PDF 2 MB Posted
- Attached to
- Wallops Flight Facility Chlorinator Upgrade Federal contract opportunity
- Solicitation number
- 80NSSC843390Q
About this file
This document contains pictures related to a Request for Information (RFI) for chlorination upgrades at the NASA Wallops Flight Facility. The RFI pictures show the existing chlorine injection sites and storage rooms at the D-4 Main Base water plant and U-49 Wallops Island water plant. They depict locations for proposed new chlorine injection equipment and monitoring devices. The related federal contract opportunity is solicitation number 80NSSC843390Q from the National Aeronautics and Space Administration Shared Services Center for upgrading the chlorinators at Wallops Flight Facility. The solicitation seeks contractor proposals to replace aging chlorination equipment and install new chlorine injection and monitoring systems at the two water plants.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Tab 4 SOW Revised 2.pdf | ||
| Tab 12 RFQ 80NSSC843390Q Revised 2.pdf | ||
| Tab 4 4 SOW Revised.pdf | ||
| Tab 12 RFQ 80NSSC843390Q Revised SOW.pdf | ||
| Chlorinator Site Visit.pdf | ||
| Tab 12 RFQ 80NSSC843390Q.pdf | ||
| Tab 12 Technical Questions and Answers.pdf | ||
| Tab 12 RFQ 80NSSC843390Q.pdf | ||
| Tab 12 RFQ 80NSSC843390Q.pdf | ||
| Tab 4 4 SOW.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D-4 Main Base water plant
U-49 Wallops Island water plant
NASA Wallops Flight Facility Chlorination Upgrades RFI response to questions submitted on 8/15/23
D-4
Chlorine injection vault
U-49
Chlorine injection vault
Suggested New -cl injection site
New -cl injection skid
Existing -cl injection pump to be replace
Location of existing supervisory control device
D-4 Main Base Water Plant (not for construction)
Main Base chlorine injection site and flow meter.
Main Base well flow meter remote monitoring instrument (Sensus Act-pak).
Main Base chlorine analyzer (Hach CL17) inoperable and requires replacement.
Main Base raw water line (6” DI) and chlorine injection line (¾” pvc). (contractor to verify size and material)
Main Base chlorine storage room (approx. 5.5’x5.5’).
U-49 Wallops Island Water Plant
Wallops island raw water line (6” DI) and chlorine injection site. (contractor to verify size and material).
Wallops island chlorine storage room (approx. 4’x6’).
Wallops island building supervisory control device. (Metasys)
U-49 Wallops Island Water Plant