This document contains a solicitation notice for the JSC Engineering, Technology and Science (JETS) II contract. The solicitation seeks proposals for engineering, technology, and science services at the Johnson Space Center. Proposals are due no later than December 15, 2021 at 4:00 p.m. Central Time, with all questions due by November 29, 2021 at 5:00 p.m. Central Time. A virtual pre-proposal pricing conference will be held on November 23, 2021 from 10:00 AM to 12:00 PM Central Time. Interested parties should register by emailing specified information to JSC-JETSII@mail.nasa.gov by November 22, 2021. The solicitation and any amendments will be available on a World Wide Web server and offerors are responsible for downloading their own copies. The presolicitation synopsis was posted on October 29, 2021. The National Aeronautics and Space Administration Johnson Space Center is the issuing agency.

View the file

Other files for this federal contract opportunity

Other files attached to JSC Engineering, Technology and Science (JETS) II, newest first.
File Type Posted
80JSC022R0003 RFP Amendment 0005 (SF30).pdf PDF
80JSC022R0003 JETS II RFP A0004.pdf PDF
80JSC022R0003 JETS II RFP QnA Responses.xlsx XLSX spreadsheet
80JSC022R0003 JETS II RFP A0004 - Markup.pdf PDF
80JSC022R0003 JETS II RFP A0004 - Clean.docx DOCX document
80JSC022R0003 JETS II RFP Change Matrix A0004.xlsx XLSX spreadsheet
80JSC022R0003 RFP Amendment 0004 (SF30).pdf PDF
Attachment L-7 Past Performance Consent Letter A0004.pdf PDF
80JSC022R0003 RFP Amendment 0003 (SF30).pdf PDF
JETS II Government Calculated Average Composite Labor Rates and Seniority Profile Rev 12-2-21.pdf PDF
Attachment J-12 IAMAW Agreement for JETS 2021.pdf PDF
80JSC022R0003 RFP Amendment 0002 (SF30) .pdf PDF
80JSC022R0003 JETS II RFP A0001 - Markup.pdf PDF
Attachment J-2 - DRL and DRD A0001.pdf PDF
Native Versions of JETS II RFP Files.zip ZIP file
80JSC022R0003 JETS II Preproposal Bulletin.pdf PDF
80JSC022R0003 JETS II RFP Cover Letter - signed.pdf PDF
80JSC022R0003 RFP Amendment 0001 (SF30).pdf PDF
80JSC022R0003 JETS II RFP A0001.pdf PDF
80JSC022R0003 JETS II RFP Change Matrix.xlsx XLSX spreadsheet
80JSC022R0003 JETS II RFP Cover Letter.pdf PDF
L-Attachments.zip ZIP file
J-Attachments.zip ZIP file
80JSC022R0003 JETS II RFP.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Super-Flex Phase 2 Starts this Friday, Feb. 28

Starting this Friday, Feb. 28, JSC will be in "weekend mode" on Flex Fridays. "Weekend mode" means:

Gates:

Gate 1 (at Saturn Lane and 2nd Street) and Gate 4 (off Space Center Boulevard, near Bay Area Boulevard) will be open.

Gates 2 and 3 will be closed.

Open buildings:

24/7 buildings: Buildings 24, 28, 48, 30 Mission Control Center, 46, and portions of several other buildings, that currently operate on weekends will continue to operate as normal.

Buildings with approved exceptions : Buildings 4 North and South, 5, 9, 10, 13, 14, 15, 16, 17, 32, 35, 36, Ellington

Field, Sonny Carter Training Facility and specific rooms or areas within several buildings. Employees within buildings that have exceptions are still encouraged to take advantage of Flex Fridays with the approval of your supervisors.

JSC Child Care Center will be open.

Badging Office B. 110 will be open.

Building 3 cafè will be open.

Gilruth will be open.

Alternate work locations: Buildings 12 & 20 will continue as alternate working locations, as they have been in

Phase 1. Building 35 will also be available. For room information, please see Super Flex FAQs.

Closed buildings:

Other buildings: Buildings that are not 24/7, or do not have an approved exception (listed above) will not have air conditioning and lights on Flex Fridays.

Building 11 cafè will be closed.

Clinic will be closed on Flex Fridays; please refer to the Super-flex FAQs for medical emergency procedures.

If a mission critical need arises and you need to work in a building that does not have air and lights, call Operations

Control Center (OCC) at x33061.

Supervisors and employees are asked to be sensitive to those that might need extra care and special assistance in situations where "buddies" are not on-site, while some employees may need to work on-site. If workplace accommodations due to a disability are necessary in order for you to participate in Phase 2 of Super-flex, please contact the Office of Equal Opportunity and Diversity at 281-483-0607.

Please visit JSC's Workplace Flexibilities webpage (http://jscpeople.jsc.nasa.gov/workplace_flexibilities.html) for updates to regularly scheduled building status for Phase 2, Super-flex FAQs, and instructions for requesting exceptions.

Detailed VPN instructions are available on IRD’s WFA website at https://workfromanywhere.jsc.nasa.gov/.

http://jscpeople.jsc.nasa.gov/workplace_flexibilities.html http://jscpeople.jsc.nasa.gov/workplace_flexibilities.html https://workfromanywhere.jsc.nasa.gov/ https://workfromanywhere.jsc.nasa.gov/

File details come from the government source that posted it. Updated .