CTSS-III_Industry_Day_Slides_-_AFCENT16_Final_FBO_Posting.pptx
PPTX presentation 79 KB Posted
- Attached to
- Communication Technical Support Services - IV Federal contract opportunity
- Solicitation number
- 831812133
- Issued by
- Defense Information Systems Agency
About this file
Industry Day Slides - AFCENT
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CTSS-IV_Industry_Day_Slides_-_Contracting_FINAL_FBO_Posting.pptx | PPTX presentation | |
| Attendee_List_FBO.docx | DOCX document | |
| 3_-_Event_Location.doc | DOC document | |
| 2-Arrival__Check-In_Procedures.doc | DOC document | |
| 1-Event_Schedule.doc | DOC document | |
| 0-CTSS-IV_Industry_Days_Package_Cover.docx | DOCX document | |
| CTSS_IV_Industry_Day_Questions_FINAL.docx | DOCX document | |
| CTSS_Labor_Categories_-_FINAL.rtf | RTF text file | |
| CTSS-IV_FBO_-_FINAL.doc | DOC document | |
| CTSS_SOW_-_FINAL.rtf | RTF text file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CTSS-IV Industry Day Colonel Keith E. Mueller January 17, 2018 Opening Comments
17 JAN 2018
Director of Communication, USAFCENT
UNCLASSIFIED
CTSS Background CTSS I Awarded January 2003 Developed prior to Sep 11, 2001 Support for 5 steady state bases “Operation Southern Watch” Requirements expand: Operations “Enduring & Iraqi Freedom
CTSS II Awarded March 2007 Supporting Operations Enduring & Iraqi Freedom Iraq retrograde, Afghanistan retrograde
CTSS III Awarded Sept 2015 Supporting Operations Enduring Freedom, Iraqi Freedom, Inherent Resolve
17 JAN 2018
CTSS Scope of Work
| Task Groups | Average FTE's | ||
| Large Base | Small Base | CONUS | |
| Knowledge Operations | 1 | 1 | |
| Cyber Systems Operations | 9 | 3 | 2 |
| Cyber Surety | 2 | 1 | |
| Client Systems | 3 | 2 | |
| Cyber Transport | 22 | 6 | 2 |
| RF Transmissions | 10 | 4 | 5 |
| Spectrum Operations | 1 | 0 | |
| Cable and Antenna Systems | 9 | 4 | |
| Communication Engineering | 3 | 1 | 4 |
| Communication Planning and Management | 3 | 2 | 9 |
| Logistics | 2 | 1 | 3 |
CTSS Scope of Work Primary Country/Locations Supported
Qatar (1), U.A.E. (1), Kuwait (3), Afghanistan (1), Pakistan (1), Jordan (1)
CTSS III currently employs 285 FTE’s at 8 different locations in the CENTCOM AOR
Projected scope in 2 years (BEST ESTIMATE):
Qatar (1), U.A.E. (1), Kuwait (3), Afghanistan (1), Pakistan (1), Jordan (1)
CTSS Future
CTSS IV
Support for “Enduring Bases”
3-6 locations
Responding to “Emerging Requirements”
Examples of events that drive unplanned requirements:
CTSS-1: 9/11/2001 drove a great number of unplanned requirements Operation Inherent Resolve (ISIS) Afghanistan Troop Increase
Questions?
image1.jpeg
File details come from the government source that posted it.