xEVAS CO2 Sensor Long Lead Piece Parts.pdf
PDF 123 KB Posted
- Solicitation number
- 80JSC021R0006
About this file
This solicitation document is for Exploration Extravehicular Activity Services (xEVAS) under solicitation number 80JSC021R0006 issued by the National Aeronautics and Space Administration Johnson Space Center. Offerors must submit responses for past performance by November 1, 2021 and all remaining volumes by December 1, 2021. The solicitation seeks proposals to provide long lead piece parts for development of a CO2 sensor for use in exploration space suits. Key components include integrated circuits, resistors, capacitors, connectors, transformers, and housings. Production and delivery of flight qualified units will also be required.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item No. Item Description Part Number/Material Type Quantity
1 TEST POINT 5015 Dev/EEE 30
2 FERRITE BEAD, 1.5A RFB1206‐251PS‐1‐B Dev/EEE 6
3 SMD CRYSTAL ‐ 8MEGHZ M1007S164 8M000000 Dev/EEE 6
4 IC, SWITCHING CONTROLLER 5962‐8670403PA Dev/EEE 6
5 IC, OP AMP, 14 pin Cdip OP400AY‐ND Dev/EEE 6
6 DIODE, RECTIFIER, ARRAY, QUAD SCHOTTKY 5962‐9053801PA Dev/EEE 6
7 IC, VOLTAGE REFERENCE, 5V, 10 P REF02 5962R8551401VHA Dev/EEE 10
8 CONNECTOR, RIGHT ANGLE, ULTRA‐MINIATURE 791‐011PC‐13MEPSC Dev/EEE 6
9 IC, uCONTROLLER, ‐BIT ATMEGAS128‐ZC‐E Dev/EEE 11
10 CAP, CERAMIC, 18pF, 100V 581‐08052U180FAT2A Dev/EEE 12
11 CAP,CERAMIC,0.1uF,50V,1210 1119‐1008‐6‐ND Dev/EEE 198
12 CAP, CERAMIC 445‐11803‐6‐ND Dev/EEE 12
13 CAP, CERAMIC, 0.047uF, 50V 77‐VJ1210Y473KXAAT Dev/EEE 36
14 CAPACITOR, TANTALUM CWR09HC336KB Dev/EEE 12
15 CAPACITOR, TANTALUM 478‐5710‐1‐ND Dev/EEE 6
16 CAPACITOR, TANTALUM 1012‐1049‐6‐ND Dev/EEE 100
17 CAPACITOR, TANTALUM 1001‐2345‐6‐ND Dev/EEE 6
18 CAPACITOR, TANTALUM 1001‐2224‐6‐ND Dev/EEE 6
19 RESISTOR, 250mW, 10K, 0.1% 667‐ERA‐8AEB103V Dev/EEE 42
20 RES,250mW,13K,0.1% D55342E07B13B0R Dev/EEE 25
21 RES,250mW,14.3K,0.1% D55342E07B14B3R Dev/EEE 100
22 RES,250mW,15K,0.1% D55342E07B15B0RTP‐ND Dev/EEE 500
23 RES,250mW,16K,0.1% D55342E07B16B0R Dev/EEE 25
24 RESISTOR D55342E07B19B6R Dev/EEE 100
25 RESISTOR, 250mW, 20K 0.1%,25ppm ERA‐8AEB203V Dev/EEE 36
26 RES,250mW,215K,0.1% D55342E07B215BR Dev/EEE 100
27 RES,250mW,218K,0.1% D55342E07B218BR Dev/EEE 100
28 RES,250mW,221K,0.1% D55342E07B221BR Dev/EEE 100
29 RES,250mW,223K,0.1% D55342E07B223BR Dev/EEE 100
30 RES,0.25W,226K,0.1% 667‐ERA‐8AEB2263V Dev/EEE 12
31 RES,250mW,229K,0.1% D55342E07B229BR Dev/EEE 100
32 RES,250mW,232K,0.1% D55342E07B232BR Dev/EEE 100
33 RES,0.25W,35.7K,0.1% D55342E07B35B7R Dev/EEE 100
34 RES,0.25W,36.5K,0.1% D55342E07B36B5R Dev/EEE 25
35 RES,0.25W,38.3K,0.1% D55342E07B38B3R Dev/EEE 25
36 RESISTOR, 250mW, 3.01K, 603‐RT1206BRD073K01L Dev/EEE 6
37 RES,0.25W,40.2K,0.1% 667‐ERA‐8AEB4022V Dev/EEE 6
38 RES,0.25W,42.2K,0.1% D55342E07B42B2R Dev/EEE 100
39 RES,0.25W,45.3K,0.1% D55342E07B45B3R Dev/EEE 100
40 RESISTOR, 470 ohm, 2%, 250mW 603‐RC1206FR‐07470RL Dev/EEE 6
41 RESISTOR,250mW,4.12K,0.1% P4.12KBCDKR‐ND Dev/EEE 6
42 RES,250mW,6.49K,0.1% D55342E07B6B49R Dev/EEE 25
43 RES,250mW,7.15K,0.1% P7.15KBCDKR‐ND Dev/EEE 12
44 RES,250mW,8.06K,0.1% D55342E07B8B06R Dev/EEE 100
45 RES,250mW,8.16K,0.1% D55342E07B8B16R Dev/EEE 100
46 RES,250mW,8.25K,0.1% D55342E07B8B25R Dev/EEE 25
47 RES,250mW,9.09K,0.1% D55342E07B9B09R Dev/EEE 100
48 RES,250mW,100ohm,1% 71‐CRCW1206‐100 Dev/EEE 20
49 RESISTOR, 250mW, 10K, 1% RC1206FR‐0710KL Dev/EEE 60
50 RES,250mW,12.1K,0.1%,100ppm P18362DKR‐ND Dev/EEE 18
51 RESISTOR 311‐1.21KFRDKR‐ND Dev/EEE 6
52 RES,250mW,200 OHM,0.1%,100ppm RNCF1206BKC200RDKR‐ND Dev/EEE 12
53 RESISTOR, 250mW,200Kohm, 100ppm 71‐CRCW1206‐200K‐E3 Dev/EEE 6
54 RES,250mW,20 OHM,0.1%,100ppm YAG5044DKR‐ND Dev/EEE 12
55 RES,250mW,22.1 OHM,0.1%,100ppm A105695‐ND Dev/EEE 12
56 RESISTOR, 250mW, 243ohm, 1% P243FDKR‐ND Dev/EEE 6
57 RESISTOR, 250mW, 274ohm, 1% 660‐RK73H2BLTD2740F Dev/EEE 54
58 RES,250mW,2.21K,0.1%,100ppm ERA‐8AEB2211V Dev/EEE 24
59 RESISTOR P2 00KFDKR‐ND Dev/EEE 18
60 RES,250mW,3.24K,0.1% 667‐ERA‐8AEB3241V Dev/EEE 6
61 RESISTOR S1206CA3521BEB Dev/EEE 6
62 RES,250mW,3.32K,1% 667‐ERJ‐8ENF3321V Dev/EEE 6
63 RESISTOR P5.62KFDKR‐ND Dev/EEE 12
64 RES,0.25W,11.5K,0.1% 667‐ERA‐8AEB1152V Dev/EEE 6
65 IC, POWER MANAGEMENT, 8 pin Plastic SOIC ISL88706IB829Z‐ND Dev/EEE 6
66 DIODE,RECTIFIER SCHOTTKY,1A, 494‐1N5819UR‐1 Dev/EEE 72
67 TRANSISTOR, BIP, 600mA, 60V, PNP 2N2907AUBMS‐ND Dev/EEE 90
68 Rad Hard equiv FET IRF5NJ540 Dev/EEE 6
69 MOSFET,P‐CHANNEL,3.1A,100V, 3 PIN, SMD‐0.2 Si7489DP‐T1‐E3 Dev/EEE 6
70 DIODE,ZENER,Voltage Regulator, 6.2V,1 5W 947‐1N4460US Dev/EEE 6
71 DIODE,ZENER,6.2V,500mW 1N829UR‐1‐ND Dev/EEE 12
72 TRANSISTOR, BIP, 800mA, 50V, NPN 2N2222AUBMS‐ND Dev/EEE 12
73 TRANSISTOR, BIP, 3A 80V, NPN 2N3421‐ND Dev/EEE 6
74 DIODE,CURRENT REGULATOR,100V,4.7mA,500mW 2‐PIN DO‐213AB JANTX1N5314UR‐1 Dev/EEE 24
75 CAP, CERAMIC 1001‐2455‐6‐ND Dev/EEE 12
76 CAP, CERAMIC 478‐3778‐6‐ND Dev/EEE 24
77 RESISTOR, 250mW, 0ohm M32159B07T Dev/EEE 100
78 HEADER CONNECTOR,MALE,PLUG,4 PIN,2x2 MTSW‐102‐07‐G‐D‐165 Dev/EEE 12
79 CONNECTOR, PCB, MALE, 20 PIN MTSW‐110‐07‐G‐D‐165 Dev/EEE 6
80 RES,1W,2ohm,1% RWR81S2R00FSB12 Dev/EEE 10
81 CONNECTOR, PCB, FEMALE, 4 PIN SLW‐102‐01‐G‐D Dev/EEE 18
82 CONNECTOR, PCB, FEMALE, 10 PIN SLW‐105‐01‐G‐D Dev/EEE 6
83 CONNECTOR, PCB, FEMALE, 20 PIN SLW‐110‐01‐G‐D Dev/EEE 6
84 MICROCIRCUIT,DETECTOR DX‐0949 Dev/EEE 6
85 TRANSFORMER, CUSTOM MAGNETIC M‐3514 Dev/EEE 6
86 CHOKE, OUTPUT COUPLED M‐3515 Dev/EEE 6
87 TRANSFORMER, CUSTOM MAGNETIC M‐3516 Dev/EEE 6
88 INDUCTOR, DUAL EMI, 137uH 30VDC M‐3517 Dev/EEE 6
89 TERMINAL, STUD TURRET SV748669‐4 Dev/EEE 72
90 MICROCIRCUIT,PRECISION CHOPPER STABILIZED OPAMP, TI, 8 pin CDIP TLC2652AMJGB Dev/EEE 24
91 RESISTOR 311‐7.87KFRDKR‐ND Dev/EEE 6
92 RESISTOR, 1W, 768 OHM, 1%, 2612 SMT pkg M55342K09B768DR Dev/EEE 6
93 RESISTOR, 250mW, 10.1K, 0.1% D55342E07B10B1R Dev/EEE 6
94 RESISTOR, 250mW, 20K 0.1%,25ppm ERA‐8AEB203V Dev/EEE 36
95 RESISTOR, 250mW, 4.99K, 0.1% 603‐RC1206FR‐074K99L Dev/EEE 42
96 RESISTOR 667‐ERJ‐8ENF1001V Dev/EEE 18
97 RESISTOR, 250mW, 1.27K, 0.1% P18365DKR‐ND Dev/EEE 6
98 Res, 0.25W,11K, 0.1%,100ppm (Select on Test Value) D55342K07B11B0R Dev/EEE 6
99 CONNECTOR, PCB, FEMALE, 6 PIN SLW‐103‐01‐G‐D Dev/EEE 6
100 Standoff SVSK1031605‐6 Dev/Mech 20
101 Standoff SVSK1031605‐4 Dev/Mech 20
102 Electronics Housing and Inserts SVSKRD1031518‐2 Dev/Mech 5
103 Flat Washer NAS620C4L Dev/Mech 30
104 Washer SVSK1031478‐2 Dev/Mech 5
105 Washer SVSK1031478‐1 Dev/Mech 15
106 Thermal Washer SVSK1005559‐1 Dev/Mech 20
107 Shielding Gasket SV809282‐1 Dev/Mech 5
108 Self Locking Nut MS21043‐04 Dev/Mech 20
109 Electronic Hsg Gasket SVSK1031451‐1 Dev/Mech 5
110 Access Cover Gasket SVSK1031626‐1 Dev/Mech 5
111 Housing Cover and Inserts SVSK1031519‐1 Dev/Mech 5
112 Preformed Packing STSV047AC019 Dev/Mech 25
113 Preformed Packing STSV047AC017 Dev/Mech 25
114 Preformed Packing STSV047AC014 Dev/Mech 25
115 Sensing Sleeve SVSK1031197‐1 Dev/Mech 5
116 Sapphire Window W12.75 Dev/Mech 10
117 Micro O‐Ring R00426‐035‐75VTB Dev/Mech 20
118 IR Lamp CL2322 Dev/Mech 5
119 IR Source Cup SVSK1031186‐1 Dev/Mech 5
120 Sense Cell Housing Assy SVSK1031283‐1 Dev/Mech 5
121 Gain Board Spacer SVSK1031362‐1 Dev/Mech 5
122 Detector Board Spacer SVSK1031361‐1 Dev/Mech 5
123 Base Plate SVSK1005517‐1 Dev/Mech 5
124 IR Source Cover SVSK1031409‐1 Dev/Mech 5
125 Access Cover SVSK1031625‐1 Dev/Mech 5
126 sheet of 0.030 thickness silicone rubber 86465K21 Dev/Mech 1
127 sheet of 0.020 thickness silicone rubber 87315K63 Dev/Mech 1
128 MICROCIRCUIT SV1022975‐1 Flight/EEE 30
129 RES,250mW,12.1K,0.1% D55342E07B12B1R Flight/EEE 100
130 RES,250mW,20ohm,0.1% D55342E07B20A0R Flight/EEE 100
131 Res, 250mW, 15Kohm, 0.1%, 25ppm (Primary Value) D55342E07B15B0R Flight/EEE 100
132 Res, 0.1W, 226K, 0.1%, 25ppm (Primary Select on Test) D55342E07B226BR Flight/EEE 100
133 RES,250mW,10K,0.1%, 25ppm (Primary Select on Test Value) D55342E07B10B0R Flight/EEE 202
134 RESISTOR D55342E07B11B5R Flight/EEE 100
135 Res, 0.25W, 40 2K, 0.1%,25ppm (Primary Select on Test Value) D55342E07B40B2R Flight/EEE 100
136 RES,250mW,200ohm,0.1% D55342E07B200AR Flight/EEE 100
137 RES,250mW,22.1ohm,0.1% D55342E07B22A1R Flight/EEE 100
138 MICROCIRCUIT, Precision Chopper Stabilized OPAMP, TI, CDIP2‐T8 SV1031716‐1 Flight/EEE 102
139 Header Connector, Male, Plug, 4 pin (2 rows X 2) SV1031721‐1 Flight/EEE 53
140 CAP,TANTALUM,22uF,20V, SMT CWR09JH226KCC Flight/EEE 44
141 CAP,TANTALUM,33uF,15V, SMT CWR09HC336KCC Flight/EEE 97
142 CAP,,1000pF,100V, 1206, CKS55 M123A21BPC102KS Flight/EEE 123
143 CAP,TANTALUM,4.7uF,50V, SMT CWR09NC475KCC Flight/EEE 44
144 CAP,TANTALUM,6.8uF,35V, SMT CWR09MH685KCC Flight/EEE 44
145 CAP,CERAMIC,0.082uF,50V,1210,CKS52 M123A11BXB823KS Flight/EEE 70
146 DIODE,RECTIFIER,1A, JANS1N5819UR‐1 Flight/EEE 440
147 DIODE,RECTIFIER,300mA,125V JANS1N6638US Flight/EEE 202
148 DIODE,ZENER,6.2V,1.5W JANS1N4460US Flight/EEE 50
149 DIODE,Schottky, Quad Array, CDIP8 5962‐9053801VPA Flight/EEE 27
150 Header Connector, PCB, Receptacle, 20 pos (2 rows X 10), 0.1 vert dual SV1031720‐4 Flight/EEE 27
151 INDUCTOR, EMI SUPPRRESSION SV1031161‐1 Flight/EEE 32
152 INDUCTOR, OUTPUT COUPLED SV1031159‐1 Flight/EEE 32
153 RES,1W,2ohm,1% RWR81S2R00FS Flight/EEE 100
154 RES,250mW,10K,1% D55342K07B10E0R Flight/EEE 500
155 RES,250mW,5.62K,0.1% D55342E07B5B62R Flight/EEE 100
156 RES,250mW,4.99K,0.1% D55342E07B4B99R Flight/EEE 225
157 RESISTOR D55342E07B7B15R Flight/EEE 100
158 RES,250mW,3.01K,0.1% D55342E07B3B01R Flight/EEE 100
159 RES,250mW,3.52K,0.1% D55342E07B3B52R Flight/EEE 100
160 RES,250mW,470ohm,2% D55342E07B470GR Flight/EEE 100
161 RES,250mW,4.12K,0.1% D55342E07B4B12R Flight/EEE 100
162 RES,1W,4.22ohm,1% RWR81S4R22FS Flight/EEE 100
163 RES,250mW,274ohm,1% D55342K07B274DR Flight/EEE 255
164 RES,250mW,1K,1% D55342K07B1E00R Flight/EEE 97
165 RES,250mW,2K,1% D55342K07B2E00R Flight/EEE 97
166 RES,250mW,3.24K,0.1% D55342K07B3B24R Flight/EEE 100
167 RES,250mW,200K,1% D55342K07B200ER Flight/EEE 100
168 RES,250mW,10ohm,1% D55342K07B10D0R Flight/EEE 100
169 RES,250mW,3.32K,1% D55342K07B3E32R Flight/EEE 100
170 TRANSFORMER, FEEDBACK SV1031160‐1 Flight/EEE 32
171 TRANSFORMER, DC / DC SV1031158‐1 Flight/EEE 32
172 IC,OP AMP,4 FUNCTION,14 PIN 5962R8777101VCA Flight/EEE 25
173 IC,SWITCHING CONTROLLER,8 PIN, UC1844 generic part number 5962‐8670407VPA Flight/EEE 38
174 Turret Terminal SV748669‐4 Flight/EEE 500
175 Glenair 791 series connector, 13 position, male, PCB, wall mount, Right angle SV1031719‐1 Flight/EEE 27
176 SEMICONDUCTOR, DIODE ‐ JANTXV SCREENED SV351‐829UR‐02 Flight/EEE 69
177 SEMICONDUCTOR, DIODE ‐ JANTXV SCREENED SV351‐5314UR‐02 Flight/EEE 123
178 RES,250mW,2.21K,0.1% D55342E07B2B21R Flight/EEE 200
179 Header Connector receptacle ‐ 4 pin (2 rows X 2) .100 4POS DL VERT T/H SV1031720‐1 Flight/EEE 80
180 CAP,CERAMIC,0.047uF,50V, 1210 M123A11BXB473KS Flight/EEE 176
181 CAP,CERAMIC,18pF,100V, SMT CDR31BP180BKUR Flight/EEE 70
182 DIODE,TVS,1.5kW,UNIDIRECTIONAL JANS1N6153AUS Flight/EEE 123
183 FILTER,FERRITE CHIP, Ferrite Beads, Data Line Filter, SMT , 250ohms ±25% impedance, 1 5Amp SV1031718‐1 Flight/EEE 49
184 Header Connector, PCB, Male, Plug,,20 PIN (2 Rows X 10) SV1031721‐2 Flight/EEE 27
185 Header Connector, PCB,Female, Receptacle,10 PIN (2 rows X 5) SV1031720‐3 Flight/EEE 27
186 MOSFET,P‐CHANNEL,3.1A,100V, 3 PIN, SMD‐0.2, 100KRAD TID, M19500/749 avail. From Infineon JANSR2N7506U8 Flight/EEE 43
187 RES,250mW,19.6K,0.1% D55342E07B19B6R Flight/EEE 100
188 RES,250mW,10.1K,0.1% D55342E07B10B1R Flight/EEE 100
189 RES,250mW,20K,0.1% D55342E07B20B0R Flight/EEE 200
190 RES,250mW,1.27K,0.1% D55342E07B1B27R Flight/EEE 100
191 RES,250mW,0ohm,MIL‐PRF‐32159 Qualified Thick Film Chip Resistor 1206 Size 25m Ohm Max. 250 mW 3.2 Amp 2‐Pin SMD M32159B07T Flight/EEE 100
192 RES,250mW,243ohm,1% D55342K07B243DR Flight/EEE 100
193 IC,VOLTAGE REFERENCE,5V,10 PIN (GDFP1‐F10 or CDFP2‐F10) SV389‐85 Flight/EEE 25
194 IC,uCONTROLLER,‐BIT,CQFP64 pkg, SV389‐87 Flight/EEE 30
195 IC,POWER MANAGEMENT, 8 PIN SV389‐7 Flight/EEE 25
196 IC,LINE TRANSCEIVER,1 FUNCTION,8 ‐CFP SMT, Half Duplex, 3 .3V, 10Mbps SV1031717‐1 Flight/EEE 84
197 RESONATOR,QUARTZ,8Mhz SV1031508‐1 Flight/EEE 49
198 Res, 250mW, 10 5Kohm, 0.1%, 25ppm (Select on Test) D55342E07B10B5R Flight/EEE 100
199 Res, 250mW, 12Kohm, 0.1%, 25ppm (Select on Test) D55342E07B12B0R Flight/EEE 100
200 Res, 250mW, 17.4Kohm, 0.1%, 25ppm (Select on Test) D55342E07B17B4R Flight/EEE 100
201 Res, 250mW, 18.7Kohm, 0.1%, 25ppm (Select on Test) D55342E07B18B7R Flight/EEE 100
202 Res, 0.1W, 215K, 0.1%, 25ppm ( Select on Test) D55342E07B215BR Flight/EEE 100
203 Res, 0.1W, 218K, 0.1%, 25ppm ( Select on Test) D55342E07B218BR Flight/EEE 100
204 Res, 0.1W, 221K, 0.1%, 25ppm ( Select on Test) D55342E07B221BR Flight/EEE 100
205 Res, 0.1W, 223K, 0.1%, 25ppm ( Select on Test) D55342E07B223BR Flight/EEE 100
206 Res, 0.1W, 232K, 0.1%, 25ppm ( Select on Test) D55342E07B232BR Flight/EEE 100
207 Res, 0.1W, 229K, 0.1%, 25ppm ( Select on Test) D55342E07B229BR Flight/EEE 100
208 RES,250mW,8.16K,0.1%, 25ppm (Select on Test Value) D55342E07B8B16R Flight/EEE 100
209 RES,250mW,8.25K,0.1%, 25ppm (Select on Test Value) D55342E07B8B25R Flight/EEE 100
210 RES,250mW,13K,0.1%, 25ppm (Select on Test Value) D55342E07B13B0R Flight/EEE 100
211 Res, 0.25W,6.49K, 0.1%,25ppm (Select on Test Value) D55342E07B6B49R Flight/EEE 100
212 Res, 0.25W,8.06K, 0.1%,25ppm (Select on Test Value) D55342E07B8B06R Flight/EEE 100
213 Res, 0.25W,9.09K, 0.1%,25ppm (Select on Test Value) D55342E07B9B09R Flight/EEE 100
214 Res, 0.25W,14K, 0.1%,25ppm (Select on Test Value) D55342E07B14B0R Flight/EEE 100
215 Res, 0.25W,14.3K, 0.1%,25ppm (Select on Test Value) D55342E07B14B3R Flight/EEE 100
216 Res, 0.25W,16K, 0.1%,25ppm (Select on Test Value) D55342E07B16B0R Flight/EEE 100
217 Res, 0.25W, 35,7K, 0.1%,25ppm ( Select on Test Value) D55342E07B35B7R Flight/EEE 100
218 Res, 0.25W, 36,5K, 0.1%,25ppm ( Select on Test Value) D55342E07B36B5R Flight/EEE 100
219 Res, 0.25W, 38 3K, 0.1%,25ppm ( Select on Test Value) D55342E07B38B3R Flight/EEE 100
220 Res, 0.25W, 42 2K, 0.1%,25ppm ( Select on Test Value) D55342E07B42B2R Flight/EEE 100
221 Res, 0.25W, 45 3K, 0.1%,25ppm ( Select on Test Value) D55342E07B45B3R Flight/EEE 100
222 Connector Clip for Testing ‐ Pure metal SMT clip 5015 Flight/EEE 149
223 IR Source Lamp, Sapphire ‐ Upscreened SV1032031‐1 Flight/EEE 32
224 Fixed Resistor, Metal Glaze/thick Film, 0.5W, 1540ohm, 75V, 1% +/‐Tol, 100ppm/Cel M55342K10B1E54R Flight/EEE 300
225 Res, 0.25W,9.7K, 0.1%,25ppm (Select on Test Value) D55342K07B9B76R Flight/EEE 100
226 Res, 0.25W,10.2K, 0.1%,25ppm (Select on Test Value) D55342K07B10B2R Flight/EEE 100
227 Res, 0.25W,11K, 0.1%,25ppm (Select on Test Value) D55342K07B11B0R Flight/EEE 50
228 Wire, 22 AWG Ag‐Cu, PTFE Insulation, Color Black STSV595‐11‐22‐0 Flight/EEE 2640
229 Wire, 22 AWG Ag‐Cu, PTFE Insulation, Color White STSV595‐11‐22‐9 Flight/EEE 2640
230 Wire, 22 AWG Ag‐Cu, PTFE Insulation, Color Red STSV595‐11‐22‐2 Flight/EEE 2640
231 Wire, 22 AWG Ag‐Cu, PTFE Insulation, Color Yellow STSV595‐11‐22‐4 Flight/EEE 2640
232 RES,250mW,49.9ohm,0.1% D55342E07B49A9R Flight/EEE 100
233 Res, 250mW, 18 2Kohm, 0.1%, 25ppm (Select on Test) D55342E07B18B2R Flight/EEE 44
234 CUP, SOURCE SV1031873‐1 Flight/Mech 22
235 HOUSING ASSY, SENSE CELL SV1031872‐1 Flight/Mech 22
236 COVER, SOURCE SV1031874‐1 Flight/Mech 22
237 SLEEVE, SENSING SV1031877‐1 Flight/Mech 11
238 SHIM, COVER SV1031875‐1 Flight/Mech 22
239 BASE PLATE, SENSOR HEAD SV1031878‐1 Flight/Mech 22
240 SPACER, GAIN BOARD SV1031902‐1 Flight/Mech 22
241 SPACER, DETECTOR BOARD SV1031906‐1 Flight/Mech 22
242 Printed Wiring Board, Detector, IRCO2 Sensor SVPB1032954‐1 Flight/Mech 22
243 Printed Wiring Board, Gain, IRCO2 Sensor SVPB1032955‐1 Flight/Mech 22
244 Printed Wiring Board, Analog, IRCO2 Sensor SVPB1032952‐1 Flight/Mech 22
245 Printed Wiring Board, Digital, IRCO2 Sensor SVPB1032953‐1 Flight/Mech 22
246 WASHER SV1031917‐1 Flight/Mech 66
247 WASHER SV1031917‐2 Flight/Mech 22
248 EMI GASKET, HOUSING SV1031919‐1 Flight/Mech 22
249 COVER AND INSERTS, HOUSING SV1031920‐1 Flight/Mech 22
250 EMI GASKET, ACCESS COVER SV1031921‐1 Flight/Mech 22
251 COVER, ACCESS SV1031922‐1 Flight/Mech 22
252 SHIELDING GASKET,ELECTRONIC SV809282‐1 Flight/Mech 22
253 HOUSING AND INSERTS, ELECTRONICS SVRD1031918‐1 Flight/Mech 22
File details come from the government source that posted it. Updated .