80JSC021R0005 - JETS II Draft RFP.pdf
PDF 1 MB Posted
- Attached to
- JSC Engineering, Technology and Science (JETS) II Federal contract opportunity
- Solicitation number
- 80JSC021JETSII
About this file
This synopsis requests capability statements for the JSC Engineering, Technology and Science II (JETS II) contract. Products and services include engineering design, development, sustaining engineering, analysis, assessment, technology development, test services, and laboratory/facility operation and maintenance for the JSC Engineering Directorate and Exploration Integration and Science Directorate. Capability statements are due by December 17, 2020 and should include company information, experience, and references. The Government may consider set-asides for small, 8(a), women-owned, veteran-owned, HUBZone, or disadvantaged businesses based on responses received.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DRFP Q and A Responses.xlsx | XLSX spreadsheet | |
| JETS II Interested Parties List 11-18-21.xlsx | XLSX spreadsheet | |
| Government Calculated Average Composite Direct Labor Rates and Seniority Profile of Incumbent Employees.pdf | ||
| 80JSC021R0005 L-Attachments.zip | ZIP file | |
| 80JSC021R0005 J-Attachments.zip | ZIP file | |
| BH3-21060 - 80JSC021R0005 - JETS II Draft RFP - Cover Letter.pdf | ||
| JETS II Industry Day QA 8-19-21.pdf | ||
| JEDII Development Plan.pdf | ||
| JETS II Virtual Tour information 8-19-21.xlsx | XLSX spreadsheet | |
| RFI - JETS II OCI 8-3-21.pdf | ||
| JETS II Communications with Industry - Division QA.pdf | ||
| EA13 Overview.pdf | ||
| Misc Info - EX Activity Report.pdf | ||
| JETS II Interested Parties 5-13-21.pdf | ||
| Industry Day and Division Charts.zip | ZIP file | |
| ES Overview.pdf | ||
| EP Overview.pdf | ||
| RFI - JETS II OCI.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
80JSC021R0005 JSC Engineering, Technology and Science II Contract Section A
Table of Contents
Table of Contents
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 LISTING OF CLAUSES INCORPORATED BY REFERENCE
B.2 DESCRIPTION OF WORK
B.3 CONTRACT VALUE
B.4 ESTIMATED COST AND AWARD FEE (NFS 1852.216-85) (SEP 1993)
B.5 Reserved
B.6 TOTAL CONTRACT FUNDING
B.7 LIMITATION OF FUNDS (FIRM-FIXED-PRICE CONTRACT) (NFS 1852.232-77)
(MAR 1989) (APPLICABLE ONLY TO FIRM-FIXED-PRICE FUNDING) (INCLUDES
PHASE-IN)
B.8 CONTRACT FUNDING (NFS 1852.232-81)(JUN 1990) (COST-REIMBURSEMENT
ONLY)
B.9 FIRM FIXED-PRICE (NFS 1852.216-78) (DEC 1988) (APPLICABLE ONLY TO
FIXED-PRICE TASK ORDERS)
B.10 IDIQ MINIMUM AND MAXIMUM ORDERING LIMITS (JSC 52.216-90) (NOV
2018)
B.11 SPECIAL PROVISIONS REGARDING CONTRACT ADJUSTMENTS (FFP Only) 15
B.12 FULLY BURDENED RATE TABLE FOR PRICING TASK ORDERS
Section C – STATEMENT OF WORK
Statement of Work (SOW) Structure
1.0 Management and Administration Requirements
1.1 Management
1.1.1 Contract Management
1.1.2 Financial Management
1.1.3 Property Management
1.1.4 Data Management
1.1.5 Procurement
1.2 Institutional Compliance
1.2.1 Safety and Health
1.2.2 Environmental
1.2.3 Quality Management
1.2.4 Configuration Management
1.2.5 Export Control
2.0 Ordered Products
2.1 Product Safety and Mission Assurance
2.2 Hardware and Software
2.2.1 Hardware and Software Products
2.2.2 Flight Hardware and Software Certification
2.2.3 Hardware and Software Testing
2.2.4 Training
2.2.5 Database Development
2.2.6 Website Development
2.2.7 Project Management
2.3 Analysis and Assessment
2.3.1 Engineering Analysis and Assessments
2.3.2 Analytical Capability
2.3.3 Analytical Products
2.3.4 Mission Services
2.3.5 Technical Services for Reviews, Boards, and Panels
2.3.6 System and Subsystem Management
2.3.7 Export Control Compliance
2.4 Facilities
2.4.1 Facility Operations & Maintenance
2.4.2 Facility Modifications
2.5 Research and Development
2.5.1 Engineering Research
2.5.2 Astromaterials, Curation, and Sample Handling
2.5.3 Planetary Exploration and Science Mission Development
2.5.4 Astromaterials Research
2.5.5 Earth Science
2.5.6 Image Science and Analysis
2.5.7 Orbital Debris
2.5.8 Hypervelocity Impact Technology and Risk Assessment
2.6 Special Projects
2.7 Education and Outreach
SECTION D - PACKAGING AND MARKING
D.1 LISTING OF CLAUSES INCORPORATED BY REFERENCE
D.2 IDENTIFICATION AND MARKING OF GOVERNMENT EQUIPMENT (NFS
1852.245-74 )(JAN 2011)
SECTION E - INSPECTION AND ACCEPTANCE
E.1 LISTING OF CLAUSES INCORPORATED BY REFERENCE
E.2 HIGHER-LEVEL QUALITY REQUIREMENT (FAR 52.246-11)(DEC 2014)
E.3 RESERVED
E.4 MATERIAL INSPECTION AND RECEIVING REPORT (NFS 1852.246-72) (APR
2015)
E.5 Government contract quality assurance functions (NFS 1852.246-71)(OCT 1988)
SECTION F - DELIVERIES OR PERFORMANCE
F.1 LISTING OF CLAUSES INCORPORATED BY REFERENCE
F.2 RESERVED
F.3 FLIGHT ITEM (JSC 52.247-95)(JUN 2020)
F.4 PLACE AND PERIOD OF PERFORMANCE
F.5 SHIPPING INSTRUCTIONS
F.6 PHASE-IN, PHASE-OUT AND CLOSE-OUT
F.7 TASK ORDER TYPE
F.8 OPTION TO EXTEND
SECTION G - CONTRACT ADMINISTRATION DATA
G.1 LISTING OF CLAUSES INCORPORATED BY REFERENCE
G.2 AWARD FEE FOR SERVICE CONTRACTS (NFS 1852.216-76)(JUN 2018)
G.3 Reserved
G.4 SUBMISSION OF VOUCHERS/INVOICES FOR PAYMENT (NFS 1852.232-
80)(APR 2018)
G.5 INSTALLATION – ACCOUNTABLE GOVERNMENT PROPERTY (NFS 1852.245-
71)(JUN 2018) ALTERNATE I (JAN 2011)
G.6 FINANCIAL REPORTING OF NASA PROPERTY IN THE CUSTODY OF
CONTRACTORS (NFS 1852.245-73)(JAN 2017)
G.7 LIST OF GOVERNMENT PROPERTY FURNISHED PURSUANT TO FAR 52.245-1
(NFS 1852.245-76)(JAN 2011)
G.8 OCCUPANCY MANAGEMENT REQUIREMENTS (NFS 1852.245-82)(SEP 2017) ..
G.9 REAL PROPERTY MANAGEMENT REQUIREMENTS (NFS 1852.245-83) (JAN
2011)
G.10 NASA SECURITY PROGRAM AND IDENTIFICATION OF EMPLOYEES (JSC
52.204-92)(FEB 2021)
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H.1 LISTING OF CLAUSES INCORPORATED BY REFERENCE
H.2 LIMITATION OF EXISTING AND FUTURE CONTRACTING (NFS 1852.209-
71)(DECEMBER 1988)
H.3 EXPORT LICENSES (NFS 1852.225-70)(FEB 2000) Alt I (FEB 2000)
H.4 KEY PERSONNEL AND FACILITIES (NFS 1852.235-71)(MAR 1989)
H.5 SMALL BUSINESS SUBCONTRACTING GOALS (JSC 52.219-90)(OCT 2006) ... 61
H.6 ENVIRONMENTAL AND ENERGY CONSERVATION REQUIREMENTS AND
HAZARDOUS MATERIALS USE (JSC 52.223-94) (JUL 2021)
H.7 OPTION TO TRANSITION FROM AWARD FEE TO FIXED FEE
H.8 OPTION TO TRANSITION FROM FIXED FEE TO AWARD FEE
H.9 REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF
OFFEROR
H.10 RESERVED
H.11 RESERVED
H.12 COMPLIANCE WITH APPLICABLE CENTER POLICIES AND PROCEDURES . 66
H.13 ASSOCIATE CONTRACTOR AGREEMENTS (ACA) FOR JSC ACTIVITIES
H.14 MITIGATION OF ORGANIZATIONAL CONFLICTS OF INTEREST
H.15 DISCLOSURE OF ORGANIZATIONAL CONFLICT OF INTEREST AFTER
CONTRACT AWARD
H.16 APPLICABILITY OF RIGHTS IN DATA
H.17 CONTRACTOR PURCHASING
H.18 WORK IN PROGRESS (WIP) REPORTING FOR ON-SITE VS. OFF-SITE WORK 70
H.19 SUBCONTRACTING WITH International Partners FOR GOODS OR SERVICES .. 71
H.20 EXTERNAL CUSTOMER EFFORT
H.21 CALIBRATION
H.22 HANDLING AND PROTECTION OF GOVERNMENT CONTROLLED
CONTRACTOR GENERATED DATA
H.23 RECEIVING INSPECTION AND TEST FACILITY (RITF) UTILIZATION
H.24 USE OF JSC FABRICATION CAPABILITY
H.25 CROSS-WAIVER OF CLAIMS AND ASSUMPTION OF RESPONSIBILITY FOR
FAA LICENSED LAUNCHES, INCLUDING SUBORBITAL LAUNCHES
H.26 UNIDENTIFIED DATA CONTAINING RESTRICTIVE OR LIMITING MARKINGS
H.27 IDENTIFICATION AND REPRESENTATION OF LIMITED RIGHTS DATA AND
RESTRICTED COMPUTER SOFTWARE (POST AWARD)
SECTION I - CONTRACT CLAUSES
I.1 LISTING OF CLAUSES INCORPORATED BY REFERENCE
I.2 RESERVED
I.3 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION
SYSTEMS (FAR 52.204-21)(JUN 2016)
I.4 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS
AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (FAR 52.204-25)(AUG
2020)
I.5 ORDERING (FAR 52.216-18)(AUG 2020)
I.6 ORDER LIMITATIONS (FAR 52.216-19)(OCT 1995)
I.7 INDEFINITE QUANTITY (FAR 52.216-22)(OCT 1995)
I.8 OPTION TO EXTEND THE TERM OF THE CONTRACT (FAR 52.217-9)(MAR
2000)
I.9 EQUAL OPPORTUNITY FOR VETERANS (FAR 52.222-35)(JUN 2020)
I.10 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (FAR 52.222-
36)(JUN 2020)
I.11 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (FAR 52.222-
42)(MAY 2014)
I.12 NOTICE OF RADIOACTIVE MATERIALS (FAR 52.223-7)(JAN 1997)
I.13 SUBMISSION OF TRANSPORTATION DOCUMENTS FOR AUDIT (FAR 52.247-
67)(FEB 2006)
I.14 CLAUSES INCORPORATED BY REFERENCE (FAR 52.252-2)(FEB 1998)
I.15 AUTHORIZED DEVIATIONS IN CLAUSES (FAR 52.252-6)(NOV 2020)
I.16 SECURITY CLASSIFICATION REQUIREMENTS (NFS 1852.204-75)(SEP 1989) 99
I.17 TASK ORDERING PROCEDURE (NFS 1852.216-80)(OCT 1996)
I.18 ADDITIONAL TASK ORDERING PROCEDURES
I.19 RESTRICTION ON FUNDING ACTIVITY WITH CHINA (NFS 1852.225-71) (Feb
2012)(DEVIATION 12-01A)
I.20 RIGHTS IN DATA – GENERAL (FAR 52.227-14)(MAY 2014); (ALTERNATE II)
(DEC 2007) (AS MODIFIED BY NFS 1852.227-14) (APR 2015)
I.21 INFORMATION TECHNOLOGY SYSTEM SUPPLY CHAIN RISK ASSESSMENT
(NFS 1852.239-74)(JAN 2020)(DEVIATION 15-03D)
I.22 CONTRACTOR COUNTERFEIT ELECTRONIC PART DETECTION AND
AVOIDANCE (NFS 1852.246-74)(SEP 2020)
SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF
OFFERORS OR RESPONDENTS
K.1 LISTING OF CLAUSES INCORPORATED BY REFERENCE
K.2 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (FAR 52.204-8)(MAR
2020)(Deviation 20-02A)
K.3 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND
VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (FAR 52.204-24)(OCT 2020) .. 120
K.4 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES—
REPRESENTATION (FAR 52.204-26)(OCT 2020)
K.5 INFORMATION REGARDING RESPONSIBILITY MATTERS (FAR 52.209-
7)(OCT 2018)
K.6 Certification Regarding Tax Matters (52.209-12)(OCT 2020)
K.7 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS –
CERTIFICATION (FAR 52.209-13)(FEB 2021)
K.8 COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (FAR
52.230-1)(JUN 2020)
K.9 PROPOSAL DISCLOSURE-COST ACCOUNTING PRACTICE CHANGES (FAR
52.230-7)(APR 2005)
K.10 RESTRICTION ON FUNDING ACTIVITY WITH CHINA – REPRESENTATION
(NFS 1852.225-72)(FEB 2012)(PCD 12-01A)
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
L.1 LISTING OF PROVISIONS INCORPORATED BY REFERENCE – SECTION L . 132
L.2 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FAR 52.252-
1) (FEB 1998)
L.3 Introduction
L.4 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA OR DATA OTHER
THAN COST OR PRICING DATA (FAR 52.215-20) (OCT 2010) – ALT. IV (OCT 2010)
L.5 TYPE OF CONTRACT (FAR 52.216-1) (APR 1984)
L.6 SERVICE OF PROTEST (FAR 52.233-2) (SEP 2006)
L.7 VIRTUAL PRE-PROPOSAL CONFERENCE (NFS 1852.215-77)(APR 2015)
L.8 REVIEW OF THE OFFEROR’S INFORMATION TECHNOLOGY SYSTEMS
SUPPLY CHAIN (NFS 1852.239-73)(JAN 2020) [DEVIATION 15-03D]
L.9 DETERMINATION OF COMPENSATION REASONABLENESS (JPI 1852.231-71)
(AUG 2021)
L.10 GOVERNMENT PROPERTY MANAGEMENT INFORMATION (NFS 1852.245-80)
(JAN 2011)
L.11 LIST OF AVAILABLE GOVERNMENT PROPERTY (NFS 1852.245-81) (JAN 2011)
L.12 ELECTRONIC SUBMISSION OF PROPOSALS – PROPOSAL MARKING AND
DELIVERY THROUGH NASA’s EFSS BOX (JULY 2021)
L.13 PROPOSAL FORMATTING INSTRUCTIONS (JPI 52.215-113)(DEC 2019)
L.14 AVAILABILITY OF SPECIFICATIONS (JPI 52.215-123) (DEC 2019)
L.15 COMMUNICATIONS REGARDING THIS SOLICITATION (JPI 52.215-124) (AUG
2018)
L.16 OFFEROR ACCEPTANCE PERIOD (JPI 52.215-125) (AUG 2018)
L.17 PERIOD COVERED BY PROCUREMENT (JPI 52.215-126) (AUG 2018)
L.18 JSC SUPER-FLEX WORK SCHEDULE (JPI 52.242-90)(AUG 2020)
L.19 Notice of Potential Organizational Conflict of Interest (OCI)
L.20 GENERAL INSTRUCTIONS FOR PREPARATION OF PROPOSAL (JPI 52.215-
107) (AUG 2018)
L.21 PROPOSAL ARRANGEMENT, PAGE LIMITATIONS, COPIES, AND DUE DATES
L.22 MISSION SUITABILITY (MS) FACTOR - VOLUME I
L.22.1 MANAGEMENT APPROACH (MA)-MISSION SUITABILITY SUBFACTOR
L.22.2 TECHNICAL APPROACH (TA) - MISSION SUITABILITY SUBFACTOR 2 ..
L.22.3 SMALL BUSINESS UTILIZATION (SBU) - MISSION SUITABILITY
SUBFACTOR 3
L.23 Past Performance Information (JSC 52.215-114)(SEP 2021) (JPI Procurement Instruction)
L.24 COST/PRICE PROPOSAL - Volume III
L.25 RESPONSIBILITY CONSIDERATIONS – VOLUME IV
L.26 MODEL CONTRACT AND ADDITIONAL REQUIREMENTS - VOLUME V
L.27 SECTION L ATTACHMENTS
L.28 IDENTIFICATION AND REPRESENTATION OF LIMITED RIGHTS DATA AND
RESTRICTED COMPUTER SOFTWARE (PRE-AWARD)
L.29 Certification Regarding Trafficking in Persons Compliance Plan (FAR 52.222-56) (Oct 2020)
SECTION M - EVALUATION FACTORS FOR AWARD
M.1 LISTING OF PROVISIONS INCORPORATED BY REFERENCE
M.2 AWARD WITHOUT DISCUSSIONS
M.3 EVALUATION FACTORS AND CRITERIA
M.4 MISSION SUITABILITY ( M S ) VOLUME I
M.4.1 MANAGEMENT APPROACH (MA) - MISSION SUITABILITY SUB-FACTOR
M.4.2 TECHNICAL APPROACH (TA) MISSION SUITABILITY SUB-FACTOR 2
M.4.3 SMALL BUSINESS UTILIZATION (SBU) – MISSION SUITABILITY
SUBFACTOR 3
M.5 PAST PERFORMANCE - VOLUME II
M.5.1 PAST PERFORMANCE EVALUATION (JSC 52.215-115)(NOV 2018)
M.6 COST AND PRICE FACTOR - VOLUME III
M.7 RESPONSIBILITY CONSIDERATIONS - VOLUME IV
M.8 MODEL CONTRACT - VOLUME V
80JSC021R0005 JSC Engineering, Technology and Science II Contract Section B
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 LISTING OF CLAUSES INCORPORATED BY REFERENCE
Clause(s) at the beginning of this Section are incorporated by reference, with the same force and effect as if they were given in full text. Clauses incorporated by reference which require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause.
The following contract clauses pertinent to this section are hereby incorporated by reference:
I. FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1)
CLAUSE
NUMBER
DATE
TITLE
NONE INCORPORATED BY REFERENCE
II. NASA FAR SUPPLEMENT (48 CFR CHAPTER 18) PROVISIONS
(End of Clauses Incorporated by Reference)
B.2 DESCRIPTION OF WORK
The Contractor shall provide all required services (except as may be expressly stated in this contract as furnished by the Government) necessary to successfully manage, deliver and/or perform, operate, maintain and provide all requirements in accordance with the Statement of Work (SOW) in Section C, as well as all Data Requirement Description (DRDs) provided in Section J, and all other requirements as specified throughout the contract.
In addition, the Contractor shall provide all resources and services (except as may be expressly stated in this contract as furnished by the Government) necessary to successfully perform all phase-in activities, in accordance with the Contract Phase-in Plan, Attachment J-10.
This contract contains Cost Reimbursable (CR) and Firm-Fixed-Price (FFP) requirements to be issued as indefinite delivery/indefinite quantity (IDIQ) task orders. The Government may issue task orders as either Cost-Plus-Award-Fee
(CPAF), or Cost-Plus-Fixed-Fee (CPFF) as applicable, or FFP as it deems appropriate throughout the life of the contract and in accordance with Clause F.7 Task Order Type.
(End of clause)
B.3 CONTRACT VALUE
The contract value will be periodically and unilaterally updated as IDIQ task orders are issued/amended. During the intervals between periodic updates of this clause, there may be some discrepancy with the total amount for the IDIQ task orders issued/amended and values shown in this clause. Actual total contract value is the sum of phase-in price plus the total value of all task orders issued/amended (FFP and Cost Reimbursable).
The total contract value is as follows in Table B.3.1:
Row Contract Element Value
1 Contract Phase-in (FFP) $OFI 2 FFP TOs NFI 3 Total Fixed-Price Contract Value (Sum Items
1 & 2)
NFI
4 Cost-Reimbursable TOs – Services NFI
5 RESERVED NFI
6 Award Fee – Services (See Table B.3.2) NFI
7 RESERVED NFI
8 Fixed Fee NFI 9 Total Cost-Reimbursable Value - per clause
B.4 (Sum Items 5-9)
NFI
10 Total Contract Value (Sum Items 3 & 10) NFI
The Maximum and Earned Award Fee and Fixed Fee for Services is summarized in Table B.3.2 below:
Fee Pool – Services
Award Fee Period Period 1 Period 2 Period 3 Period 4 Period 5
10/1/22 - 9/30/23
10/1/23 - 9/30/24
10/1/24 - 9/30/25
10/1/25 - 9/30/26
10/1/26 - 9/30/27
Max Award Fee NFI NFI NFI NFI NFI
Earned Award Fee NFI NFI NFI NFI NFI
Fixed Fee NFI NFI NFI NFI NFI
Period 6 Period 7 Period 8 Period 9 Period 10
10/1/27 - 9/30/28
10/1/28 - 9/30/29
10/1/29 - 9/30/30
10/1/30 - 9/30/31
10/1/31 - 9/30/32
Max Award Fee NFI NFI NFI NFI NFI
Earned Award Fee NFI NFI NFI NFI NFI
Fixed Fee NFI NFI NFI NFI NFI
Table B.3.3 - RESERVED
RESERVED
Task Order Maximum Award Fee Earned Award Fee Fixed Fee
TO TBD NFI NFI NFI
Total NFI NFI NFI
B.4 ESTIMATED COST AND AWARD FEE (NFS 1852.216-85) (SEP 1993)
The estimated cost of this contract is the sum of Table B.3.1 rows 4 and 5. The maximum available award fee, excluding base fee, if any, is the sum of Table B.3.1 rows 6 and 7. The base fee is $0. Total estimated cost, base fee and maximum award fee is the sum of Table B.3.1, rows 4-7.
(End of Clause)
B.5 RESERVED
B.6 TOTAL CONTRACT FUNDING
The total contract funded amounts are summarized in the following Table B.6.1:
Row Contract Element Previous Funding Action
This Funding Action
Cumulative Funding
1 Contract Phase-In (FFP) NFI NFI NFI 2 Firm-Fixed-Price NFI NFI NFI 3 Firm Fixed Price Funds -
Subtotal (per clause B.7)
NFI NFI NFI
4 Cost (exclusive of fee) NFI NFI NFI 5 Fee (per clause B.6) NFI NFI NFI 6 Allotted Cost Reimbursement
Funds - Subtotal (per clause B.8)
NFI NFI NFI
7 Total Contract Funded Amount NFI NFI NFI
B.7 LIMITATION OF FUNDS (FIRM-FIXED-PRICE CONTRACT) (NFS 1852.232-77)
(MAR 1989) (APPLICABLE ONLY TO FIRM-FIXED-PRICE FUNDING)
(INCLUDES PHASE-IN)
(a) Of the total price shown in Table B.3.1, row 3, the amount shown in Table B.6.1, row 3, is presently available for payment and allotted to this contract. It is anticipated that from time to time additional funds will be allocated to the contract, until the total price of said contract is allotted.
SCHEDULE FOR ALLOTMENT OF FUNDS
[The Government will allocate additional funds on periodic basis]
[The Government will allocate additional funds on periodic basis]
(b) The Contractor agrees to perform or have performed work under this contract up to the point at which, if this contract is terminated pursuant to the Termination for Convenience of the Government clause of this contract, the total amount payable by the Government (including amounts payable for subcontracts and settlement costs) pursuant to paragraphs (f) and (g) of that clause would, in the exercise of reasonable judgment by the Contractor, approximate the total amount of the time allotted to the contract. The Contractor is not obligated to continue performance of the work beyond that point. The Government is not obligated in any event to pay or reimburse the Contractor for more than the amount from time to time allotted to the contract, anything to the contrary in the Termination for Convenience of the Government clause notwithstanding.
(c)
(1) It is contemplated that funds presently allotted to this contract will cover the work to be performed until NFI.
(2) If funds allotted are considered by the Contractor to be inadequate to cover the work to be performed until that date, or an agreed date substituted for it, the Contractor shall notify the Contracting Officer in writing when within the next 60 days the work will reach a point at which, if the contract is terminated pursuant to the Termination for Convenience of the Government clause of this contract, the total amount payable by the Government (including amounts payable for subcontracts and settlement costs) pursuant to paragraphs (f) and (g) of that clause will approximate 75 percent of the total amount then allotted to the contract.
(3)
(i) The notice shall state the estimate when the point referred to in paragraph (c)(2) of this clause will be reached and the estimated amount of additional funds required to continue performance to the date specified in paragraph (c)(1) of this clause, or an agreed date substituted for it.
(ii) The Contractor shall, 60 days in advance of the date specified in paragraph (c)(1) of this clause, or an agreed date substituted for it, advise the Contracting Officer in writing as to the estimated amount of additional funds required for the timely performance of the contract for a further period as may be specified in the contract or otherwise agreed to by the parties.
(4) If, after the notification referred to in paragraph (c)(3)(ii) of this clause, additional funds are not allotted by the date specified in paragraph (c)(1) of this clause, or an agreed date substituted for it, the Contracting Officer shall, upon the Contractor’s written request, terminate this contract on that date or on the date set forth in the request, whichever is later, pursuant to the Termination for Convenience of the Government clause.
(d) When additional funds are allotted from time to time for continued performance of the work under this contract, the parties shall agree on the applicable period of contract performance to be covered by these funds. The provisions of paragraphs (b) and (c) of this clause shall apply to these additional allotted funds and the substituted date pertaining to them, and the contract shall be modified accordingly.
(e) If, solely by reason of the Government’s failure to allot additional funds in amounts sufficient for the timely performance of this contract, the Contractor incurs additional costs or is delayed in the performance of the work under this contract, and if additional funds are allotted, an equitable adjustment shall be made in the price or prices (including appropriate target, billing, and ceiling prices where applicable) of the items to be delivered, or in the time of delivery, or both.
(f) The Government may at any time before termination, and, with the consent of the Contractor, after notice of termination, allot additional funds for this contract.
(g) The provisions of this clause with respect to termination shall in no way be deemed to limit the rights of the Government under the Default clause of this contract. The provisions of this Limitation of Funds clause are limited to the work on and allotment of funds for the items set forth in paragraph (a) of this clause. This clause shall become inoperative upon the allotment of funds for the total price of said work except for rights and obligations then existing under this clause.
(h) Nothing in this clause shall affect the right of the Government to terminate this contract pursuant to the Termination for Convenience of the Government clause of this contract.
B.8 CONTRACT FUNDING (NFS 1852.232-81)(JUN 1990) (COST-
REIMBURSEMENT ONLY)
(a) For purposes of payment of cost, exclusive of fee, in accordance with the Limitation of Funds clause, the total amount allotted by the Government to this contract is the amount shown in Table B.6.1 row 4. This allotment is for JSC Engineering, Technology and Science (JETS) II efforts and covers the following estimated period of performance: NFI through NFI.
(b) An additional amount shown in Table B.6.1 row 5 is obligated under this contract for payment of fee.
B.9 FIRM FIXED-PRICE (NFS 1852.216-78) (DEC 1988) (APPLICABLE ONLY TO
FIXED-PRICE TASK ORDERS)
The total firm fixed price of this contract is shown in Table B.3.1, row 3.
B.10 IDIQ MINIMUM AND MAXIMUM ORDERING LIMITS (JSC 52.216-90) (NOV
2018)
In accordance with FAR 52.216-22, Indefinite Quantity, the contract guaranteed minimum amount* to be ordered under this contract is $20,000,000 and the contract Not to Exceed (NTE) amount* which may be ordered under this contract is $1,803,000,000. The Government is not obligated to order more than the minimum specified, but may order up to the NTE amount. The Contractor is obligated to fulfill orders issued, up to the NTE amount within the limits specified in FAR 52.216-19 Order Limitations.
B.11 SPECIAL PROVISIONS REGARDING CONTRACT ADJUSTMENTS (FFP
ONLY)
(a) Revisions to milestones, missions, schedules, manifests and/or processing requirements may be made by the Government, and shall be deemed within the scope of this contract. The Government will consider a proposed equitable adjustment (increase or decrease) to the contract value (per task order), when the estimated cost (exclusive of fee) of any single event exceeds 5% of contract value (per task order) or, when the aggregate amount of all events estimated to have a cost impact of 5% or less (exclusive of fee) of contract value reaches 20% of contract value (per task order) for the contract year unless the contractor’s actions are a significant contributing factor causing a cost increase.
(b) The Government will consider an adjustment to the contract, for estimated cost/price only (no fee) for those events equal to or less than the above thresholds.
B.12 FULLY BURDENED RATE TABLE FOR PRICING TASK ORDERS
This clause sets forth the standard labor and overtime rates to be utilized in the subsequent negotiation of Cost-Reimbursable (CR) and FFP IDIQ Task Orders in accordance with clause I.19 Task Ordering Procedure (NFS 1852.216-80) and clause. The bottom of the table allows indirect rates to be applied to any non-labor resources other than those listed in clause H.17 Contractor Purchasing, as required by task order, if applicable.
Rates used for pricing of CR/FFP IDIQ task orders shall not exceed the negotiated labor, indirect, and fee/profit rates established in the Fully Burdened Rate Table shown below.
The labor rates are fully burdened composite team rates (prime and subcontractors) but exclude fee/profit. The Not-to Exceed (NTE) fee/profit rate is the maximum rate which may be proposed or negotiated for individual CR/FFP Task Orders during contract performance. Fee/Profit rates provided below shall be in accordance with clause I.19, Task Ordering Procedures (NFS 1852.216- 80), fee/profit guidelines.
The parties agree that the fully burdened labor rates established below shall not be subject to any equitable adjustment (upwards or downwards), regardless of actual rates incurred during contract performance, except for Collective Bargaining Agreement, Service Contract Labor Standards (FFP Only).
B.12.1 Standard Labor Rates ($/hr) – JETS II
SLC
CY1 CY2 CY3 CY4 CY5
10/1/22 - 9/30/23
10/1/23 - 9/30/24
10/1/24 - 9/30/25
10/1/25 - 9/30/26
10/1/26 - 9/30/27
Program Manager OFI OFI OFI OFI OFI Manager OFI OFI OFI OFI OFI Supervisor OFI OFI OFI OFI OFI Scientist I OFI OFI OFI OFI OFI Scientist II OFI OFI OFI OFI OFI Scientist III OFI OFI OFI OFI OFI Scientist IV OFI OFI OFI OFI OFI Senior Scientist Specialist OFI OFI OFI OFI OFI Engineer I OFI OFI OFI OFI OFI Engineer II OFI OFI OFI OFI OFI Engineer III OFI OFI OFI OFI OFI Engineer IV OFI OFI OFI OFI OFI Senior Engineer Specialist OFI OFI OFI OFI OFI
IT I OFI OFI OFI OFI OFI
IT II OFI OFI OFI OFI OFI
IT III OFI OFI OFI OFI OFI
IT IV OFI OFI OFI OFI OFI
Computer Security System Specialist I OFI OFI OFI OFI OFI
Computer Security System Specialist II OFI OFI OFI OFI OFI
Engineering Technologist
I OFI OFI OFI OFI OFI
Engineering Technologist
II
OFI OFI OFI OFI OFI
III
Senior Engineering Technologist
Technician I OFI OFI OFI OFI OFI Technician II OFI OFI OFI OFI OFI Technician III OFI OFI OFI OFI OFI Technician Specialist OFI OFI OFI OFI OFI Business Specialist I OFI OFI OFI OFI OFI
Business Specialist II OFI OFI OFI OFI OFI Business Specialist III OFI OFI OFI OFI OFI Administration Specialist I OFI OFI OFI OFI OFI
Administration Specialist II OFI OFI OFI OFI OFI
Administration Specialist
III OFI OFI OFI OFI OFI
Project Controls Specialist
I OFI OFI OFI OFI OFI
Project Controls Specialist
II OFI OFI OFI OFI OFI
Project Controls Specialist
II OFI OFI OFI OFI OFI
Configuration Management Specialist I OFI OFI OFI OFI OFI
Configuration Management Specialist II OFI OFI OFI OFI OFI
Quality Assurance Specialist I OFI OFI OFI OFI OFI Quality Assurance Specialist II OFI OFI OFI OFI OFI Safety Manager OFI OFI OFI OFI OFI Safety Engineer I OFI OFI OFI OFI OFI Safety Engineer II OFI OFI OFI OFI OFI Safety Engineer III OFI OFI OFI OFI OFI Software Quality Assurance Engineer I OFI OFI OFI OFI OFI Software Quality Assurance Engineer II OFI OFI OFI OFI OFI Software Quality Assurance Engineer III OFI OFI OFI OFI OFI Software Quality Assurance Engineer IV OFI OFI OFI OFI OFI
SOW 1 Rate OFI $/hr NFI NFI NFI NFI Non-Labor Resources G&A Rate OFI % OFI % OFI % OFI % OFI %
NTE Award Fee OFI % OFI % OFI % OFI % OFI % NTE Fixed Fee OFI % OFI % OFI % OFI % OFI % NTE Profit OFI % OFI % OFI % OFI % OFI %
B.12.1 Standard Labor Rates ($/hr) – JETS II (Cont.)
CY6 CY7 CY8 CY9 CY10
10/1/27 - 9/30/28
10/1/28 - 9/30/29
10/1/29 - 9/30/30
10/1/30 - 9/30/31
10/1/31 - 9/30/32
Program Manager OFI OFI OFI OFI OFI
Manager OFI OFI OFI OFI OFI Supervisor OFI OFI OFI OFI OFI Scientist I OFI OFI OFI OFI OFI Scientist II OFI OFI OFI OFI OFI Scientist III OFI OFI OFI OFI OFI Scientist IV OFI OFI OFI OFI OFI Senior Scientist Specialist OFI OFI OFI OFI OFI Engineer I OFI OFI OFI OFI OFI Engineer II OFI OFI OFI OFI OFI Engineer III OFI OFI OFI OFI OFI Engineer IV OFI OFI OFI OFI OFI Senior Engineer Specialist OFI OFI OFI OFI OFI
IT I OFI OFI OFI OFI OFI
IT II OFI OFI OFI OFI OFI
IT III OFI OFI OFI OFI OFI
IT IV OFI OFI OFI OFI OFI
Computer Security System Specialist I OFI OFI OFI OFI OFI
Computer Security System Specialist II OFI OFI OFI OFI OFI
Engineering Technologist
I OFI OFI OFI OFI OFI
II
III
Technician II OFI OFI OFI OFI OFI Technician III OFI OFI OFI OFI OFI Technician Specialist OFI OFI OFI OFI OFI Business Specialist I OFI OFI OFI OFI OFI Business Specialist II OFI OFI OFI OFI OFI Business Specialist III OFI OFI OFI OFI OFI Administration Specialist I OFI OFI OFI OFI OFI
Administration Specialist II OFI OFI OFI OFI OFI
Administration Specialist
III OFI OFI OFI OFI OFI
Project Controls Specialist
I OFI OFI OFI OFI OFI
Project Controls Specialist
II OFI OFI OFI OFI OFI
Project Controls Specialist
II OFI OFI OFI OFI OFI
Configuration Management Specialist I OFI OFI OFI OFI OFI
Configuration Management Specialist II OFI OFI OFI OFI OFI
Quality Assurance Specialist I OFI OFI OFI OFI OFI Quality Assurance Specialist II OFI OFI OFI OFI OFI Safety Manager OFI OFI OFI OFI OFI Safety Engineer I OFI OFI OFI OFI OFI Safety Engineer II OFI OFI OFI OFI OFI Safety Engineer III OFI OFI OFI OFI OFI Software Quality Assurance Engineer I OFI OFI OFI OFI OFI Software Quality Assurance Engineer II OFI OFI OFI OFI OFI Software Quality Assurance Engineer III OFI OFI OFI OFI OFI Software Quality Assurance Engineer IV OFI OFI OFI OFI OFI
SOW 1 Rate NFI NFI NFI NFI NFI Non-Labor Resources G&A Rate OFI % OFI % OFI % OFI % OFI %
NTE Award Fee OFI % OFI % OFI % OFI % OFI %
B.12.1 Overtime Labor Rates ($/hr) – JETS II
CY1 CY2 CY3 CY4 CY5
10/1/22 - 9/30/23
10/1/23 - 9/30/24
10/1/24 - 9/30/25
10/1/25 - 9/30/26
10/1/26 - 9/30/27
Engineering Technologist I OFI OFI OFI OFI OFI Engineering Technologist II
Technologist III
Technician II OFI OFI OFI OFI OFI Technician III OFI OFI OFI OFI OFI Technician Specialist OFI OFI OFI OFI OFI
SOW 1 Rate OFI $/hr NFI NFI NFI NFI Non-Labor Resources G&A Rate OFI % OFI % OFI % OFI % OFI %
NTE Award Fee OFI % OFI % OFI % OFI % OFI %
B.12.1 Overtime Labor Rates ($/hr) – JETS II (Cont.)
CY6 CY7 CY8 CY9 CY10
10/1/27 - 9/30/28
10/1/28 - 9/30/29
10/1/29 - 9/30/30
10/1/30 - 9/30/31
10/1/31 - 9/30/32
Engineering Technologist I OFI OFI OFI OFI OFI
Technologist II
Technologist III
Technician II OFI OFI OFI OFI OFI Technician III OFI OFI OFI OFI OFI Technician Specialist OFI OFI OFI OFI OFI
SOW 1 Rate NFI NFI NFI NFI NFI Non-Labor Resources G&A Rate OFI % OFI % OFI % OFI % OFI %
NTE Award Fee OFI % OFI % OFI % OFI % OFI %
[END OF SECTION]
80JSC021R0005 JSC Engineering, Technology and Science II Contract Section C
Section C – STATEMENT OF WORK
Statement of Work (SOW) Structure
The Statement of Work includes a Management and Administrative Requirements section, (Section 1.0), which includes activities that are fairly constant, predictable, and provide the framework under which the ordered work may occur; and an Ordered Products section (Section 2.0) that provides for the ordering and delivery of products and services. Task orders (TOs) under Section 2.0 can be either completion form or term form. Multiple task orders will be in effect during the performance period of the contract. Technical and performance requirements will be specified in the task orders.
The structure of the SOW should not be construed as defining a required organizational configuration. The types of work and services described herein may more aptly be distributed over multiple organizations whose purpose is to provide the products and services required by the Engineering Directorate and the Exploration Integration and Science Directorate (EISD) and their customers as well as other NASA and government customers.
1.0 Management and Administration Requirements
1.1 Management
1.1.1 Contract Management
The contractor shall develop and implement management functions to ensure that all work activities are accomplished in accordance with contract provisions. The contractor shall provide and maintain management systems for the planning, organization, control, and reporting of all activities required by this contract. These systems shall assure accomplishment of technical and schedule requirements and cost objectives. The contractor shall document these management functions and systems in the Contract Management Plan, in accordance with Data Requirement Description (DRD) MGMT-01 Contract Management Plan which defines and integrates all work activities and requirements across the contract, including subcontractor effort. The contractor’s management approach shall fully integrate all related plans and activities, including those of subcontractors and major vendors.
The contractor shall provide a representative to and participate in Engineering Directorate management meetings (for example, EA Staff, Engineering Leadership Council). The contractor shall provide channels for communication to each Division and Office utilizing the contract.
The Contract Work Breakdown Structure (WBS) for SOW Section 1 shall be the structure of this SOW; the WBS for SOW Section 2 shall be the structure of the active Task Orders. The contractor shall use the Contract WBS as the framework for contract planning, budgeting, cost reporting, and schedule status reporting to the Government.
The contractor shall provide reporting in accordance with DRD MGMT-03, Contract Management Report and Contract Management Summary Review. The contractor shall conduct monthly Contract Business Reviews (CBR) with NASA management to status the contractor’s financial and technical activities under the contract per DRD MGMT-03.
Once per quarter, the CBR will be replaced with a Contract Management Summary Review (CMSR) per DRD MGMT-03.
The contractor shall provide oversight and integration to maximize efficiency and accommodate downtime and fluctuations in customer demand for facilities where the contractor is the laboratory or facility manager.
The Contractor shall develop and implement a plan to continuously identify and propose initiatives to infuse advanced technology, innovations, and industry best practices (Technology, Innovations, and Process Improvement (TIPI) plan). This TIPI plan shall promote improvements in quality, capability, and overall efficiency within all areas of responsibility defined in this SOW per DRD MGMT-11, Technology, Innovations, and Process Improvement (TIPI) Plan. The initiatives accepted by NASA will be implemented through TOs under Section 2 as required.
The contractor shall develop and implement a plan to promote partnerships with the aerospace industry and promote the sharing and incubation of aerospace technologies within all areas of responsibility defined in this SOW per DRD MGMT-6, Partnership and Technology Incubation Plan.
The Contractor shall develop and implement an External Customer Plan in accordance with DRD MGMT-10, External Customer Plan, and clause H.20, EXTERNAL CUSTOMER EFFORT, to recruit and secure external customers. The intent of the plan is to allow the contractor to market and use the excess capacity of the Engineering and Exploration Integration and Science Directorate unique facilities (and other facilities as directed), for the purpose offsetting the government’s cost of maintaining and improving technical capabilities without compromising safety, process integrity or infrastructure resources.
The contractor shall develop and implement an Organizational Conflict of Interest (OCI) Mitigation Plan in accordance with DRD MGMT-12, Organizational Conflicts of Interest Mitigation Plan.
1.1.2 Financial Management
The contractor shall provide financial reporting by cost element and include subcontractor financial data. The contractor shall provide financial and supplemental reporting in accordance with the DRD BP-01, NF533 Cost and Data Reporting.
The contractor shall allocate all SOW Section 1 costs to the TOs issued under Section 2 on a pro rata basis based on direct labor hours for the prime contractor and teammates.
A SOW 1 allocation rate to be used for TO proposal development will be negotiated prior to each fiscal year. The contractor shall provide a SOW 1 rate proposal per DRD BP-08, SOW 1 Cost Proposal.
1.1.3 Property Management
The contractor shall provide, and implement, a Government Property Management Plan in accordance with DRD BP-09, Government Property Management Plan. The contractor shall provide Logistics Reporting in compliance with DRD BP-07, Reports Required for Logistics. The contractor shall provide Financial Reporting of Contractor- Held Property in accordance with DRD BP-04. Initial Property accountability to be transferred to the Contractor is given in Appendix J-4 Government Furnished Property (off-site).
The contractor shall furnish and maintain all vehicles necessary to perform work required under this contract. Interagency Fleet Vehicles (GSA vehicles) may be available in accordance with FAR 52.251-2, Interagency Fleet Management System Vehicles and Related Services.
1.1.4 Data Management
The contractor shall develop and implement a Data and Records Management Plan in accordance with DRD BP-02, Data and Records Management Plan. This plan shall describe the management, preparation, control, and dissemination of data required under this contract. This plan shall define an integrated approach for data management including management of documentation. The data management plan shall include provisions for electronic on-line access to contractor management systems including, access and interface requirements. The contractor shall provide the Government with required training to access and use these systems.
The contractor shall maintain, operate, and secure data and software systems which provide for the management, collection, preparation, publication, control and dissemination of information and technical data required by this contract. Proprietary or non-standard applications, protocols, or Information Technology (IT) systems shall not be utilized without prior NASA contractual authorization. The contractor shall provide an acceptable high speed data connection from the contractor’s off-site facility to the JSC Trusted Internet Connections (TIC) access point.
The contractor shall develop and implement uniform IT management and operational approaches for all IT associated with this contract. The contractor shall develop and implement an IT capital planning and investment control process in accordance with DRD IT-01, Information Technology Capital Planning and Investment Control (CPIC) Document and an IT Security Plan in accordance with DRD IT-02, Information Technology (IT) Security Plan and Reports.
The contractor shall provide a single point of contact for all IT matters capable of resolving contract-wide issues. The contractor shall not acquire any IT hardware or software or any cloud services without the additional coordination and approval of the EA IT Assets Group Lead (or designee).
1.1.5 Procurement
The contractor shall procure supplies, services and materials required in the performance of the SOW. Purchases under this contract may include a wide range of components, assemblies and commercial items. Purchases authorized by Task Order (Section 2) should be charged to that Task Order.
For all flight materials and products and as directed by task order, the contractor shall maintain identification data throughout the life of this contract including: material/product receipt, all stages of production, delivery, and installation.
The contractor shall perform off-site shipping and receiving functions for the JETS II including receiving and stocking of materials, mechanical and electronic parts, and inspection and receiving of finished products.
1.2 Institutional Compliance
1.2.1 Safety and Health
The contractor shall perform tasks to ensure the protection of personnel, property, equipment, and the environment in contractor products and activities generated in support of institutional and spaceflight program objectives. To ensure compliance with pertinent NASA policies, requirements, federal, state, and local regulations for safety, health, environmental protection, and fire protection, the contractor will develop and implement a safety and health program per a NASA-approved safety and health plan in accordance with DRD SMA-03, Safety and Health Plan. The “JSC Safety and Health Requirements” provides detailed requirements and instructions regarding safety and health procedures and policies at JSC and is incorporated by reference into all JSC contracts when performance is on site at a JSC facility. It can be viewed at http://jscHandbook.jsc.nasa.gov.
1.2.2 Environmental
The contractor shall conduct all on-site work in compliance with JSC's Environmental Management System (EMS) in accordance with JPR 8550.1, Johnson Space Center Environmental Compliance Procedural Requirements. The contractor shall provide Environmental Compliance reporting in accordance with DRD BP-05, Environmental Compliance Reports.
1.2.3 Quality Management
JSC has SAE AS9100 registration and intends to maintain it. The performance of Quality Assurance functions, responsibilities, and tasks, in accordance with the JSC Quality Management System (QMS), will be performed onsite at JSC by the JSC Safety and Mission Assurance Directorate’s Quality and Flight Equipment Division and its support contractor. The JETS II contractor shall perform all other work on-site in accordance with the JSC Quality Management System and shall ensure work involving this contract performed off-site is in accordance with SAE AS9100. The Contractor shall develop and implement a Quality Plan in accordance with DRD SMA-01, Quality Plan, for work conducted off-site. Should it be determined to be in the best interest of the Government for the JETS II Contractor to perform onsite quality assurance functions, responsibilities, and tasks they will be specified by Task Order.
The Contractor shall register with and be a participative member of the Government- Industry Data Exchange Program (GIDEP). The Contractor shall respond to all GIDEP notifications and NASA Advisories issued from the NASA Advisory Notice and Alerts Distribution and Response Tracking System in accordance with DRD SMA-07, Government-Industry Data Exchange Program (GIDEP) and NASA Advisory Problem Data Sharing and Utilization Program Documentation and Reporting.
The contractor shall report and resolve problems involving spaceflight equipment, spaceflight-like equipment and critical Ground Support Equipment in accordance with DRD SMA-06 Problem Reporting and Corrective Action (PRACA) for the JSC Government Furnished Equipment (GFE) and Flight Products.
The contractor shall comply with the requirements in Attachment J-24, Quality Requirements.
1.2.4 Configuration Management
The contractor shall develop and implement a Flight Products Configuration Management (CM) Plan in accordance with DRD BP-03 Flights Products Configuration Management Plan. The plan shall define processes for CM of hardware, software and firmware, engineering drawings, hardware parts lists, as-designed vs. as-built vs. as-qualified hardware, configuration accounting, and maintenance. The plan shall define processes for documentation and tracking of shelf life, operational life, and time cycle life, for life limited components and assemblies. The contractor shall prepare and coordinate appropriate configuration control board directives, waivers, deviations, exceptions, and maintain accurate, complete, and current CM data.
The following requirements are applicable:
A. Hardware and software shall be designated per the definitions provided in JSC-
08080-2, Std. G-14, Classification of Flight and Non-Flight Equipment.
B. Class I, Class IE, Class II and Ground Support Equipment (GSE) design shall be documented in released drawings or electronic files in the JSC Engineering Design Information Infrastructure.
C. The drawing release/review process shall comply with JPR 8500.4, Engineering Drawing Systems Manual .
D. Class I, Class IE, Class II and GSE hardware and software as built configuration shall match a released configuration.
E. The CM plan shall address all of the requirements in JPD 7123.1, JSC Configuration Management Policy.
1.2.5 Export Control
The contractor shall develop and implement an Export Control Plan (ECP) in accordance with DRD MGMT-04, Export Control Plan.
2.0 Ordered Products
2.1 Product Safety and Mission Assurance
The contractor shall perform tasks associated with product design, development, test, and operations including: hazard analyses, risk assessments, system safety planning, reliability and maintainability predictions, Failure Modes and Effects Analysis (FMEA), and development of Critical Item Lists (CIL), life-cycle (wear-out) estimates for maintainable items, Limited Life Items identification, and qualitative maintainability assessment.
The contractor shall provide documentation including: hazard analysis reports, risk assessment reports, FMEA worksheets, Critical Items Lists, limited life item lists, certification data packages, and acceptance data packages. The contractor shall comply with the appropriate DRD based upon the Program/Project supported.
2.2 Hardware and Software
2.2.1 Hardware and Software Products
The contractor shall provide deliverable end items that include, but are not limited to:
hardware and software, support equipment, prototypes, electronic and computer and camera systems, mockups, test articles, training hardware, laboratory test equipment, and research instruments. The Government may require support for Government developed flight hardware, or may ask for turnkey delivery of flight equipment, or anything in between. The requirements will be specified in a TO.
The contractor shall perform tasks associated with product development including:
design, fabrication, test, maintenance, repair, hardware and software integration, pre and post use processing, procedure development, and procedures for operational use for system and subsystem components for NASA program products.
The types of activities requested may include, but are not limited to:
• Advanced Studies
• Analysis and Trade Studies
• Concept Definition
• Systems Engineering and Integration
• Mission Architecture Definition, Design, and Planning
• Engineering Design and Development
• Manufacturing, Testing, Verification, and Certification
• Sustaining Engineering Activities [Hardware Resupply, Refurbishment, Mission
Hardware Support Activities, Failure Analysis, Repair, Operating Procedures]
• Flight Hardware Requirements Survey, Assessment, and Consolidation
• Engineering, Quality, and Safety Analyses
The contractor shall provide documentation including: engineering drawings, analysis reports, technical specifications and reports, test procedures and reports, and operations manuals as appropriate for hardware or software type.
Types of Data and Design Documentation required may include but are not limited to:
• Design Review Documentation
• Safety Review Documentation
• Test, Verification, and Certification Data
• Management Documentation
• Analysis Data Products
2.2.2 Flight Hardware and Software Certification
The contractor shall certify flight hardware and software in accordance with the applicable DRDs (e.g. RV-03, Project Technical Requirements Specification (PTRS), RV-04, Project Requirements and Verification Document (PRVD), RV-05, Certification and Acceptance Requirements Document (CARD)). The contractor shall perform tasks including: analyses, certification test plan development, certification, verification, and acceptance testing of hardware and software components, subsystems and systems.
The contractor shall follow the software engineering development and maintenance processes and practices required for compliance with NASA software engineering standards (e.g. NPR 7150.2, NASA Software Engineering Requirements), and Capability Maturity Model Integrated (CMMI) standards when the contractor is supporting the development of Class A software. This includes providing support for CMMI appraisals and audits. If the contractor is not CMMI maturity level 3 certified, development of Class A software shall be performed in accordance with the standards of JSC Spacecraft Software Engineering Team (SSET) and advised by the SSET Manager.
2.2.3 Hardware and Software Testing
The contractor shall perform or support testing, including the development and execution of plans and procedures, and the generation and analysis of data along with reports which document the performance of the product under test.
Testing is used in all phases of product development, i.e. design, development, evaluation, certification/qualification, and life determination. Testing is applied to materials, components, sub-assemblies, and complete assemblies. Testing often involves the modification of test systems and parameters to produce the environment required by the requester to meet particular objectives and margin demonstrations.
Validation of test system readiness, including pre-test reviews is often required.
Types of testing include but are not limited to:
• Thermal
• Vacuum and Thermal Vacuum
• Shock and Vibration
• Acoustics
• Oxygen Acceptance and initial wetting
• Electromagnetic Interference/Electromagnetic Compatibility
• Ionizing Radiation
• Vacuum Ultraviolet Light
• Atomic Oxygen
• Static/Dynamic Loads
• Contrast Ratio, Bi-directional Reflectance Distribution Function (BDRF)
• Function Performance
• Life Demonstration
• Software Verification and Validation
• Destructive Analysis and Lot Acceptance
• Failure Detection, Isolation, and Recovery
• Energy storage and conversion
• Power Distribution
• Failure modes
• Toxicity Screening by analytical means
• Off-gassing
• Wet Chemistry
• Metallurgy
2.2.4 Training
The contractor shall develop and maintain training capabilities, materials, and systems and provide training to users, including astronauts.
2.2.5 Database Development
The contractor shall design, develop, test, implement, acquire, and document technical and mission supporting databases required to support data requirements. Technical databases include but are not limited to: real-time data acquisition, data archival, data analysis, requirements development, design criteria data, flight parameters data, and hardware lists.
2.2.6 Website Development
The contractor shall design, develop, modify, test and install technical and mission supporting websites. Technical websites include but are not limited to: real-time data acquisition, data archival, data analysis, requirements development, design criteria data, flight parameters data, and hardware lists. The contractor shall provide configuration documentation and training on new and modified websites.
2.2.7 Project Management
The contractor shall perform project management in support of NASA objectives, including design, development, test and certification of Government Furnished Equipment (GFE) flight hardware and software, research and development projects, and in-house ground-based projects.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .