This is a Work Write-Up document prepared by the City of Jackson Community Development Department for roof and gutter repairs at 827 Bush Street in Jackson, Michigan. The scope of work includes stripping and installing a new roof on both the home and garage (approximately 20 squares total), installing new architectural shingles with ice shield protection, installing 7/16" oriented-strand board sheathing where necessary, reflashing chimneys and vents, installing ridge venting, and trimming trees back approximately 10 feet from the roof. The project also includes replacing approximately 160 linear feet of gutters using 5-inch K-type aluminum with a maximum hanger spacing of 30 inches and installing approximately 80 linear feet of downspouts in commercial size. The owner currently has gutter guards that will be reinstalled after new gutters are installed. A permit is required for this project. The document was prepared on August 3, 2026, by sharrison@cityofjackson.org and is designated as Exhibit 1.
The work write-up requires both the owner and contractor to sign the document only if it becomes part of a final construction contract and both parties have reviewed and agreed to the work and pricing. The contractor is responsible for final measurements, and all work must comply with Michigan Building Code standards and manufacturer's instructions. The document notes that the home was previously stripped years ago with only one existing layer of roofing, eliminating the need for new decking at this time. The project is part of the City of Jackson's Community Development Department program for qualified homeowners, with awards granted to the qualified lowest bidder. All bidders must have completed Sam.gov registration, proper licensing, and obtain required permits prior to work commencement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Work Write-Up
R05 - ROOF - STRIP AND INSTALL
* EXHIBIT 1 *
Dated: 8/3/2026
CUSTOMER INFORMATION
827 Bush Street roof/repairs 827 Bush, MI - Jackson, MI 49202--3236
PREPARED BY
sharrison@cityofjackson.org
* NOTE *
THE CUSTOMER AND CONTRACTOR MUST SIGN THE BOTTOM OF EACH PAGE ONLY IF
1) THIS WORK WRITE-UP BECOMES PART OF A CONSTRUCTION CONTRACT
2) THE UNDERSIGNED CUSTOMER AND CONTRACTOR HAVE REVIEWED, APPROVED AND AGREED TO THE WORK AND PRICES DESCRIBED IN THIS WORK WRITE-UP
Location: Unassigned
| General Requirements |
| Quantity |
| Units |
| Total |
1 - R05 - ROOF - STRIP AND INSTALL
(Specification ID:1.05000 )
Sq
* PERMIT REQUIRED *
Strip existing roof, removing all shingles and felt. Make repairs to the existing roof framing where required to provide adequate strength and a true and level surface. Install 7/16” oriented-strand board sheathing to cover all areas of roof deck. Just before proceeding, sweep roof thoroughly to remove all debris. Install ice shield at all lower roof edges. Ice shield shall extend at least 24" inside the interior surface of the exterior wall line of the building, in accordance with the Michigan Building Code. Install new 15% asphalt saturated felt according to manufacturer's directions. Furnish and install new roofing material of a color as selected by owner, must be architectural style. Installation shall include metal drip and rake edge, two layers of 90# roll valley or metal valley in all valleys. Reflash chimney, plumbing vents, and vertical walls with appropriate neoprene boots and metal step flashing where possible. Install ventilation units sufficient to vent all areas of attic. Ridge venting when used shall cover the full length of the roof ridge. Installation of all materials shall follow manufacturer's printed instructions and G.S. 1.
Contractor is responsible for final measurement.
NOTE: THE HOME WAS STRIPED YEARS AGO AND CURRENTLY THERE IS ONLY ONE LAYER.NO DECKING WILL BE NEEDED AT THIS TIME.
Remove chimney down to the inside of the attic, infill accordingly.
Trim tress back off roof approximately 10 ft to include garage.
Approximately20 squares on HOME AND GARAGE.
New roofing material type shall be architectural shingles.
Manufacturer: __________ Color Name/Number: __________ Contractor's Initials: ____________________ Owner's Initials: __________ Rehab Initials: ________
2 - G08 - GUTTERWORK
(Specification ID:1.08000 )
LF
Furnish and install gutter and downspout. Replacements shall match existing as to materials, finish, shape and size. Do not mix galvanized with copper or aluminum. Where replacements are of a complete system or side of a system having no cross connections with sections not to be replaced, used baked pre-enameled aluminum, 5-inch K-type in standard colors. Minimum thickness of aluminum shall be .027 inches for troughs and fittings. Use one or a combination of strap hangers, spike and ferrules or fascia hangers. Space hangers and slip joint connectors per manufacturer's instructions. Maximum spacing of hangers shall be 48 inches OC for galvanized and 30 inches for aluminum. Use only recommended gutter seal and rivets or screws at all joints. All work, whether a complete new system or a partial replacement, shall have the system with a pitch of not less than 1 inch in 16 feet. Divert the water away from the foundation using appropriate extensions and/or concrete splash blocks. All work to conform to code and G.S. 4a.
Contractor responsible for final measurements.
Owner has gutter guard installed, these shall be reinstalled after the new gutters go up.
All Downspouts shall be commercial size.
Approximately 160 linear feet of gutter on all elevation(s).
Approximately 80 linear feet of downspout on all elevation(sn).
Subtotal for General Requirements
Total
Prepared By: sharrison@cityofjackson.org on 8/3/2026
OWNER ACCEPTS SCOPE OF WORK
I have read the contents of this work write up and received a copy. I fully understand the repairs to be made to my property.
| x_________________________ | __________ | |
| Owner: | Date |
CONTRACTOR ACCEPTS SCOPE OF WORK
I have read the contents of this work write up and agree to perform all work called for in accordance with the bid submitted on __________.
| x_________________________ | __________ | |
| Contractor | Date |
| x____________________________ | __________ | |
| Construction Specialist | Date |
| Prepared By: sharrison@cityofjackson.org on 8/3/2026 |
| 4 of 4 |
image1.png
File details come from the government source that posted it. Updated .