This annex provides preliminary requirements for delivery of extravehicular robotic systems to the Gateway logistics module. Key requirements include delivery of 11 units totaling 2,200 kg in mass to the Gateway in one or more launch packages. Thermal control must maintain components from -50 to +80 degrees Celsius during transit. Limited telemetry, health data, and imagery must be transmitted, and commands sent for checkouts and heater control until robotic interfaces are released for integration at the Gateway. Power of 1.8 kW must be provided during transit and 2.2 kW for integration. Horizontal integration of the two largest units is required. Contamination must be limited on sensitive surfaces from all internal and external sources, including thruster plumes, according to specified standards.

The related solicitation is for Gateway Logistics Services to provide logistics resupply capabilities to and from the Gateway module in cislunar orbit. The anticipated RFP release date is August 15, 2019. Proposals are due as specified in the RFP, with the National Aeronautics and Space Administration evaluating all submissions. The work involves delivery of extravehicular systems and other supplies to the Gateway per the requirements outlined in the annex.

Attachment 01, GLS SOW, Annex A

View the file

Other files for this federal contract opportunity

Other files attached to Gateway Logistics Services, newest first.
File Type Posted
80KSC019R0002_Amend_04.pdf PDF
Attachment_03,_GLS-RQMT-001C1_Gateway_Logistics_Services_Requirements_Amend_03.pdf PDF
Attachment_02,_Data_Requirements_Descriptions_Amend_03.pdf PDF
80KSC019R0002_Amend_03.pdf PDF
80KSC019R0002_Amend_02.pdf PDF
DSG-SPEC-MECH-017,_Gateway_Program_Docking_System_Specification_(Public_Release).pdf PDF
80KSC019R0002_Amend._01.pdf PDF
Attachment_07,_GLS_Space_System_Architecture.pdf PDF
Attachment_10,_Small_Business_Subcontracting_Plan.pdf PDF
Attachment_05,_Definitions.pdf PDF
Appendix_B,_Sample_Consent_Letter.pdf PDF
Appendix_C,_Past_Performance_Questionnaire.pdf PDF
Attachment_04,_Acronyms_and_Abbreviations.pdf PDF
RFP_Cover_Letter_Final.pdf PDF
Attachment_03,_GLS-RQMT-001_Gateway_Logistics_Services_Requirements.pdf PDF
Attachment_08_Work_Plan.pdf PDF
Attachment_02,_Data_Requirements_Descriptions.pdf PDF
Appendix_A,_GLS_Pricing_Workbook.xlsx XLSX spreadsheet
Appendix_D,_Points_of_Contact_(POC)_for_Support_from_NASA_Centers.pdf PDF
RFP_80KSC019R0002.pdf PDF
Attachment_09,_Subcontract_Management_Plan.pdf PDF
Attachment_01,_GLS_SOW.pdf PDF
Attachment_06,_Organizational_Conflicts_of_Interest_(OCI)_Avoidance_Plan.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Annex A

THIS PAGE IS INTENTIONALLY BLANK

ANNEX A RFP 80KSC019R0002

Gateway Extravehicular Robotics (EVR) System Delivery Requirements Gateway Logistics Services

Annex A provides preliminary requirements for delivery of the Gateway Deep Space Extravehicular

Robotic (DSXR) System. The following reference documents provide additional detail:

CSA-GWY-ID-0001, EVR Interface Requirements and Definition Document

CSA-GWY-CD-0001, Gateway External Robotics Concept Description Document

CSA-GWY-CO-0001, Gateway External Robotics Concept of Operations

MASS/VOLUME

1.0 The Contractor shall deliver the following DSXR items as unpressurized cargo to Gateway as part of one or more launch packages:

Volume Allocation [m]

Item Category

Mass

Allocation

[kg] x y z Based on

(incl. FSE)

Unit 1 Critical Core 960 6.54 2.13 1.66 XLA

Unit 2 Critical Core 50 0.84 1.18 0.81

DAT +

SDA

Unit 3 Nominal Core 205 2.59 1.11 1.30

XDA +

SDA

Unit 4 Nominal Core 225 0.84 1.18 0.81 TOC

Unit 5 Nominal Core Tool 105 0.84 1.18 0.81 FFCT

Unit 6 Nominal Core Tool 35 0.55 0.40 0.30 VST

Unit 7 Nominal Lunar Tool 30 0.55 0.40 0.30 LST

Unit 8 Nominal Utilization Tool 75 0.80 0.62 0.62

PET +

Nanos

Unit 9 Nominal Utilization

Platform

225 0.84 1.18 0.81 EUP

Unit 10 Adaptor Tool Reserve 220 0.84 1.18 0.81 MBA

Unit 11 TBD Reserve 70 0.84 1.18 0.81 RES

TOTAL 2200

NOTE: Units 1 and 2 must be in the first delivery package.

THERMAL

2.0 The Contractor shall provide a capability to maintain the thermal environment of the DSXR elements within a range of -50 deg C (-58 deg F) to +80 deg C (+176 deg F) during all the mission phases from pre-launch to delivery to the Gateway.

ANNEX A RFP 80KSC019R0002

Gateway Extravehicular Robotics (EVR) System Delivery Requirements Gateway Logistics Services

COMMAND, CONTROL AND DATA HANDLING

3.0 The Contractor shall provide the capability to receive, record, and transmit limited telemetry and imagery health and status data from the DSXR during transit to Gateway. The Contractor shall provide cameras for DSXR checkout and public affairs. The arm systems data should be continuously recorded, but may be downlinked periodically or after a communication blackout.

4.0 The Contractor shall provide the capability to command DSXR from the ground while in transit for limited commanding for checkout and heater control. The DSXR will be inhibited from performing any motions during transit until walk off at gateway.

5.0 The Contractor shall provide the capability to command release of Flight Support Equipment

(FSE) hold downs to enable walk off of the arm once arrived at Gateway. Robotic interfaces and hardware release components for the mission will be Government furnished.

POWER

6.0 The Contractor shall provide 1.8kW of power to the DSXR throughout transit.

7.0 The Contractor shall provide 2.2kW of power to the DSXR to enable walk off to Gateway.

INTEGRATION

8.0 The Contractor shall provide for horizontal integration of the two largest units (Units 1 and 3) to the logistics vehicle in order to enable match machining and ground integration of manipulator

FSE to supporting structure.

CONTAMINATION

9.0 The Contractor shall avoid directing thruster plumes near the DSXR to avoid damaging sensitive optical and thermal control surfaces. Plume keep-out zones are TBD.

10.0 The Contractor shall limit contaminant deposition onto cargo sensitive surfaces, induced by all sources of contamination in the unpressurized cargo volume (materials outgassing, venting, leakage, pyrotechnics and thruster plumes) during integrated operations, ascent, transit, and while docked to Gateway, using SSP 50833, International Space Station Program Cargo

Transport Interface Requirements Document, paragraph 3.2.3.8.1.5, as guidance. This limit does not include mission-specific cargo-to-cargo induced contamination when multiple cargo elements are present.