About this file
Attachment L-4 Historical Projects List
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0003_-_80MSFC18R0027_(002).pdf | ||
| Amendment_0002_-_80MSFC18R0027.pdf | ||
| Amendment_0001_-_80MSFC18R0027.pdf | ||
| Amendment_0002_-_80MSFC18R0027.pdf | ||
| Amendment_0002_-_80MSFC18R0027.pdf | ||
| Minor_Construction_Contract-IV_Industry_Day_Briefing_Charts.pdf | ||
| Industry_Day_Attendees_List.pdf | ||
| Attachment_L-3__Past_Performance_Questionnaire.pdf | ||
| Amendment_0001_-_80MSFC18R0027.pdf | ||
| SF1442_.pdf | ||
| Terms_and_Conditions.pdf | ||
| Attachment_L-1_Offeror_Information_Form.pdf | ||
| ETF_Map.pdf | ||
| Attachment_L-2__Past_Performance_Questionaire_Recipient_List.pdf | ||
| Attachment_L-5_MSFC_Technical_Specifications_For_Repairs_And_Construction_TSRC_11_Rev_2.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment L-4 Historical Projects List
FWR Bldg. Title Cost
2372822 4727 Replace Roof $398,889
2419333 4624 REQUEST TO BUILD TWO ADDITIIONAL BAYS (52’X200’) ONTO BLDG
4624. THE DESIGN SHOULD MATCH THE EXISTING BLDG. $960,846
2464833 4708 Replace CRU 2,3,4 $246,283 2736496 4675 Demolish Building $142,500 2905743 4663 Rewire lighting controls in computer room $63,430 3029878 4718 Replace all roof sections with a like roof or TPC membrane roof system $266,635 3207788 Softball Design and construct a second softball field $365,092 3262196 4707 Demolish Optics Coating Chamber $167,000 3262337 4205 Install Doors and windows between rooms 109 and 109A $12,202 3262356 4250 Remodel UCS Control room (room 29) to bring area up to state of the art status. $44,280 3262693 4487 Replace MCC0001 in room E09, C-wing $36,962
3292760 4619 Install UCS pressure differential gauges at the equipment TH-1, TH-2, TH-3, TH-4, and TH-5 $21,131
3298326 4624 Replace Metal Roof $211,144 3344847 4205 Provide direct heat recovery chiller $426,663 3373930 4653 Repair Air flow problems in rooms 26,26A27,27A27B,27C $358,911 3373944 8037 Refurbish MSFC Dock $57,251 3382831 4610 Install occupancy sensors in all hallways on all floors $21,790 3399093 4631 Paint yellow boundary lines in Bldg. 4631 $35,000 3426657 4583 Replace roof $367,777 3426789 4755 Provide connections and pads for cooling tower for plug welder in south high bay $46,685 3439766 4515 Demo building $166,000 3442828 4663 Mods to room A109 $44,072 3452954 4705 Replace FID01 Panel $22,000 3452956 4705 Replace FID02 Panel $53,000 3452957 4483 Replace FID01 Panel $15,797 3469335 4705 Mods to rooms C125 and C108C $33,777 3476224 4723 Modifications to building 4723. $117,187 3476391 4465 Add HVAC system to building $34,300 3493172 4708 Paint cafeteria $10,719 3498847 4663 Replace MCC1, room A106 $8,518 3530313 4583 Install modular walls for west test area control room and customer rooms, 205 & 171 $364,364 3533393 4250 SID01 Replacement, room 25(E4) $185,696 3533483 4623 SID01 Replacement, room 107 $145,138 3544111 4487 Provide potable water supply and drain to east wall of C207 $19,730
3550151 4205 Install 16 new 208 3phase 50A circuits in room 109. Wire power supplies to junction boxes. $14,186
3550267 4207 Provide power to support WAN. Replace 8-208V 30A circuits’ w/L6-30 receptacles. $16,184 3561030 4663 Noise Reduction in control room B204 $20,111 3567468 4483 Replace concrete slab to support post lift. $5,913
3567493 4207 Replace 2 older HVAC chilled water units in room 150 w/one Leibert HVAC chilled water unit from 4663 rm C260 $40,307
3573132 4754 Install fused cutoff switch and duct work for sand blaster $6,745 3580592 4315 Repair Shower & Locker Rooms $155,334 3583355 4707 Provide Potable water meter $82,350 3589786 4207 Provide ten set points $8,497 3595358 4663 Provide HVAC unit - room B103A $63,608
3599268 4707 Prepare room 100 for installation of Laser Xline 1000 Machine and Laser MI machine $104,149
3602852 4480 Replace Roof $56,508
3605061 4625 Resurface pavement at the rollup door. $235,141 3605068 4200 Renovation options for Heritage Gallery, room 121 $135,997
3630013 4708 Relocate electrical and communications floor boxes to match new cubicle layout.
Replace old carpet with new GFE carpet. $32,855
3630154 4718 Install or upgrade secondary containment to meet regulations, west end $5,370 3630216 4707 Provide proper containment for generator gas tanks supporting the autoclave. $14,886
3636073 4723 Connect existing potable water meters to feeds for army buildings nor of the NASA boundary to UCS. $48,000
3641371 4649 Build Flooring Structure for SLS derived Habitat mockup. $68,777 3662890 4659 Replace High bay lights in the Nitrogen Loading/Unloading area with LED $42,982 3667052 4705 Assess existing environmental conditions of cleanrooms on east side of building $148,200 3667167 4200 Remodel room 120 $26,500 3667171 4207 Installation of LED or Solar powered parking lot lights in south parking lot $32,573 3672328 4610 Replace Air Handler 4610-AH003 in room 3076A $42,211
3672405 4752 Remove covering on floor in south high bay and provide electrical outlets for equipment. $221,146
3672476 4711 Install 60KW generator and automatic transfer switch. $43,470
3672480 4476 Remove outlets, conduit and cabling on walls in room 117. Install power, phone and video under floor. Install new outlets around wall. $24,440
3678486 4540 Repair apron on south side of building $120,604 3683617 4476 Add a wall and door internal to building $12,001 3683623 4476 Evaluate HVAC needs in room 110, 113, 114 $117,801 3694979 4476 Remove roll up door and close up hole in wall in room 113D $27,638 3701037 4539 Replace DXAC1 with 2 high efficiency units sized for bldg. 4539 and 4540 basement $129,000 3701039 4249 Install occupancy sensors as appropriate $58,718 3701170 4752 Mods to North end of highbay $145,919 3701254 4466 Add two walls and electrical outlets $128,200
3701336 4610/44 82/4646 Remove existing concrete canopies and replace with new lightweight metal canopies. $17,910
3716225 4707 Install power and shop air in room 121 for new equipment $85,578 3716274 4656 Provide supplemental heat in high bay $89,799 3730309 4249 Upgrade finishes $24,777 3734306 4707 Mods to room 102/102A/103 $27,667 3734308 4250 Upgrade suite 33 $14,478 3738327 4207 Install Power meters for PDUs, HVAC & DX units in Annex and room 145B $88,300 3738665 4607 Replace existing 400W metal Halide lights in hibay with LED fixtures $59,600
3738679 4207 Evaluate power on CRU DX2 and condenser on MSF-B 4208 and relocate to the A-side power in 4207. $9,845
3766310 4200 Replace carpet in suite 408/408A/408B/408C and 408D $27,277 3773566 4708 Move Archives photo from 4353/115 & 123 to 4708/B14 $78,066
3781994 4765 Install a permanent generator, transfer switch to support cooling equipment for chemical coolers in SW corner of building. $35,300
3789296 4583 Install 100 KW generator outside building. $87,550 3792525 4487 Replace concrete pad outside double doors to improve drainage $13,200
3795915 4611 Upgrade fuel storage tanks leak detection and automated fuel delivery system.
Upgrade fuel dispensers and card readers $35,497
3798890 4650 Install HVAC system in calibration lab $123,000 3801745 4481 Install Fence around elevated slabs $29,950 3802070 4607 Install Dorset 4 card MS5 panel with I/O cards $26,818 3809058 4757A Install ramp going to west end of building to eliminate water $68,430 3809109 4200 Mods to G-29 to accommodate archives from 4353 $68,439
3809110 4583 Repair water leaks in Test Stand 115. $179,513 3809167 4200 Paint & Carpet room 828 $45,402 3809334 4705 Renovate rooms E105 & E105A for IDIQ Pipefitter personnel $47,187 3812543 4524 Repair water leak outside and mate to existing carbon steel $445,860 3819682 4471 Install Fence around elevated slabs $31,703 3826251 4487 Provide a design for replacing existing fire alarm system in the building $441,706 3836244 4572 Fabrications of a load frame structure for lifting hardware tests. $29,460
3839490 4619 Install 2 additional 480V 3 phase outlets in room 157 to support the new milling machine. Replace wiring from machines and replace with to outlets. $17,861
3842971 4663 Provide 50KW of UPS power and cooling solution to use during the annual power outage $95,290
3850236 4250 Upgrade suite 59 $166,326
3856508 4353 Remove portrait studio backdrop and roller units from rm 108 and reinstall them in Bldg. 4200 rm G26E. $4,889
3856612 4200 Paint & Carpet Self Study learning center, room G13 $113,637 3856718 4646 Repaint exterior doors. Remove old paint prior to painting. $11,062
3860063 4347 Replace rollup door on observatory tower to make it electrically operable from the 4347 control room downstairs. $14,822
3864754 4207 Replace roof sections 1 & 2 with standing seam metal panel roof system $206,931 3864785 4466 Replace DXAC1 with 2 high efficiency heat pumps serving east/west test areas. $129,900 3871535 4203 Provide new finish on cafeteria walls. Work to be done in 2 phases. $3,950 3874943 4464 Install steam meters that are not on natural gas CoF plan $405,509 3878097 4200 Construct Temporary parking lot on the south side of 4200 complex $122,222 3893778 4619 Install safety system to access roof area above room 301. $4,374
3893779 4619 Safety improvements to LTA east bridge cranes (1) safety gate at south end of bridge walkway (2) extend handrails on north end of walkway. $4,526
3896666 4635-3 Install metal awning on west side of building 70' x 30' $98,447
3904216 4705 Redesign sprinkler piping system in room 125 to ensure the crane will not hit the piping. $22,950
3908327 4220 Provide Cap for Glass Railing Panels $61,700
3915903 4671/46 79 Convert building heating from steam to electricity $68,408
3916027 4755 Replace 400W metal halide fixtures with LED type in high bays $198,494
3919452 4602 Provide 115V power and install O2 sensors in rm 1148/1150/1169/1187B and connect sensors to UCS $30,112
3919546 4752 Perform electrical mods to south end of high bay $20,450 3923378 MSFC Design and fab support stands for large items transported by the MSFC KDTS. $33,742 3930323 4670 Convert the building heating from steam to electricity $591,340
3937436 4487 Construct a way to install or remove large equipment on 2nd floor of A/AB wing area. $32,290
3959987 4491 Replace AH-1 with new more efficient chilled water unit. $300,812 3967035 4625B Remove all asphalt from within the perimeter of building and replace with concrete. $63,305 3967061 4625A Remove all asphalt from within the perimeter of building and replace with concrete. $145,500
3967062 4628 Install concrete pad inside fenced area at the SE corner behind the hydrogen test facility. $11,600
3973932 4667 Install foundation supports for a 10,000 gallon above ground diesel storage tank in the western edge of Bldg. 4666. $41,758
3985152 4619 Provide safe pathway from 4619 horn room to the acoustic horn air regulator panel adjacent to Bldg. 4616. $6,300
3995861 4708 Relocate EOC in Bldg. 4629 and J911 Dispatch Center Bldg. 4312 to Bldg. 4708 basement $143,399
3996080 4249 Provide finish upgrades in room 112, 116 116A-116E, 117, 122, 129, 131-131B, 133 $90,146 4000145 4619 Install a facility static ground system in the east vibration lab (Rm 148) $52,300 4000181 4260 Install sidewalk from Bldg. 4260 to Bldg. 4250. $148,900
4010400 4708 Perform analysis of HVAC, electrical, mechanical and structural requirements to move the Payload Rack Checkout Unit (PRCU) from Bldg. 4755 to Bldg. 4708 $104,345
4017673 4663 Enclose rm B170 to support NEACC ICAM test lab moving to B1078A area. $22,337
4017891 4663 Provide redundant 75kW power to support the relocation of the Data Operations Control Room (DOCR) from M101. $67,585
4024867 4663 Install qty 2 - 40 or 50 ton DX Leibert units in B160. $297,646 4040561 4655 Excavate and refill approx. 100 ft. trench for installation of high purity air pipe. $16,483 4051165 4346 Bollards for CDC $60,665
4054516 4530/46 99/4697 /4693
(1) Provide electrical infrastructure to support generator backup power of test equipment required for test conducted at 4699 and 4697. (2) Provide electrical infrastructure to support generator backup power of test equipment for test conducted at 4693
$94,930
4061217 0 Install Water Fountains/Bottle Fillers $18,233 4065692 4755 Replace Roof and insulation above entry/office space $119,315 4069830 4663 Enclose Room B107 to support HOSC DOCR monitoring personnel $124,437
4076891 4755 REPLACE EXTERIOR PERSONNEL DOORS $40,963
4076894 4482 Replace Windows in high bay areas $54,623 4091079 4573 Demolish Washington Gentry Crane $225,000
4109054 4572 Install roll-up door on north side of test bay; install heavy folding metal platform inside to match door; install small awning outside above door; install wall pack lights on each side of door
$86,499
4116246 4203 Remove existing wall between CR4142 & 4138, add receptacles and relocate polycom and projection system to room 4216 $23,861
4123899 4628 Replace 4628-ODT0001 $162,841 4123907 4619 Install transfer switch to provide backup generator power to 4619-146 and 4619-145 $190,750
4127767 MSFC Install approved "SHARE THE ROAD" bike signs at various heavily traveled bike routes on MSFC roads. $4,555
4135675 4663 Remove 2 HVAC units - B107 $13,722 4142418 4631 Correct HVAC issues in D105 $50,524
4142469 4205 Replace existing 60 amp, 208V 3 phase connect in trench with breaker panel and 5 separate 110V, 30A breakers and five NEMA L5-30 outlets. Transfer panel PPA305L circuits to SRPA 305 circuits.
$17,914
4142608 4625A Install louver and turbine vents to prevent excess condensation on the stored mater in building. Install see thru panels to allow natural light inside for safer operations. $32,520
4150116 4711 Connect Hamamastu X-ray stem to the existing interlock system. Add switch to provide key lockout. $2,226
4166102 4203 Paint CR on 3rd & 4th floors. $27,000 4170212 4601 Enclose room 2301 to make an office and small conference room $45,600 4210850 4754 Install 230V 3phase power on east wall for equipment $14,750 4211014 4663 Transfer load from existing 625KVA UPS to existing 750 KVA UPS $38,000 4222244 4220 Install 4220 DX Cooling Addition Package $151,400 4233037 4200 Install new sign in the training center, G13 $10,731 4233109 4707 In room 101, repaint and replace floor tile $19,716 4233378 4200 Install 3 automatic handicap accessible door openers in G13 $14,858 4248425 4619 In room 301, install LED ceiling lights. $11,403 4282298 4663 Remodel the ladies restroom (C207) to add more toilets. $23,002 4285897 4487 Temporary Emergency Cooling $7,369 4297048 4610 Mods to room 4028, 2084, 3066, 3098 $11,856
4297060 4207 Install/Purchase a GSA approved pedestrian door w/deadbolt to meet SCIF standards $10,669 4297064 4207 Install 12"x12" viewport in supply air duct, HVAC to meet SCIF standards $900 4297065 4260 Install charging station in south parking spots $19,868 4301062 4207 Install one PDU in room 145 $6,850 4308802 4707 Modify access to meet ADA requirements in rooms 100/102/121 $32,500 4312221 4649 Install 75 KVA transformer to support new equipment in room 100 $8,767 4330329 4663 Enclose room B160 to support the NDC moving from B160 west end area/ $22,800
4330350 4663 Install additional set points and control cards for UCS to provide redundant monitoring in three major data center support buildings. $36,995
4330356 4663 Provide 100 KW of UPS power from A-wing UPS to B-wing $26,484 4330360 4487 Complete repair on AHU-007, room B126 $109,002
4337922 4635-1 Cut out 7 ft. section of cinder block retaining wall and build concrete ramp for forklift access $5,890
4337924 4755 Install 480V in west central wall of south highbay for vertical trim tool $7,910 4358982 4660 Demolish 4660 $149,900 4366629 4436 Install Hydraulics System $14,610 4374348 4205 Add 208V UPS between panel and existing loads in room 109. $112,519 4374372 4663 Modifications to room C200 $252,028 4385978 4436 Expand room 112B $80,484 4397201 4601 Redesign room 1101 to accommodate new org moving in $2,951 4411313 4760 Replace DXAC0003 & DXAC0004 $71,595 4411552 4520 Replace the 4 wooden poles and relocate 2 additional poles $122,413 4443450 4759 Install drop ceiling or drop sprinklers to accommodate testing in room 103 $26,528 4443550 4707 Provide power in east end of high bay. $6,319 4443551 4708 Provide power in room 1110C $11,832 4450580 4436 add 10 additional 30A outlets in room 112B $4,497 4454749 4663 Room mods to rooms A214, and A220 $38,200 4454750 4666 Perform Drainage improvements for the building site $12,915 4465661 4572 Install 5 vertical 120 cu ft. vessel on the east side. $81,600 4479622 4707 Provide power outlets in room 101 $5,794 4487179 4207 Install one vertical HPA storage tank $49,909 4487184 4619 Redesign parking lot lighting on west end of building $99,484 4509143 4663 Install BTU meter for Chiller in Room 169A $114,708 4509155 4663 Install chilled water piping for HVAC units in B113 $9,228 4524644 4619 Design complete bathroom renovation and construct new bathroom $59,600 4532503 4470 Replace roof on building $29,187 4532627 4200 Refinish walls in hallway of 8th floor $32,821 4540688 4776 Provide and install two new motors in room 103 $33,310 4549077 4663 Design/Evaluate Electrical Panels in room 1 $15,900 4549157 4610 Install generator supporting room 1039 $77,900 4557476 4619 Install roll-up door in south wall of room 164C. $21,000 4560937 4316 GOES Weather Receiving Ground Station $74,000 4573160 Tiros & Gemini Intersection Improvements $23,538 4581126 4205 Install 8 additional 120VAC outlets along east wall in room 1108 $4,720 4581151 4711 Install a new process chiller for the electrostatic levitation lab, room E112 $9,792
4581167 4619 Install mezzanine over control area platform with walls, windows and lighting in room 155 $49,057
4581173 4619 Install standalone dedicated grounding system for west end of bldg. $14,180
4581264 4605 Add a vent line for LN2 system to Combined Environmental Effect Facility, room 13A $4,900
4581308 4708 Provide system to remove existing panels to access the roll up door in room 1110. $121,188
4584757 4260 Install white noise system for the 1st & 2nd floor $36,997 4588834 4619 Perform mods to room 147A $28,143 4596115 4600 Install a GPS antenna on roof running to room 4005 $3,400
4603581 4676 Install new concrete support structure and foundation for supporting large pressure vessels $13,707
4603643 4482 Provide proper restroom ventilation for rooms 201 & 202 $11,835
4611170 4220 Investigate options for reducing glare and high temps on west, south and east sides of bldg. $52,193
4615056 4493 Provide 2 UPS outlets in room 151 $2,990 4619015 4649 Build the corridor $71,100 4619051 4707 Refurbish conference room 105 $33,327 4627495 4624 Construct a lay down yard north of building $175,682 4627617 4207 Replace door frame in B5 to meet SCIF requirements $15,561 4627619 4755 Build a lean-to that will encompass the southeast entry (Main Door) $21,335 4642780 4747 Refinish floor in the two westerly room with epoxy floor coating. $15,685 4657454 4631 Repair bank of 3 culverts running underneath Ranger Street, SW of bldg. $8,763 4661641 4663 Install a water fountain with bottle water filler in B-wing 2nd floor $5,500 4673109 4708 Install hydration Station between rooms 1258A & 1258C $6,987 4673151 4651 Install backup generator for the air stripper $56,800 4676905 4205 Add power outlets to room 109A, 109, 110, 111 $156,573 4688184 45Area Construct Berms at each end of pressure vessel V0345 $52,293 4695173 4619 Construct a pole barn $126,385
4706684 4610 Install two electrical meters and 2 return air temp transmitters at 4610-DXAC4 &
4610-DXAC5 $10,200
4709948 4205 Replace connectors and breakers in north trench, room 109 $4,856 4728176 4655 Demolish and remove south drywall airlock and north drywall airlock $11,348 4733093 4200 Paint suite 222 $21,789
4764240 4572 Provide new concrete support structure for large pressure vessel on south side of bldg. $88,582
4795177 4655 Install 480V panels on east wall $25,686 4806538 4751 Construct earthen berms on North and south ends of V106, V107, and V269 $108,315 4814777 4619 Install concrete ramp at south rollup door $4,800 4818000 4487 Remove CRC in AB105A. Relocate CRC in AB105 and re-duct within room $66,938 4822461 4708 Relocate structural cross member roof bracing to prevent from blocking egress $1,981 4826122 4260 Install window coverings for 2nd floor $5,453 4829965 4487 Install LED Wall mount fixtures between A & B wing $2,500
4841365 4466 Paint exterior doors, including roll up doors. Add exterior lighting to parking lto and paint stripes in parking lot $13,335
4841453 4705 Install foundation to accommodate 5-axis machining center $183,333 4845160 4663 Install 1 - 30 ton CX Leibert in B161 $144,372 4845170 4663 Install a spare PDU in room B161 $44,098 4848959 4708 Prepare room 1110 to support the installation of the PAF Assembly tool $18,668 4856755 4711 Install electrical drops in room E113. $5,005 4856767 4693 Modify handrails on levels 17 & 18 $14,494 4893267 4487 Remove CRC-0016 and repair floor $29,604 4901364 4718 Install circuits and breakers in Panel in room 118 $7,940
4916541 MSFC
Dock Provide Power for the Pegasus barge $5,700
4951178 4487 Move generator from NE corner of 4476 to near 4487 room AB105 $117,767 4959236 4747 Remove plating tanks from area. $36,900 4966680 4602 Connect services (Water/Electrical) to room 1189 $22,030
4973651 4200 Remodel Conference room 715A $29,487 5020715 4205 Install 12 each 20A duplex outlets to room 112G and 112H $7,393
5020748 4663 Relocate power for B-wing east entry card readers and B107 break room to A-wing non-critical power $10,779
5020802 4711 For Plasma Torch System in room W140A: 1. Disconnect existing power, 2. provide three outlets, 3. Remove existing cabinet, 4. Move disconnect to new location $60,790
5040576 4693 Install user provide 208V 100A pin & sleeve receptacle $10,774 5048016 4625B Install adequate lighting for work being performed in building $3,451 5109857 4487 Carpet rooms BC151, BC151B, provide electrical connections for cubicles. $16,648 5132780 4663 Remove Soundsoak and install sheet rock and paint walls in room B202 $16,091
R0004480 86 4602 Reconfigure existing electrical disconnects to meet code in room 1185 $4,948
File details come from the government source that posted it.