L-9 TRST_and_BOE_Template.xlsx

XLSX spreadsheet 198 KB Posted

Attached to
Neutral Buoyancy Laboratory (NBL) Operations Contract II (NOC II)
Solicitation number
80JSC023R0007
Issued by

About this file

This document contains templates and instructions for a federal solicitation seeking a contractor to provide operations and support services for the Neutral Buoyancy Laboratory (NBL) at the National Aeronautics and Space Administration Johnson Space Center.

The solicitation requests proposals to provide management, support services, facility and mockup maintenance, training, event support, and external customer support for the NBL. The contractor will be responsible for quality assurance, safety, logistics, configuration management, facility projects, mockup projects, and core operations including control center support and facility security. The anticipated contract period is nine years consisting of a five-year base period and four one-year options. Templates are provided for offerors to summarize proposed labor resources by standard labor category and non-labor costs for each contract line item and year. Detailed cost and pricing information must be included along with rationale and assumptions supporting the basis of estimates.

View the file

Other files

File Type Posted
J-23 NOC II DD Form 254.pdf PDF
NOC II Final RFP_Amendment 3.pdf PDF
NOC II Final RFP QandA Set 2.pdf PDF
NOC II Pre-Proposal Conference Q and A.pdf PDF
SF30-80JSC023R0007_Amendment 2.pdf PDF
L-10 TCP Templates.xlsx XLSX spreadsheet
NOC II Pre-Proposal Conference.pdf PDF
L-5 NOC II Cost Plus Template.xlsx XLSX spreadsheet
SF30-Amend 1 - Final.pdf PDF
NOC II Final RFP Questions and Answers Set 1.pdf PDF
80JSC023R0007 NOC II Final RFP.zip ZIP file
Technical Library Request Form.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions NOC Enclosure 4

Instructions for completing the TRST: CW and TRT:BOE.

The Technical Resources Summary Template- Core Work (TRST- CW) and the Technical Resources Template: Basis of Estimate (TRT -BOE) which are discussed in the paragraphs below, are required of the prime Offeror only. Offerors are required to identify the SLCs identified by NASA for this solicitation.

Note: An Offeror may not necessarily propose WYEs for every SLC.

These templates are designed to summarize all proposed labor and non-labor resources (prime and all subcontractors resources combined) for the core effort by SLC – both prior to the implementation of any proposed efficiencies and after the implementation of proposed efficiencies – for each and every contract year. These templates requires labor resources identification in Work Year Equivalent (WYEs) by SLC.

A.) Technical Resources Summary Template – Core Work (TRST –CW) Instructions

This template is designed to summarize all proposed labor and non-labor resources for the core effort by SLC – both prior to the implementation of any proposed efficiencies and after the implementation of proposed efficiencies for each and every contract year.

In the column entitled “WYEs Before Efficiencies”, Offerors are required to identify their assumed staffing level prior to the implementation of any efficiencies that result from the application of the Offeror’s technical and management approach. The Offeror shall provide rationale, detailed narrative, and validation of their resources basis in Volume I – Mission Suitability.

In the column entitled “Hours Resources Basis Before Efficiencies”, Offerors are required to identify their assumed productive direct labor hours prior to the implementation of any efficiencies that result from the application of the Offeror’s technical and management approach.

If an Offeror proposes efficiencies, then the column entitled “WYEs After Efficiencies” shall include all proposed labor resources after implementation of the efficiencies in accordance with the Offeror’s technical and management approach to satisfying the SOW core requirements. The Offeror shall also provide an integrated discussion including rationale, detailed narrative, and validation of their resources with the proposed efficiencies implemented as part of their responses in Volume I – Mission Suitability. Sufficient detail to allow a thorough Government understanding and analysis of the proposed efficiency must be provided. The Offeror’s proposal must present a clear and consistent description of what is being proposed across all sections.

In the column entitled “Proposed Hours After Efficiencies” Offerors are required to identify their assumed productive direct labor hours after the implementation of any efficiencies that result from the application of the Offeror’s technical and management approach.

If no efficiencies are proposed, the number of hours proposed in the “Hours Resources Basis Before Efficiencies” column is to be identical to the “Proposed Hours After Efficiencies” column.

IMPORTANT NOTE: Efficiencies are allowed across all contract years. However, all deltas must be fully justified in accordance with the instructions for the “BOE” paragraph in Volume I – Mission Suitability.

Finally, the reference columns provided must be used by the Offerors to refer the NASA evaluators to the specific Volume I – Mission Suitability “BOE” paragraph which provides the analysis of the efficiency resulting in the resource delta(s). The NASA evaluators will compare all “BOE” paragraphs to proposed resources for equivalence and to ensure all parts of the proposal reconcile.

The bottom of the TRST template addresses non-labor resources. In the column entitled “NLR Before Efficiencies”, Offerors are required to identify their assumed NLR resources prior to the implementation of any efficiencies that result from the application of the Offeror’s technical and management approach. The Offeror shall provide rationale, detailed narrative, and validation of their resources basis in Volume I – Mission Suitability.

If an Offeror proposes efficiencies, then the column entitled “NLR After Efficiencies” shall include all proposed NLR resources after implementation of the efficiencies in accordance with the Offeror’s technical and management approach to satisfying the SOW Baseline requirements. The Offeror shall also provide an integrated discussion including rationale, detailed narrative, and validation of their resources with the proposed efficiencies implemented as part of their responses in Volume I – Mission Suitability. Sufficient detail to allow a thorough Government understanding and analysis of the proposed efficiency must be provided.

The Offeror’s proposal must present a clear and consistent description of what is being proposed across all sections.

If no NLR efficiencies are proposed, the number of NLRs in the “NLR Basis Before Efficiencies” column is to be identical to the “NLR After Efficiencies” column.

IMPORTANT NOTE: Efficiencies are allowed across all contract years. However, all deltas must be fully justified in accordance with the instructions for the “BOE” paragraph in Volume I – Mission Suitability.

Important Note: The TRST functions as a link between Volume I – Mission Suitability and Volume III – Cost/Price Proposal. An Offeror may not necessarily propose WYEs for every SLC.

B) Technical Resource Template : BOE (TRT) Core Work (CW) Instructions

For each WBS, complete each BOE spreadsheet as instructed below.

In the columns entitled “CY 1” through “CY 9” (Contract Year 1 through Contract Year 9), Offerors are required to propose the number of hours and WYEs required to successfully perform the WBS requirements.

At the bottom of the template, Offerors are required to fill in their proposed NLR cost by type, and by Contract Year.

Note: The TRT: BOE, must roll-up to the offeror TRST: CW.

1) Description: The Offeror shall provide rationale, detailed narrative, and validation of their resources basis in Volume I – Mission Suitability. The Offeror shall also provide an integrated discussion including rationale, detailed narrative, and validation of their resources with the proposed efficiencies implemented as part of their responses in Volume I – Mission Suitability. Sufficient detail to allow a thorough Government understanding and analysis of the proposed efficiency must be provided. The Offeror’s proposal must present a clear and consistent description of what is being proposed across all sections.

Explain the technical approach for providing the required tasks (and subtasks for subsections where applicable, e.g., sections 1.3, 1.4, and 1.5) from the WBS. Provide sufficient discussion to fully demonstrate understanding of the associated requirements. Also, describe the processes used to accurately identify, monitor, and control risks. Identify those specific risks that you believe should be addressed relative to performance of work under this WBS element and discuss plans to mitigate or accept each risk. You may adjust the space in the spreadsheet for additional explanation.

2) Basis of Estimate Rationale: Explain the BOE by providing supporting rationale for all labor resources (WYEs & skill mix) proposed. Include a discussion regarding how the proposed WYEs were estimated. Also, include a discussion associated with any assumptions made regarding the requirements that led to the proposed resources such as: "we assume that a verification plan for the XYZ deliverables already exist and all we are responsible for is the maintenance of the plan.” Include sufficient narrative discussion to convince the Government that the proposed resources are realistic for the proposed approach. You may adjust the space in the spreadsheet for additional explanation.

3) Resources Table: The Resources Table contains detailed resources for the prime and subcontractors that correspond with the narrative discussions provided earlier in the template. The details represent the combined resources for the prime and subcontractors . The tables must reconcile with your detailed cost proposal. Only use the specific SLC to be proposed; for example, “Management - Executive”. You may create additional SLC lines or delete unneeded ones in the spreadsheet. Use “Reference” field to tie back to rationale. Note: The SLCs in the contract remains unchanged.

TRST-CW

Technical Resources Summary Template (TRST) - Core Work (CW)
Prime Offeror Company Name:
PRIME AND ALL SUBCONTRACT (INCLUDING MINOR SUBCONTRACTORS) RESOURCES COMBINED
NASA (JSC)
Standard Labor CategoryIncumbent Retention % Contract Year 1Base PeriodOption Period 1Option Period 2Option Period 3Option Period 4
CY1CY2CY3CY4CY5CY 6CY 7
WYEs Before EfficienciesHours Resources Basis Before EfficienciesProposed WYEs After EfficienciesProposed Hours After EfficienciesDelta from Resources Basis (WYE)Reference to comprehensive explanation of efficiency in Volume xx, Mission SuitabilityWYEs Before EfficienciesHours Resources Basis Before EfficienciesProposed WYEs with EfficienciesProposed Hours After EfficienciesDelta from Resources Basis (WYE)Reference to comprehensive explanation of efficiency in Volume xx, Mission SuitabilityWYEs Before EfficienciesHours Resources Basis Before EfficienciesProposed WYEs with EfficienciesProposed Hours After EfficienciesDelta from Resources Basis (WYE)Reference to comprehensive explanation of efficiency in Volume xx, Mission SuitabilityWYEs Before EfficienciesHours Resources Basis Before EfficienciesProposed WYEs with EfficienciesProposed Hours After EfficienciesDelta from Resources Basis (WYE)Reference to comprehensive explanation of efficiency in Volume xx, Mission SuitabilityWYEs Before EfficienciesHours Resources Basis Before EfficienciesProposed WYEs with EfficienciesProposed Hours After EfficienciesDelta from Resources Basis (WYE)Reference to comprehensive explanation of efficiency in Volume xx, Mission SuitabilityWYEs Before EfficienciesHours Resources Basis Before EfficienciesProposed WYEs with EfficienciesProposed Hours After EfficienciesDelta from Resources Basis (WYE)Reference to comprehensive explanation of efficiency in Volume xx, Mission SuitabilityWYEs Before EfficienciesHours Resources Basis Before EfficienciesProposed WYEs with EfficienciesProposed Hours After EfficienciesDelta from Resources Basis (WYE)Reference to comprehensive explanation of efficiency in Volume xx, Mission SuitabilityWYEs Before EfficienciesHours Resources Basis Before Efficiencies
1860Contract Year1Productive Hours1860Contract Year2Productive Hours1860Contract Year3Productive Hours1860Contract Year4Productive Hours1860Contract Year5Productive Hours1860Contract Year6Productive Hours1860Contract Year7Productive Hours1860
Ex: Business Specialist 3100%8.57.56.51.0Paragraph x, Page xx8.57.51.0Paragraph x, Page xx8.07.01.0Paragraph x, Page xx8.07.01.0Paragraph x, Page xx7.07.00.0Paragraph x, Page xx7.007.000.00Paragraph x, Page xx7.006.001.00Paragraph x, Page xx7.00
Program Manager0.00.00.00.00.00.00.00.00.00.0
Manager0.00.00.00.00.00.00.00.00.00.0
Supervisor II0.00.00.00.00.00.00.00.00.00.0
Supervisor I0.00.00.00.00.00.00.00.00.00.0
Engineer IV0.00.00.00.00.00.00.00.00.00.0
Engineer III0.00.00.00.00.00.00.00.00.00.0
Engineer II0.00.00.00.00.00.00.00.00.00.0
Engineer I0.00.00.00.00.00.00.00.00.00.0
Administrative Specialist III0.00.00.00.00.00.00.00.00.00.0
Administrative Specialist II0.00.00.00.00.00.00.00.00.00.0
Administrative Specialist I0.00.00.00.00.00.00.00.00.00.0
Technician III0.00.00.00.00.00.00.00.00.00.0
Technician II0.00.00.00.00.00.00.00.00.00.0
Technician I0.00.00.00.00.00.00.00.00.00.0
NBL Dive Operations Specialist IV0.00.00.00.00.00.00.00.00.00.0
NBL Dive Operations Specialist III0.00.00.00.00.00.00.00.00.00.0
NBL Dive Operations Specialist II0.00.00.00.00.00.00.00.00.00.0
NBL Dive Operations Specialist I0.00.00.00.00.00.00.00.00.00.0
IT Professional III
IT Professional II0.00.00.00.00.00.00.00.00.00.0
IT Professional I0.00.00.00.00.00.00.00.00.00.0
Business Specialist II0.00.00.00.00.00.00.00.00.00.0
Business Specialist I0.00.00.00.00.00.00.00.00.00.0
Technical Professional III0.00.00.00.00.00.00.00.00.00.0
Technical Professional II0.00.00.00.00.00.00.00.00.00.0
Technical Professional I0.00.00.00.00.00.00.00.00.00.0
Operations Expert
Structural Engineer/Analyst
Other: (Specify)0.00.00.00.00.00.00.00.00.00.0
Other: (Specify)0.00.00.00.00.00.00.00.00.00.0
Total0.00.00.00.00.00.00.00.00.00.00.00.00.00.0
CY1CY2CY3CY4CY5CY 6CY 7CY 8CY 9
Non-Labor Resources (NLR) Cost ($)NLR Resources BasisProposed NLR Cost with EfficienciesDelta from NLR Resources BasisReference to comprehensive explanation of efficiency in Volume xx, Mission SuitabilityNLR Resources BasisProposed NLR Cost with EfficienciesDelta from NLR Resources BasisReference to comprehensive explanation of efficiency in Volume xx, Mission SuitabilityNLR Resources BasisProposed NLR Cost with EfficienciesDelta from NLR Resources BasisReference to comprehensive explanation of efficiency in Volume xx, Mission SuitabilityNLR Resources BasisProposed NLR Cost with EfficienciesDelta from NLR Resources BasisReference to comprehensive explanation of efficiency in Volume xx, Mission SuitabilityNLR Resources BasisProposed NLR Cost with EfficienciesDelta from NLR Resources BasisReference to comprehensive explanation of efficiency in Volume xx, Mission SuitabilityNLR Resources BasisProposed NLR Cost with EfficienciesDelta from NLR Resources BasisReference to comprehensive explanation of efficiency in Volume xx, Mission SuitabilityNLR Resources BasisProposed NLR Cost with EfficienciesDelta from NLR Resources BasisReference to comprehensive explanation of efficiency in Volume xx, Mission SuitabilityNLR Resources BasisProposed NLR Cost with EfficienciesDelta from NLR Resources BasisReference to comprehensive explanation of efficiency in Volume xx, Mission SuitabilityNLR Resources BasisProposed NLR Cost with EfficienciesDelta from NLR Resources BasisReference to comprehensive explanation of efficiency in Volume xx, Mission SuitabilityTotal NLR Cost CY1 Thru CY7
Materials/Equipment$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Travel$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Other Direct Costs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total NLR Cost$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 00.00.0$ - 0$ - 0$ - 0$ - 00.00.0$ - 0$ - 0$ - 0

whether or not in red font. Please remember to remove red highlighted examples from the templates in your official proposal submission.

1.0 Neutral Buoyancy Laboratory Operations Contract (NOC) Basis of Estimate & Technical Resources

TRT: Basis of Estimate (BOE)
WBS Number:1.0
WBS Title:Contract Management
Description:
Roll up of 1.1, 1,2 and 1.3
Basis of Estimate Composition:
Assumptions
Rationale
Assumptions
Resource Table:
Costs:Basic PeriodOption 1Option 2Option 3Option 4Option 5Total
CY 1CY 2SubtotalCY 3CY 4CY 5SubtotalCY 6CY 7SubtotalCY 8CY 9
WYE (see Instructions, paragraph B3)
Program Manager
Manager
Supervisor II
Supervisor I
Engineer IV
Engineer III
Engineer II
Engineer I
Administrative Specialist III
Administrative Specialist II
Administrative Specialist I
Technician III
Technician II
Technician I
NBL Dive Operations Specialist IV
NBL Dive Operations Specialist III
NBL Dive Operations Specialist II
NBL Dive Operations Specialist I
IT Professional III
IT Professional II
IT Professional I
Business Specialist II
Business Specialist I
Technical Professional III
Technical Professional II
Technical Professional I
Operations Expert
Structural Engineer/Analyst
Total WYEs

Non-Labor Resources $*:

Subtotal - NLR

1.1 Neutral Buoyancy Laboratory Operations Contract (NOC) Basis of Estimate & Technical Resources

TRT: Basis of Estimate (BOE)
WBS Number:1.1
WBS Title:Program Management and Contract Administration
Description:
Basis of Estimate Composition:
Assumptions
Rationale
Assumptions
Costs:Basic PeriodOption 1Option 2Option 3Option 4Option 5Total
CY 1CY 2SubtotalCY 3CY 4CY 5SubtotalCY 6CY 7SubtotalCY 8CY 9
WYE (see Instructions, paragraph B3)
Program Manager
Manager
Supervisor II
Supervisor I
Engineer IV
Engineer III
Engineer II
Engineer I
Administrative Specialist III
Administrative Specialist II
Administrative Specialist I
Technician III
Technician II
Technician I
NBL Dive Operations Specialist IV
NBL Dive Operations Specialist III
NBL Dive Operations Specialist II
NBL Dive Operations Specialist I
IT Professional III
IT Professional II
IT Professional I
Business Specialist II
Business Specialist I
Technical Professional III
Technical Professional II
Technical Professional I
Operations Expert
Structural Engineer/Analyst
Total WYEs

Non-Labor Resources $*:

Subtotal - NLR

1.2 Neutral Buoyancy Laboratory Operations Contract (NOC) Basis of Estimate & Technical Resources

TRT: Basis of Estimate (BOE)
WBS Number:1.2
WBS Title:Financial and Procurement
Description:
Basis of Estimate Composition:
Assumptions
Rationale
Assumptions
Costs:Basic PeriodOption 1Option 2Option 3Option 4Option 5Total
CY 1CY 2SubtotalCY 3CY 4CY 5SubtotalCY 6CY 7SubtotalCY 8CY 9
WYE (see Instructions, paragraph B3)
Program Manager
Manager
Supervisor II
Supervisor I
Engineer IV
Engineer III
Engineer II
Engineer I
Administrative Specialist III
Administrative Specialist II
Administrative Specialist I
Technician III
Technician II
Technician I
NBL Dive Operations Specialist IV
NBL Dive Operations Specialist III
NBL Dive Operations Specialist II
NBL Dive Operations Specialist I
IT Professional III
IT Professional II
IT Professional I
Business Specialist II
Business Specialist I
Technical Professional III
Technical Professional II
Technical Professional I
Operations Expert
Structural Engineer/Analyst
Total WYEs

Non-Labor Resources $*:

Subtotal - NLR

1.3 Neutral Buoyancy Laboratory Operations Contract (NOC) Basis of Estimate & Technical Resources

TRT: Basis of Estimate (BOE)
WBS Number:1.3
WBS Title:NBL Line Management
Description:
Basis of Estimate Composition:
Assumptions
Rationale
Assumptions
Costs:Basic PeriodOption 1Option 2Option 3Option 4Option 5Total
CY 1CY 2SubtotalCY 3CY 4CY 5SubtotalCY 6CY 7SubtotalCY 8CY 9
WYE (see Instructions, paragraph B3)
Program Manager
Manager
Supervisor II
Supervisor I
Engineer IV
Engineer III
Engineer II
Engineer I
Administrative Specialist III
Administrative Specialist II
Administrative Specialist I
Technician III
Technician II
Technician I
NBL Dive Operations Specialist IV
NBL Dive Operations Specialist III
NBL Dive Operations Specialist II
NBL Dive Operations Specialist I
IT Professional III
IT Professional II
IT Professional I
Business Specialist II
Business Specialist I
Technical Professional III
Technical Professional II
Technical Professional I
Operations Expert
Structural Engineer/Analyst
Total WYEs

Non-Labor Resources $*:

Subtotal - NLR

2.0 Neutral Buoyancy Laboratory Operations Contract (NOC) Basis of Estimate & Technical Resources

TRT: Basis of Estimate (BOE)
WBS Number:2.0
WBS Title:Support Services
Description:
Roll up of 2.1, 2.2, 2.3, and 2.4
Basis of Estimate Composition:
Assumptions
Rationale
Assumptions
Costs:Basic PeriodOption 1Option 2Option 3Option 4Option 5Total
CY 1CY 2SubtotalCY 3CY 4CY 5SubtotalCY 6CY 7SubtotalCY 8CY 9
WYE (see Instructions, paragraph B3)
Program Manager
Manager
Supervisor II
Supervisor I
Engineer IV
Engineer III
Engineer II
Engineer I
Administrative Specialist III
Administrative Specialist II
Administrative Specialist I
Technician III
Technician II
Technician I
NBL Dive Operations Specialist IV
NBL Dive Operations Specialist III
NBL Dive Operations Specialist II
NBL Dive Operations Specialist I
IT Professional III
IT Professional II
IT Professional I
Business Specialist II
Business Specialist I
Technical Professional III
Technical Professional II
Technical Professional I
Operations Expert
Structural Engineer/Analyst
Total WYEs

Non-Labor Resources $*:

Subtotal - NLR

2.1 Neutral Buoyancy Laboratory Operations Contract (NOC) Basis of Estimate & Technical Resources

TRT: Basis of Estimate (BOE)
WBS Number:2.1
WBS Title:Quality, Safety, and Environmental and Facility Management
Description:
Basis of Estimate Composition:
Assumptions
Rationale
Assumptions
Costs:Basic PeriodOption 1Option 2Option 3Option 4Option 5Total
CY 1CY 2SubtotalCY 3CY 4CY 5SubtotalCY 6CY 7SubtotalCY 8CY 9
WYE (see Instructions, paragraph B3)
Program Manager
Manager
Supervisor II
Supervisor I
Engineer IV
Engineer III
Engineer II
Engineer I
Administrative Specialist III
Administrative Specialist II
Administrative Specialist I
Technician III
Technician II
Technician I
NBL Dive Operations Specialist IV
NBL Dive Operations Specialist III
NBL Dive Operations Specialist II
NBL Dive Operations Specialist I
IT Professional III
IT Professional II
IT Professional I
Business Specialist II
Business Specialist I
Technical Professional III
Technical Professional II
Technical Professional I
Operations Expert
Structural Engineer/Analyst
Total WYEs

Non-Labor Resources $*:

Subtotal - NLR

2.2 Neutral Buoyancy Laboratory Operations Contract (NOC) Basis of Estimate & Technical Resources

TRT: Basis of Estimate (BOE)
WBS Number:2.2
WBS Title:Logistics
Description:
Basis of Estimate Composition:
Assumptions
Rationale
Assumptions
Costs:Basic PeriodOption 1Option 2Option 3Option 4Option 5Total
CY 1CY 2SubtotalCY 3CY 4CY 5SubtotalCY 6CY 7SubtotalCY 8CY 9
WYE (see Instructions, paragraph B3)
Program Manager
Manager
Supervisor II
Supervisor I
Engineer IV
Engineer III
Engineer II
Engineer I
Administrative Specialist III
Administrative Specialist II
Administrative Specialist I
Technician III
Technician II
Technician I
NBL Dive Operations Specialist IV
NBL Dive Operations Specialist III
NBL Dive Operations Specialist II
NBL Dive Operations Specialist I
IT Professional III
IT Professional II
IT Professional I
Business Specialist II
Business Specialist I
Technical Professional III
Technical Professional II
Technical Professional I
Operations Expert
Structural Engineer/Analyst
Total WYEs

Non-Labor Resources $*:

Subtotal - NLR

2.3 Neutral Buoyancy Laboratory Operations Contract (NOC) Basis of Estimate & Technical Resources

TRT: Basis of Estimate (BOE)
WBS Number:2.3
WBS Title:CM/DM
Description:
Basis of Estimate Composition:
Assumptions
Rationale
Assumptions
Costs:Basic PeriodOption 1Option 2Option 3Option 4Option 5Total
CY 1CY 2SubtotalCY 3CY 4CY 5SubtotalCY 6CY 7SubtotalCY 8CY 9
WYE (see Instructions, paragraph B3)
Program Manager
Manager
Supervisor II
Supervisor I
Engineer IV
Engineer III
Engineer II
Engineer I
Administrative Specialist III
Administrative Specialist II
Administrative Specialist I
Technician III
Technician II
Technician I
NBL Dive Operations Specialist IV
NBL Dive Operations Specialist III
NBL Dive Operations Specialist II
NBL Dive Operations Specialist I
IT Professional III
IT Professional II
IT Professional I
Business Specialist II
Business Specialist I
Technical Professional III
Technical Professional II
Technical Professional I
Operations Expert
Structural Engineer/Analyst
Total WYEs

Non-Labor Resources $*:

Subtotal - NLR

2.4 Neutral Buoyancy Laboratory Operations Contract (NOC) Basis of Estimate & Technical Resources

TRT: Basis of Estimate (BOE)
WBS Number:2.4
WBS Title:Training
Description:
Basis of Estimate Composition:
Assumptions
Rationale
Assumptions
Costs:Basic PeriodOption 1Option 2Option 3Option 4Option 5Total
CY 1CY 2SubtotalCY 3CY 4CY 5SubtotalCY 6CY 7SubtotalCY 8CY 9
WYE (see Instructions, paragraph B3)
Program Manager
Manager
Supervisor II
Supervisor I
Engineer IV
Engineer III
Engineer II
Engineer I
Administrative Specialist III
Administrative Specialist II
Administrative Specialist I
Technician III
Technician II
Technician I
NBL Dive Operations Specialist IV
NBL Dive Operations Specialist III
NBL Dive Operations Specialist II
NBL Dive Operations Specialist I
IT Professional III
IT Professional II
IT Professional I
Business Specialist II
Business Specialist I
Technical Professional III
Technical Professional II
Technical Professional I
Operations Expert
Structural Engineer/Analyst
Total WYEs

Non-Labor Resources $*:

Subtotal - NLR

3.0 Neutral Buoyancy Laboratory Operations Contract (NOC) Basis of Estimate & Technical Resources

TRT: Basis of Estimate (BOE)
WBS Number:3.0
WBS Title:NBL Operations
Description:
Roll up of 3.1 and 3.2
Basis of Estimate Composition:
Assumptions
Rationale
Assumptions
Costs:Basic PeriodOption 1Option 2Option 3Option 4Option 5Total
CY 1CY 2SubtotalCY 3CY 4CY 5SubtotalCY 6CY 7SubtotalCY 8CY 9
WYE (see Instructions, paragraph B3)
Program Manager
Manager
Supervisor II
Supervisor I
Engineer IV
Engineer III
Engineer II
Engineer I
Administrative Specialist III
Administrative Specialist II
Administrative Specialist I
Technician III
Technician II
Technician I
NBL Dive Operations Specialist IV
NBL Dive Operations Specialist III
NBL Dive Operations Specialist II
NBL Dive Operations Specialist I
IT Professional III
IT Professional II
IT Professional I
Business Specialist II
Business Specialist I
Technical Professional III
Technical Professional II
Technical Professional I
Operations Expert
Structural Engineer/Analyst
Total WYEs

Non-Labor Resources $*:

Subtotal - NLR

3.1 Neutral Buoyancy Laboratory Operations Contract (NOC) Basis of Estimate & Technical Resources

TRT: Basis of Estimate (BOE)
WBS Number:3.1
WBS Title:OCC Support and Facility Security
Description:
Basis of Estimate Composition:
Assumptions
Rationale
Assumptions
Costs:Basic PeriodOption 1Option 2Option 3Option 4Option 5Total
CY 1CY 2SubtotalCY 3CY 4CY 5SubtotalCY 6CY 7SubtotalCY 8CY 9
WYE (see Instructions, paragraph B3)
Program Manager
Manager
Supervisor II
Supervisor I
Engineer IV
Engineer III
Engineer II
Engineer I
Administrative Specialist III
Administrative Specialist II
Administrative Specialist I
Technician III
Technician II
Technician I
NBL Dive Operations Specialist IV
NBL Dive Operations Specialist III
NBL Dive Operations Specialist II
NBL Dive Operations Specialist I
IT Professional III
IT Professional II
IT Professional I
Business Specialist II
Business Specialist I
Technical Professional III
Technical Professional II
Technical Professional I
Operations Expert
Structural Engineer/Analyst
Total WYEs

Non-Labor Resources $*:

Subtotal - NLR

3.2 Neutral Buoyancy Laboratory Operations Contract (NOC) Basis of Estimate & Technical Resources

TRT: Basis of Estimate (BOE)
WBS Number:3.2
WBS Title:Event Support
Description:
Basis of Estimate Composition:
Assumptions
Rationale
Assumptions
Costs:Basic PeriodOption 1Option 2Option 3Option 4Option 5Total
CY 1CY 2SubtotalCY 3CY 4CY 5SubtotalCY 6CY 7SubtotalCY 8CY 9
WYE (see Instructions, paragraph B3)
Program Manager
Manager
Supervisor II
Supervisor I
Engineer IV
Engineer III
Engineer II
Engineer I
Administrative Specialist III
Administrative Specialist II
Administrative Specialist I
Technician III
Technician II
Technician I
NBL Dive Operations Specialist IV
NBL Dive Operations Specialist III
NBL Dive Operations Specialist II
NBL Dive Operations Specialist I
IT Professional III
IT Professional II
IT Professional I
Business Specialist II
Business Specialist I
Technical Professional III
Technical Professional II
Technical Professional I
Operations Expert
Structural Engineer/Analyst
Total WYEs

Non-Labor Resources $*:

Subtotal - NLR

4.0 Neutral Buoyancy Laboratory Operations Contract (NOC) Basis of Estimate & Technical Resources

TRT: Basis of Estimate (BOE)
WBS Number:4.0
WBS Title:Maintenance
Description:
Roll up of 4.1 and 4.2
Basis of Estimate Composition:
Assumptions
Rationale
Assumptions
Costs:Basic PeriodOption 1Option 2Option 3Option 4Option 5Total
CY 1CY 2SubtotalCY 3CY 4CY 5SubtotalCY 6CY 7SubtotalCY 8CY 9
WYE (see Instructions, paragraph B3)
Program Manager
Manager
Supervisor II
Supervisor I
Engineer IV
Engineer III
Engineer II
Engineer I
Administrative Specialist III
Administrative Specialist II
Administrative Specialist I
Technician III
Technician II
Technician I
NBL Dive Operations Specialist IV
NBL Dive Operations Specialist III
NBL Dive Operations Specialist II
NBL Dive Operations Specialist I
IT Professional III
IT Professional II
IT Professional I
Business Specialist II
Business Specialist I
Technical Professional III
Technical Professional II
Technical Professional I
Operations Expert
Structural Engineer/Analyst
Total WYEs

Non-Labor Resources $*:

Subtotal - NLR

4.1 Neutral Buoyancy Laboratory Operations Contract (NOC) Basis of Estimate & Technical Resources

TRT: Basis of Estimate (BOE)
WBS Number:4.1
WBS Title:Mockup Maintenance
Description:
Basis of Estimate Composition:
Assumptions
Rationale
Assumptions
Costs:Basic PeriodOption 1Option 2Option 3Option 4Option 5Total
CY 1CY 2SubtotalCY 3CY 4CY 5SubtotalCY 6CY 7SubtotalCY 8CY 9
WYE (see Instructions, paragraph B3)
Program Manager
Manager
Supervisor II
Supervisor I
Engineer IV
Engineer III
Engineer II
Engineer I
Administrative Specialist III
Administrative Specialist II
Administrative Specialist I
Technician III
Technician II
Technician I
NBL Dive Operations Specialist IV
NBL Dive Operations Specialist III
NBL Dive Operations Specialist II
NBL Dive Operations Specialist I
IT Professional III
IT Professional II
IT Professional I
Business Specialist II
Business Specialist I
Technical Professional III
Technical Professional II
Technical Professional I
Operations Expert
Structural Engineer/Analyst
Total WYEs

Non-Labor Resources $*:

Subtotal - NLR

4.2 Neutral Buoyancy Laboratory Operations Contract (NOC) Basis of Estimate & Technical Resources

TRT: Basis of Estimate (BOE)
WBS Number:4.2
WBS Title:Systems Maintenance
Description:
Basis of Estimate Composition:
Assumptions
Rationale
Assumptions
Costs:Basic PeriodOption 1Option 2Option 3Option 4Option 5Total
CY 1CY 2SubtotalCY 3CY 4CY 5SubtotalCY 6CY 7SubtotalCY 8CY 9
WYE (see Instructions, paragraph B3)
Program Manager
Manager
Supervisor II
Supervisor I
Engineer IV
Engineer III
Engineer II
Engineer I
Administrative Specialist III
Administrative Specialist II
Administrative Specialist I
Technician III
Technician II
Technician I
NBL Dive Operations Specialist IV
NBL Dive Operations Specialist III
NBL Dive Operations Specialist II
NBL Dive Operations Specialist I
IT Professional III
IT Professional II
IT Professional I
Business Specialist II
Business Specialist I
Technical Professional III
Technical Professional II
Technical Professional I
Operations Expert
Structural Engineer/Analyst
Total WYEs

Non-Labor Resources $*:

Subtotal - NLR

5.0 Neutral Buoyancy Laboratory Operations Contract (NOC) Basis of Estimate & Technical Resources

TRT: Basis of Estimate (BOE)
WBS Number:5.0
WBS Title:Core Projects
Description:
Roll up of 5.1 and 5.2
Basis of Estimate Composition:
Assumptions
Rationale
Assumptions
Costs:Basic PeriodOption 1Option 2Option 3Option 4Option 5Total
CY 1CY 2SubtotalCY 3CY 4CY 5SubtotalCY 6CY 7SubtotalCY 8CY 9
WYE (see Instructions, paragraph B3)
Program Manager
Manager
Supervisor II
Supervisor I
Engineer IV
Engineer III
Engineer II
Engineer I
Administrative Specialist III
Administrative Specialist II
Administrative Specialist I
Technician III
Technician II
Technician I
NBL Dive Operations Specialist IV
NBL Dive Operations Specialist III
NBL Dive Operations Specialist II
NBL Dive Operations Specialist I
IT Professional III
IT Professional II
IT Professional I
Business Specialist II
Business Specialist I
Technical Professional III
Technical Professional II
Technical Professional I
Operations Expert
Structural Engineer/Analyst
Total WYEs

Non-Labor Resources $*:

Subtotal - NLR

5.1 Neutral Buoyancy Laboratory Operations Contract (NOC) Basis of Estimate & Technical Resources

TRT: Basis of Estimate (BOE)
WBS Number:5.1
WBS Title:Facility Projects
Description:
Roll -up of 5.1.1, 5.1.2, 5.1.3
Basis of Estimate Composition:
Assumptions
Rationale
Assumptions
Costs:Basic PeriodOption 1Option 2Option 3Option 4Option 5Total
CY 1CY 2SubtotalCY 3CY 4CY 5SubtotalCY 6CY 7SubtotalCY 8CY 9
WYE (see Instructions, paragraph B3)
Program Manager
Manager
Supervisor II
Supervisor I
Engineer IV
Engineer III
Engineer II
Engineer I
Administrative Specialist III
Administrative Specialist II
Administrative Specialist I
Technician III
Technician II
Technician I
NBL Dive Operations Specialist IV
NBL Dive Operations Specialist III
NBL Dive Operations Specialist II
NBL Dive Operations Specialist I
IT Professional III
IT Professional II
IT Professional I
Business Specialist II
Business Specialist I
Technical Professional III
Technical Professional II
Technical Professional I
Operations Expert
Structural Engineer/Analyst
Total WYEs

Non-Labor Resources $*:

Subtotal - NLR

5.1.1 Neutral Buoyancy Laboratory Operations Contract (NOC) Basis of Estimate & Technical Resources

TRT: Basis of Estimate (BOE)
WBS Number:5.1.1
WBS Title:Estimation
Description:
Basis of Estimate Composition:
Assumptions
Rationale
Assumptions
Costs:Basic PeriodOption 1Option 2Option 3Option 4Option 5Total
CY 1CY 2SubtotalCY 3CY 4CY 5SubtotalCY 6CY 7SubtotalCY 8CY 9
WYE (see Instructions, paragraph B3)
Program Manager
Manager
Supervisor II
Supervisor I
Engineer IV
Engineer III
Engineer II
Engineer I
Administrative Specialist III
Administrative Specialist II
Administrative Specialist I
Technician III
Technician II
Technician I
NBL Dive Operations Specialist IV
NBL Dive Operations Specialist III
NBL Dive Operations Specialist II
NBL Dive Operations Specialist I
IT Professional III
IT Professional II
IT Professional I
Business Specialist II
Business Specialist I
Technical Professional III
Technical Professional II
Technical Professional I
Operations Expert
Structural Engineer/Analyst
Total WYEs

Non-Labor Resources $*:

Subtotal - NLR

5.1.2 Neutral Buoyancy Laboratory Operations Contract (NOC) Basis of Estimate & Technical Resources

TRT: Basis of Estimate (BOE)
WBS Number:5.1.2
WBS Title:Management
Description:
Basis of Estimate Composition:
Assumptions
Rationale
Assumptions
Costs:Basic PeriodOption 1Option 2Option 3Option 4Option 5Total
CY 1CY 2SubtotalCY 3CY 4CY 5SubtotalCY 6CY 7SubtotalCY 8CY 9
WYE (see Instructions, paragraph B3)
Program Manager
Manager
Supervisor II
Supervisor I
Engineer IV
Engineer III
Engineer II
Engineer I
Administrative Specialist III
Administrative Specialist II
Administrative Specialist I
Technician III
Technician II
Technician I
NBL Dive Operations Specialist IV
NBL Dive Operations Specialist III
NBL Dive Operations Specialist II
NBL Dive Operations Specialist I
IT Professional III
IT Professional II
IT Professional I
Business Specialist II
Business Specialist I
Technical Professional III
Technical Professional II
Technical Professional I
Operations Expert
Structural Engineer/Analyst
Total WYEs

Non-Labor Resources $*:

Subtotal - NLR

5.1.3 Neutral Buoyancy Laboratory Operations Contract (NOC) Basis of Estimate & Technical Resources

TRT: Basis of Estimate (BOE)
WBS Number:5.1.3
WBS Title:Implementation
Description:
Basis of Estimate Composition:
Assumptions
Rationale
Assumptions
Costs:Basic PeriodOption 1Option 2Option 3Option 4Option 5Total
CY 1CY 2SubtotalCY 3CY 4CY 5SubtotalCY 6CY 7SubtotalCY 8CY 9
WYE (see Instructions, paragraph B3)
Program Manager
Manager
Supervisor II
Supervisor I
Engineer IV
Engineer III
Engineer II
Engineer I
Administrative Specialist III
Administrative Specialist II
Administrative Specialist I
Technician III
Technician II
Technician I
NBL Dive Operations Specialist IV
NBL Dive Operations Specialist III
NBL Dive Operations Specialist II
NBL Dive Operations Specialist I
IT Professional III
IT Professional II
IT Professional I
Business Specialist II
Business Specialist I
Technical Professional III
Technical Professional II
Technical Professional I
Operations Expert
Structural Engineer/Analyst
Total WYEs

Non-Labor Resources $*:

Subtotal - NLR

5.2 Neutral Buoyancy Laboratory Operations Contract (NOC) Basis of Estimate & Technical Resources

TRT: Basis of Estimate (BOE)
WBS Number:5.2
WBS Title:Mockup Projects
Description:
Roll up of 5.2.1, 5.2.2, 5.2.3
Basis of Estimate Composition:
Assumptions
Rationale
Assumptions
Costs:Basic PeriodOption 1Option 2Option 3Option 4Option 5Total
CY 1CY 2SubtotalCY 3CY 4CY 5SubtotalCY 6CY 7SubtotalCY 8CY 9
WYE (see Instructions, paragraph B3)
Program Manager
Manager
Supervisor II
Supervisor I
Engineer IV
Engineer III
Engineer II
Engineer I
Administrative Specialist III
Administrative Specialist II
Administrative Specialist I
Technician III
Technician II
Technician I
NBL Dive Operations Specialist IV
NBL Dive Operations Specialist III
NBL Dive Operations Specialist II
NBL Dive Operations Specialist I
IT Professional III
IT Professional II
IT Professional I
Business Specialist II
Business Specialist I
Technical Professional III
Technical Professional II
Technical Professional I
Operations Expert
Structural Engineer/Analyst
Total WYEs

Non-Labor Resources $*:

Subtotal - NLR

5.2.1 Neutral Buoyancy Laboratory Operations Contract (NOC) Basis of Estimate & Technical Resources

TRT: Basis of Estimate (BOE)
WBS Number:5.2.1
WBS Title:Estimation
Description:
Basis of Estimate Composition:
Assumptions
Rationale
Assumptions
Costs:Basic PeriodOption 1Option 2Option 3Option 4Option 5Total
CY 1CY 2SubtotalCY 3CY 4CY 5SubtotalCY 6CY 7SubtotalCY 8CY 9
WYE (see Instructions, paragraph B3)
Program Manager
Manager
Supervisor II
Supervisor I
Engineer IV
Engineer III
Engineer II
Engineer I
Administrative Specialist III
Administrative Specialist II
Administrative Specialist I
Technician III
Technician II
Technician I
NBL Dive Operations Specialist IV
NBL Dive Operations Specialist III
NBL Dive Operations Specialist II
NBL Dive Operations Specialist I
IT Professional III
IT Professional II
IT Professional I
Business Specialist II
Business Specialist I
Technical Professional III
Technical Professional II
Technical Professional I
Operations Expert
Structural Engineer/Analyst
Total WYEs

Non-Labor Resources $*:

Subtotal - NLR

5.2.2 Neutral Buoyancy Laboratory Operations Contract (NOC) Basis of Estimate & Technical Resources

TRT: Basis of Estimate (BOE)
WBS Number:5.2.2
WBS Title:Management
Description:
Basis of Estimate Composition:
Assumptions
Rationale
Assumptions
Costs:Basic PeriodOption 1Option 2Option 3Option 4Option 5Total
CY 1CY 2SubtotalCY 3CY 4CY 5SubtotalCY 6CY 7SubtotalCY 8CY 9
WYE (see Instructions, paragraph B3)
Program Manager
Manager
Supervisor II
Supervisor I
Engineer IV
Engineer III
Engineer II
Engineer I
Administrative Specialist III
Administrative Specialist II
Administrative Specialist I
Technician III
Technician II
Technician I
NBL Dive Operations Specialist IV
NBL Dive Operations Specialist III
NBL Dive Operations Specialist II
NBL Dive Operations Specialist I
IT Professional III
IT Professional II
IT Professional I
Business Specialist II
Business Specialist I
Technical Professional III
Technical Professional II
Technical Professional I
Operations Expert
Structural Engineer/Analyst
Total WYEs

Non-Labor Resources $*:

Subtotal - NLR

5.2.3 Neutral Buoyancy Laboratory Operations Contract (NOC) Basis of Estimate & Technical Resources

TRT: Basis of Estimate (BOE)
WBS Number:5.2.3
WBS Title:Implementation
Description:
Basis of Estimate Composition:
Assumptions
Rationale
Assumptions
Costs:Basic PeriodOption 1Option 2Option 3Option 4Option 5Total
CY 1CY 2SubtotalCY 3CY 4CY 5SubtotalCY 6CY 7SubtotalCY 8CY 9
WYE (see Instructions, paragraph B3)
Program Manager
Manager
Supervisor II
Supervisor I
Engineer IV
Engineer III
Engineer II
Engineer I
Administrative Specialist III
Administrative Specialist II
Administrative Specialist I
Technician III
Technician II
Technician I
NBL Dive Operations Specialist IV
NBL Dive Operations Specialist III
NBL Dive Operations Specialist II
NBL Dive Operations Specialist I
IT Professional III
IT Professional II
IT Professional I

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .