CLIN2_VADR_LSIRD_Template_EXAMPLE.pdf

PDF 171 KB Posted

Attached to
Venture-Class Acquisition of Dedicated and Rideshare (VADR) Launch Services Federal contract opportunity
Solicitation number
80KSC021R0034_On-Ramp_Issue01
Issued by
National Aeronautics and Space Administration Kennedy Space Center

About this file

This document is a Launch Service Interface Requirements Document (LSIRD) sample template for CubeSat launch services under the Venture-Class Acquisition of Dedicated and Rideshare (VADR) Launch Services solicitation issued by the National Aeronautics and Space Administration Kennedy Space Center. The template provides an example of spacecraft requirements that may be included in a request for launch services, such as dimensions, mass properties, temperature and humidity processing requirements, random vibration environments, required orbit, and power and operation requirements after deployment. It defines spacecraft and CubeSat dispenser hardware interface and integration requirements to ensure technical compatibility and mission success.

View the file

Other files for this federal contract opportunity

Other files attached to Venture-Class Acquisition of Dedicated and Rideshare (VADR) Launch Services, newest first.
File Type Posted
CLIN1_VADR_LSIRD_Template_EXAMPLE.pdf PDF
SF30 Amendment 2.pdf PDF
VADR Change Log Amendment 1.pdf PDF
VADR RFP_on-ramp 2023 Amendment 1.pdf PDF
VADR Questions and Responses Amendment 1.pdf PDF
SF30.pdf PDF
Attachment 04_Definitions.pdf PDF
Appendix A_Past Performance Questionnaire.pdf PDF
For reference_original VADR Questions and Responses.pdf PDF
Attachment 03_CDRLS.pdf PDF
For Reference_LAUNCH VEHICLE CERTIFICATION LSP PLN 324.01 Rev C.pdf PDF
SF 1449.pdf PDF
For reference_Public Law 105-303.pdf PDF
VADR On-ramp cover letter.pdf PDF
VADR RFP_on-ramp 2023.pdf PDF
Attachment 01_SOW_Comformed_on-ramp 2023.pdf PDF
Attachment 02_Meetings and Formal Reviews.pdf PDF
Attachment 05_Launch Service Capabilities_Specs and Envs.pdf PDF
VADR Change Log_synopsis.xlsx XLSX spreadsheet
Public Law 105303 Title II Section 201.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Note: This LSIRD template includes an example of the type of spacecraft requirements that may be included as part of an RLSP for a

CLIN 2 launch service.

Launch Service Interface Requirements Document (LSIRD)

Sample Template for

VADR Streamlined CubeSat Launch Services CLIN 2

Document Purpose

This document defines the [MISSION] to Launch Service Provider and CubeSat dispenser interface/integration requirements and constraints necessary to assure technical compatibility and to contribute to mission success.

Document Objectives

1. To define the [MISSION] Spacecraft(s) (SC) and CubeSat dispenser hardware to

Launch Service Contractor and CubeSat dispenser integration and interface requirements

2. To identify facility and mission operations support requirements

Introduction and Scope

Provides a brief description of the Spacecraft (SC) and its mission. Includes the following items at a minimum:

Spacecraft readiness dates and required launch and/or orbital injection date

Payload(s) and/or instrument(s) description

Picture/drawing of SC in launch configuration after separation, and after release of deployables.

SC Figures

1. STRUCTURES AND HARDWARE

A. SC TERFACE/SEPARATION SYSTEM

Provides a description of the dispenser requirements and images detailing the SC dimensions.

2. STIFFNESS (SC FREQUENCY)

This section states the minimum fundamental frequency, separation, and isolation requirements.

3. SC PROPERTIES

Table 1 - SC Mass Properties

CubeSat Size

SC predicted flight mass (kg)

SC Maximum predicted flight mass (kg)

Dispenser Type

SC Width (mm) from Rail-to-Rail (or Tab to tab) in X and Y direction

SC Height (mm) from Dispenser -Z Feet/Contact Plane to +Z

If required: Maximum Diameter and height of the “Tuna

Can” Cylindrical protrusions on the -Z end?

Maximum protrusions beyond the plane of the rails (or tabs) in the X and Y Directions

SC Figures

Miscellaneous (i.e description of deployables)

4. ENVIROMENTS

A. GROUND OPERATIONS TEMPERATURE & HUMIDITY

Providers payload processing facility requirements including, but not limited to, humidity, temperature, and cleanliness requirements.

B. DYNAMIC ENVIRONMENTS

I. RANDOM VIBRATION ENVIRONMENT

5. ADDITIONAL AND/OR UNIQUE MISSION CHARACTERISTICS

6. ORBIT

A. ORBIT INSERTION REQUIREMENTS

Provides offeror with the required orbit, SC power and operation requirements after deployment

7. FCC Consulting Services

If required, include detail of the SC requirements for FCC consulting services including the number of uplink and downlink frequencies requiring licensing.

File details come from the government source that posted it. Updated .