This document contains a Request for Proposal and related opportunity notice for Gateway Logistics Services. The National Aeronautics and Space Administration Kennedy Space Center is seeking proposals to provide logistics resupply capabilities to and from the Gateway, which will be an assembly of elements in cislunar orbit providing habitation, docking, and logistics supply capabilities. Offerors should propose providing logistics modules to deliver cargo, payloads, and other Gateway elements via launch and logistic vehicles. The anticipated release date for the RFP is August 15, 2019, with responses due on the date specified therein. The North American Industry Classification System code is 481212 and size standard is 1,500 employees.
RFP Cover Letter
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Significant Changes Since Draft RFP
80KSC019R0002
Change Affected Documents / Sections Changed the logistics module design requirement for docked operations to 1 year (from 3 years) and the nominal mission duration to 6 months (from 1 year). This resulted in changing the Mission Unique Capability for 'Additional 6-month docked operations' to 'Additional 3-month docked operations'.
RFP 80KSC019R0002 / 1.2, 1.2.3, 6.2.15, 7.2
Attachment 01, GLS SOW / 4.1 and 5.0 Attachment 03, GLS-RQMT-001 / 1.2 and L3-GLS-1104
Added requirements for the Gateway Extravehicular Robotics (EVR) System with accompanying instructions to offerors and evaluation criteria.
RFP 80KSC019R0002 / 6.2.15 and 7.3 Attachment 01, GLS SOW / 4.1.3.7, 4.2.2, 6.8 and Annex A Attachment 03, GLS-RQMT-001 / L3-GLS-1116, L3-GLS-1119, L3- GLS-1120 and L3-GLS-1121
Reduced the number of years Offerors are required to propose fixed pricing from 7 to 6.
Offerors are now only required to provide pricing through 2025.
RFP 80KSC019R0002 / 1.2.2, 1.2.3, 6.2.15, and 7.3 Appendix A, GLS Pricing Workbook
Deleted Advance Understanding Regarding Termination Settlement under FAR 52.212- 4(l) and all associated terms through the solicitation.
RFP 80KSC019R0002 / 2
Updated domestic source requirement. RFP 80KSC019R0002 / 2.2.25 and 5.7 Clarified that any proposed capabilities above those specified in the RFP that are considered through evaluations to be a proposal strength, will be incorporated into the resulting contract if the Offeror is selected for award.
RFP 80KSC019R0002 / 7.2
Added when the Command & Data Handling Gateway Simulator/Emulator would be available to the contractor in clause NFS 1852.245-76 -- LIST OF GOVERNMENT- FURNISHED PROPERTY PURSUANT TO FAR 52.245-1 (JAN 2011) and provision NFS
1852.245-81 LIST OF AVAILABLE GOVERNMENT PROPERTY (JAN 2011).
RFP 80KSC019R0002 / 2.2.16 and 6.2.10
Under the Adjustments to Mission Schedule clause, reduced the number of Grace Day/Postponement Days
RFP 80KSC019R0002 / 2.2.22
Updated the Contractor Objectives on Gateway Logistics Missions clause to clarify that the Contractor can use GLS Missions to remove non-NASA cargo from the Gateway if approved in advance by NASA.
RFP 80KSC019R0002 / 2.2.29
Updated Special Understanding Regarding Damage to Government Payloads clause to replace "spacecraft" with "cargo, payloads or other Gateway elements" and make the clause applicable to all missions.
RFP 80KSC019R0002 / 2.2.32
Updated how the Total Evaluated Price will be calculated taking into account the TEP Adjustment for "rent free" government equipment, property or services to include taking into account .
RFP 80KSC019R0002 / 6.2.15 and 7.2 Appendix A, GLS Pricing Workbook
Updated list of specific launch vehicle and logistic vehicle Performance Capabilities to be proposed.
RFP 80KSC019R0002 / 6.2.15
The scope of the Gateway Logistics Service has been updated to include, “science and utilization,” with accommodation for, “crew performing work inside the Logistics Vehicle,” while docked to the Gateway. Updates have been made to the SOW and Requirements to be consistent with this additional scope of work.
Attachment 01, GLS SOW / 2.0
The requirement for Program Management Review has been updated from once per year to, “at least twice per year,” and two additional requirements have been added to the PMR to, “describe extensibility of vehicle capabilities (including the Contractor’s ability to deliver other Elements of Gateway),” and to, “describe contemplated and implemented changes to the launch and logistics vehicles in sufficient detail for NASA to determine if the changes constitute a Common GLS Configuration Change.”
Attachment 01, GLS SOW / 3.2.1
The scope of the NASA requirements for Preservation of the Space and Lunar Environments has been limited to the vicinity of the Moon and Earth-Moon Lagrange points. It is noted that Orbital Debris requirements for spacecraft and launch vehicle stages outside the lunar sphere of influence or the vicinity of an Earth-Moon Lagrange point fall under the authority of the FAA. DRD GLS-007, Orbital Debris Assessment and End of Mission Plan, has also been updated to reflect this change.
Attachment 01, GLS SOW / 3.7.1.6
Probabilistic Risk Assessment (PRA), has been added to address the GLS Contractor support and delivery of required information for the Gateway Program to perform PRAs for Gateway. DRD GLS-006, Safety Data Package (SDP), has also been updated with additional data deliverables to reflect this change.
Attachment 01, GLS SOW / 3.7.4
Change Affected Documents / Sections Cargo accommodation requirements have been changed. The Level 3 Cargo Requirements and the SOW, section 4.1.1.3 (previously section 4.1.1.2.1), have been updated to state that the Contractor shall accommodate active payloads as Middeck Locker (MDL) or MDL-equivalent payloads (with or without equivalent structural mounting) and passive cargo in Cargo Transfer Bags (CTBs) or in an alternative passive cargo stowage system. A note has also been added to this section of the SOW, to reference typical ISS cargo packing density for CTBs.
Attachment 01, GLS SOW / 4.1.1 Attachment 03, GLS-RQMT-001 / L3-GLS-1080, L3-GLS-1081, L3- GLS-1082 and L3-GLS-1083
The SOW (subsection 4.1.1.4, previously Section 4.1.1.2.2) has been updated to add the statement, “in order to optimize the cargo delivery service, the contractor may propose an alternative cargo stowage system to increase packing and Gateway operational efficiency.” The Requirements document has also been updated to reflect this change.
Attachment 01, GLS SOW / 4.1.1 Attachment 03, GLS-RQMT-001 / L3-GLS-1081
The SOW, subsection 4.1.1.7 (previously Section 4.1.1.3) has been updated to clarify that the, “remaining passive cargo will be handed over at no later than the latest time defined in the Cargo hand-over load schedule in the GLS Space System Architecture contract attachment.” The minimum requirement for Cargo and Payload Late Load Capability has been removed. The RFP has been updated to state that, "solutions with final pressurized and unpressurized cargo handover and stow timeline events closer to launch may be rated more favorably if it is determined to be advantageous to the Government."
RFP 80KSC019R0002 / 7.3
Attachment 01, GLS SOW / 4.1.1.7 Attachment 03, GLS-RQMT-001 / L3-GLS-1085
Subsection 4.1.3.5 has been updated to establish the unpressurized payload thermal environment requirement; reference to SSP 50833 has been removed. The section has also been updated to clarify that this requirement only applies to the transit phase of the mission.
Attachment 01, GLS SOW / 4.1.3
Added requirements for external/unpressurized payloads that are intended for handling by the Gateway Extravehicular Robotics (EVR) System. Reference to applicable EVR interfaces (SORI & LORI) and reference to additional applicable EVR requirements contained in CSA-GWY-ID-0001, Gateway Extra-Vehicular Robotics Interface Requirements and Definition Document, are provided.
Attachment 01, GLS SOW / 4.1.3 Attachment 03, GLS-RQMT-001 / L3-GLS-1118 and L3-GLS-1122
Unpressurized Cargo Physical Integration has been reduced to two cases (instead of three) for unpressurized cargo physical integration. Case 1 applies only to permanently mounted cargo that is not intended for EVR interaction; Case 2 applies to cargo that is intended for handling by the Gateway Extravehicular Robotics (EVR) System, and includes reference to applicable EVR interfaces (SORI & LORI) and additional applicable EVR requirements contained in CSA-GWY-ID-0001.
Attachment 01, GLS SOW / 4.2.2
The list of, “Additional Mission Unique Capabilities,” has been removed from this section.
This list is found in the RFP, Section 1.2.3.
Attachment 01, GLS SOW / 5.0
Mission Specific Critical Design Review (MSCDR) has been updated to include Gateway/delivery system compatibility testing and delivery of DRD GLS-207, Mission Specific Hardware Test Plan.
Attachment 01, GLS SOW / 6.4.1.3
Added requirements for Pressurized Payload & Cargo Environment when not integrated with the Gateway ECLS system (i.e., during ground processing, launch, transit and while docked with atmosphere isolated from Gateway)
Attachment 03, GLS-RQMT-001 / L3-GLS-1126, L3-GLS-1127 and
L3-GLS-1128
Six requirements for the habitable volume environment were removed and replaced with one requirement pointing to the Gateway Program Subsystem Specification for
ECLSS, DSG-SPEC-ECLS-007.
Attachment 03, GLS-RQMT-001 removed: L3-GLS-1102, L3-GLS-1042, L3-GLS-1047, L3-GLS-
1053, L3-GLS-1055, L3-GLS-1099
added L3-GLS-1123
Deleted L3-GLS-1058 Structural Health Monitoring which is no longer a system requirement.
Attachment 03, GLS-RQMT-001 / 3.10
Added a requirement for Vestibule Pressurization capability. Attachment 03, GLS-RQMT-001 / L3-GLS-1045
Added requirements for Docked Power Quality Specification and Payload Power Quality Specification as specified in DSG-SPEC-PQS-020, Gateway Electrical Power Quality Specification Requirements for 120Vdc.
Attachment 03, GLS-RQMT-001 / L3-GLS-1115 and L3-GLS-1117
Spectrum Regulatory Compliance requirements were deleted from the Requirements Document because they are covered by the RFP.
Attachment 03, GLS-RQMT-001 / L3-GLS-1031 and L3-GLS-1032
The requirement for Logistics Module and Payload Data During Transit has been clarified to require data downlink a minimum of once per 24 hours.
Attachment 03, GLS-RQMT-001 / L3-GLS-1035
A requirement for Payload Commanding during transit has been added. Attachment 03, GLS-RQMT-001 / L3-GLS-1124 Added two requirements to safety section of the requirements document for Unplanned cargo gas release and shatterable materials.
Attachment 03, GLS-RQMT-001 / L3-GLS-1151 and L3-GLS-2142
Change Affected Documents / Sections The Crew Hatch Requirement has been updated to require compliance to DSG-SPEC- HTCH-019, Gateway Program Subsystem Specification for Hatches, and other hatch requirements have been removed.
Attachment 03, GLS-RQMT-001 Updated: L3-GLS-1066 Removed: L3-GLS-2126, L3-GLS-2125 and L3-GLS-2129
Added a requirement for compliance with Gateway Visiting Vehicle Interface Requirements Document and a draft set of Gateway-to-VV Interface requirements has been added to the bidder's library for reference.
Attachment 03, GLS-RQMT-001 / L3-GLS-1125
Removed minimum lunar distance requirement. This is no longer a system requirement. Attachment 03, GLS-RQMT-001 / L3-GLS-1094
Deleted requirement for Logistics Module Health and Status Measurement Redundancy. Attachment 03, GLS-RQMT-001 / L3-GLS-2063
Added requirement Logistics Module Identification of Monitor Loss while operating within the Gateway Rendezvous Sphere.
Attachment 03, GLS-RQMT-001 / L3-GLS-2140
Separated requirement Logistics Module Computer Initiated Hazards and Controls into two separate requirements for clarity.
Attachment 03, GLS-RQMT-001 / L3-GLS-2066 and L3-GLS-2141