Amendment 0002, answers to submitted questions.

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

No. QUESTION Answer Amend

No.

Can the same rater be used on 2 different PPQs? EXAMPLE: If we have complete 2 unrelated projects for NASA, can PPQs from both projects be submitted even thought the same person was the rater for both projects?

Yes, the same Rater can fill out multiple PPQs for different projects.

At the walkdown, it was mentioned not to bid the Bid Option. Is this correct? YES. Bid option is not included in this project.

Is a general contractor required for this bid or can the electrical contractors bid this directly to NASA? Any Contractor with NAICS 237130 may submit a proposal.

At the walkdown, it was mentioned that the temp generators and fuel will be provided by the Government.

Is that correct?

YES, the generator portion will be provided by others.

Will the Government provide and install the temporary generator panels shown on E-6? YES, the generator portion will be provided by others.

Will the Government provide and install the temporary power cables from the temp generator to the loads shown on E-6?

YES, the generator portion will be provided by others.

Section E.3 of the solicitation talks about tests on fire protection, fire suppression, HVAC, compressed air, and all other assemblies of components which must be tested as an inter-related whole to verify proper functioning. Section C calls for the contractor to perform the tests. Section C1 calls the tests “in house”. It is unclear if the contractor will test these systems or “in house”. Are these tests on the Government systems going to be performed by Government personnel since they are familiar with these systems?

YES, all these systems will be tested in house and are not in the scope of this project.

Spec section 01 11 00 talks about a salvage plan for items designated by the contracting officer as materials and equipment to be salvaged. Please define which items will be considered salvage items and which items will be required to be removed from the site by the contractor.

No salvage items to be returned to the Government in this project.

There was a mix of rigid conduit and EMT conduit visible on the walkdown. E-1 Note H calls for exposed conduit to be Rigid Conduit. The specs list rigid and EMT. Is EMT acceptable above 5ft or is all of the new exposed conduit required to be rigid? Is EMT allowed to be installed anywhere?

EMT is not allowed inside the electrical room.

ONLY rigid conduit.

Does the Project Owner (NASA) or the bidder provide the temporary service generators? YES, the generator portion will be provided by others.

Does the Project Owner (NASA) or the bidder provide the fuel for the temporary service generators? YES, the generator portion will be provided by others.

Does the Project Owner (NASA) or the bidder provide the cables for the temporary hook-up for the Temporary Service generators? This includes from the generator to the Temporary Panel and from the temporary panel to the Load Panels

YES, the generator portion will be provided by others.

13 Can the person who is the Superintendent of the bidder also be the Site Safety and Health Officer? YES it can. 0002

If the bidder is supplying the temporary service generators, what is the route of the cables ? Can they be on the floor, overhead, etc.?

NO, the generator portion will be provided by others.

Has the Bid Option listed in Drawings been removed from the RFP and is not to be included in the bid? YES, the bid portion is not included in the

RFP.

Please confirm that the Bid Option is not party of this Solicitation. YES, the Bid Option is not part of the solicitation.

17 Who is to provide the generator? The Government. 0002 18 Who is to provide the (4) portable power cables? The Government. 0002 19 Who is to provide the generator? The Government. 0002 20 Who is to provide the (1) portable power cable from generator to temporary panel? The Government. 0002 21 Who is to provide the (7) portable power cables? The Government. 0002 22 Who is to provide the temporary panel? The Government. 0002

Please confirm drawings E-7 and E-9 are not in this Solicitation. YES, sheets E-7 and E-9 are not part of the solicitation.

What is the AFF height to the mezzanne floor and from the mezzanne floor to the ceiling? Mezzanne floor Elevation = 28'-0" AFF

Ceiling Elevation = 40'-0" AFF

Will the mezzanne floor support the weight of the new switchboard and possible a man lift? YES, as long as it can fit thru the mezzanne doors.

26 If we are not providing the generators will we be required to provide continuous 24/7 on-site presence? NO. 0002

Drawing E-8 Note F should conductors need to be lengthened. Butt-splice new conductor to existing conductors. At this time it is unknown if the conductors will need to be lengthened. Could this be addressed as a site change condition after the bid?

NO, include in this bid the splicing of the conductors.

What is the height of the existing switchboard? Government don't have the information.

During the solicitation, bidders had the opportunity to measure the heigh of the existing switchgear.

29 What is the height of the Basis of Design switchboard? 103.30 inches, including top of trolley 0002

Can you provide the weight of the ship splits for the Basis of Design switchboard? Estimated Shipping Weight Ship Split 1 - 3000 LBS Ship Split 2 - 4060 LBS Ship Split 3 - 1570 LBS

80KSC019R00140002.pdf
80KSC019R0014 Substation Answers.pdf
topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: 0002
Code[0]: KSC
Code[1]:
AccountingData[0]:
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]: C. M. Julius Williams, Contracting Officer
Description[0]: The purpose of Amendment 0002 is to:

A) Provide Government answers to submitted questions, see attached..

B) Proposal due date and time remain unchanged at May 30, 2019 by 2:00 PM EST.

FacilityCode[0]:
Code[2]: KSC
IssuedBy[0]: NASA/John F. Kennedy Space Center

Office of Procurement Mail Code OP-CS

KENNEDY SPACE CENTER FL 32899

NameandAddress[0]:
AdministeredBy[0]: NASA/John F. Kennedy Space Center

Office of Procurement Mail Code OP-CS

KENNEDY SPACE CENTER FL 32899

ContractIDCode[0]:
ReqNumber[0]:
AmendmentNo[1]: 80KSC019R0014
ModificationNo[0]:
ProjectNo[0]: 99214
Page[0]: 1
Pages[0]: 2
EffectiveDate[0]: 20 May 2019
Dated9B[0]: Apr 30, 2019
Dated10B[0]:
CheckBox9[0]: 1
CheckBox10[0]: Off
CheckBox11[0]: 1
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: Off
Extended[0]: Off
NotExtended[0]: 1
2019-05-20T17:53:40-0400
CHRISTOPHER WILLIAMS
DateSigned[0]:
DateSigned[1]: May 20, 2019
Copies[0]: 1
CopiesReturned[0]: