MESC 80JSC021R0009 RFP Sections A-K.doc

DOC document 37 MB Posted

Attached to
Mission Enabling Services Contract (MESC) Federal contract opportunity
Solicitation number
80JSC021R0009
Issued by
National Aeronautics and Space Administration Johnson Space Center

About this file

This document is a request for proposal for the Mission Enabling Services Contract issued by NASA's Johnson Space Center. The RFP seeks offers to provide mission enabling services to support NASA/JSC. Key details include:

  • The NAICS code is 541512 with a size standard of $30 million. The acquisition is a partial small business set-aside.

  • A pre-proposal conference will take place on September 8, 2021 from 9-11 AM CDT where additional pre-proposal information can be found.

  • It is the offeror's responsibility to monitor the MESC website for any amendments to the RFP. Potential offerors must download their own copy of the solicitation and any amendments.

  • Questions should be directed to the contracting specialist listed in the solicitation. The deadline to submit proposals in response to this RFP was not included in the document provided.

View the file

Other files for this federal contract opportunity

Other files attached to Mission Enabling Services Contract (MESC), newest first.
File Type Posted
MESC RFP Q and A Round 3.pdf PDF
80JSC021R0009 MESC Amend 0003.pdf PDF
Attachment L-03 Baseline EPM Template Rev 2.xlsx XLSX spreadsheet
MESC RFP Q and A Round 2.pdf PDF
Attachment L-04 IDIQ EPM Template Rev 1.xlsx XLSX spreadsheet
Attachment L-03 Baseline EPM Template Rev 1.xlsx XLSX spreadsheet
MESC 80JSC021R0009 Amend 0002.pdf PDF
MESC 80JSC021R0009 RFP Updated thru Amend 0002.pdf PDF
MESC RFP QandA Final 9.20.21.pdf PDF
80JSC021R0009 MESC Amend 001.pdf PDF
Attachment L-04 IDIQ EPM Template.xlsx XLSX spreadsheet
Attachment L-03 Baseline EPM Template.xlsx XLSX spreadsheet
Attachment L-08 Past Performance Relevancy Matrix.xlsx XLSX spreadsheet
80JSC021R0009 MESC RFP - Final.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mission Enabling Services Contract (MESC) Section A: Table of Contents Solicitation# 80JSC021R0009

A-2

A.2 DETAILED TABLE OF CONTENTS

SECTION A. SOLICITATION/CONTRACT FORM, SF33

Page A.1 Standard Form 33 A-1 A.2 Detailed Table of Contents A-2

SECTION B. SUPPLIES OR SERVICES AND PRICES/COSTS

B-1 B.1 Listing Of Clauses Incorporated By Reference B-1 B.2 Services To Be Furnished B-1 B.3 Contract Type B-1 B.4 Phase-In And Contract Values B-2 B.5 NFS 1852.232-81 Contract Funding (Jun 1990) [Applicable Only To Baselines A and B] B-2 B.6 JSC 52.216-90 IDIQ Minimum And Maximum Ordering Limits (Nov 2018) [Applicable Only To IDIQ] B-3 B.7 FFP IDIQ Rates [Applicable Only To IDIQ] B-3

SECTION C. STATEMENT OF WORK

C-1 C.1 Baseline A: NAMIS Services C-6 C.2 Baseline B: Spaceflight Enabling Services C-20

C.3 IDIQ

C-32

SECTION D. PACKAGING AND MARKING

D-1 D.1 Listing of Clauses Incorporated by Reference D-1 D.2 NFS 1852.245-74 Identification and Marking of Government Equipment (Jan 2011) D-1

SECTION E. INSPECTION AND ACCEPTANCE

E-1 E.1 Listing of Clauses Incorporated by Reference E-1 E.2 FAR 52.246-11 Higher-Level Contract Quality Requirement (Dec 2014) E-1

SECTION F. DELIVERIES OR PERFORMANCE

F-1 F.1 Listing of Clauses Incorporated by Reference F-1 F.2 Place of Performance F-1 F.3 Period of Performance [Applicable only to Baselines A and B] F-1

F.4 Option To Extend Period Of Performance [Applicable Only to Baselines A and B] F-2 F.5 Shipping Instructions F-3 F.6 Contract Transition [Applicable only to Baselines A and B] F-3

SECTION G. CONTRACT ADMINISTRATION DATA

G-1 G.1 Listing of Clauses Incorporated by Reference G-1 G.2 NFS 1852.232-80 Submission of Vouchers for Payment (April 2018) G-1 G.3 NFS 1852.245–71 Installation-Accountable Government Property (Jun 2018) Alternate I (Jan 2011) [Applicable to Baseline A, Baseline B, and some IDIQ Task Orders as defined in the individual Task Order solicitation] G-3 G.4 NFS 1852.245–73 Financial Reporting Of NASA Property In The Custody Of Contractors (Jan 2017) G-5 G.5 NFS 1852.245-76 List Of Government Property Furnished Pursuant To FAR 52.245– 1 (Jan 2011) G-7 G.6 NFS 1852.245-82 Occupancy Management Requirements (Sep 2017)) G-7 G.7 JSC 52.204-92 NASA Security Program and Identification of Employees.

(FEB 2021)

G-8 G.8 Technical Direction G-10

SECTION H. SPECIAL CONTRACT REQUIREMENTS

H-1 H.1 Listing of Clauses Incorporated By Reference H-1 H.2 NFS 1852.209-71 Limitation Of Future Contracting (Dec 1988) H-1 H.3 NFS 1852.225-70 Export Licenses (Feb 2000) – Alternate 1 (Feb 2000) H-2 H.4 NFS 1852.232-77 Limitation Of Funds (Fixed-Price Contract) (Mar 1989) H-3 H.5 NFS 1852.235-71 Key Personnel And Facilities (Mar 1989) H-5 H.6 JSC 52.219-90 Small Business Subcontracting Goals (Oct 2006) [Applies only to other than Small Business on Baseline A] H-5 H.7 JSC 52.223-94 Environmental (and Energy Conservation Requirements— Reserved) and Hazardous Materials Use (Jul 2021) H-6 H.8 Use of EAR Exceptions H-9

PART II -- CONTRACT CLAUSES

SECTION I. CONTRACT CLAUSES

I-1 I.1 Listing of Clauses Incorporated by Reference I-1 I.2 FAR 52.204-21 Basic Safeguarding of Covered Contractor Information Systems (Jun 2016) I-6 I.3 FAR 52.204-25 Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment (Aug 2020) I-8 Mission Enabling Services Contract (MESC) Section A: Table of Contents

A-4

I.4 FAR 52.215-13 Subcontractor Certified Cost or Pricing Data - Modifications (Jun 2020) I-11 I.5 FAR 52.216-18 Ordering (Aug 2020) [Applicable Only To IDIQ] I-12 I.6 FAR 52.216-19 Order Limitations (Oct 1995) [Applicable Only to IDIQ] I-12 I.7 FAR 52.216-22 Indefinite Quantity (Oct 1995) [Applicable Only To IDIQ] I-13 I.8 FAR 52.217-9 Option To Extend The Term Of The Contract (Mar 2000) [Applicable Only To Baselines A and B] I-14 I.9 FAR 52.219-14 Limitations on Subcontracting (Mar 2020) [Deviation 19- 02A] I-14 I.10 FAR 52.219-28 Post Award Small Business Program Representation (Nov 2020) I-15 I.11 FAR 52.222-19 Child Labor ---Cooperation with Authorities and Remedies (Apr 2021) [Deviations 20-02A] I-19 I.12 FAR 52.222-35 Equal Opportunity for Veterans (Jun 2020) I-20 I.13 FAR 52.222-36 Equal Opportunity for Workers with Disabilities (Jun 2020) I-21 I.14 FAR 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Products (May 2008) I-21 I.15 FAR 52.225-5 Trade Agreements (Apr 2021) [Deviation 20-02A] [Applicable to Baseline A] I-22 I.16 FAR 52.230-2 Cost Accounting Standards (Jun 2020) I-25 I.17 FAR 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Apr 2021) [Deviation 20-03A] I-27 I.18 FAR 52.244-6 Subcontracts for Commercial Items (Apr 2021) [Deviation 20-03A] I-27 I.19 FAR 52.252-2 Clauses Incorporated by Reference (Feb 1998) I-29 I.20 FAR 52.252-6 Authorized Deviations in Clauses (Nov 2020) I-30 I.21 NFS 1852.204-76 Security Requirements for Unclassified Information Technology Resources [Deviation 21-01] I-30 I.22 NFS 1852.239-74 Information Technology System Supply Chain Risk Assessment (Deviation 15-03D) I-32 I.23 Task Ordering Procedures [Applicable Only To IDIQ] I-33

PART III -- LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J. LIST OF ATTACHMENTS

J-01-1 J-1 Cover Sheet J-01-1 J-2 Data Requirements List J-01-4 J-3 Standard Labor Categories J-03-3 J-4 List of Government-Furnished Computer Software J-04-1 J-5 Installation Accountable Government Furnished Equipment J-05-1 J-6 List of Government-Provided Facilities J-06-1 J-7 List of Applicable Documents J-07-1 J-8 Contract Phase-In Plan J-08-1

J-9 Abbreviated Total Compensation Plan J-09-1 J-10 Management and Staffing Plan J-10-1 J-11 Small Business Subcontracting Plan J-11-1 J-12 Organizational Conflict of Interest (OCI) Mitigation Plan J-12-1 J-13 IT Security Management Plan J-13-1 J-14 Government Property Management Plan J-14-1 J-15 Safety and Health Plan J-15-1 J-16 Emergency Preparedness & Disaster Recovery / Continuity of Operations Plan (DRCOP) J-16-1 J-17 Work Breakdown Structure (WBS) J-17-1 J-18 Equipment Replacement (ER) Plan J-18-1

PART IV -- REPRESENTATIONS AND INSTRUCTIONS

SECTION K. REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS

K-1 K.1 Listing of Provisions Incorporated by Reference K-1 K.2 FAR 52.204-8 Annual Representations and Certifications (Apr 2021) [Deviation 20-02A] K-1 K.3 FAR 52.209-7 Information Regarding Responsibility Matters (Oct 2018) K-5 K.4 Far 52.209-12 Certification Regarding Tax Matters (Oct 2020) K-7 K.5 FAR 52.230-1 Cost Accounting Standard Notices and Certification (Jun 2020) [Not applicable to small businesses] K-7 K.6 FAR 52.230-7 Proposal Disclosure—Cost Accounting Practice Changes (Apr 2005) [Applies to other than Small Business only] K-10 K.7 NFS 1852.225-72 Restriction on Funding Activity with China-Representation (Feb 2012) (Deviation 12-01A) K-11

SECTION L. INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

L-1 L.1 Listing of Provisions Incorporated by Reference L-1 L.2 FAR 52.215-20 Requirements For Certified Cost Or Pricing Data And Data Other Than Certified Cost Or Pricing Data (Oct 2010) Alternate IV (Oct 2010) L-2 L.3 FAR 52.216-1 Type Of Contract (Apr 1984) L-2 L.4 FAR 52.233-2 Service Of Protest (Sep 2006) L-3 L.5 FAR 52.252-1 Solicitation Provisions Incorporated By Reference (Feb 1998) L-3 L.6 FAR 52.252-5 Authorized Deviations In Provisions (Nov 2020) L-4 L.7 NFS 1852.215-77 Preproposal/Pre-Bid Conference (Apr 2015) L-4 L.8 NFS 1852.215-81 Proposal Page Limitations (Apr 2015) L-5 L.9 NFS 1852.239-73 Review of the Offeror’s Information Technology Systems Supply Chain (Jan 2020) (Deviation 15-03D) L-6

L.10 NFS 1852.245-80 Government Property Management Information (Jan 2011) L-7 L.11 NFS 1852.245-81 List of Available Government Property (Jan 2011) L-9 L.12 JPI 1852.231-71 Determination of Compensation Reasonableness (Jun 2020) L-9 L.13 JSC 52.215-107 General Instructions For Preparation Of Proposal (Aug 2018) L-10 L.14 JSC 52.215-123 Availability Of Specifications (Dec 2019) L-12 L.15 JSC 52.215-124 Communications Regarding This Solicitation (Aug 2018) L-12 L.16 JSC 52.215-125 Offeror Acceptance Period (Aug 2018) L-13 L.17 JSC 52.215-126 Period Covered By Procurement (Aug 2018) L-13 L.18 JSC 52.242-90 JSC Super-Flex Work Schedule (Aug 2020) L-14 L.19 Government Provided Facilities and Services [Applicable Only to IDIQ] L-14 L.20 Instructions For Proposal Preparation L-15 L.20.1 Introduction L-16 L.20.2 Proposal Arrangement, Page Limitations, Copies, and Due Dates L-17 L.20.3 Reserved L-23 L.20.4 Technical Acceptability Factor - Volume I L-23 L.20.5 Past Performance – Volume II L-30 L.20.6 Cost and Price Factor- Volume III L-34 Responsibility Considerations – Volume IV Model Contract - Volume V L-43 L-46

SECTION L. ATTACHMENTS

L1.1 L-01 Staffing Expectations L-1.1 L-02 IDIQ Technical Scenario L-2.1 L-03 Baseline EPM Template L-3.1 L-04 IDIQ EPM Template L-4.1 L-05 Government Resources Estimate (GRE) L-5.1 L-06 Past Performance Questionnaire L-6.1 L-07 Past Performance Consent Letters L-7.1 L-08 Past Performance Relevancy Matrix L-8.1 L-09 SF1408 Pre-award Survey of Prospective Contractor Accounting System L-9.1 L-10 Small Business Subcontracting Tables – Baseline A L-10.1

SECTION M.EVALUATION FACTORS FOR AWARD TO OFFERORS

M-1 M.1 Listing of Provisions Incorporated by Reference M-1 M.2 JSC 52.215-122 Streamlined Procurement Evaluation Factors For Award (Performance Price Tradeoff (PPT) Or Limited Tradeoff (LTO)) (Nov 2018) M-1 M.3 Technical Acceptability Factor (Volume I) M-3 M.4 Past Performance Factor (Volume II) M-4

M.5 Cost/Price Factor (Volume III) M-9 M.6 Responsibility Considerations (Volume IV) M-12 M.7 Model Contract (Volume V) M-14

Mission Enabling Services Contract (MESC) Section B: Supplies or Services and Prices/Costs

B-1

B. SUPPLIES OR SERVICES AND PRICES/COSTS

LISTING OF CLAUSES INCORPORATED BY REFERENCE

The following contract clauses pertinent to this section are hereby incorporated by reference:

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSE

NUMBER DATE TITLE

NONE INCORPORATED BY REFERENCE

NASA FAR SUPPLEMENT (48 CFR CHAPTER 18) PROVISIONS CLAUSE

NUMBER DATE TITLE

NONE INCORPORATED BY REFERENCE

(End of Clauses Incorporated by Reference)

SERVICES TO BE FURNISHED

The Contractor shall provide all resources and services (except as may be expressly stated in this contract as furnished by the Government) necessary to accomplish requirements in accordance with the Statement of Work (SOW) set forth in Section C, as well as any information or actions required by other clauses or attachment incorporated in Sections A-J of this contract.

The Contractor shall perform phase-in period activities in accordance with the phase-in plan set forth in Attachment J-08, Contract Phase-in Plan (for Baseline A and B awards only).

(End of Clause)

CONTRACT TYPE

The MESC is a multiple award hybrid contract with two Cost type baselines and multi- award IDIQ component. The contract types for the different areas of work for the MESC contracts are as follows:

Single Award, Baseline A: Cost-Plus-Fixed-Fee (CPFF)

Single Award, Baseline B: CPFF

Multiple-Award IDIQ: Firm-Fixed-Price (FFP) task orders.

(End of Clause)

PHASE-IN AND CONTRACT VALUES

Baseline A: NASA Aircraft Management Information System (NAMIS) Services

The total FFP phase-in of Baseline A is $[Offeror Fill-In (OFI)]. This value is not included in the contract value in (a)(2).
The estimated cost of Baseline A is $[OFI], exclusive of the fixed-fee of

$[OFI]. The total estimated cost and fixed-fee of Baseline A is $[OFI].

Fixed Fee for Baseline A is [OFI]%, Baseline B: Spaceflight Enabling Services

The total FFP phase-in of Baseline B is $[OFI]. This value is not included in the contract value in (b)(2).
The estimated cost of Baseline B is $[OFI], exclusive of the fixed-fee of $[OFI].

The total estimated cost and fixed-fee of Baseline B is $[OFI].

Fixed Fee for Baseline B is [OFI]%.

Indefinite Delivery/Indefinite Quantity (IDIQ)

FFP TOs: The total firm fixed price is $[TBD].

* Applicable only to Baseline A & B, paragraphs a and b: The estimated cost, fixed fee, and total values of the exercised option period(s) will be incorporated into this clause and a total estimated cost and fixed fee values will be established that include the base and the awarded option period(s). For the estimated cost and fixed fee values of option period(s) see Clause F.4, Options to Extend Period of Performance [Applicable Only to Baselines A and B].

**Applicable only to IDIQ, paragraph c of this clause shall be unilaterally updated periodically to reflect the total value of task orders issued.

(End of Clause)

NFS 1852.232-81 CONTRACT FUNDING (JUN 1990) [Applicable Only to Baselines A and B] For purposes of payment of cost, exclusive of fee, in accordance with the Limitation of Funds clause, the total amount allotted by the Government to this contract is $[TBD]. This allotment is for Mission Enabling Services Contract (MESC) and covers the following estimated period of performance: October 1, 2022, through [TBD].

An additional amount of $[TBD] is obligated under this contract for payment of fee.

(End of Clause)

JSC 52.216-90 IDIQ MINIMUM AND MAXIMUM ORDERING LIMITS (NOV 2018) [Applicable Only to IDIQ]

In accordance with FAR 52.216-22, Indefinite Quantity, the guaranteed minimum to be ordered under this contract is $20,000 and the contract Not to Exceed (NTE) amount which may be ordered under this contract is $35,000,000*. The Government is not obligated to order more than the minimum specified but may order up to the NTE amount. The Contractor is obligated to fulfill orders issued, up to the NTE amount within the limits specified in FAR 52.216-19 Order Limitations.

*$35M is the sum total to be divided up by all contracts awarded under IDIQ

(End of Clause)

FFP IDIQ RATES [Applicable Only To IDIQ]

Fully Burdened Rates exclusive of profit – The purpose of this clause is to set forth the rates to be utilized in the subsequent negotiation of FFP IDIQ orders in accordance with clause I.23, Task Ordering Procedure. The bottom of the table allows indirect rates to be applied to any non-labor resources, except for travel, as required by task order, if applicable. Pricing of all FFP IDIQ orders shall be in accordance with the negotiated rates set forth below. Under no circumstances shall the rates used to price out task orders exceed the agreed-upon rates (including labor, indirect, and profit rates) in the Fully Burdened Rate Table shown below. The labor rates are fully-burdened composite team rates (prime and all subcontractors); these composite labor rates include wages, overhead, and G&A, but exclude prime profit. The rates in this table are maximum rates which may be proposed or negotiated for individual task orders during contract performance, for any place of performance, and will be used for evaluating task orders/revisions and determining price reasonableness. The Contractor may propose lower rates on individual orders. The parties agree that the fully burdened labor rates established below shall not be subject to any equitable adjustment (upwards or downwards), regardless of actual rates incurred during contract performance with exception of those required by statute.

Table B-1: On-site Labor Rates Category Unit

CY1

CY2

CY3

CY4

CY5

Administrative Assistant hr.

OFI

OFI

OFI

OFI

OFI

Business Process Specialist I hr.

OFI

OFI

OFI

OFI

OFI

Business Process Specialist II hr.

OFI

OFI

OFI

OFI

OFI

Business Process Specialist III hr.

OFI

OFI

OFI

OFI

OFI

Business Specialist I hr.

OFI

OFI

OFI

OFI

OFI

Business Specialist II hr.

OFI

OFI

OFI

OFI

OFI

Computer Security Systems Specialist hr.

OFI

OFI

OFI

OFI

OFI

Computer Engineer I hr.

OFI

OFI

OFI

OFI

OFI

Computer Engineer II hr.

OFI

OFI

OFI

OFI

OFI

Computer Engineer III hr.

OFI

OFI

OFI

OFI

OFI

Computer Engineer IV hr.

OFI

OFI

OFI

OFI

OFI

Database Analyst I hr.

OFI

OFI

OFI

OFI

OFI

Database Analyst II hr.

OFI

OFI

OFI

OFI

OFI

Database Analyst III hr.

OFI

OFI

OFI

OFI

OFI

Deputy Program Manager hr.

OFI

OFI

OFI

OFI

OFI

Engineer I hr.

OFI

OFI

OFI

OFI

OFI

Engineer II hr.

OFI

OFI

OFI

OFI

OFI

Engineer III hr.

OFI

OFI

OFI

OFI

OFI

Engineer IV hr.

OFI

OFI

OFI

OFI

OFI

Graphic Specialist I hr.

OFI

OFI

OFI

OFI

OFI

Graphic Specialist II hr.

OFI

OFI

OFI

OFI

OFI

Graphic Specialist III hr.

OFI

OFI

OFI

OFI

OFI

Intern hr.

OFI

OFI

OFI

OFI

OFI

IT Professional I hr.

OFI

OFI

OFI

OFI

OFI

IT Professional II hr.

OFI

OFI

OFI

OFI

OFI

IT Professional III hr.

OFI

OFI

OFI

OFI

OFI

Lead Software Quality Assurance Engineer hr.

OFI

OFI

OFI

OFI

OFI

Program Manager hr.

OFI

OFI

OFI

OFI

OFI

Project Control Specialist I hr.

OFI

OFI

OFI

OFI

OFI

Project Control Specialist II hr.

OFI

OFI

OFI

OFI

OFI

Project Control Specialist III hr.

OFI

OFI

OFI

OFI

OFI

Project Control Specialist IV hr.

OFI

OFI

OFI

OFI

OFI

Project Manager hr.

OFI

OFI

OFI

OFI

OFI

Quality Assurance Specialist hr.

OFI

OFI

OFI

OFI

OFI

Senior Training Specialist hr.

OFI

OFI

OFI

OFI

OFI

Software Engineer I hr.

OFI

OFI

OFI

OFI

OFI

Software Engineer II hr.

OFI

OFI

OFI

OFI

OFI

Software Engineer III hr.

OFI

OFI

OFI

OFI

OFI

Software Engineer IV hr.

OFI

OFI

OFI

OFI

OFI

Software Engineer V hr.

OFI

OFI

OFI

OFI

OFI

Software Manager hr.

OFI

OFI

OFI

OFI

OFI

Software Quality Assurance Engineer hr.

OFI

OFI

OFI

OFI

OFI

Systems Administrator I hr.

OFI

OFI

OFI

OFI

OFI

Systems Administrator II hr.

OFI

OFI

OFI

OFI

OFI

Systems Administrator III hr.

OFI

OFI

OFI

OFI

OFI

Technical Editor hr.

OFI

OFI

OFI

OFI

OFI

Technical Writer hr.

OFI

OFI

OFI

OFI

OFI

Training Specialist hr.

OFI

OFI

OFI

OFI

OFI

Web Software Developer hr.

OFI

OFI

OFI

OFI

OFI

Other: (Specify) hr.

OFI

OFI

OFI

OFI

OFI

Indirect Cost Rate to be applied to non-labor resources (Identify separately each rate(s))

OFI

OFI

OFI

OFI

OFI

Not-To-Exceed (NTE) Profit

OFI

OFI

OFI

OFI

Table B-2: Off-site Labor Rate Category Unit

CY1

CY2

CY3

CY4

CY5

Administrative Assistant hr.

OFI

OFI

OFI

OFI

OFI

Business Process Specialist I hr.

OFI

OFI

OFI

OFI

OFI

Business Process Specialist II hr.

OFI

OFI

OFI

OFI

OFI

Business Process Specialist III hr.

OFI

OFI

OFI

OFI

OFI

Business Specialist I hr.

OFI

OFI

OFI

OFI

OFI

Business Specialist II hr.

OFI

OFI

OFI

OFI

OFI

Computer Security Systems Specialist hr.

OFI

OFI

OFI

OFI

OFI

Computer Engineer I hr.

OFI

OFI

OFI

OFI

OFI

Computer Engineer II hr.

OFI

OFI

OFI

OFI

OFI

Computer Engineer III hr.

OFI

OFI

OFI

OFI

OFI

Computer Engineer IV hr.

OFI

OFI

OFI

OFI

OFI

Database Analyst I hr.

OFI

OFI

OFI

OFI

OFI

Database Analyst II hr.

OFI

OFI

OFI

OFI

OFI

Database Analyst III hr.

OFI

OFI

OFI

OFI

OFI

Deputy Program Manager hr.

OFI

OFI

OFI

OFI

OFI

Engineer I hr.

OFI

OFI

OFI

OFI

OFI

Engineer II hr.

OFI

OFI

OFI

OFI

OFI

Engineer III hr.

OFI

OFI

OFI

OFI

OFI

Engineer IV hr.

OFI

OFI

OFI

OFI

OFI

Graphic Specialist I hr.

OFI

OFI

OFI

OFI

OFI

Graphic Specialist II hr.

OFI

OFI

OFI

OFI

OFI

Graphic Specialist III hr.

OFI

OFI

OFI

OFI

OFI

Intern hr.

OFI

OFI

OFI

OFI

OFI

IT Professional I hr.

OFI

OFI

OFI

OFI

OFI

IT Professional II hr.

OFI

OFI

OFI

OFI

OFI

IT Professional III hr.

OFI

OFI

OFI

OFI

OFI

Lead Software Quality Assurance Engineer hr.

OFI

OFI

OFI

OFI

OFI

Program Manager hr.

OFI

OFI

OFI

OFI

OFI

Project Control Specialist I hr.

OFI

OFI

OFI

OFI

OFI

Project Control Specialist II hr.

OFI

OFI

OFI

OFI

OFI

Project Control Specialist III hr.

OFI

OFI

OFI

OFI

OFI

Project Control Specialist IV hr.

OFI

OFI

OFI

OFI

OFI

Project Manager hr.

OFI

OFI

OFI

OFI

OFI

Quality Assurance Specialist hr.

OFI

OFI

OFI

OFI

OFI

Senior Training Specialist hr.

OFI

OFI

OFI

OFI

OFI

Software Engineer I hr.

OFI

OFI

OFI

OFI

OFI

Software Engineer II hr.

OFI

OFI

OFI

OFI

OFI

Software Engineer III hr.

OFI

OFI

OFI

OFI

OFI

Software Engineer IV hr.

OFI

OFI

OFI

OFI

OFI

Software Engineer V hr.

OFI

OFI

OFI

OFI

OFI

Software Manager hr.

OFI

OFI

OFI

OFI

OFI

Software Quality Assurance Engineer hr.

OFI

OFI

OFI

OFI

OFI

Systems Administrator I hr.

OFI

OFI

OFI

OFI

OFI

Systems Administrator II hr.

OFI

OFI

OFI

OFI

OFI

Systems Administrator III hr.

OFI

OFI

OFI

OFI

OFI

Technical Editor hr.

OFI

OFI

OFI

OFI

OFI

Technical Writer hr.

OFI

OFI

OFI

OFI

OFI

Training Specialist hr.

OFI

OFI

OFI

OFI

OFI

Web Software Developer hr.

OFI

OFI

OFI

OFI

OFI

Other: (Specify) Composite hr.

OFI

OFI

OFI

OFI

OFI

Indirect Cost Rate to be applied to non-labor resources (Identify separately each rate(s))

OFI

OFI

OFI

OFI

OFI

NTE Profit

OFI

OFI

OFI

* Offeror may propose additional labor categories but must fill-in the proposed rates in this table and provide the proposed labor category’s description and qualifications in Attachment J-03, Standard Labor Categories.

** Maximum profit rate to be applied to firm-fixed price task orders

Travel

All travel shall be in accordance with the Federal Travel Regulation, approved by the Government prior to travel, and allocated to the contract based on actual airfare and per diem rates per the most current official contiguous United Stated (CONUS) or Outside (OCONUS) Per Diem Rates, located at www.gsa.gov/travelpolicy. All requests for travel shall include the purpose and the rationale for the travel, such as why the purpose cannot be accomplished through a means other than travel (i.e., teleconferencing). Price relating to approved travel will be charged directly to individual task orders under this contract.

Materials and other Non-Labor Resources

Non-labor Resources, including but not limited to, materials, equipment, and facilities will be negotiated on a task order basis in accordance with Clause I.23, Task Ordering Procedures [Applicable Only to IDIQ]. As applicable, include separate price estimates for materials and other miscellaneous non-labor resources that are required for performance of the task order. All non-labor resources that are proposed must be allowable and allocable in accordance with the FAR, NASA FAR Supplement, and any other applicable NASA procurement policy documents. The Contractor shall include back-up information with their estimate that provides rationale for their proposed price estimates for materials and other non-labor resources.

Profit Rates

The Offeror shall propose profit rates that are commensurate with the type of work authorized under the resultant contract. Task orders issued under the resultant contract shall not exceed the originally-proposed fee or profit rates.

(End of Clause)

[END OF SECTION]

Mission Enabling Services Contract (MESC) Section C: Statement of Work

C-1

Mission Enabling Services Contract (MESC)

Statement of Work

Section C

Table of Contents

Introduction5
Baseline A: NAMIS Services6
Scope7
General Requirements8

file_0.png file_1.wmf

Contract Management 8 file_2.png file_3.wmf

Financial Management 9 file_4.png file_5.wmf

Task Management 9 file_6.png file_7.wmf

Task and Project Control 9 file_8.png file_9.wmf

Planning and Execution 10 file_10.png file_11.wmf

Change Management 10 file_12.png file_13.wmf

Acceptance of Software 10 file_14.png file_15.wmf

Briefings, Schedules, and Budgets 11 file_16.png file_17.wmf

Requirements Analysis & Development Services 11 file_18.png file_19.wmf

Process Analysis Services 11 file_20.png file_21.wmf

Quality Assurance and Process Certifications 11 file_22.png file_23.wmf

Technology Evaluations 11 file_24.png file_25.wmf

Government Property 11 file_26.png file_27.wmf

Non-Disclosure Agreements (NDAs) 12 file_28.png file_29.wmf

Information Technology Security 12 file_30.png file_31.wmf

Emergency Preparedness 12 file_32.png file_33.wmf

Regulatory Impacts 12 file_34.png file_35.wmf

Safety and Health13
Infrastructure Services Requirements13

file_36.png file_37.wmf

Configuration Management and Control 13 file_38.png file_39.wmf

System Testing and Quality Control 13 file_40.png file_41.wmf

Implementation Services 14 file_42.png file_43.wmf

System Integration Services 14 file_44.png file_45.wmf

Infrastructure Support and Operations 14 file_46.png file_47.wmf

Server and System Administration 15 file_48.png file_49.wmf

Disaster Recovery and Continuity of Operations Plan (DRCOP)15
End-User Support Services Requirements15

file_50.png file_51.wmf

User Support and Help Desk 16 file_52.png file_53.wmf

User Training16
Software Development, Maintenance, and Sustaining Engineering16

file_54.png file_55.wmf

Software Maintenance and Sustaining Engineering 16 file_56.png file_57.wmf

Software Development and Modification Services16
Technical Publications and Document Management17
Baseline B: Spaceflight Enabling Services20
Scope20
General Requirements20

file_58.png file_59.wmf

Contract Management 21 file_60.png file_61.wmf

Change Management 21 file_62.png file_63.wmf

Technical Meeting Support 22 file_64.png file_65.wmf

Technology Evaluations 22 file_66.png file_67.wmf

Logistics 22 file_68.png file_69.wmf

Government Property 22 file_70.png file_71.wmf

Non-Disclosure Agreements (NDAs) 23 file_72.png file_73.wmf

Information Technology Security 23 file_74.png file_75.wmf

Emergency Preparedness 24 file_76.png file_77.wmf

Safety and Health24
Infrastructure Service Requirements24

file_78.png file_79.wmf

Configuration Management and Control 24 file_80.png file_81.wmf

FOD IT (FIT) System Sustaining Engineering Support 24 file_82.png file_83.wmf

FOD IT (FIT) System Operations Support 25 file_84.png file_85.wmf

Collaboration and Web Services Support25
End-User Support Requirements25

file_86.png file_87.wmf

Enhanced User Support Services 26 file_88.png file_89.wmf

Standard User Support Services26
Software Development, Maintenance, and Sustaining Engineering26
IT Resource Management (ITRM) Support27
FOD Project Information System CM and Support27
FOD Business Office Configuration Management Document Management Support28
Facility Utilization and Optimization Support28
Schedule Support29
IDIQ32
Scope32
General Requirements32

file_90.png file_91.wmf

Contract Management 32 file_92.png file_93.wmf

Financial Management 33 file_94.png file_95.wmf

Change Management 33 file_96.png file_97.wmf

Technology Evaluations 33 file_98.png file_99.wmf

Government Property 33 file_100.png file_101.wmf

Non-Disclosure Agreements (NDAs) 34 file_102.png file_103.wmf

Information Technology Security 34 file_104.png file_105.wmf

Emergency Preparedness 34 file_106.png file_107.wmf

Safety and Health34
High-Level Requirements and Work Characterization35

file_108.png file_109.wmf

Management and Mission Support Services 35 file_110.png file_111.wmf

Advanced Research and Development Technology Support36
Appendix A:Acronyms37

Introduction file_112.png file_113.png file_114.wmf file_115.wmf file_116.wmf

The purpose of the Mission Enabling Services Contract (MESC) is to provide development, sustainment, and maintenance of specialized and highly specialized mission-enabling applications and services to the JSC Flight Operations Directorate (FOD) and its affiliate organizations. The MESC requirements span the flight support requirements of NASA/JSC for the benefit of its external customers and partners, including, but not limited to, other NASA centers, International Partners, other Government organizations, and affiliated commercial enterprise partners.

The MESC contracting vehicle consists of three parts: two single-award baselines and a multiple- award Indefinite Delivery/Indefinite Quantity (IDIQ) component. Under the terms of this solicitation, a "baseline" comprises activities that satisfy known, continuous US government requirements that exist independent of another baseline or any task order under the IDIQ vehicle.

The two single-award baselines are the following:

Baseline A: NASA Aircraft Management Information System (NAMIS) Services
Baseline B: Spaceflight Enabling Services (SES)

The multiple-award IDIQ component covers new content within the general scope of the types of work covered by Baseline B where the specific IDIQ tasks are not identified as part of the Baseline B contract scope. Additionally, IDIQ covers advanced research and development technology support.

Contractors for Baseline A, B, and IDIQ shall ensure completion of badging requirements to comply with NASA/JSC IT requirements and systems.

Baseline A: NAMIS Services file_117.png file_118.wmf

Baseline A provides the requirements for the comprehensive support for the NASA Aircraft Management Information System (NAMIS), an integrated, module-based, custom software suite that supports aircraft flight operations across NASA and other Government Agencies. NAMIS is an Agency-wide system in use by Ames Research Center (ARC), Armstrong Flight Research Center (AFRC), Glenn Research Center (GRC), NASA Headquarters, Johnson Space Center (JSC), Kennedy Space Center (KSC), Langley Research Center (LaRC), Marshall Space Flight Center (MSCF), Stennis Space Center (SSC), and Wallops Flight Facility (WFF). NAMIS is also used by other Government agencies and external organizations.

NAMIS operates under the authority of the Office of the NASA Chief Information Officer. NAMIS is hosted by the Aircraft Operations Division of FOD at JSC. For other agencies and organizations, NAMIS may be hosted at JSC or hosted locally by the user on user resources. NAMIS is managed by the NASA NAMIS Project Manager and the NASA NAMIS Technical Manager reporting to the NAMIS Steering Committee.

NASA operates an extensive variety of types, series, and models of aircraft. Many are special purpose or heavily-modified aircraft. Operations and maintenance of such a diverse fleet requires extensive technical documentation and publications support, much of which is incorporated into NAMIS and all of which is included in the scope of Baseline A. The documentation consists of technical publications, including maintenance manuals, operating manuals, Service Bulletins (SB), Airworthiness Directives (AD), and Time Compliance Technical Orders (TCTO). The technical documentation is generated by multiple sources, including the military, the Original Equipment Manufacturer (OEM) and the Federal Aviation Administration (FAA). NASA must receive, review, and integrate all of the documentation from all of the sources and generate appropriate NASA technical documentation.

Frequently, NASA aircraft missions require that NASA design, fabricate, test, and implement aircraft modifications and configuration changes. Most of these changes require NASA, or the operating organization, to generate technical documentation to support and provide instructions for continued airworthiness. Most of these modifications are unique to the Agency’s aircraft and require expertise in multiple aeronautical engineering disciplines. The exact nature of the aircraft modifications requiring generation of documentation cannot be determined in advance.

NAMIS users depend on multiple computer-based systems and tools for safety and mission-critical decision support; consequently, this effort is heavily focused on quality assurance and quality control of all the aircraft operations support system components.

Scope

The scope shall include all the life-cycle support elements for an enterprise-level, agency-wide project, including project management, requirements analysis, software development, testing, and verification. This includes the upgrading and integration of NAMIS and a range of data management systems to support all aspects of aviation and aircraft activities including maintenance, quality assurance, technical publications and documentation, engineering, and operations. This includes IT security management, Disaster Recovery and Continuity of Operations Plan (DRCOP) development and support, remote access support, sustaining support of deployed components, and execution of administration processes. Responsibilities also include supporting strategic and enterprise planning for the migration of data management systems into a cost-effective open systems architecture that provides users with accurate and timely information.

The scope shall include sustaining and modification of the NAMIS modules as necessary to adapt the system to provide support for other Agency activities, as required. NAMIS consists of seven modules:

Flight Scheduling Application

Flight Data Capture Flight Records & Currency Aircraft Logistics System

Work Card System
Aircraft Maintenance System
NASA Web Reporting Site

The scope shall include sustaining and modification of the following supplemental applications as well as those listed in Attachment J-04, List of Government-Furnished Computer Software:

Engineering Work Order Application
ViPER (Virtual Publications Electronic Repository)
QMT (Quality Management Tool)
NAARS (NASA Aviation Anomaly Reporting System)
Application Deployment Utility
Attachments Web Service
Nametags
Purchase Order (1307)

AOD Web Reporting Site Aircraft Operations Web Site Qualification Requirements Pack and Go Document Integration Tool

Help Desk Application
Infrastructure Application

The scope shall include all services relating to implementing the NAMIS system at or on behalf of other agencies, including data cleansing, data loading, agency-specific capabilities, system configuration, development of training programs and materials, training, and user support.

The scope shall include providing IT services related to implementing Center-based and Agency- wide systems, and includes all the usual and customary efforts implied by and associated with migrating legacy systems to automated processes, upgrading existing computer-based systems, and sustaining such systems.

The scope shall include adapting the NAMIS modules for tracking and management of newly identified air and ground vehicles and other assets approved by the Government.

The scope shall extend to the associated systems that share data, hardware, software, or human resources with the NAMIS system. Examples include: security systems, system service interfaces, system data exchange interfaces, etc.

The scope shall include providing subject matter expertise at the request of the Government in all phases and aspects of aircraft operations, aircraft engineering, aircraft and ground safety, and NASA, Occupational Safety and Health Administration (OSHA) and FAA regulatory requirements relating to safety and or flight operations.

The scope shall include system engineering, operations support and sustaining engineering, application development, system maintenance and operations, data management services, system integration services, infrastructure upgrades, security management, and prototyping.

The scope shall include development and maintenance of the full spectrum of services associated with aircraft documentation.

The scope shall include the full range of integration and implementation services for any Federal agency or external organization that enters into an agreement with NASA.

General Requirements

This section of the Statement of Work (SOW) specifies the general requirements applicable to Baseline A.

file_119.png file_120.wmf

Contract Management The Contractor shall provide leadership, management oversight, direction, and problem resolution for all functions performed under Baseline A. The Contractor shall provide contract management to act as the primary interface to the Contracting Officer (CO), Contracting Officer Representative (COR), NASA NAMIS Project Manager, and the NASA NAMIS Technical Manager. The Contractor shall:

Provide a management interface who is authorized to direct day-to-day work, coordinate with NASA on contractual matters, respond to questions and action items from NASA, and resolve problems.

Prepare program performance metrics and report program performance.
Accept and utilize existing hardware, software, and documentation unless otherwise agreed with NASA.
For activities performed under this contract, adhere to the JSC Quality Management System (QMS) and appropriate FOD quality management documentation.
Comply with Attachment J-07, List of Applicable Documents.
Integrate with and utilize, to the maximum extent practicable, the NASA-established contract management system that includes but is not limited to order processing, contract correspondence, and Data Requirements Document (DRD) delivery.

1.2.1.1 Project Management and Staffing

The Contractor shall organize and institute integrated processes and tools for managing the products and services specified in Baseline A, in accordance with the approved Contract Management and Staffing Plan (Attachment J-10).

The Contractor shall perform activities at the request of the Government that support research, development, acquisition, and sustainment efforts across a broad spectrum of functional disciplines in order to effectively assist in the implementation of Government programs.

file_121.png file_122.wmf

Financial Management The Contractor shall provide project support in the area of financial management and includes, but is not limited to:

Conducting financial studies and research
Evaluating project funding plans and changes

Providing comments and recommendations for program guidance Providing project budgeting and cost estimating file_123.png file_124.wmf

Task Management For each task, the Contractor shall prepare a Task Management Plan describing the technical approach, organizational resources, management controls, and schedule to be employed to meet the cost, performance, and schedule requirements for authorized tasks. The Contractor shall provide a Work Breakdown Structure (WBS) that will allow project management and control to the subproject and task level. The Contractor shall provide monthly progress status which includes financial reports showing the cost-to-date and projected cost to completion by month for each project or major task under the SOW. Supporting or associated other direct charges (ODCs) shall be allocated to the appropriate task by the contractor. Status reports shall be provided to monitor progress to the CO, COR, NASA NAMIS Project Manager, and NASA NAMIS Technical Manager by the contractor.

file_125.png file_126.wmf

Task and Project Control Due to shifting budgets and mission priorities and because the Government desires the ability to capitalize on opportunities discovered during development and operations, project schedules and priorities can shift. Based upon the Government’ s evaluation of priorities and available resources, the Government will make a determination of when to proceed on a major project and will issue written instructions that will include an Authority to Proceed (ATP) for the task or project. Upon receipt of an ATP, the contractor shall provide implementation plans and schedules using standard project planning tools to the Government. Each major project will be independently tracked for technical and financial performance. The Task Management Plan shall be updated as appropriate to reflect each project or task as it is added to the on-going effort.

file_127.png file_128.wmf

Planning and Execution The Contractor shall assist in strategic planning and execution of projects. The Contractor shall support the development of technology roadmaps, risk management plans, and strategies to support acquisition and programmatic decisions relative to project and mission objectives.

file_129.png file_130.wmf

Change Management The Contractor shall implement changes to hardware and software components managed under Baseline A. These changes include corrections of issues, sustaining engineering change requests, and any other change authorized by the Government. The Contractor shall update all related documentation when changes are released.

The Contractor shall integrate with and utilize the NASA-established discrepancy reporting program and systems for the submittal, status, review, ranking, and reporting of discrepancies, including, but not limited to Incident Reports (IR), Anomaly Reports (AR), Issues, etc.

The Contractor shall track discrepancies against the released code base and the NASA requirements specifications, and track change requests against the user requirements.

The Contractor shall perform scheduled and emergency releases. Scheduled releases shall occur no less frequently than once per quarter and shall consist of corrections of discrepancies/issues as well as changes and enhancements to the existing code base. Emergency releases shall be made on an as-required basis upon approval of the NASA Technical Manager.

Routine changes to aircrew flight currency requirements shall be released by the contractor immediately upon completion of successful user acceptance testing.

The Contractor shall provide changes to the NAMIS components based on requirements as specified and approved by the NASA NAMIS Technical Manager and the NASA NAMIS Configuration Control Board (CCB). Corrections of issues shall be implemented as approved by the NAMIS CCB. Change Requests (CRs) shall be executed as approved by the NAMIS CCB. The Contractor shall update all related documentation when changes are released.

file_131.png file_132.wmf

Acceptance of Software The task sub-task project plans will include detailed acceptance criteria and standards for specific software deliverables. The general acceptance criteria for all software deliverables developed or customized under this SOW is completed through acceptance testing by the users.

file_133.png file_134.wmf

Briefings, Schedules, and Budgets The Contractor shall assist in the development of briefings, schedules, and budgets. As required, the Contractor shall provide periodic status reports to the Government.

file_135.png file_136.wmf

Requirements Analysis & Development Services The Contractor shall provide services in support of requirements analysis and development. These analyses shall include business requirements, functional requirements, and user requirements as well as agency, center, program, project, system, and design requirements development. This shall include management and tracking of all forms of requirements from “cradle to grave” including business requirements, functional requirements and design requirements. Services in this task area are directed at the requirements relating to the tools and software that will be developed and supported under Baseline A.

file_137.png file_138.wmf

Process Analysis Services When requested, the Contractor shall support process-reengineering by performing independent analyses of Government processes. The Contractor shall provide written recommendations for process improvements to include justification and basis for recommended changes along with impacts of implementing, or failing to implement, the recommendations.

file_139.png file_140.wmf

Quality Assurance and Process Certifications The Contractor shall possess certification of its quality assurance quality control processes applicable to software development in accordance with the Software Engineering Institutes Capability Maturity Model (CMM) or Capability Maturity Model Integration (CMMI) Level 3. An independent certifying authority must provide this certification.

The Contractor shall employ procedures developed and certified in accordance with the CMMI Level 3 or greater unless specifically waived in writing by the NASA NAMIS Project Manager, NASA NAMIS Technical Manager, and COR. This requirement shall extend to all deliverables by subcontractors retained or employed by the Contractor for Baseline A work.

file_141.png file_142.wmf

Technology Evaluations When requested by the Government, the Contractor shall provide recommendations for commercial alternatives (hardware software tools, components or complete solutions) that shall include an evaluation of existing Commercial-Off-The-Shelf (COTS) products, as well as products available through Government-Off-The-Shelf (GOTS) solutions. The Contractor shall provide life- cycle cost benefit analyses of the recommended commercial alternatives.

file_143.png file_144.wmf

Government Property Physical equipment, as enumerated in Attachment J-05, List of Installation-Accountable Government Property is classified as Government property. “Contractor-acquired property” means property acquired, fabricated, or otherwise provided by the Contractor as a direct contract charge to NASA for performing a contract and for which NASA has title.

Attachment J-05, List of Installation-Accountable Government Property, identifies the on-site Government physical property made available on a no-charge basis for use in performance of MESC. NASA will provide onsite contractors with standard NASA End User Services and Technologies (NEST) computer seats and phone seats as Agency Institutional IT. NASA is responsible for support and asset management of Agency Institutional IT, including hardware and all standard software. Mobile phone seats will also be provided to Contractor personnel who are on-call for help-desk and customer assistance at the discretion of the Government.

The Contractor shall submit updates to the List of Installation-Accountable Government Property, in accordance with the schedule defined in Attachment J-05.

The Contractor shall document and maintain MESC Government property management processes and procedures in accordance with DRD-07, Government Property Management Plan (PMP).

The Contractor shall utilize the Government’ s property tracking system for MESC property identified in Attachment J-05, List of Installation-Accountable Government Property. The Contractor shall provide custodians to input and manage data in the Governments property tracking system for property provided under this contract.

The Contractor shall be the delegated property administrator and shall designate a point-of-contact for MESC Government property administration and management.

file_145.png file_146.wmf

Non-Disclosure Agreements (NDAs) The Contractor shall provide a nondisclosure statement (per company policy), a signed individual nondisclosure statement for each person supporting specific tasks as identified by the Government, and a summary of the procedures for information control and protection that are applicable to all personnel supporting those tasks.

file_147.png file_148.wmf

Information Technology Security The Contractor shall provide support for the annual NASA JSC Security Plan requirements as set forth in NPR 2810.1, Security of Information Technology and shall ensure that the NAMIS system satisfies applicable certification and accreditation standards. This shall include ensuring the NAMIS components meet NASA and organizational security standards. Reference DRD-06, Information Technology (IT) Security Management Plan and Reports.

file_149.png file_150.wmf

Emergency Preparedness The Contractor shall institute and implement processes and procedures to ensure emergency preparedness and disaster recovery, in accordance with DRD-09, Emergency Preparedness Disaster Recovery / Continuity of Operations Plan (DRCOP).

file_151.png file_152.wmf

Regulatory Impacts The Contractor shall provide appropriate business case and risk analysis of applicable federal regulations, federal laws, and directives, including impacts or constraints arising from applicability of these regulations, laws, and directives to the products and services supported under Baseline A. Examples include, but are not limited to:

FAA Airworthiness Directives

OSHA Directives file_153.png file_154.wmf

Safety and Health The contractor shall perform tasks to ensure the protection of personnel, property, equipment, and the environment in contractor products and activities generated in support of institutional and spaceflight program objectives. To ensure compliance with pertinent NASA policies, requirements, federal, state, and local regulations for safety, health, environmental protection, and fire protection, the contractor will develop and implement a safety and health program per a NASA-approved safety and health plan. The “JSC Safety and Health Requirements” document provides detailed requirements and instructions regarding safety and health procedures and policies at JSC and is incorporated by reference into all JSC contracts when performance is on site at a JSC facility. It can be viewed at http://jscHandbook.jsc.nasa.gov.

Infrastructure Services Requirements file_155.png file_156.wmf

This section of the SOW specifies the services requirements for the IT infrastructure in Baseline A. Configuration Management and Control The Contractor shall provide configuration control of all requirements and specifications. The Contractor shall provide configuration management and tracking for all code. Configuration and management tracking shall include traceability of all requirements through all levels, i.e. requirements through acceptance tests. Configuration management shall also extend to the hardware and full software load on each server supported under Baseline A.

file_157.png file_158.wmf

System Testing and Quality Control The Contractor shall provide testing and quality control services for all deliverables under Baseline A. This shall include documentation of appropriate measurements and metrics. Test and quality control procedures shall be tailored as appropriate and include the following:

Functional testing
Performance testing
Module testing

Integration testing Reliability testing

User testing
Parallel testing

Performance testing DRCOP testing

All implementations shall include test plans and processes that are designed to exercise the system capabilities. Tests shall exercise all software components.

file_159.png file_160.wmf

Implementation Services The Contractor shall provide implementation support to include:

Data extraction from legacy systems

Data cleansing Data loading Data conversion services Ad hoc reports and queries

Configuration, operation, and maintenance of the system
Security management for the system
DRCOP development
System sustaining engineering

System administration including system security management and operations file_161.png file_162.wmf

System Integration Services The Contractor shall provide integration services to integrate products delivered under this baseline with appropriate legacy and external systems. This may include, but is not limited to, any or all of the following systems and any and all other related systems developed under or acquired by the Government:

The electronic catalog system of the Air Force (D043)
The military electronic invoicing system, known as MILSBILLS

Military Standard Requisitioning and Issue Procedures (MILSTRIP)

Other contractors systems conditioned on agreement between the contractors and the approval of the Government (Example: Deltek Time and Expense suite)
The NASA Integrated Enterprise Management (IEM) Program Core Finance Systems System, Applications and Products (SAP)

file_163.png file_164.wmf

Infrastructure Support and Operations The Contractor shall provide data management services for the NAMIS IT infrastructure and its support systems. The data management services include database administration (DBA) support, web site administration and support, product administration support for the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .