHONE MANHOLE
CTV CABLE TELEVISION
W WATER
WSB WATER SERVICE BOX (HOUSE LINE)
WV WATER VALVE (MAIN LINE)
SUBSURFACE EXPLORATION
ABBR. DESCRIPTION
REPLACE ABBREVIATION "AB" WITH:
AH HAND AUGER
CP CONE PENETROMETER
DA 2 INCHES CASED DRILL HOLE
DM DRILLING MUD
DN 4 INCHES CASED DRILL HOLE
FH HOLLOW FLIGHT AUGER
PA POWER AUGER
PH PROBE
PT PERCOLATION TEST HOLE
RP 1 INCH SAMPLER (RETRACTABLE PLUG)
SP SEISMIC POINT
TP TEST PIT
ABBREVIATION "C" IN CATEGORIES:
DA, DM, DN, AND FH WITH:
B BRIDGE
C CUT
D DAM
F FILL
K CULVERT
W WALL
X TO BE USED IF ONE OF THE ABOVE CANNOT BE
DEFINE AT THE TIME THE EXPLORATION IS MADE
INDEX
TOTAL NUMBER OF SHEETS: 34
SHEET
NUMBER
TITLE DRAWING NUMBER
1 COVER SHEET CVER
2 INDEX AND ABBREVIATIONS INDX-1
3 LEGEND - POINT SYMBOLOGY LEGD-1
4 LEGEND - LINE SYMBOLOGY LEGD-2
5 TYPICAL SECTIONS TYPS-1
6 GENERAL NOTES NOTE-1
7 ENVIRONMENTAL NOTES (SHEET 1 OF 2) NOTE-2
8 ENVIRONMENTAL NOTES (SHEET 2 OF 2) NOTE-3
9 DETOUR PLAN WZTC-1
10 WORKZONE TRAFFIC CONTROL NOTES WZTC-2
11 BASELINE DIAGRAM, BASELINE TIES, BENCHMARKS, AND ALIGNMENT DATA TABLE BLTB-1
12 HIGHWAY MAINTENANCE JURISDICTION PLAN MJPS-1
13 MISCELLANEOUS DETAILS AND TABLES (SHEET 1 OF 2) MSDT-1
14 MISCELLANEOUS DETAILS AND TABLES (SHEET 2 OF 2) MSDT-2
15 BORING LOGS (SHEET 1 OF 3) BORE-1
16 BORING LOGS (SHEET 2 OF 3) BORE-2
17 BORING LOGS (SHEET 3 OF 3) BORE-3
18 GENERAL PLAN GNPS-1
19 ROAD PROFILE PROF-1
20 STREAM PROFILE PROF-2
21 GRADING, EROSION, AND SEDIMENT CONTROL PLAN GESC-1
22 STRUCTURE PLAN STRC-1
23 STRUCTURE SECTIONS STRC-2
24 EXCAVATION, REMOVAL, & EMBANKMENT PLAN EXEM-1
25 STRUCTURE DETAILS (SHEET 1 OF 5) DTLS-1
26 STRUCTURE DETAILS (SHEET 2 OF 5) DTLS-2
27 STRUCTURE DETAILS (SHEET 3 OF 5) DTLS-3
28 STRUCTURE DETAILS (SHEET 4 OF 5) DTLS-4
29 STRUCTURE DETAILS (SHEET 5 OF 5) DTLS-5
30 BRIDGE RAIL PLAN RAIL-1
31 SHOP CURVED RAIL DETAILS RAIL-2
32 BRIDGE RAIL DETAILS (SHEET 1 OF 3) RAIL-3
33 BRIDGE RAIL DETAILS (SHEET 2 OF 3) RAIL-4
34 BRIDGE RAIL DETAILS (SHEET 3 OF 3) RAIL-5
STANDARD
SYMBOLS
(PLANS)
ITEM PAYMENT UNIT:
ESTIMATE OF
QUANTITIES SHEET
EQUIVALENT
NOMENCLATURE:
(SPECS/PROPOSAL)
ft FT LINEAR FEET ft2 SF SQUARE FEET ft3 CY CUBIC YARD mi MI MILES
AC AC ACRES
lb LB POUND
TON TON TON
GAL GAL GALLON
203-01 203-02
209-01 209-02 209-03 209-05 209-06
402-01
606-04 606-06
619-02 619-10 619-11 619-12 619-20 619-60 619-61 619-66
625-01
645-01 645-03
646-13 646-14 646-15
NYSDOT STANDARD SHEETS
BY REFERENCE, THE FOLLOWING NYSDOT STANDARD SHEETS ARE INCLUDED IN THIS
CONTRACT:
OF A LICENSED PROFESSIONAL ENGINEER,
ARCHITECT, LANDSCAPE ARCHITECT, OR LAND
SURVEYOR, TO ALTER AN ITEM IN ANY WAY. IF AN
ITEM BEARING THE STAMP OF A LICENSED
PROFESSIONAL IS ALTERED, THE ALTERING
ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT,
OR LAND SURVEYOR SHALL STAMP THE
DOCUMENT AND INCLUDE THE NOTATION
"ALTERED BY" FOLLOWED BY THEIR SIGNATURE,
THE DATE OF SUCH ALTERATION, AND A SPECIFIC
DESCRIPTION OF THE ALTERATION. PRINT DATE:
MANAGER:
PROJECT NUMBER:
DRAWN BY:DESIGNED BY: CHECKED BY:
SHEET No.
S-LGND
DRAWING No.
ALL DIMENSIONS IN US SURVEY FEET UNLESS OTHERWISE NOTED
NOTE: ALL UTILITY LOCATIONS SHOWN ARE QUALITY LEVEL
DOCUMENT NAME: PIN: BIN:
ON:
PREPARED BY:
10/13/2026
STATE OF NEW YORK
AS BUILT REVISIONS
DESCRIPTION OF WORK:
SIGNATURE DATE
Copyright © 2026. Colliers Engineering & Design All Rights Reserved. This drawing and all the information contained herein is authorized for use only by the party for whom the services were contracted or to whom it is certified. This drawing may not be copied, reused, disclosed, distributed or relied upon for any other purpose without the express written consent of Colliers Engineering & Design.
www.colliersengineering.com
Engineering & Design
Phone:
COLLIERS ENGINEERING & DESIGN,
ARCHITECTURE, LANDSCAPE ARCHITECTURE,
SURVEYING CT, P.C.
Engineering & Design
(QLA).
D#:
OAK SUMMIT ROAD OVER SPROUT CREEK
STRUCTURE REPLACEMENT (BIN: 2272380)
OAK SUMMIT ROAD
TOWN OF WASHINGTON
DUTCHESS COUNTY
8763.22 2272380
DAF JWH ASC DAF
23013783G
C
OF 34
ALBANY
18 Corporate Woods Blvd.
Suite 400 Albany, NY 12211
518.459.3252
D041406
DANIEL A. FARNAN
OCTOBER 13, 2026
DA
NIEL A . FA RNAN
No. 092510
STA T E OF NEW Y ORK
L ICENSED PROFESSIONAL ENGIN
EE
R
LEGEND - POINT SYMBOLOGY
LGND-1
ALIGNMENT
CELL NAME DESCRIPTION
ACC CENTER OF CURVATURE
ACOGO COGO
ACS CURVE TO SPIRAL
ADPI_P DETOUR, POINT OF INTERSEC.
ADPL_P DETOUR, POINT ON LINE
AEQN EQUATION
AEQNAHDEQUATION AHEAD
AEQNBK EQUATION BACK
AEVT EVENT STATION
APC POINT OF CURVATURE
APCC POINT OF COMPOUND CURVATURE
API POINT OF INTERSECTION
APOB POINT OF BEGINNING
APOC POINT OF CURVATURE
APOE POINT OF END
APOL POINT ON LINE
APOS POINT ON SPIRAL
APOT POINT ON TANGENT
APOVC POINT ON VERTICAL CURVE
APOVT POINT ON VERTICAL TANGENT
APORC POINT ON REVERSE CURVE
APT POINT ON TANGENCY
APVC POINT OF VERTICAL CURVATURE
APVCC POINT OF VERT. CMPND. CURVE
APVI POINT OF VERT. INTERSECTION
APVRC POINT OF VERT. REVERSE CURVE
APVT POINT OF VERTICAL TANGENCY
ASC SPIRAL TO CURVE
ASPI SPIRAL POINT OF INTERSECTION
ASTS SPIRAL TO SPIRAL
AST SPIRAL TO TANGENT
ATS TANGENT TO SPIRAL
AVEVT VERTICAL EVENT POINT
AVHIGH VERTICAL HIGH POINT
AVLOW VERTICAL LOW POINT
BRIDGE
BSC BRIDGE, SCUPPER
CONTROL
CBP BASELINE, POINT
CBPOL BASELINE, POINT ON LINE
CBSP BASELINE, SPUR POINT
CBTP BASELINE, TIE POINT
CPBM BENCHMARK
CPH POINT, HORIZ. PHOTOGRAMMETRY
CPSM POINT, SURVEY MARKER, PERM.
CPSV POINT, VERT., PHOTOGRAMMETRY
DRAINAGE
CELL NAME DESCRIPTION
DINV INVERT
DS STRUCTURE, RECTANGULAR
DSI STRUCTURE, INVERT
DSM STRUCTURE, MANHOLE
DSMTXX_P
STRUCTURE, MANHOLE,
TYPE "XX"
"XX" = 48, 60, 72, 96
DSR STRUCTURE, ROUND
DSR"X"CB_P
STRUCTURE, RECT., WITH CURB
TYPE "X"
"XX" = F, G, N, O, P, R
DST"X"_P STRUCTURE, RECT., TYPE "X"
"X" = I, K, L, M, O, P, U
ENVIRONMENTAL
EIOP_P STR., INLET, OUTLET PROT.
EIPGB_P STR., INLET PROT., GRAVEL BAG
EIPHS_P STR., INLET PROT., HAY/STRAW
EIPP_P STR., INLET PROT., PREFAB.
EIPSF_P STR., INLET PROT., SILT FENCE
ERCB RISER, CONCRETE BOX
ETRS_P TRAP, SEDIMENT
EWFG WETLAND FLAG
GEOTECHNICAL
GDH DRILL HOLE
LANDSCAPE
LLS ELEVATION, SPOT
LFP FLAG POLE
LMB MAILBOX
LPB PAPER BOX
LPST POST, SINGLE
LRB ROCK, BOULDER
LSHC SHRUB, CONIFEROUS
LSHD SHRUB, DECIDUOUS
LTC TREE, CONIFEROUS
LTD TREE, DECIDUOUS
LTS TREE, STUMP
LTW_P TREE, WELL OR WALL
LUKP UNKNOWN POINT
ITS
CELL NAME DESCRIPTION
IANT_P ANTENNAS
IASCTS ACCOU. SPEED/COUNT SNSR.S
ICABPAD CABINET & PAD
ICCTV CCTV SITE
ICDPD CDPD TRANSCEIVER
ICELLT CELL PHONE TOWER
ICJB CONDUIT JACK OR BORING
ICNTLCABCONTROLLER CABINET
ICPB COMMUNICATION PULL BOX
ICTD CONDUIT TURNING DOWN
ICTU CONDUIT TURNING UP
ICVTRT COMM. VEH. ROAD TRANSCEIVER
IDEFAULTDEFAULT
IEZR E-ZPASS READER
IEZTR TRANSMITTAL READER
IFOXCAB FIBER OPTIC X-CONNECT CABINET
IFUSSPL FUSION SPLICE
IHARADV HAR ADVISORY SIGN
IHARST HAR SITE
ILC LOAD CENTER
IMECSPL MECHANICAL SPLICE
IMSCS PORT. SPEED & COUNT SENSOR
IMSCTS MICRO SPEED & COUNT SENSOR
IMT MICROWAVE TRANSCEIVER
IOVHVMS PERM. OVERHEAD VMS
IPASCS PORT. ACCOU. SPD & CNT. SENSOR
IPEDS PEDESTRIAN SIGNAL HEAD
IPSS PAVEMENT SURFACE SENSOR
IPVMS PERM. VMS
IRM RAMP METER
IRWIS RDWY WEATHER INFO. SENSOR
ISP SOLAR PANEL
ISST SPREAD SPECT. TRANSCEIVER
ITDB TELEPHONE DEMARCATION BLK
ITP SUBSURFACE TEMP. PROBE
IVTRT VEHICLE TO RDWY TRANSCEIVER
IWIMD WEIGHT IN MOTION DETECTOR
IWVR WIRELESS VIDEO REPEATER
IWVRC WIRELESS VIDEO RECEIVER
IWVTT WIRELESS VIDEO TRANSMITTER
ROW
CELL NAME DESCRIPTION
MDL1P DEED LINE, TYPE 1
MDL2P DEED LINE, TYPE 2
MDL3P DEED LINE, TYPE 3
MDL4P DEED LINE, TYPE 4
MDL5P DEED LINE, TYPE 5
MEEP EASEMENT, EXISTING
MEPAP_P EASEMENT, PERM., APPROX.
MEPP_P EASEMENT, PERM., BACK LINE
MEPSP_P EASEMENT, PERM., SHAPE
MFAP_P FEE ACQUISITION, APPROX.
MFP_P FEE ACQUISITION, BACK LINE
MFSP_P FEE ACQUISITION, SHAPE
MHBAP HIGHWAY BNDRY., APPROX.
MHBCP HISTORICAL, BLDG. CORNERS
MHBP HIGHWAY BNDRY, PT.
MJCP PT., JURIS. CITY
MPBC PT., BUILDING CORNER
MPCC PT., CROSS CUT
MPDH PT., DRILL HOLE
MPF PT., FENCE LOCATION
MPIP PT., IRON PIPE
MPIR PT., IRON ROD
MPM PT., MONUMENT
MPMM PT., MONUMENT, MISC.
MPN PT., NAIL
MPR PT., RAILROAD SPIKE
MPSP PT., SPIKE
MPST PT., STAKE
MPTW PT., TREE W/ WIRE
MPWL PT., WALL, LOCATION
ROW, ACQUISITION
MFS_P_T FEE ACQUISITION
MEPS_P_TEASEMENT, PERMANENT
METS_P_TEASEMENT, TEMPORARY
METS_P_TOCCUPANCY, TEMPORARY
MFS_P_T FEE ACQUISITION W/O ACCESS
ROADWAY
RES_P ELEVATION, SPOT
RGA GUIDE RAIL, ANCHOR
RGP GUIDE POST, SINGLE
SIGNS
CELL NAME DESCRIPTION
S SINGLE POST
S_P SINGLE POST, PROPOSED
SB_P BACK TO BACK, PROPOSED
SDEL DELINEATORS
SPM PARKING METER
SRM REFERENCE MARKERS
SRSC3 SHLD, CITY, 1, 2, 3 DIG.
SRSC4 SHLD, CITY, 4 DIG.
SRSCT2 SHLD, CITY TOUR, 1-2 DIG.
SRSCT4 SHLD, CITY TOUR, 3-4 DIG.
SRSI SHLD, INTERSTATE
SRSN2 SHLD, NATIONAL, 2 DIG.
SRSN3 SHLD, NATIONAL, 3 DIG.
SRSS2 SHLD, STATE, 2 DIG.
SRSS3 SHLD, STATE, 3 DIG.
SRSS4 SHLD, STATE, 4 DIG.
UTILITIES
CELL NAME DESCRIPTION
UEB ELECTRIC, BOX
UEM ELECTRIC, METER
UEMH ELECTRIC, MANHOLE
UEPT ELECTRIC, POLE, TRANS.
UGM GAS, METER
UGMH GAS, MANHOLE
UGLM GAS, LINE MARKER
UGP GAS/FUEL PUMP
UGV GAS, VALVE
UGVT GAS, VENT
ULP LIGHTING, POLE
ULPM LIGHTING, POLE, MEDIAN
ULPP LIGHTING, POLE, PED.
UMFC MISC. FILLER CAP
UOLM OIL, LINE MARKER
UP POLE, WITH UTILITY
UPD POLE, DEAD (NO UTILITY)
UPL POLE, WITH LIGHT
USMH SANITARY SEWER MANHOLE
UTB TELEPHONE, BOOTH
UTLM TELEPHONE, LINE MARKER
UTMH TELEPHONE, MANHOLE
UTVLM CABLE TV, LINE MARKER
UTVPB CABLE TV, PULL BOX
UUB UNKNOWN, BOX
UUJB UNKNOWN, JUNCTION BOX
UUMH UNKNOWN, MANHOLE
UUPB UNKNOWN, PULL BOX
UUVL UNKNOWN, VALVE
UUVT UNKNOWN, VENT
UUW UNKNOWN, WELL
UWFH WATER, FIRE HYDRANT
UWM WATER, METER
UWMH WATER, MANHOLE,
UWV WATER, VALVE
UWW WATER, WELL
TRAFFIC CONTROL
TCBJ BOX, JUNCTION
TCBP BOX, PULL BOX
TCBS BOX, SPLICE
TCMC MICROCOMPUTERCABINET
TCPP PED POLE
TCSH SIGNAL HEADS
TCSP SIGNAL POLE
TRAFFIC WORK ZONE
TWZAP_P ARROW PANEL
TWZAPC_P ARROW PANEL, CAUTION
MODE
TWZAPT_P ARROW PANEL, TRAILER OR
SUPPORT
TWZBCD_P BARRICADE (TYPE III)
TWZCMS_P CHANGEABLE MESSAGE
SIGN (PVMS)
TWZFLG_P FLAGGER
TWZFT_P FLAG TREE
TWZIA_P
IMPACT ATTENUATOR /
CRASH CUSHION
(TEMPORARY)
TWZLUM_PLUMINAIRE (TEMPORARY)
TWZSDT_P SYMBOL, DIRECTION OF
TRAFFIC
TWZSDTD_P
SYMBOL, DIRECTION OF
TEMPORARY TRAFFIC
DETOUR
TWZSGN_P SIGN (TEMPORARY)
TWZSIG_P SIGNAL, TRAFFIC OR
PEDESTRIAN (TEMPORARY)
TWZWL_P WARNING LIGHT
TWZWV_P WORK VEHICLE
TWZWVA_P WORK VEHICLE WITH TRUCK
MOUNTED ATTENUATOR
OF A LICENSED PROFESSIONAL ENGINEER,
ARCHITECT, LANDSCAPE ARCHITECT, OR LAND
SURVEYOR, TO ALTER AN ITEM IN ANY WAY. IF AN
ITEM BEARING THE STAMP OF A LICENSED
PROFESSIONAL IS ALTERED, THE ALTERING
ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT,
OR LAND SURVEYOR SHALL STAMP THE
DOCUMENT AND INCLUDE THE NOTATION
"ALTERED BY" FOLLOWED BY THEIR SIGNATURE,
THE DATE OF SUCH ALTERATION, AND A SPECIFIC
DESCRIPTION OF THE ALTERATION. PRINT DATE:
MANAGER:
PROJECT NUMBER:
DRAWN BY:DESIGNED BY: CHECKED BY:
SHEET No.
S-LGND
DRAWING No.
ALL DIMENSIONS IN US SURVEY FEET UNLESS OTHERWISE NOTED
NOTE: ALL UTILITY LOCATIONS SHOWN ARE QUALITY LEVEL
DOCUMENT NAME: PIN: BIN:
ON:
PREPARED BY:
10/13/2026
STATE OF NEW YORK
AS BUILT REVISIONS
DESCRIPTION OF WORK:
SIGNATURE DATE
Copyright © 2026. Colliers Engineering & Design All Rights Reserved. This drawing and all the information contained herein is authorized for use only by the party for whom the services were contracted or to whom it is certified. This drawing may not be copied, reused, disclosed, distributed or relied upon for any other purpose without the express written consent of Colliers Engineering & Design.
www.colliersengineering.com
Engineering & Design
Phone:
COLLIERS ENGINEERING & DESIGN,
ARCHITECTURE, LANDSCAPE ARCHITECTURE,
SURVEYING CT, P.C.
Engineering & Design
(QLA).
D#:
OAK SUMMIT ROAD OVER SPROUT CREEK
STRUCTURE REPLACEMENT (BIN: 2272380)
OAK SUMMIT ROAD
TOWN OF WASHINGTON
DUTCHESS COUNTY
8763.22 2272380
DAF JWH ASC DAF
23013783G
C
OF 34
ALBANY
18 Corporate Woods Blvd.
Suite 400 Albany, NY 12211
518.459.3252
D041406
DANIEL A. FARNAN
OCTOBER 13, 2026
DA
NIEL A . FA RNAN
No. 092510
STA T E OF NEW Y ORK
L ICENSED PROFESSIONAL ENGIN
EE
R
LEGEND - LINE SYMBOLOGY
LGND-2
ALIGNMENT
STYLE NAME DESCRIPTION
AC CONTROL (CENTERLINE)
AD_P DETOUR
AT_P TRANSITION CONTROL
BRIDGE
BR RAIL
BSHT SHEET PILING
CONTROL
CB BASELINE
CBPR BASELINE, PROJECTION
DRAINAGE
DCP CULVERT PIPE
DCP_P CULVERT PIPE (DIR)
DDG_P DITCH, GRASS LINED
DDP_P DITCH, PAVED INVERT
DDS_P DITCH, STONE LINED
DFL_P FLOW LINE
DSSD SLOTTED DRAIN
ENVIRONMENTAL
EBLHS BALE, STRAW
ECT CURTAIN, TURBIDITY
EDMC DAM, COFFER TYPE
EDMEC_P DAM, EARTHEN, CHECK
EDMPC_P DAM, PREFAB, CHECK
EDMSC_P DAM, STONE, CHECK
EFNS FENCE, SILT
EFNSV FENCE, SILT & VEGETATION
EFNV FENCE, VEGETATION
EWAA_P WETLAND, ADJACENT AREA
EWF WETLAND, FEDERAL
EWFS WETLAND, FEDERAL AND STATE
EWM WETLAND, MITIGATION AREA
EWS WETLAND, STATE
TRAFFIC WORK ZONE
TWZBT_P TRAFFIC MAINTENANCE BARRICADE
TWZBTWL_P TRAFFIC MAINTENANCE BARRICADE LIGHTS
TMBT_P TRAFFIC BARRICADE, PROPOSED
TMBTL_P TRAFFIC BARRICADE LIGHTS, PROP
TMDB_P TRAFFIC DEVICE, BARRELS
TMDBL_P TRAFFIC DEVICE LIGHTS, BARRELS
TWZPMRC_P TRAFFIC DEVICE, CONES
LANDSCAPE
STYLE NAME DESCRIPTION
LABL AREA, BRUSH LINE
LAHR AREA, HEDGE ROW
LAPB AREA, PLANTING BED
LAWA AREA, WOODED AREA OUTLINE
LAWE AREA, WATERS EDGE
LCUT_P CUT LIMIT
LFILL_P FILL LIMIT
LFNC FENCE
LTRC TREE ROW, CONIFEROUS
LTRD TREE ROW, DECIDUOUS
LWH WALL, H PILE
LWR WALL, RETAINING
LWS WALL, STONE
ROW MAPPING
MDL DEED LINE
MEE EASEMENT, EXISTING
MEP_P EASEMENT, PERMANENT
MEPA_P EASEMENT, PERMANENT, APPROX.
MET_P EASEMENT, TEMPORARY
META_P EASEMENT, TEMPORARY, APPROX.
MF_P FEE ACQUISITION, W/ ACCESS
MFA_P FEE ACQUISITION, APPROXIMATE
MFS_P FEE ACQUISITION, SHAPE
MFWOA_P FEE ACQUISITION, W/O ACCESS
MHA HISTORICAL, ACQUISITION
MHBA HIGHWAY BOUNDARY, APPROX.
MHBW HWY BOUNDARY, FACE OF WALL
MHBWOA HIGHWAY BOUNDARY, W/O ACCESS
MJC JURISDICTION, CITY
MJCY JURISDICTION, COUNTY
MJHD JURISDICTION, HISTORIC DISTRICT
MJLL JURIS., (GREAT, MILITARY) LOT LINE
MJN JURISDICTION, NATION
MJPB JURISDICTION, PUBLIC LANDS
MJS JURISDICTION, STATE
MJT JURISDICTION, TOWN
MJV JURISDICTION, VILLAGE
MPL PROPERTY LOT LINE
MPLA PROPERTY LOT LINE, APPROXIMATE
MSL SUB LOT LINE
ROADWAY
STYLE NAME DESCRIPTION
RG GUIDE RAIL, MISCELLANEOUS
RGB GUIDE RAIL, BOX BEAM
RGBM GUIDE RAIL, BOX BEAM, MEDIAN
RGC GUIDE RAIL, CABLE
RGCB GUIDE RAIL, CONCRETE BARRIER
RGP_P GUIDE POST
RGW GUIDE RAIL, W BEAM
RGWM GUIDE RAIL, W BEAM, MEDIAN
RPB PARKING BUMPER
RRC RAIL ROAD, CATERNARY
RRER RAIL ROAD, 3RD RAIL
RRPLS_P RAIL, PHOTO, LARGE SCALE
RRPSS RAIL, PHOTO, SMALL SCALE
RRS RUMBLE STRIP
RRSLS_P RAIL, SURVEY, LARGE SCALE
RRSSS RAIL, SURVEY, SMALL SCALE
SIGNS
SBLB BILLBOARDS
SM MULTIPLE POST
SSO STRUCTURE, OVERHEAD
SSOC STRUCTURE, OVHD. CANTILEVER
STRIPING
STB* BROKEN LINE
STDB* DOUBLE BROKEN LINE
STDL* DOTTED LINE LONG
STDS* DOTTED LINE SHORT
STFB* FULL BARRIER LINE
STH* HATCH LINE
STPB* PARTIAL BARRIER LINE
STRCT ROUNDABOUT, CAT TRACKS
STRYL ROUNDABOUT, YIELD LINE
STSB STOP BAR
STSE* SOLID EDGE
STXL* X WALK, LADDER LINE
STXL_P X WALK, LADDER LINE, PROPOSED
TRAFFIC CONTROL
TCSW SIGNAL, SPAN WIRE
UTILITIES
STYLE NAME DESCRIPTION
UC CONDUIT, UNDERGROUND
UCH CONDUIT, HANGING
UCO CONDUIT, OVERHEAD
UE ELECTRIC LINE, UNDERGROUND
UEH ELECTRIC LINE, HANGING
UEO ELECTRIC LINE, OVERHEAD
UETO ELECTRIC TRANSMISSION, OVERHEAD
UESS ELECTRIC, SUBSTATIONS
UFO FIBER OPTIC, UNDERGROUND
UFOH FIBER OPTIC, HANGING
UFOO FIBER OPTIC, OVERHEAD
UG GAS, UNDERGROUND
UGH GAS, HANGING
UGO GAS, OVERHEAD
UIC INFORM CABLE, UNDERGROUND
UICH INFORM CABLE, HANGING
UO OIL LINE, UNDERGROUND
UOH OIL LINE, HANGING
UPBP POLE, BRACE, PUSH BRACE
UPGW POLE, GUY WIRE
USA SANITARY SEWER, UNDERGROUND
USAH SANITARY SEWER, HANGING
USAF SANITARY SEWER, FORCE MAIN, UGND
USAFH SANITARY SEWER, FORCE MAIN, HANG
UT TELEPHONE, UNDERGROUND
UTH TELEPHONE, HANGING
UTO TELEPHONE, OVERHEAD
UTV CABLE TV, UNDERGROUND
UTVH CABLE TV, HANGING
UTVO CABLE TV, OVERHEAD
UUU UNKNOWN, UNDERGROUND
UUH UNKNOWN, HANGING
UUO UNKNOWN, OVERHEAD
UW WATER LINE, UNDERGROUND
UWH WATER LINE, HANGING
PROPOSED ℄
OF IMPROVEMENT
9'-0"
TRAVEL LANE
2'-0"
SHLDR
2'-0"
SHLDR
PROPOSED SHOULDER BACKUP, ITEM
203.24010017 (TYP.)
MEET EXISTING
GRADE
ROUND 4'
V.C. (TYP.)
2.0%2.0%6.0% 6.0%
4" TOPSOIL ROADSIDE,
ITEM 610.1402 (TYP)
TURF ESTABLISHMENT -
ROADSIDE, ITEM 610.1601
2" 9.5 F3 TOP COURSE ASPHALT, 80 SERIES, ITEM 404.0983
2" 19.0 F9 BINDER COURSE ASPHALT, 80 SERIES, ITEM 404.1989
T.G.L.
12" MIN. SUBBASE COURSE, TYPE I, ITEM 304.11000008
STRAIGHT TACK COAT
ITEM 407.0103
9'-0"
TRAVEL LANE
ITEM 203.02 (TYP.)
ASPHALT JOINT
ADHESIVE, ITEM
418.7603
BOX BEAM GUIDE RAILING
ITEM 606.10 (TYP.)
EMBANKMENT IN PLACE,
ITEM 203.03 (TYP.)
4" 37.5 F9 BASE COURSE ASPHALT, 80 SERIES, ITEM 404.3789
2'-3" 2'-3"
9'-0"
TRAVEL LANEVARIES VARIES
MATCH EXISTINGMATCH EXISTING
9'-0"
TRAVEL LANE2'-3" 2'-3"
PROPOSED ℄
OF IMPROVEMENTPROPOSED SHOULDER BACKUP, ITEM
203.24010017 (TYP.)
MEET EXISTING
GRADE
ROUND 4'
V.C. (TYP.)4" TOPSOIL ROADSIDE,
ITEM 610.1402 (TYP)
TURF ESTABLISHMENT -
ROADSIDE, ITEM 610.1601
2" 9.5 F3 TOP COURSE ASPHALT,
80 SERIES, ITEM 404.0983
T.G.L.
STRAIGHT TACK COAT
ITEM 407.0103
ASPHALT JOINT
ADHESIVE, ITEM 418.7603
BOX BEAM GUIDE RAILING
ITEM 606.10 (TYP.)
EMBANKMENT IN PLACE,
ITEM 203.03 (TYP.)
2" MISCELLANEOUS COLD
MILLING OF BITUMINOUS
CONCRETE, ITEM 490.30
IT IS A VIOLATION OF LAW FOR ANY PERSON,
UNLESS THEY ARE ACTING UNDER THE DIRECTION
OF A LICENSED PROFESSIONAL ENGINEER,
ARCHITECT, LANDSCAPE ARCHITECT, OR LAND
SURVEYOR, TO ALTER AN ITEM IN ANY WAY. IF AN
ITEM BEARING THE STAMP OF A LICENSED
PROFESSIONAL IS ALTERED, THE ALTERING
ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT,
OR LAND SURVEYOR SHALL STAMP THE
DOCUMENT AND INCLUDE THE NOTATION
"ALTERED BY" FOLLOWED BY THEIR SIGNATURE,
THE DATE OF SUCH ALTERATION, AND A SPECIFIC
DESCRIPTION OF THE ALTERATION. PRINT DATE:
MANAGER:
PROJECT NUMBER:
DRAWN BY:DESIGNED BY: CHECKED BY:
SHEET No.
S-TYPS
DRAWING No.
ALL DIMENSIONS IN US SURVEY FEET UNLESS OTHERWISE NOTED
NOTE: ALL UTILITY LOCATIONS SHOWN ARE QUALITY LEVEL
DOCUMENT NAME: PIN: BIN:
ON:
PREPARED BY:
10/13/2026
STATE OF NEW YORK
AS BUILT REVISIONS
DESCRIPTION OF WORK:
SIGNATURE DATE
Copyright © 2026. Colliers Engineering & Design All Rights Reserved. This drawing and all the information contained herein is authorized for use only by the party for whom the services were contracted or to whom it is certified. This drawing may not be copied, reused, disclosed, distributed or relied upon for any other purpose without the express written consent of Colliers Engineering & Design.
www.colliersengineering.com
Engineering & Design
Phone:
COLLIERS ENGINEERING & DESIGN,
ARCHITECTURE, LANDSCAPE ARCHITECTURE,
SURVEYING CT, P.C.
Engineering & Design
(QLA).
D#:
OAK SUMMIT ROAD OVER SPROUT CREEK
STRUCTURE REPLACEMENT (BIN: 2272380)
OAK SUMMIT ROAD
TOWN OF WASHINGTON
DUTCHESS COUNTY
8763.22 2272380
DAF JWH ASC DAF
23013783G
C
OF 34
ALBANY
18 Corporate Woods Blvd.
Suite 400 Albany, NY 12211
518.459.3252
D041406
DANIEL A. FARNAN
OCTOBER 13, 2026
DA
NIEL A . FA RNAN
No. 092510
STA T E OF NEW Y ORK
L ICENSED PROFESSIONAL ENGIN
EE
R
TYPICAL SECTIONS
TYPS-1
PROPOSED OAK SUMMIT ROAD TYPICAL SECTION
STA. R1+12.40 TO STA. R2+40.00
SCALE:1" = 4'-0"
PROPOSED OAK SUMMIT ROAD MILLING SECTION
STA. R2+40.00 TO STA. R2+65.00
SCALE:1" = 4'-0"
ITEM DESCRIPTION UNIT
ITEM 203.02 UNCLASSIFIED EXCAVATION AND DISPOSAL CY
ITEM 203.03 EMBANKMENT IN PLACE CY
ITEM 203.24010017 SHOULDER BACKUP MATERIAL TON
ITEM 304.11000008 SUBBASE COURSE, TYPE I CY
ITEM 404.0983 9.5 F3 TOP COURSE ASPHALT, 80 SERIES TON
ITEM 404.1989 19.0 F9 BINDER COURSE ASPHALT, 80 SERIES TON
ITEM 404.3789 37.5 F9 BASE COURSE ASPHALT, 80 SERIES TON
ITEM DESCRIPTION UNIT
ITEM 407.0103 STRAIGHT TACK COAT GAL
ITEM 418.7603 ASPHALT PAVEMENT JOINT ADHESIVE LF
ITEM 490.30 MISCELLANEOUS COLD MILLING OF BITUMINOUS CONCRETE SY
ITEM 606.100002 BOX BEAM GUIDE RAILING (SHOP BENT OR SHOP MITERED) LF
ITEM 610.1402 TOPSOIL - ROADSIDE CY
ITEM 610.1601 TURF ESTABLISHMENT - ROADSIDE SY
OF A LICENSED PROFESSIONAL ENGINEER,
ARCHITECT, LANDSCAPE ARCHITECT, OR LAND
SURVEYOR, TO ALTER AN ITEM IN ANY WAY. IF AN
ITEM BEARING THE STAMP OF A LICENSED
PROFESSIONAL IS ALTERED, THE ALTERING
ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT,
OR LAND SURVEYOR SHALL STAMP THE
DOCUMENT AND INCLUDE THE NOTATION
"ALTERED BY" FOLLOWED BY THEIR SIGNATURE,
THE DATE OF SUCH ALTERATION, AND A SPECIFIC
DESCRIPTION OF THE ALTERATION. PRINT DATE:
MANAGER:
PROJECT NUMBER:
DRAWN BY:DESIGNED BY: CHECKED BY:
SHEET No.
S-NOTE
DRAWING No.
ALL DIMENSIONS IN US SURVEY FEET UNLESS OTHERWISE NOTED
NOTE: ALL UTILITY LOCATIONS SHOWN ARE QUALITY LEVEL
DOCUMENT NAME: PIN: BIN:
ON:
PREPARED BY:
10/13/2026
STATE OF NEW YORK
AS BUILT REVISIONS
DESCRIPTION OF WORK:
SIGNATURE DATE
Copyright © 2026. Colliers Engineering & Design All Rights Reserved. This drawing and all the information contained herein is authorized for use only by the party for whom the services were contracted or to whom it is certified. This drawing may not be copied, reused, disclosed, distributed or relied upon for any other purpose without the express written consent of Colliers Engineering & Design.
www.colliersengineering.com
Engineering & Design
Phone:
COLLIERS ENGINEERING & DESIGN,
ARCHITECTURE, LANDSCAPE ARCHITECTURE,
SURVEYING CT, P.C.
Engineering & Design
(QLA).
D#:
OAK SUMMIT ROAD OVER SPROUT CREEK
STRUCTURE REPLACEMENT (BIN: 2272380)
OAK SUMMIT ROAD
TOWN OF WASHINGTON
DUTCHESS COUNTY
8763.22 2272380
DAF JWH ASC DAF
23013783G
C
OF 34
ALBANY
18 Corporate Woods Blvd.
Suite 400 Albany, NY 12211
518.459.3252
D041406
DANIEL A. FARNAN
OCTOBER 13, 2026
DA
NIEL A . FA RNAN
No. 092510
STA T E OF NEW Y ORK
L ICENSED PROFESSIONAL ENGIN
EE
R
GENERAL NOTES
NOTE-1
GENERAL NOTES:
1. LIVE LOAD: AASHTO HL-93 AND NYSDOT DESIGN PERMIT VEHICLE.
2. CONSTRUCTION AND MATERIALS SPECIFICATIONS: STANDARD SPECIFICATIONS, CONSTRUCTION AND MATERIALS, NEW YORK STATE DEPARTMENT OF TRANSPORTATION, OFFICE OF ENGINEERING, WITH CURRENT ADDITIONS AND
MODIFICATIONS.
3. DETAILS ON THE DRAWINGS LABELED AS "NOT TO SCALE" ARE INTENTIONALLY DRAWN NOT TO SCALE FOR VISUAL CLARITY. ALL OTHER DETAILS FOR WHICH NO SCALE IS SHOWN ARE DRAWN PROPORTIONALLY AND ARE FULLY
DIMENSIONED.
4. ALL SHOP DRAWINGS SUBMITTED FOR THIS PROJECT SHALL BE IN US CUSTOMARY UNITS.
5. THE STRUCTURE SHALL BE MAINTAINED IN ACCORDANCE WITH THE GUIDELINES CONTAINED IN THE CURRENT EDITION OF
THE AASHTO MAINTENANCE MANUAL FOR ROADWAYS AND BRIDGES.
6. THE COST OF WATER USED FOR COMPACTION OF SELECT FILL ITEMS SHALL BE INCLUDED IN THE UNIT PRICE BID FOR ITEM
203.21 - SELECT STRUCTURE FILL.
7. THE COST FOR ALL JOINT MATERIAL SHALL BE INCLUDED IN THE UNIT PRICES BID FOR THE VARIOUS ITEMS OF THE
CONTRACT, UNLESS OTHERWISE SPECIFIED ON THE PLANS.
8. THE CONTRACTOR SHALL SURVEY AND STAKEOUT FOR CONSTRUCTION OF THE STRUCTURE. THIS COST IS TO BE INCLUDED
UNDER ITEM 625.01
9. WHENEVER ITEMS IN THE CONTRACT REQUIRE MATERIALS TO BE REMOVED AND DISPOSED OF, THE COST OF SUPPLYING A DISPOSAL AREA AND TRANSPORTATION TO THAT AREA SHALL BE INCLUDED IN THE UNIT PRICES BID FOR THOSE ITEMS.
10. THE CONTRACTOR IS ADVISED THAT ADDITIONAL "NOTES" WILL BE FOUND ON SUBSEQUENT SHEETS OF THE CONTRACT PLANS AND SUCH "NOTES", WHILE PERTAINING TO THESE SPECIFIC SHEETS THEY ARE PLACED ON, ALSO SUPPLEMENT THE
GENERAL NOTES LISTED HEREIN.
11. NO ADDITIONAL PAYMENT WILL BE MADE FOR WORK CALLED FOR BY NOTES ON THE PLANS OR IN THE SPECIFICATIONS FOR WHICH NO ITEM NUMBER IS INDICATED. THE COST OF SUCH WORK SHALL BE INCLUDED IN THE PRICES FOR VARIOUS
ITEMS OF THIS CONTRACT.
12. CARE SHALL BE TAKEN TO RETAIN NATURAL GROWTH AND PREVENT DAMAGE TO TREES WITHIN AND OUTSIDE THE LIMITS OF CONSTRUCTION, AND NOT SCHEDULED FOR REMOVAL. ANY DAMAGE CAUSED TO THIS NATURAL GROWTH SHALL BE
RESTORED AT THE EXPENSE OF THE CONTRACTOR AS DIRECTED BY THE ENGINEER.
13. THE CONTRACTOR IS TO VISIT THE SITE BEFORE BIDDING, TO FAMILIARIZE THEMSELVES WITH THE FIELD CONDITIONS AND TO JUDGE FOR THEMSELVES THE EXTENT AND NATURE OF THE WORK TO BE DONE UNDER THIS CONTRACT. NO EXTRA COMPENSATION WILL BE ALLOWED BECAUSE OF THE CONTRACTORS FAILURE TO INCLUDE IN THEIR BID ALL ITEMS AND MATERIALS WHICH THEY ARE REQUIRED TO FURNISH IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
14. THE EXISTING PAVEMENT SHALL BE KEPT CLEAN AND FREE OF MUD AND DEBRIS AT ALL TIMES.
15. EXISTING DRAINAGE SHALL BE MAINTAINED AND OPEN AT ALL TIMES.
16. THE PROPOSED STRUCTURE WILL BE ASSIGNED THE BRIDGE IDENTIFICATION NUMBER (BIN) OF 2272380. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO FABRICATE AND INSTALL A BRIDGE IDENTIFICATION NUMBER (BIN) PLATE AFTER
CONSTRUCTION OF THE PROPOSED STRUCTURE IS COMPLETED.
WORK LIMITS:
1. THE WORK LIMITS ARE DEFINED AS SHOWN THROUGHOUT THESE CONTRACT DOCUMENTS.
STORAGE OF MATERIALS:
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING PERMISSION FROM THE TOWN FOR LOCATIONS TO BE USED
TO STORE MATERIALS WITHIN THE RIGHT-OF-WAY. THE CONTRACTOR SHALL OBTAIN THE WRITTEN PERMISSION OF THE PROPERTY OWNERS PRIOR TO UTILIZING ANY AREAS OUTSIDE OF THE RIGHT-OF-WAY TO STORE MATERIALS. A COPY OF ANY WRITTEN PERMISSION TO STORE MATERIALS ON PRIVATE PROPERTY, IF OBTAINED, SHALL BE SUBMITTED TO THE
ENGINEER.
UTILITY QUALITY LEVEL NOTES:
FOUR SEPARATE QUALITY LEVELS OF SUBSURFACE UTILITY FACILITY INFORMATION ARE GENERALLY RECOGNIZED AND ARE AS
FOLLOWS:
SUBSURFACE UTILITY FACILITY INFORMATION SHOWN HEREIN IS CONSIDERED: QLC
QUALITY LEVEL A (QLA): QUALITY LEVEL A IS THE HIGHEST DEGREE OF ACCURACY. THE INFORMATION SHOWN ON THE PLANS HAS BEEN OBTAINED BY THE ACTUAL EXPOSURE (OR VERIFICATION OF PREVIOUSLY EXPOSED AND SURVEYED UTILITY FACILITIES) OF SUBSURFACE UTILITIES, USING (TYPICALLY) MINIMALLY INTRUSIVE EXCAVATION EQUIPMENT TO DETERMINE THEIR PRECISE HORIZONTAL AND VERTICAL POSITIONS, AS WELL AS THEIR OTHER UTILITY FACILITY ATTRIBUTES. (SHOWN AS
QLA)
QUALITY LEVEL B (QLB): QUALITY LEVEL B IS THE SECOND HIGHEST DEGREE OF ACCURACY. THE INFORMATION SHOWN ON THE PLANS HAS BEEN OBTAINED THROUGH THE APPLICATION OF APPROPRIATE SURFACE GEOPHYSICAL METHODS (I.E., UNDERGROUND CAMERAS, RADAR, SONAR, TONE OUTS, ETC.) TO IDENTIFY THE EXISTENCE AND APPROPRIATE HORIZONTAL POSITION OF SUBSURFACE UTILITY FACILITIES. QUALITY LEVEL B DATA ARE REPRODUCIBLE BY SURFACE GEOPHYSICS AT ANY POINT OF THEIR DEPICTION. THE INFORMATION WAS SURVEYED TO APPLICABLE TOLERANCES AND REDUCED ONTO THE PLANS.
NO EXCAVATIONS WERE PERFORMED. (SHOWN AS QLB)
QUALITY LEVEL C (QLC): QUALITY LEVEL C IS THE THIRD HIGHEST DEGREE OF ACCURACY. THE INFORMATION SHOWN ON THE PLANS HAS BEEN OBTAINED BY SURVEYING AND PLOTTING VISIBLE ABOVE-GROUND UTILITY FEATURES AND BY USING PROFESSIONAL JUDGEMENT IN CORRELATING THIS INFORMATION TO QUALITY LEVEL D INFORMATION. (SHOWN AS QLC)
QUALITY LEVEL D (QLD): QUALITY LEVEL D IS THE LOWEST DEGREE OF ACCURACY. THE INFORMATION SHOWN ON THE PLANS WAS DERIVED SOLELY FROM EXISTING NYSDOT AND/OR UTILITY COMPANY RECORDS OR RECOLLECTIONS. (SHOWN AS QLD) THE QUALITY LEVEL DEFINITIONS SHALL BE PROVIDED IN THE GENERAL NOTES SECTION OF THE PLANS.
UTILITY NOTES:
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL UTILITIES THAT MAY BE ENCOUNTERED WITHIN
THE WORK LIMITS. THE COST OF ANY WORK TO PROTECT UTILITIES SHALL BE INCLUDED IN THE PRICE BID FOR VARIOUS
ITEMS IN THE CONTRACT.
2. THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING ALL UTILITY COMPANIES TO COORDINATE CONNECTION OF
SERVICES. THE CONTRACTOR SHALL ALSO COORDINATE TEMPORARY METERING OF SERVICES.
3. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATION WITH UTILITY COMPANIES, IF FURTHER UTILITY RELOCATIONS ARE
REQUIRED AT THE TIME OF CONSTRUCTION. SEE UTILITY CONTACTS TABLE.
NON-PAVED SURFACE NOTES:
1. THE CONTRACTOR SHALL NOT EXPOSE ANY SUBGRADE THAT CANNOT BE BACKFILLED AND COMPACTED WITH SUBBASE
MATERIAL BY THE END OF EACH WORK DAY OR AS APPROVED BY THE ENGINEER.
2. COMPACTED SUBBASE MATERIAL SHALL NOT BE EXPOSED FOR MORE THAN SEVEN CALENDAR DAYS OR AS APPROVED BY
THE ENGINEER.
FOUNDATION NOTES:
1. HIGHWAY EMBANKMENT MATERIAL AND SELECT STRUCTURE FILL, ITEM 203.21, SHALL BE PLACED SIMULTANEOUSLY, IN
CONTACT, ON BOTH SIDES OF THE VERTICAL PAYMENT LINE.
2. SUBSURFACE EXPLORATIONS HAVE BEEN MADE FOR THIS PROJECT AT LOCATIONS INDICATED ON THE GENERAL PLAN.
BORING LOGS AND OTHER SUBSURFACE INFORMATION MADE AVAILABLE FOR THE INSPECTION OF BIDDERS WERE
OBTAINED WITH REASONABLE CARE AND RECORDED IN GOOD FAITH.
3. THE SOIL AND ROCK DESCRIPTIONS SHOWN ARE AS DETERMINED BY A VISUAL INSPECTION OF THE SAMPLES FROM THE VARIOUS EXPLORATIONS UNLESS OTHERWISE NOTED. THE OBSERVED WATER LEVELS AND/OR WATER CONDITIONS INDICATED THEREON ARE AS RECORDED AT THE TIME OF EXPLORATION. THESE LEVELS AND/OR CONDITIONS MAY VARY CONSIDERABLY, WITH TIME, ACCORDING TO THE PREVAILING CLIMATE, RAINFALL, AND OTHER FACTORS.
4. IN THE EVENT THAT SUBSURFACE CONDITIONS VARY FROM THOSE SHOWN BY THE EXPLORATIONS, THE CONTRACTOR WILL STILL BE REQUIRED TO ESTABLISH THE FOUNDATIONS TO THE NECESSARY LOAD CARRYING CAPACITIES AS DIRECTED
BY THE ENGINEER.
5. IT WILL BE THE CONTRACTOR'S OBLIGATION AND RESPONSIBILITY TO USE METHODS AND EQUIPMENT WHICH WILL
INSURE THE SATISFACTORY COMPLETION OF THE REQUIRED WORK WITHOUT DELAY.
6. THE 2024 GEOTECHNICAL ENGINEERING REPORT COMPLETED BY ATLANTIC TESTING LABORATORIES WAS USED FOR REFERENCE WITH THE GEOTECHNICAL DESIGN AND RECOMMENDATIONS COMPLETED FOR THIS PROJECT.
REINFORCEMENT NOTES:
1. BAR REINFORCEMENT SPACING INDICATED ON THE PLANS ARE MAXIMUM UNLESS OTHERWISE SPECIFIED.
2. COVER FOR BAR REINFORCEMENT ON THESE PLANS SHALL BE 2 INCHES UNLESS OTHERWISE SPECIFIED.
3. BAR REINFORCEMENT INDICATED ON THESE PLANS SHALL BE GRADE 60 EPOXY COATED
STRUCTURE FOUNDATION NOTES:
1. EXCAVATION BELOW PAYMENT LINES FOR ITEM 206.01 SHOWN HEREIN WILL NOT BE ALLOWED WITHOUT WRITTEN
PERMISSION FROM THE ENGINEER. BACKFILL OF UNAUTHORIZED EXCAVATIONS BELOW PAYMENT LINES WILL BE AT THE
CONTRACTOR'S EXPENSE.
2. GROUND WATER WAS ASSUMED AT ELEVATION ±572.60'
COFFERDAM AND HYDRAULIC NOTES:
1. SHOULD THE CONTRACTOR ELECT TO LAY BACK A PORTION OF THE EXISTING EARTH ADJACENT TO AN EXCAVATION
REQUIRING A COFFERDAM, ANY REQUIRED EXTENSIONS OF THE COFFERDAM NECESSARY TO KEEP WATER FROM ENTERING
THE EXCAVATION SHALL BE FURNISHED AND PLACED AT NO COST TO THE OWNER.
2. WHERE A COFFERDAM IS USED, THE COST OF DEWATERING THE ENTIRE EXCAVATION, REGARDLESS OF SOURCE OF WATER, SHALL BE INCLUDED IN THE UNIT PRICE BID FOR THE COFFERDAM ITEMS 553.020001 AND 553.020002.
3. SHOULD FIELD CONDITIONS REQUIRE A CHANGE FROM THE TYPE OF COFFERDAM SYSTEM CALLED FOR ON THE PLANS, THE ENGINEER-IN-CHARGE SHALL CONTACT THE OWNER FOR COORDINATION WITH APPROPRIATE AGENCIES TO APPROVE
THE CHANGE.
4. DEWATERING OF THE COFFERDAM SHALL BE ACCOMPLISHED BY PUMPING THE WATER TO GEOTEXTILE FABRIC COLLECTION BAGS OUTSIDE THE AREA OF THE STREAM BED AS SHOWN ON THE CONTRACT PLANS, OR A SUITABLE LOCATION AS APPROVED BY THE ENGINEER. TEMPORARY SOIL EROSION AND WATER POLLUTION CONTROL, SUCH AS STRAW BALES OR APPROVED EQUAL, MAY BE REQUIRED AS DETERMINED BY THE ENGINEER-IN-CHARGE. NO SETTLEMENT
BASIN SHALL BE CONSTRUCTED.
5. ORDINARY HIGH WATER IS ESTIMATED TO BE 570.87' FROM SURVEY. THIS IS DEFINED AS THE HIGHEST SURFACE WATER ELEVATION LIKELY TO BE ENCOUNTERED DURING ONE CONSTRUCTION SEASON (OTHER THAN MAJOR FLOODS). IT IS ALWAYS LESS THAN THE ORDINARY HIGH WATER ELEVATION AND IT IS USUALLY AN OBSERVED ELEVATION RATHER THAN A
COMPUTED ONE.
CHAMFER NOTE:
1. ALL EXPOSED EDGES OF CONCRETE SHALL BE CHAMFERED 1".
SURVEY NOTES:
1. THE CONTRACTOR SHALL SURVEY AND STAKE OUT THE EXISTING R.O.W. LINES AND THE PROPOSED R.O.W TAKING LINES
DURING THE INITIAL STAGES FOR THE PROJECT. THIS WORK SHALL INCLUDE RECOVERY AND PRESERVATION OF THE EXISTING R.O.W. AND PROPERTY MARKERS THAT WILL BE DISTURBED DURING THE WORK AND WILL NEED TO BE REPLACED IN ACCORDANCE WITH SECTION 105-10 OF THE STANDARD SPECIFICATIONS. COST SHALL BE INCLUDED IN THE UNIT PRICE BID
FOR ITEM 625.01 SURVEY OPERATIONS.
2. SURVEY CONTROL POINTS SHALL BE REPLACED IF DISTURBED. IF A SURVEY CONTROL MARKER CANNOT BE RESET IN ITS ORIGINAL LOCATION, ONE SHALL BE SET IN A NEW LOCATION WITH SIMILAR VISIBILITY AND THE BASE LINE TIES SHALL BE UPDATED ACCORDINGLY. COST SHALL BE INCLUDED IN THE UNIT PRICE BID FOR ITEM 625.01 SURVEY OPERATIONS.
3. R.O.W. MARKER ITEMS 625.05 SHALL BE LOCATED AND PLACED IN THE FIELD BY OR UNDER THE DIRECT SUPERVISION OF A LICENSED LAND SURVEYOR. HE/SHE SHALL FURNISH THE ENGINEER WITH A STAMPED OR SIGNED LISTING OF ALL MARKER LOCATIONS SHOWING THEIR FINAL POSITION (BY STATION AND OFFSET TO THE NEAREST HUNDREDTH OF A FOOT). THE COST OF SURVEY REQUIRED FOR LOCATING MARKERS SHALL BE INCLUDED IN THE UNIT PRICE BID FOR THE R.O.W. MARKERS.
4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DOCUMENT THE EXISTING HORIZONTAL AND VERTICAL ALIGNMENTS PRIOR TO EXCAVATION AND MATCH THE EXISTING HORIZONTAL AND VERTICAL ALIGNMENTS WITH THE PROPOSED PAVEMENT UNLESS OTHERWISE NOTED IN THE PLANS. COST SHALL BE INCLUDED IN THE UNIT PRICE BID FOR ITEM 625.01
SURVEY OPERATIONS.
UTILITY CONTACT TABLE
UTILITY COMPANY POINT OF CONTACT EMAIL
CENTRAL HUDSON GAS & ELECTRIC LINDSAY CULLEN LCULLEN@CENHUD.COM
VERIZON COMMUNICATIONS JIMMY CHIU JIMMY.CHIU@VERIZON.COM
OPTIMUM COMMUNICATIONS JASON CURRAN JASON.CURRAN@ALTICEUSA.COM
RIGHT-OF-WAY NOTES:
1. ALL WORK TO BE PERFORMED UNDER THIS CONTRACT WILL BE WITHIN THE PUBLIC RIGHT-OF-WAY (ROW) IN ACCORDANCE WITH SECTION 105-15 OF THE STANDARD SPECIFICATIONS. THE CONTRACTOR IS TO ASSURE HIMSELF THAT ALL WORK IS BEING PERFORMED WITHIN THE ROW, INCLUDING BUT NOT LIMITED TO VEHICLE ACCESS; STORAGE OF EQUIPMENT, MATERIALS, DEBRIS AND WASTE; LANDSCAPING; VEGETATION REMOVAL AND MANAGEMENT; GRADING, SEEDING AND THE
INSTALLATION OF TURF; AND THE INSTALLATION OF ANY FENCES OR PROTECTIVE BARRIER.
2. IF CONTRACTOR IS UNABLE TO IDENTIFY THE LIMITS OF THE RIGHTS-OF-WAY WHEN THE CONTRACT CALLS FOR WORK IN THOSE VICINITIES, THE CONTRACTOR MUST CONTACT THE PROJECT ENGINEER FOR DEFINITIVE BOUNDARY DETERMINATIONS BEFORE ANY WORK MAY BE INITIATED AT THOSE LOCATIONS (STANDARD SPECIFICATIONS SECTIONS
105-10 AND 625).
3. IN ACCORDANCE WITH SECTION 105-15 OF THE STANDARD SPECIFICATIONS, RELEASES FOR ANY NON-ESSENTIAL CONTRACT WORK OUTSIDE OF THE EXISTING RIGHTS-OF-WAY, INCLUDING PLANTINGS, LANDSCAPING OR DRIVEWAY ENHANCEMENT, WILL BE PROVIDED BY THE PROJECT ENGINEER AND IN NO INSTANCE ARE TO BE SECURED BY THE CONTRACTOR. THE CONTRACTOR SHALL NOT INVADE UPON PRIVATE PROPERTIES, LANDS OR BUILDINGS OUTSIDE OF THE RIGHTS-OF-WAY FOR ANY REASON WITHOUT FIRST SECURING WRITTEN PERMISSION FROM THE PROPERTY OWNER (STANDARD SPECIFICATIONS
SECTION 105-15).
4. THE CONTRACTOR WILL BE HELD LIABLE FOR ANY DAMAGES DONE. ANY SUCH INJURIES OR DAMAGES SHALL BE SATISFACTORILY REPAIRED OR ITEMS REPLACED AT THE CONTRACTOR'S EXPENSE (STANDARD SPECIFICATIONS SECTION
107-08 AND 107-09).
OF A LICENSED PROFESSIONAL ENGINEER,
ARCHITECT, LANDSCAPE ARCHITECT, OR LAND
SURVEYOR, TO ALTER AN ITEM IN ANY WAY. IF AN
ITEM BEARING THE STAMP OF A LICENSED
PROFESSIONAL IS ALTERED, THE ALTERING
ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT,
OR LAND SURVEYOR SHALL STAMP THE
DOCUMENT AND INCLUDE THE NOTATION
"ALTERED BY" FOLLOWED BY THEIR SIGNATURE,
THE DATE OF SUCH ALTERATION, AND A SPECIFIC
DESCRIPTION OF THE ALTERATION. PRINT DATE:
MANAGER:
PROJECT NUMBER:
DRAWN BY:DESIGNED BY: CHECKED BY:
SHEET No.
S-NOTE
DRAWING No.
ALL DIMENSIONS IN US SURVEY FEET UNLESS OTHERWISE NOTED
NOTE: ALL UTILITY LOCATIONS SHOWN ARE QUALITY LEVEL
DOCUMENT NAME: PIN: BIN:
ON:
PREPARED BY:
10/13/2026
STATE OF NEW YORK
AS BUILT REVISIONS
DESCRIPTION OF WORK:
SIGNATURE DATE
Copyright © 2026. Colliers Engineering & Design All Rights Reserved. This drawing and all the information contained herein is authorized for use only by the party for whom the services were contracted or to whom it is certified. This drawing may not be copied, reused, disclosed, distributed or relied upon for any other purpose without the express written consent of Colliers Engineering & Design.
www.colliersengineering.com
Engineering & Design
Phone:
COLLIERS ENGINEERING & DESIGN,
ARCHITECTURE, LANDSCAPE ARCHITECTURE,
SURVEYING CT, P.C.
Engineering & Design
(QLA).
D#:
OAK SUMMIT ROAD OVER SPROUT CREEK
STRUCTURE REPLACEMENT (BIN: 2272380)
OAK SUMMIT ROAD
TOWN OF WASHINGTON
DUTCHESS COUNTY
8763.22 2272380
DAF JWH ASC DAF
23013783G
C
OF 34
ALBANY
18 Corporate Woods Blvd.
Suite 400 Albany, NY 12211
518.459.3252
D041406
DANIEL A. FARNAN
OCTOBER 13, 2026
DA
NIEL A . FA RNAN
No. 092510
STA T E OF NEW Y ORK
L ICENSED PROFESSIONAL ENGIN
EE
R
ENVIRONMENTAL NOTES
(SHEET 1 OF 2)
NOTE-2
DRAINAGE NOTES:
1. THE CONTRACTOR SHALL BECOME ACQUAINTED WITH THE DRAINAGE CHARACTERISTICS OF THE AREA IN ORDER TO
PROGRESS WORK EFFICIENTLY WITH FULL KNOWLEDGE OF THE POTENTIAL DRAINAGE PROBLEMS.
2. THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN DRAINAGE THROUGHOUT THE LIFE OF CONSTRUCTION.
STORM WATER POLLUTION PREVENTION AND TEMPORARY SOIL EROSION
AND SEDIMENT CONTROL GENERAL REQUIREMENTS:
1. THE CONTRACTOR SHALL BE IN COMPLIANCE WITH ALL OF THE REQUIREMENTS OF THE EROSION AND SEDIMENT
CONTROL PLANS.
2. FINAL LOCATION AND DETAILS OF TURBIDITY CURTAIN, COFFERDAMS, PUMP SYSTEM, TEMPORARY WATERWAY DIVERSION
STRUCTURES, AND SEDIMENT TRAP SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL.
3. WITH EXCEPTION OF WORK COMPLETED UNDER SEPARATE PAY ITEMS IN THIS CONTRACT, ALL SEDIMENT AND EROSION CONTROL WORK SHOWN ON THE CONTRACT DOCUMENTS WILL BE COMPLETED UNDER THE PROVISIONS OF SECTION 209
- "TEMPORARY SOIL EROSION AND WATER POLLUTION CONTROL."
4. THE CONTRACTOR'S ATTENTION IS ALSO DIRECTED TO SECTION 107-12 "SOIL EROSION, WATER AND POLLUTION ABATEMENT" OF THE SPECIFICATIONS. ANY ACTIVITY OR REVISION TO THE CONTRACT INITIATED BY THE CONTRACTOR UNLESS OTHERWISE ORDERED BY THE ENGINEER IN CHARGE SHALL BE IN ACCORDANCE WITH THE PROVISIONS OF
SECTION 107-12.
5. IN ACCORDANCE WITH SECTIONS 107 AND 108 OF THE SPECIFICATIONS, THE CONTRACTOR SHALL PREPARE A SCHEDULE FOR ACCOMPLISHING TEMPORARY AND PERMANENT EROSION AND SEDIMENT CONTROL WORK. THE CONTRACTOR SHALL IDENTIFY THE ESTIMATED COMPLETION OF PERMANENT EROSION AND SEDIMENT CONTROL WORK IN THEIR SCHEDULE.
PARTICULAR ATTENTION IS DIRECTED TO THE COMPLETION OF WORK IN THE ROADSIDE AREA PROGRESSIVELY THROUGH CONSTRUCTION WHENEVER AREAS CAN BE PERMANENTLY STABILIZED AT THE COMPLETION OF WORK. DURING FINAL STABILIZATION, NO PAYMENT WILL BE MADE FOR TEMPORARY SEEDING OR MULCHING UNLESS DIRECTED BY THE E.I.C.
6. EROSION AND SEDIMENT CONTROL STRUCTURES SHALL BE PLACED PRIOR TO THE START OF ANY CONSTRUCTION OPERATION AND SHALL REMAIN IN PLACE UNTIL THE SOIL IS STABILIZED WITH SEEDING AND/OR MULCH. THE CONTRACTOR SHALL PERFORM NECESSARY WORK TO ISOLATE CONSTRUCTION ACTIVITIES OR WORK AREA FROM WATER COURSES OR IMPOUNDMENTS PRIOR TO COMMENCING WORK AND SHALL STABILIZE DISTURBED AREA WITH APPROPRIATE TEMPORARY OR PERMANENT EROSION CONTROL MEASURES IMMEDIATELY FOLLOWING THE COMPLETION OF THE WORK AS TO PROTECT SUCH WATER BODIES AGAINST CONTAMINATION FROM SILTATION AND OTHER FORMS OF
POLLUTION OR CONTAMINANTS FROM THE CONSTRUCTION AREA.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR A WEEKLY INSPECTION OF ALL SEDIMENT AND POLLUTION CONTROL STRUCTURES, SEEDING AND MULCHED AREAS, SODDED DITCHES, EROSION CONTROL BLANKETS, OR OTHER CONTRACT WORK, EITHER TEMPORARY OR PERMANENT, TO ASSURE THAT IT IS FUNCTIONING AS IT WAS ORIGINALLY INTENDED AND
IS IN GOOD CONDITION.
8. THE SITE SHALL AT ALL TIMES BE GRADED AND MAINTAINED SUCH THAT ALL STORM WATER RUNOFF IS DIVERTED TO SOIL
EROSION AND SEDIMENT CONTROL DEVICES.
9. ALL AREAS ON A 1:3 SLOPE OR GREATER SHALL BE STABILIZED IMMEDIATELY UPON COMPLETION OF GRADING WITH SEED
AND MULCH - TEMPORARY, ITEM 209.1003.
10. ALL DISTURBED AREAS SHALL BE RESTORED TO PRE-CONSTRUCTION CONDITION UNLESS OTHERWISE NOTED.
11. INSTALL BIODEGRADABLE 12" SEDIMENT FILTER LOG, ITEM 209.23010009, ALONG TOE OF ALL FILL SLOPES THROUGHOUT
THE LIMITS OF THE PROJECT.
PERMIT NOTES:
1. THE CONTRACTOR SHALL COMPLY WITH ANY & ALL PERMIT REQUIREMENTS PROVIDED IN THE CONSTRUCTION
DOCUMENTS.
MAINTENANCE OF EROSION & SEDIMENT CONTROLS:
1. THE CONTRACTOR SHALL EMPLOY A PERSON OR FIRM TO INSPECT THE SITE AND THE SEDIMENT CONTROLS INSTALLED
ON AT LEAST A WEEKLY BASIS, AND AFTER EVERY RAINFALL OF ½ " OR MORE.
2. SILT FENCE SHALL BE MONITOR FOR MAINTENANCE ON A DAILY BASIS. SEDIMENT SHALL BE REMOVED WHEN 50% OF THE SILT FENCE HAS BEEN FILLED, OR WHEN SEDIMENT CREATES "BULGES" IN FENCE. SILT FENCE SHALL BE REPAIRED WHERE
RIPS OCCUR OR IF FENCE HAS PULLED AWAY FROM POSTS.
3. ALL DISTURBED SOILS TREATED WITH TEMPORARY SEED AND MULCH ITEMS SHALL BE MONITORED. THE CONTRACTOR SHALL APPLY ADDITIONAL TEMPORARY SEED AND MULCH ITEMS AS NEEDED IF PRIOR APPLICATIONS HAVE BEEN DISTURBED BY CONSTRUCTION OR THE WEATHER. ALL DISTURBED SOIL SURFACES SHALL, AT MINIMUM, BE COVERED
WITH MULCH AT ALL TIMES.
4. GEOTEXTILE SEDIMENT FILTER BAGS USED FOR DEWATERING CONSIDERED FULL WHEN REMAINING BAG FLOW AREA HAS BEEN REDUCED BY 75%. AT THIS POINT, IT SHOULD BE REPLACED WITH A NEW BAG. DISPOSAL MAY BE ACCOMPLISHED BY
REMOVING THE BAG TO AN APPROPRIATE OFFSITE LOCATION.
5. COFFERDAMS AND TURBIDITY CURTAINS SHALL BE INSPECTED AND MAINTAINED IN ACCORDANCE WITH THE MANUFACTURE'S SPECIFICATIONS. AT MINIMUM, THE CONTRACTOR SHALL INSPECT COFFERDAMS DAILY TO ASSURE PROPER PERFORMANCE AND STABILITY. ANY HOLES, LEAKS OR TORN AREAS SHALL BE FIXED IMMEDIATELY.
6. DRAINAGE INLET PROTECTION SHALL BE INSPECTED PERIODICALLY TO INSURE NO SEDIMENT FROM CONSTRUCTION ACTIVITIES CAN ENTER STORM DRAINS. ANY HOLES, LEAKS OR TORN AREAS SHALL BE FIXED IMMEDIATELY.
7. CONCRETE WASHOUTS SHALL BE REPLACED WHEN 50% FULL. INSTALL MULTIPLE WASHOUTS IF CONCRETE USAGE WILL
EXCEED 50% OF ONE WASHOUT DURING ONE POUR.
TREE & WETLAND PROTECTION NOTES
1. THE AREA BENEATH THE DRIP LINE OF ALL TREES WITH A TRUNK DIAMETER OF 3 INCHES OR GREATER LOCATED OUTSIDE
OF THE PROJECT CLEARING LIMITS OR IN PROXIMITY TO STAGING AND STOCKPILING AREAS SHALL NOT BE DISTURBED.
DISTURBANCE INCLUDES REMOVING TREES, STOCKPILING MATERIAL, STORING EQUIPMENT, OR DRIVING AND PARKING VEHICLES BENEATH DRIP LINES OF TREES. ADDITIONAL TREES REQUIRING PROTECTION MAY BE DESIGNATED BY THE ENGINEER-IN-CHARGE (EIC). THE CONTRACTOR SHALL SUBMIT A PLAN TO THE EIC FOR APPROVAL SHOWING THE PROPOSED STAGING, STORAGE AND STOCKPILE AREAS FOR EACH SITE PRIOR TO PLACEMENT OF ANY EQUIPMENT OR
MATERIALS AT THE SUBJECT AREA.
TIME OF YEAR CUTTING RESTRICTIONS FOR INDIANA BAT & NORTHERN
LONG-EARED BAT & TRICOLORED BAT
1. IN ORDER TO PREVENT ANY DIRECT TAKINGS OF INDIANA BAT (MYOTIS SODALIS), NORTHERN LONG-EARED BAT (MYOTIS
SEPTENTRIONALIS), AND TRICOLORED BAT (PERIMYOTIS SUBFLAVUS), ALL FEDERAL AND STATE LISTED THREATENED SPECIES, THE CONTRACTOR'S ATTENTION IS HEREBY DIRECTED TO THE FACT THAT TREE CUTTING SHALL ONLY BE PERFORMED FROM OCTOBER 31 THROUGH MARCH 31. TIME OF YEAR TREE CUTTING RESTRICTIONS APPLY TO TREES THAT
ARE 2 INCHES OR GREATER DIAMETER AT BREAST HEIGHT (DBH).
REMOVAL NOTES:
1. THE EXISTING SUBSTRUCTURES SHALL BE REMOVED WITHIN THE LIMITS SHOWN ON THE PLANS, UNDER ITEM 202.19.
2. ACCORDING TO THE REQUIREMENTS OF SUBSECTION 202-3.01 GENERAL AND SAFETY REQUIREMENTS, A REMOVAL PLAN, SIGNED BY A LICENSED AND REGISTERED PROFESSIONAL ENGINEER IN THE STATE OF NEW YORK, SHALL BE SUBMITTED TO
THE ENGINEER THIRTY (30) DAYS PRIOR TO BEGINNING THE DEMOLITION.
3. NO RECORD PLANS AVAILABLE.
4. LIMITS AND METHODS FOR REMOVAL OF PAINT AT LOCATIONS OF FASTENER REMOVAL OR FLAME CUTTING SHALL BE AS DESCRIBED IN SUBSECTIONS 202-3.05 AND 574 OF THE STANDARD SPECIFICATIONS. THE COST OF PAINT REMOVAL SHALL BE INCLUDED IN THE LUMP SUM PRICE(S) BID FOR THE SUPERSTRUCTURE REMOVAL ITEM(S) (OR THE UNIT PRICE BID FOR
THE SUBSTRUCTURE REMOVAL ITEM).
5. REFER TO SUBSECTION 107-05 OF THE STANDARD SPECIFICATIONS FOR SAFETY AND HEALTH REQUIREMENTS.
6. DURING REMOVAL OPERATIONS, THE CONTRACTOR SHALL NOT BE ALLOWED TO DROP WASTE CONCRETE, DEBRIS AND OTHER MATERIAL TO THE AREA BELOW THE CULVERT EXCEPT WHERE THE PLANS SPECIFICALLY PERMIT THE DROPPING OF MATERIAL. PLATFORMS, NETS, SCREENS, OR OTHER PROTECTIVE DEVICES SHALL BE USED TO CATCH THE MATERIAL. IF THE ENGINEER DETERMINES THAT ADEQUATE PROTECTIVE DEVICES ARE NOT BEING EMPLOYED, THE WORK SHALL BE
SUSPENDED UNTIL ADEQUATE PROTECTION IS PROVIDED.
7. THE COST OF FURNISHING, INSTALLING, MAINTAINING, REMOVING, AND DISPOSING OF ALL PLATFORMS, NETS, SCREENS, OR OTHER PROTECTIVE DEVICES SHALL BE INCLUDED IN THE UNIT PRICES BID FOR THE APPROPRIATE ITEMS OF THE
CONTRACT.
8. CARE SHOULD BE TAKEN TO RETAIN NATURAL GROWTH AND PREVENT DAMAGE TO TREES WITHIN AND OUTSIDE THE LIMITS OF CONSTRUCTION, AND NOT SCHEDULED FOR REMOVAL. ANY DAMAGE CAUSED TO THIS NATURAL GROWTH SHALL BE RESTORED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR AS ORDERED BY THE ENGINEER (A.O.B.E.)
SEQUENCE OF CONSTRUCTION NOTES:
PRIOR TO DISTURBANCE OF ANY KIND, THE CONTRACTOR SHALL HAVE A COPY OF THE EROSION CONTROL PLAN ON SITE THROUGHOUT THE LIFE OF THE PROJECT. THE CONTRACTOR SHALL HAVE A PRE-CONSTRUCTION MEETING WITH THE COUNTY AND ALL OTHER INTERESTED AGENCIES PRIOR TO ANY WORK BEING DONE. THE CONSTRUCTION OF THIS PROJECT SHALL FOLLOW THE APPROXIMATE SEQUENCE OUTLINED BELOW, SUBJECT TO APPROVAL BY THE E.I.C.:
1. PLACE ALL TRAFFIC CONTROL MAINTENANCE DEVICES, BARRICADES, ETC.
2. CONTRACTOR SHALL INSTALL THE SEDIMENT FILTER LOG AND OTHER SEDIMENT CONTROL DEVICES.
3. INSTALL COFFERDAM SYSTEMS.
4. EXCAVATE EXISTING PAVEMENT,
5. REMOVE EXISTING CULVERT STRUCTURE AND WING WALLS COMPLETELY.
6. EXCAVATE FOR AND CONSTRUCT NEW FOOTINGS.
7. INSTALL NEW PRECAST STRUCTURE.
8. CONSTRUCT NEW CAST IN PLACE WINGWALLS AND PLACE STONE ARMORING.
9. STABILIZE ALL DISTURBED AREAS AS SOON AS POSSIBLE.
10. PLACE NEW ASPHALT PAVEMENT ON ROADWAY.
11. INSTALL NEW SIGNS, FINAL TOPSOIL AND SEEDING.
12. RESTORE ALL AREAS USED FOR STORAGE, ACCESS, ETC AND CLEAN UP PROJECT SITE.
13. AFTER ALL AREAS HAVE REACH 80% STABILIZATION, REMOVE ALL SEDIMENT CONTROLS. CLEAN AND CLOSE SITE.
14. REMOVE ALL TRAFFIC CONTROL MAINTENANCE DEVICES AND OPEN TO PUBLIC.
DAMAGE TO EXISTING STRUCTURES OR VEGETATION:
1. NUMEROUS STRUCTURES AND VEGETATION ARE PRESENT WITHIN THE WORK LIMITS AND ARE TO REMAIN IN PLACE. SOME
EXISTING STRUCTURES ARE TO BE ADJUSTED WITHIN THIS CONTRACT. THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR ALL DAMAGE CAUSED BY THEIR OPERATIONS TO THE EXISTING STRUCTURES OR MATERIALS WHICH ARE NOT INCLUDED AS PART OF INTENDED WORK. ALL DAMAGE TO THE EXISTING STRUCTURES OR MATERIALS WHICH ARE NOT PART OF THE INTENDED WORK SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR WITHOUT COST TO THE OWNER, AND TO THE
SATISFACTION OF THE ENGINEER IN CHARGE.
OF A LICENSED PROFESSIONAL ENGINEER,
ARCHITECT, LANDSCAPE ARCHITECT, OR LAND
SURVEYOR, TO ALTER AN ITEM IN ANY WAY. IF AN
ITEM BEARING THE STAMP OF A LICENSED
PROFESSIONAL IS ALTERED, THE ALTERING
ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT,
OR LAND…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .