Atch 5 PAST PERFORMANCE SURVEY 86614620Q00002.docx
DOCX document 28 KB Posted
- Attached to
- Study of Sub-metering in Housing and Urban Development Projects Federal contract opportunity
- Solicitation number
- 86614620Q00002
About this file
This document contains a past performance survey template for evaluation of proposals submitted in response to solicitation number 86614620Q00002. The solicitation is for a study of sub-metering utilities in Housing and Urban Development projects. The selected contractor will analyze the effectiveness of installing additional utility meters in public housing, multifamily housing, and rental assistance demonstration projects to shift utility costs from the properties to individual tenants. The past performance survey requests information from references on the quality, schedule, cost control and business relations performance of the contractor or key personnel on a prior, relevant project. Ratings of exceptional, very good, satisfactory, marginal or unsatisfactory are required for each performance area, with comments for exceptional, very good, marginal or unsatisfactory ratings.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 86614620Q00002 Study of Submetering Utilities Amended Dec 4 2019.docx | DOCX document | |
| 86614620Q00002 Study of Submetering Utilities Amended Dec 2019.docx | DOCX document | |
| Atch 3 Labor Mix 86614620Q00002.xlsx | XLSX spreadsheet | |
| Atch 1 Non-Disclosure Agreement 86614620Q00002.docx | DOCX document | |
| 86614620Q00002 Study of Submetering Utilities 11-25-19.docx | DOCX document | |
| Atch 4 PAST PERFORMANCE CHART 86614920Q00002.docx | DOCX document | |
| Atch 2 Price and Labor Rates 86614620Q00002 11-25-19.xlsx | XLSX spreadsheet | |
| Combo-Synopsis Study of Sub-metering in HUD Projects 11-25-19.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Study of Sub-metering Utilities in HUD Projects
POLICY DEVELOPMENT AND RESEARCH 86614620Q00002
Attachment 5 - Past Performance Survey
PAST PERFORMANCE SURVEY
This past performance survey is to be completed on the designated contractor or key personnel as designated below:
PAST PERFORMANCE PROJECT IDENTIFICATON (To be filled out by the Offeror):
| CONTRACTOR OR KEY PERSONNEL NAME: |
| Click here to enter text. |
| CONTRACT or ORDER NUMBER: |
| Click here to enter text. |
| PROJECT TITLE: |
| Click here to enter text. |
| TOTAL PERIOD OF PERFORMANCE, INCLUDING OPTIONS |
| Click here to enter text. |
PAST PERFORMANCE REFERENCE INFORMATION (To be filled out by the Reference):
| NAME: |
| Click here to enter text. |
| TITLE: |
| Click here to enter text. |
| AGENCY or CUSTOMER: |
| Click here to enter text. |
| PHONE: |
| Click here to enter text. |
| Click here to enter text. |
The Department of Housing and Urban Development (HUD) is procuring the services described in the box below. You have been selected by the contractor or key personnel identified above to provide past performance information to HUD to be used in evaluating the offeror’s proposal for this acquisition. Thank you for your input.
| Summarize the services acquired here. |
| If this past performance survey is related to key personnel, please summarize the level of interface you had with the designated key personnel throughout the life of the project you oversaw. |
For each of the Five (5) criteria listed below, the rater must choose One (1) Adjectival Rating by checking the box, as applicable. At a minimum, for any rating that is checked Exceptional, Very Good, Marginal or Unsatisfactory, please submit additional comments to substantiate the rating. If Cost Control is N/A, Please explain why.
1. QUALITY OF SERVICE
| RATING |
| Adjectival Rating |
| Definition |
Exceptional Performance meets contractual requirements and exceeds many to the Government’s benefit. The element being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor/Key Personnel were highly effective
Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit. The element being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor/Key Personnel were effective
Satisfactory Performance meets contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the Contractor/Key Personnel appear or were satisfactory
Marginal Performance does not meet some contractual requirements. The element being assessed reflects a serious problem for which the Contractor/Key Personnel has not yet identified corrective actions.
Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the Contractor’s/Key Personnel’s corrective actions appear or were ineffective.
ADDITIONAL COMMENTS:
Click here to enter text.
2. SCHEDULE
| RATING |
| Adjectival Rating |
| Definition |
Performance meets contractual requirements and exceeds many to the Government’s benefit. The element being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor/Key Personnel were highly effective
Performance meets contractual requirements and exceeds some to the Government’s benefit. The element being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor/Key Personnel were effective
Performance meets contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the Contractor/Key Personnel appear or were satisfactory
Performance does not meet some contractual requirements. The element being assessed reflects a serious problem for which the Contractor/Key Personnel has not yet identified corrective actions.
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the Contractor’s/Key Personnel’s corrective actions appear or were ineffective.
Click here to enter text.
3. COST CONTROL
| RATING |
| Adjectival Rating |
| Definition |
Performance meets contractual requirements and exceeds many to the Government’s benefit. The element being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor/Key Personnel were highly effective
Performance meets contractual requirements and exceeds some to the Government’s benefit. The element being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor/Key Personnel were effective
Performance meets contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the Contractor/Key Personnel appear or were satisfactory
Performance does not meet some contractual requirements. The element being assessed reflects a serious problem for which the Contractor/Key Personnel has not yet identified corrective actions.
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the Contractor’s/Key Personnel’s corrective actions appear or were ineffective.
Not Applicable
Click here to enter text.
4. BUSINESS RELATIONS
| RATING |
| Adjectival Rating |
| Definition |
Performance meets contractual requirements and exceeds many to the Government’s benefit. The element being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor/Key Personnel were highly effective
Performance meets contractual requirements and exceeds some to the Government’s benefit. The element being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor/Key Personnel were effective
Performance meets contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the Contractor/Key Personnel appear or were satisfactory
Performance does not meet some contractual requirements. The element being assessed reflects a serious problem for which the Contractor/Key Personnel has not yet identified corrective actions.
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the Contractor’s/Key Personnel’s corrective actions appear or were ineffective.
Click here to enter text.
File details come from the government source that posted it. Updated .