This solicitation requests proposals for the Human Space Flight Technical Integration Contract (HSFTIC). The contract is a total small business set-aside with a NAICS code of 541715 and size standard of 1,250. The National Aeronautics and Space Administration Johnson Space Center plans to release the request for proposal on November 1, 2019 with a proposal due date of December 11, 2019. The solicitation and any amendments will be available on the Johnson Space Center procurement website and Federal Business Opportunities website. Offerors must notify the issuing office of their intent to submit a proposal. All technical questions must be submitted in writing. The contract will provide technical integration services for human space flight programs.

SSP 50191

View the file

Other files for this federal contract opportunity

Other files attached to Human Space Flight Technical Integration Contract (HSFTIC), newest first.
File Type Posted
HSFTIC J-17 placeholder (FRFP).docx DOCX document
HSFTIC Interested Parties List - Rev. 1.pdf PDF
MD_1015_RA_FINAL.docx DOCX document
SSP41142P1_RF_CD_012044_.pdf PDF
42097P1_AE_RF_012968.pdf PDF
SSP41017p1rG.pdf PDF
SSP41143Pt1RevC.PDF PDF
6.0.zip ZIP file
N_PR_9501_002E_.pdf PDF
SSP_50316-Rev_C.docx DOCX document
SSP_57011_Rev_E.docx DOCX document
Applicable_5.zip ZIP file
ISS_Program_Flight_Rate.pptx PPTX presentation
MD_1040_FINAL_PSF_US_Charter.docx DOCX document
SSP_50578-RevC.docx DOCX document
42097P2RE_AE_RE_012967.pdf PDF
DSG-PLAN-004_Gateway_Configuration_and_Data_Management_Plan_Baseline.pdf PDF
SSP_50826.doc DOC document
SSP-50615_Baseline.doc DOC document
Subsystem_&_Mission_Functions_to_Modules.xlsx XLSX spreadsheet
Gateway_generic_org_chart.pptx PPTX presentation
SSP_50038.DOC DOC document
SSP_50190-RevF.docx DOCX document
SSP-50715_RevA.docx DOCX document
SSP_50273_Rev_J.docx DOCX document
50281.DOC DOC document
SSP_50469-RevD-Retired.docx DOCX document
Initial_Baseline_DSG-CONOP-001_06_2019.docx DOCX document
POH_Vol_2_2-2-18.pdf PDF
SSP_50200-01-ANXZ-RevB_SPIP_OZ.docx DOCX document
SSP_50744-Rev_A.docx DOCX document
ssp42097_p2_rd.pdf PDF
SSP_52055_Revision_D.doc DOC document
Work_Load_Indicators_Matrix_FRFP.xlsx XLSX spreadsheet
SSP_41140_P2_RD_111010.pdf PDF
SSP_42007-Rev_L-SSCD_15992.docx DOCX document
SSP_50420-HTV3-Baseline.docx DOCX document
Signed_Approved_Charter_31Aug08_IRT_Charter.doc DOC document
SSP_41147,_Part_1_Rev_C.pdf PDF
SSP_42121-Part_1-RevC.docx DOCX document
SSP_50754-RevA-DCN001-EAR99.docx DOCX document
SSP_50839-RevB-DCN001-Collated_Master.pdf PDF
SSP41148.pdf PDF
PALSTORE.PROD.O0073170.G0000001.IL TXT text file
SSP_30575-RevF.docx DOCX document
SSP_41165-RevN.docx DOCX document
SSP_50005_Rev_G.pdf PDF
SSP_50309_Part_2.pdf PDF
DRFP_Industry_Questions_and_Answers.pdf PDF
Draft_HSFTIC_Request_for_Proposal.pdf PDF
Show all 50

Human Space Flight Technical Integration Contract (HSFTIC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SSP 50191

NASA/ESA Bilateral Safety and Product Assurance Requirements

����International Space Station ��Program

��Baseline

��December 31, 1997��

National Aeronautics and Space Administration�International Space Station Program�Johnson Space Center�Houston, Texas�

REVISION AND HISTORY PAGE

Revision Letter�Description�Publication Date��-

�Initial Release�05-05-99�������PREFACE

The NASA/ESA Bilateral Safety and Product Assurance Requirements document is a joint National Aeronautics and Space Administration (NASA) and European Space Agency (ESA) document which describes all safety and product assurance requirements applicable to the ESA.

The contents of this document are derived from JESA 30000, section 9, Revision A, November 1993: NASA/STA Space Station Freedom Joint Program Definition and Requirements Document (JPDRD); Safety and Product Assurance Requirements, and SSP 30000, section 9, Revision F, September 1993; Space Station Program Definition and Requirements, section 9: Product Assurance Requirements.

The NASA/ESA Bilateral Safety and Product Assurance Requirements document is controlled after approval signatures, by the NASA Space Station Program Director and the ESA Program Manager. Both NASA and ESA herein mutually agree that the execution of this document is necessary for the effective and safe integration of the ESA Elements into the International Space Station.

/s/ R. H. Brinkley/s/ F. A. Longhurst 15 March 1999
Randy H. BrinkleyF.A. Longhurst
Manager,Manager,
Space Station ProgramHead of Manned Spaceflight
Programme Dept, D/MSM, ESA

INTERNATIONAL SPACE STATION PROGRAM

NASA/ESA BILATERAL SAFETY AND PRODUCT ASSURANCE REQUIREMENTS DOCUMENT

CONCURRENCE

May, 1997

Prepared By:Robert HooiNASA
PRINT NAMEORGN
/s/ Robert Hooi11/12/98
SIGNATUREDATE
Concurred By:Gladys HendersonNASA
(NASA S&MA,PRINT NAMEORGN

International Partners Lead) /s/ Gladys Henderson 1/5/99 SIGNATURE DATE

Concurred By:Jerry HolsombackNASA
(NASA Manager, S&MA)PRINT NAMEORGN
/s/ Jerry Holsomback4/1/99
SIGNATUREDATE
Concurred By:Gregor WoopESA
(ESA)PRINT NAMEORGN
/s/ Gregor Woop10-3-99
SIGNATUREDATE
DQARichard D. DelgadoOL
PRINT NAMEORGN
/s/ Richard D. Delgado11-12-98
SIGNATUREDATE

INTERNATIONAL SPACE STATION PROGRAM

NASA/ESA BILATERAL SAFETY AND PRODUCT ASSURANCE REQUIREMENTS DOCUMENT

LIST OF CHANGES

May, 1997

All changes to paragraphs, tables, and figures in this document are shown below:

SSCBD ENTRY DATE CHANGE PARAGRAPH(S)

TABLE(S)

FIGURE(S)

APPENDIX(ES)

ADDENDA
�PARAGRAPHTABLE OF CONTENTSPAGE
1.0INTRODUCTION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1 - 1
1.1PURPOSE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1 - 1
1.2SCOPE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1 - 1
1.3MANAGEMENT APPROACH. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1 - 1
1.3.A. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1 - 1
1.3.B. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1 - 1
1.3.C. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1 - 1
1.3.D. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1 - 1
1.4RELATION TO OTHER PROGRAM REQUIREMENTS. . . . . . . . . . . . . . .1 - 1
1.4.1PROGRAM REQUIREMENTS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1 - 1
1.4.2GSE HARDWARE AND SOFTWARE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1 - 2
MOTIVATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1 - 2
INDEPENDENT EVALUATIONS FOR NASA OR THE
INTERNATIONALPARTNERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1 - 2
DATA EXCHANGE AGREEMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1 - 2
SAFETY AND PRODUCT ASSURANCE DATABASE . . . . . . . . . . . . . . . . .1 - 2
MILESTONE REVIEWS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1 - 2
DELEGATION OF AUTHORITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..1 - 2
APPLICABLE AND REFERENCE DOCUMENTS . . . . . . . . . . . . . . . . . . . ..2 - 1
APPLICABLE DOCUMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..2 - 1
REFERENCE DOCUMENTS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2 - 1
EQUIVALENCY OF PROCESS DOCUMENTS. . . . . . . . . . . . . . . . . . . . . . .2 - 3
RELIABILITY AND MAINTAINABILITY. . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 1
MANAGEMENT. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 1
ORGANIZATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 1
PLANNING. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 1
RELIABILITY PLANS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 1
MAINTAINABILITY PLANS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 1
AUDITS AND SURVEYS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 1
SUPPLIER RELIABILITY AND MAINTAINABILITY CONTROL. . . . . . . . .3 - 2
NASA OR INTERNATIONAL PARTNER FURNISHED
EQUIPMENT(GFE/IGFE)RELIABILITY AND MAINTAINABILITY.. . . . . .3 - 2
RELIABILITY AND MAINTAINABILITY ENGINEERING. . . . . . . . . . . . . .3 - 2
RELIABILITY AND MAINTAINABILITY DESIGN CRITERIA. . . . . . . . . . .3 - 3
RELIABILITY AND MAINTAINABILITY ANALYSES/TRADE STUDIES. .3 - 3
RELIABILITY ANALYSES/TRADE STUDIES. . . . . . . . . . . . . . . . . . . . . . . .3 - 3
3.2.2.2MAINTAINABILITY ANALYSES/TRADE STUDIES. . . . . . . . . . . . . . . . . . .3 - 3
HARDWARE FAILUE MODES AND EFFECTS ANALYSES (FMEA)s. . . . .3 - 3
FLIGHT HARDWARE FMECAs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 3
GSE FMECAs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 3
PAYLOAD FMECAs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 3
CRITICALITY CATEGORIES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 3
CRITICALITY CATEGORIES FOR ESA PROJECTS. . . . . . . . . . . . . . . . . . .3 - 3
CRITICALITY CATEGORY 1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 3
CRITICALITY CATEGORY 1R. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 3
CRITICALITY CATEGORY 1S. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 3
CRITICALITY CATEGORY 1SR. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 3
CRITICALITY CATEGORY 1P. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 4
CRITICALITY CATEGORY 2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 4
CRITICALITY CATEGORY 2R. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 4
CRITICALITY CATEGORY 3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 4
GSE CRITICALITY CATEGORY. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 4
GSE CRITICALITY CATEGORY 1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 4
GSE CRITICALITY CATEGORY 1R. . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 4
GSE CRITICALITY CATEGORY 1S. . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 4
GSE CRITICALITY CATEGORY 2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 4
3.2.4.2.5GSE CRITICALITY CATEGORY 3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 4
CRITICAL ITEM CONTROL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 4
CRITICAL ITEMS LIST(CIL) PREPARATION. . . . . . . . . . . . . . . . . . . . .3 - 4
3.2.5.1.A. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 4
3.2.5.1.B. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 4
3.2.5.1.C. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 5
RELIABILITY AND MAINTAINABILITY DATA. . . . . . . . . . . . . . . . . .3 - 5
LIMITED-LIFE ITEMS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 5
MILESTONE REVIEWS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 5
CONFIGURATION CONTROL BOARDS AND PANELS. . . . . . . . . . . . .3 - 5
PROBLEM REPORTING SYSTEM. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 5
3.2.11VERIFICATION ASSURANCE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 5
ELECTRICAL, ELECTRONIC, AND ELECTROMECHANICAL (EEE)
AND MECHANICAL PARTS CONTROL. . . . . . . . . . . . . . . . . . . . . . . . .3 - 5
QUALITY ASSURANCE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 1
MANAGEMENT AND PLANNING. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 1
PLANNING. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 1
ORGANIZATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 1
QUALITY PROGRAM PLAN. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 1
PLANNING FOR ON-ORBIT ACTIVITIES . . . . . . . . . . . . . . . . . . . . . . . .4 - 1
MANAGEMENT ASSESSMENT DATA . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 1
TRAINING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 2
INTERNAL QUALITY PROGRAM AUDITS AND SURVEYS . . . . . . . . .4 - 2
MILESTONE REVIEWS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 2
4.2DESIGN AND DEVELOPMENT CONTROLS . . . . . . . . . . . . . . . . . . . . .4 - 2
TECHNICAL DOCUMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 2
4.2.1.A. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 2
4.2.1.B. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 3
QUALITY SUPPORT TO DESIGN REVIEWS . . . . . . . . . . . . . . . . . . . . .4 - 3
CHANGE CONTROL VERIFICATION . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 3
PRODUCT/PROCESS DEVELOPMENT AND VALIDATION . . . . . . . . .4 - 3
IDENTIFICATION AND DATA RETRIEVAL . . . . . . . . . . . . . . . . . . . . . .4 - 3
GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 3
4.3.1.A. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 4
4.3.1.A.1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 4
4.3.1.A.2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 4
4.3.1.A.3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 4
4.3.1.B. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..4 - 4
4.3.1.C. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 4
4.3.1.D. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 4
4.3.1.E. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 4
4.3.1.F. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 4
RETENTION OF RECORDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 4
RECORD RETRIEVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 4
PROCUREMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 5
PROCUREMENT CONTROLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..4 - 5
SELECTION OF CONTRACTOR PROCUREMENT SOURCES . . . . . . . .4 - 5
4.4.2.A. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 5
4.4.2.B. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 5
4.4.2.C. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 5
4.4.3PROCUREMENT DOCUMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 5
4.4.3.A. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 5
4.4.3.B. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 5
4.4.3.C. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 5
4.4.3.C.1CHANGES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 6
4.4.3.C.2TEST RESULTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 6
4.4.3.C.3ESA SOURCE INSPECTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 6
REVIEW OF PROCUREMENT DOCUMENTS . . . . . . . . . . . . . . . . . . . . .4 - 6
NASA QUALITY ASSURANCE PERSONNEL AT SOURCE . . . . . . . . . .4 - 6
RECEIVING INSPECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 6
PROCUREMENT SOURCE DATA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 7
AUDITS AND SURVEYS OF PROCUREMENT SOURCE
OPERATIONS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..4 - 7
4.4.8.A. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 7
4.4.8.B. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 7
4.4.8.C. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 7
FABRICATION CONTROLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 7
FABRICATIONS OPERATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 7
4.5.1.A. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 8
4.5.1.B. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 8
4.5.1.C. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 8
4.5.1.D. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 8
4.5.1.E. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 8
4.5.1.F. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 8
4.5.1.G. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 8
4.5.1.H. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 8
4.5.1.I. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 8
4.5.1.J. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 8
4.5.1.K. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . .. .4 - 8
4.5.1.L. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 9
4.5.1.M. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 9
4.5.1.N. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 9
ARTICLE AND MATERIAL CONTROLS . . . . . . . . . . . . . . . . . . . . . . . . .4 - 9
4.5.2.A. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 9
4.5.2.B. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 9
4.5.2.C. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 9
CLEANLINESS/CONTAMINATION CONTROL. . . . . . . . . . . . . . . . . . . .4 - 9
PROCESS CONTROLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 10
NONDESTRUCTIVE EVALUATION (NDE) . . . . . . . . . . . . . . . . . . . . . . .4 - 10
WORKMANSHIP STANDARDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 10
CONTROL OF TEMPORARY INSTALLATIONS AND REMOVALS . . .4 - 10
INSPECTION PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 10
TEST CONTROLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 10
VERIFICATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 11
TEST PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . .4 - 11
4.6.2.A. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 11
4.6.2.B. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 11
4.6.2.C. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 11
4.6.2.D. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 11
4.6.2.E. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 11
4.6.2.F. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 11
4.6.2.G. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 11
4.6.2.H. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 11
4.6.2.I. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 11
4.6.2.J. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 11
4.6.2.K. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 12
4.6.2.L. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 12
4.6.2.M. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 12
4.6.2.N. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 12
4.6.2.O. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 12
4.6.2.P. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 12
4.6.2.Q. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 12
TEST PERFORMANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 12
4.6.3.A. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 12
4.6.3.B. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 12
4.6.3.C. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 12
4.6.3.D. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 13
4.6.4INSPECTION AND TEST RECORDS AND DATA . . . . . . . . . . . . . . . . .4 - 13
4.6.4.1RECORDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 13
END-ITEM ACCEPTANCE DATA PACKAGE(ADP) . . . . . . . . . . . . .. .4 - 13
4.6.4.3.A. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 13
4.6.4.3.B. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 13
4.6.4.3.C. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 13
4.6.4.3.D. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 13
4.6.4.3.E. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 13
4.6.4.3.F. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 13
4.6.4.3.G. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 14
4.6.4.3.H. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 14
4.6.4.3.J. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 14
4.7NONCONFORMING ARTICLES AND MATERIALS . . . . . . . . . . . . . . . .4 - 14
NONCONFORMANCE CONTROL SYSTEM . . . . . . . . . . . . . . . . . . . . . .4 - 14
IDENTIFICATION OF NONFORMANCES . . . . . . . . . . . . . . . . . . . . . . . .4 - 14
NONCONFORMANCE EVALUATION . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 14
NONCONFORMANCE DISPOSITIONS . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 15
4.7.4.ARETURN TO SUPPLIER A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 15
4.7.4.BRETURN FOR REWORK OR COMPLETION OF OPERATIONS A . . . . .4 - 15
4.7.4.CSCRAP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 15
4.7.4.DMATERIAL REVIEW BOARD(MRB) . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 15
MATERIAL REVIEW BOARD (MRB) ACTION . . . . . . . . . . . . . . . . . . . .4 - 15
4.7.5.A. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 15
4.7.5.B. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 15
4.7.5.B.1REPAIR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 16
4.7.5.B.2USE AS IS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 16
4.7.5.B.3SCRAP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 16
4.7.5.B.4WAIVERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 16
4.7.5.B.5ARTICLES OR MATERIALS RETURNED TO SOURCE . . . . . . . . . . . .4 - 16
4.7.5.CMRB HOLDING AREA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 16
4.7.5.DSUPPLIER MRB . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 16
4.7.5.ERECURRENCE CONTROL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 17
4.7.6PROBLEM REPORTING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 17
METROLOGY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 17
4.8.1METROLOGY CONTROLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 17
4.8.2CALIBRATION RECORDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..4 - 17
4.8.2.A. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 17
4.8.2.B. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 17
4.8.2.C. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 17
4.8.2.D. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 17
4.8.2.E. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 17
4.8.2.F. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 18
4.8.2.G. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 18
4.8.2.H. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 18
MEASUREMENT ACCURACY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 18
CALIBRATION CONTROLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 18
FACILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 18
TRACEABILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 18
HANDLING, STORAGE, AND TRANSPORTATION . . . . . . . . . . . . . . . .4 - 18
IDENTIFICATION AND LABELING . . . . . . . . . . . . . . . . . . . . . . . . . . . ..4 - 18
CALIBRATION INTERVALS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 18
RECALL SYSTEM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 19
ENVIRONMENTAL REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 19
4.8.5REMEDIAL ACTION AND RECURRENCE CONTROL . . . . . . . . . . . . .4 - 19
4.9.ASTAMP AND MARKING MATERIALS . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 19
4.9.BSTAMP TRACEABILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 19
4.9.CSTAMP APPLICATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 19
4.9.DELECTRONIC DATA CONTROL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 19
4.9.ESTAMPING/MARKING APPLICATION . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 20
4.9.FSTATUS STAMPING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 20
4.9.GSTAMPING METHODS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 20
4.9.HSTAMP SIGNIFICANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 20
CONTRACTOR STAMP DESIGNS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 20
HANDLING, STORAGE, PRESERVATION, MARKING LABELING,
PACKING AND SHIPPING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 20
PROCEDURES AND INSTRUCTIONS CONTROL . . . . . . . . . . . . . . . . .4 - 20
HANDLING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 20
STORAGE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..4 - 20
4.10.3.A. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 20
4.10.3.B. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 20
4.10.3.C. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 21
4.10.3.D. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 21
4.10.4PRESERVATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 21
4.10.5PACKAGING AND PACKING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 21
4.10.6MARKING AND LABELING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 21
SHIPPING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 21
4.10.7.1CONTROLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 21
4.10.7.1.A. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..4 - 21
4.10.7.1.B. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..4 - 21
4.10.7.2UNSCHEDULED REMOVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 22
4.11SAMPLING PLANS, STATISTICAL PLANNING, AND ANALYSES . . .4 - 22
4.11.1SAMPLING PLANS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 22
4.11.2STATISTICAL ANALYSES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 22
4.12CONTROL OF NASA AND INTERNATIONAL PARTNER PROPERTY. .4 - 22
4.12.1CONTRACTOR RESPONSIBILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 22
4.12.1.A. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 22
4.12.1.B. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 22
4.12.1.C. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 22
4.12.1.D. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 23
4.12.1.E. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 - 23
UNSUITABLE NASA OR INTERNATIONAL PARTNER PROPERTY . .4 - 23
SOFTWARE PRODUCT ASSURANCE. . . . . . . . . . . . . . . . . . . . . . . . ..5 - 1
MANAGEMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 1
ORGANIZATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 1
SOFTWARE PRODUCT ASSURANCE PLANNING . . . . . . . . . . . . . . . . . 5 - 1
5.1.3FORMAL AND INTERNAL REVIEWS . . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 1
5.1.4SUBTLER REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 1
5.1.5NON-DEVELOPMENTAL SOFTWARE . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 1
NASA OR ESA FURNISHED SOFTWARE . . . . . . . . . . . . . . . . . . . . . . . .5 - 2
PROGRESS REPORTING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 2
CONTROL BOARDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 2
5.1.9OPERATIONS AND MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . ..5 - 2
TRAINING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 2
5.1.11SPA TOOLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 2
SOFTWARE QUALITY ASSURANCE . . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 2
AUDITS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . .5 - 2
TOOLS, TECHNIQUES, AND METHODOLOGIES . . . . . . . . . . . . . . . . .5 - 3
SOFTWARE DOCUMENTATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 3
SOFTWARE CODE INSPECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 3
5.25SOFTWARE TESTING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 3
5.2.6SOFTWARE LIFE-CYCLE PROCESS EVALUATION . . . . . . . . . . . . . . .5 - 4
5.3CONFIGURATION MANAGEMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 4
5.3.1CONFIGURATION IDENTIFICATION, STATUS ACCOUNTING AND
VERIFICATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 4
5.3.2CONFIGURATION CHANGE CONTROL . . . . . . . . . . . . . . . . . . . . . . . . .5 - 4
5.3.3SOFTWARE DELIVERY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 4
SOFTWARE LIBRARIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 5
5.4NONCONFORMANCE REPORTING AND CORRECTIVE ACTION . . .5 - 5
5.4.1NONCONFORMANCE REPORTING . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 5
5.4.2CORRECTIVE ACTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 5
5.4.3ISS PROBLEM REPORTING AND CORRECTIVE ACTION . . . . . . . . . .5 - 5
RELIABILITY AND MAINTAINABILITY ASSURANCE . . . . . . . . . . . .5 - 5
TRADE STUDIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 5
STANDARDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 5
5.5.3FORMAL SOFTWARE REVIEWS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 5
5.5.4NONCONFORMANCE ANALYSIS . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..5 - 5
5.5.5REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 5
5.5.6DESIGN ANALYSIS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 6
FAULT TOLERANCE ANALYSIS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 6
5.5.8SOURCE CODE EVALUATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 6
5.5.9TEST . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 6
5.6SOFTWARE SAFETY ASSURANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 6
5.7INTEGRATION ASSURANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 6
5.8VERIFICATION AND VALIDATION . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 7
INDEPENDENT VERIFICATION AND VALIDATION . . . . . . . . . . . . . .5 - 7
5.10CERTIFICATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 7
5.11SECURITY AND PRIVACY ASSURANCE . . . . . . . . . . . . . . . . . . . . . . . .5 - 7
5.12IDENTIFICATION AND DATA RETRIEVAL . . . . . . . . . . . . . . . . . . . . ..5 - 7
6.0SAFETY. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6 - 1
6.1SAFETY MANAGEMENT. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6 - 1
6.1.1SAFETY APPROACH. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6 - 1
6.1.2ORGANIZATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6 - 1
6.1.3LAUNCH SITE SAFETY PLAN. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6 - 1
SAFETY REVIEW REQUIREMENTS. . . . . . . . . . . . . . . . . . . . . . . . . . . .6 - 1
6.1.4.1SPACE STATION REVIEW AND CERTIFICATION. . . . . . . . . . . . . . . .6 - 1
6.1.4.2SPACE STATION USER PAYLOAD SAFETY REVIEWS. . . . . . . . . . . .6 - 2
SAFETY AUDIT TEAMS AND SURVEYS. . . . . . . . . . . . . . . . . . . . . . . .6 - 2
6.1.6MISHAP REPORTING AND INVESTIGATION. . . . . . . . . . . . . . . . . . . .6 - 2
6.1.7SAFETY TRAINING AND CERTIFICATION. . . . . . . . . . . . . . . . . . . . . .6 - 2
6.1.8WAIVERS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6 - 2
6.2SYSTEM SAFETY. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..6 - 3
SYSTEM SAFETY OBJECTIVES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6 - 3
6.2.1.A. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6 - 3
6.2.1.B. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6 - 3
6.2.1.C. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6 - 3
6.2.1.D. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6 - 3
ESA PROJECTS SYSTEM SAFETY TECHNICAL REQUIREMENTS. . .6 - 3
6.2.3SAFETY ANALYSES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6 - 3
6.2.4HAZARD ELIMINATION AND CONTROL. . . . . . . . . . . . . . . . . . . . . . . .6 - 3
6.2.5HAZARD REPORT CLOSURE CONTROL. . . . . . . . . . . . . . . . . . . . . . . .6 - 3
6.2.6HUMAN ENGINEERING. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6 - 4
6.2.7SPECIFICATIONS AND PROCEDURES REVIEW. . . . . . . . . . . . . . . . . .6 - 4
NASA OR INTERNATIONAL PARTNER FURNISHED EQUIPMENT
SAFETY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6 - 4
6.2.9GROUND SUPPORT EQUIPMENT (GSE) SAFETY. . . . . . . . . . . . . . . . .6 - 4
6.2.10REVIEW OF CHANGES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6 - 4
6.2.11REVIEW OF FLIGHT AND GROUND HARDWARE FAILURES . . . . . .6 - 5
6.2.12EVALUATION OF GROUND AND FLIGHT TEST RESULTS . . . . . . . .6 - 5
6.2.13EVALUATION OF MISSION OPERATIONAL ACTIVITY . . . . . . . . . . .6 - 5
INDUSTRIAL SAFETY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6 - 5
APPENDIX A ABBREVIATIONS AND ACRONYMS. . . . . . . . . . . . . .A - 1
APPENDIX B GLOSSARY OF TERMS . . . . . . . . . . . . . . . . . . . . . . . . .B - 1 �1.0 INTRODUCTION

The ESA PA/Safety requirements are contained in the ESA project system requirements (e.g. COL-RQ-ESA-001, MS-RQ-ESA-004) and its associated ESA standards specification documents.

1.1 PURPOSE

This document establishes the joint hardware and software safety and product assurance (reliability, maintainability, and Quality Assurance) implementation requirements between NASA and ESA for the design, development, production, test, and operation of ESA vehicles, during the ISS program.

1.2 SCOPE

These safety and product assurance requirements are applicable to all flight equipment, Orbital Support Equipment (OSE), Flight Support Equipment (FSE), and certain Ground Support Equipment (GSE) (as specified herein) and related software supplied for the ESA projects.

1.3 MANAGEMENT APPROACH

The ESA Product Assurance implementation and Safety approach is covered by MS-RQ-ESA-004 and associated ESA standards specification documents.

Management of safety and product assurance shall include the following:

1.3.A Defining the major hardware and software safety and product assurance tasks and assuring that they are performed as integral parts of all phases of the program

1.3.B Evaluating the safety, reliability, maintainability, and quality of hardware, software, and operations through analyses, tests, reviews, and assessments

1.3.C Providing timely status reporting through periodic project reviews and as a part of overall project status reports

1.3.D Ensuring compatible safety and product assurance requirements for manufacturing, test, launch, and ground operations. For ESA, a safety and product assurance management plan shall be prepared by the project contractor. Safety and product assurance management shall have direct unimpeded access to the management level having full project responsibility.

1.4 RELATION TO OTHER PROGRAM REQUIREMENTS

1.4.1 PROGRAM REQUIREMENTS

The safety and product assurance analytical and verification requirements set forth in this document shall take precedence in cases of conflict with requirements contained in sub-tier documents. The safety and product assurance design requirements are contained in, for instance, in the applicable ESA segment specifications (e.g. SSP 41160, Segment Specification for the European Space Agency). The ESA requirements of MS-RQ-ESA-004 shall be the basis of the safety and product assurance program for the ESA projects and its interface to the ISS.

1.4.2 GSE HARDWARE AND SOFTWARE

NASA provided Safety and Mission Assurance (S&MA) analyses for GSE hardware and software used by ISS, but procured by other programs, need not be performed again when evaluation approved by the Product Groups and International Partners Project Office proposing the use of the GSE shows each analysis to be adequate to meet the intent of the applicable ISS analytical requirements document. All Critical Items and accepted risk hazards identified in these analyses must be baselined by the ISS.

1.5 MOTIVATION

Not Applicable.

1.6 INDEPENDENT EVALUATIONS FOR NASA OR THE INTERNATIONAL PARTNERS

ESA reserves the right to appoint independent representatives to assist in Safety and Product Assurance evaluation activities. These representatives will provide technical support to the applicable parent organization and determine effectiveness of and recommend improvements for Safety and Product Assurance activities.

NASA participation in such activities at ESA contractors will be subject to ESA agreement, on a case by case basis.

1.7 DATA EXCHANGE AGREEMENTS

All S&PA exchange data between NASA and ESA as agreed through the requirement of this document shall be identified in SSP 50127, NASA/ESA Data Exchange Agreement.

1.8 SAFETY AND PRODUCT ASSURANCE DATABASE

Safety and product assurance databases shall be established. The data transfer format will be defined in the SSP 50127, NASA/ESA Data Exchange Agreement.

1.9 MILESTONE REVIEWS

Safety and product assurance activities shall include supporting design reviews, and NASA and ESA design and readiness reviews. Participation in milestone reviews shall assure that safety and product assurance requirements are adequately considered.

1.10 DELEGATION OF AUTHORITY

This document will be revised as required. Revisions will be made according to the agreements in the NASA/ESA Joint Management Plan, SSP 50019. �2.0 APPLICABLE AND REFERENCE DOCUMENTS

2.1 APPLICABLE DOCUMENTS

The following documents of the date, issue, and revision shown form part of this document to the extent specified herein.

For NASA generated documents, “Current Issue" is shown in place of the specific date and issue when the document is under Program Office Space Station Control Board (SSCB) control

For ESA generated documents, “Current Issue” is shown in place of the specific date and issue, when the document is under ESA Configuration Control.

ESA DOCUMENT

“XXX”-RQ-ESA-001 “XXX” System Requirements Document by the (Current Issue) applicable (Current Issue) ESA project “XXX”(e.g. XXX = COL for APM/COF project)

MS-RQ-ESA-004 Product Assurance Requirements (Current Issue)

MS-ESA-HB-13Manned Space Flight Human Factors Engineering
(Current Issue)Handbook

MS-RQ-ESA-028 CPRACA Requirements for Columbus (Current Issue)

MS-ESA-PR-004 Safety Review Process for the Manned Spaceflight Projects (Current Issue)

2.2 REFERENCE DOCUMENTS

The following documents referred to herein may be utilized by ESA for information and guidance in implementing the requirements of this document.

ISS DOCUMENTS

SSP 30309Safety Analysis and Risk Assessment Requirements
(Current Issue) Document
Reference Paragraph 6.2.3

SSP 30459 Space Station Interface Development Process Requirements

SSP 30599 Safety Review Process Document Reference Paragraph 6.1.4.2

SSP 41160 Segment Specification for the European Space Agency Attached Pressurized Module

SSP 41170 Configuration Management Requirements

SSP 41173Space Station Quality Assurance Requirements.
(Current Issue) Reference Paragraph 4.0

SSP 50005 International Space Station Flight Crew Integration Standard (NASA-STD-3000/T)

SSP 50013 Information Systems Plan

SSP 50127 Bilateral Data Exchange Agreement

TSS 30696, Volume 2Assembly and Maintenance Implementation DefinitionDocument (AMIDD) Volume II:Maintenance
Reference Paragraph 3.1.1.2

NASA-STD-3000 Man-Systems Integration Standards Reference Paragraph 6.2.6

NHB 1700.1 (V1-A) Basic Safety Manual Reference Paragraph 6.3

NHB 1700.1 (V3) System Safety

NHB 1700.1 (V9) NASA Safety Manual-Fire Protection Reference Paragraph 6.3

�2.3 EQUIVALENCY OF PROCESS DOCUMENTS

The following matrix delineates the correspondence between ESA documents and documents called out in SSP 30000, Section 9. The matrix shows the status of the determination of the Meet/Exceed equivalency of the documents (See Matrix Provided per JESA 30000) (matrix - page 1)

TABLE 1 TRACEABILITY MATRIX

NASA �Rev.�ESA Tier 3�Rev.�Equivalency�Date ��SSP 30223 Problem Reporting and Corrective Action System Requirements for the Space Station Program�D 29July 92�Columbus Problem Reporting and Corrective Action Requirements COL-RQ-ESA-028�Issue 4 30-Jan-92�YES Usage per paragraph 4.7.6�Aug-92��SSP 30233 Space Station Requirements for Materials and Processes� C 26 Sep 91�PSS-01-70�Issue 3 Oct 87�YES Per BB003255�Aug-92��SSP 30234 Instructions for Preparation of Failure Modes and Effects (FMEA) and Critical Items List (CIL) for Space Station�A 30 Jun 88 with SSCBD BB000658B�Document per ESA/NASA agreement���Dec-97��SSP 30309 Hazard Analysis and Risk Assessment Requirements�B 23 Oct 91 with SSCBD BB003134�Columbus System Requirements Document (SRD) COL-RQ-ESA-001 ESA/Columbus PA/Safety Requirements COL-RQ-ESA-004 System Safety requirements for ESA Space Systems Associated Equipment PSS-01-40�Issue 2 12 Aug 92

Issue 1, Rev E Dec 91

Issue 2 Sept 88�Yes with 3 exceptions: 1)SSP 30309 Para. 3.1.5 will be modified 2)Para 5.2 and Para 5.4.3 are pending approval of SSP 30599 in change Request BB003229B *NOTE 1*�Aug-92��SSP 30312 Electrical, Electronic, and Electromechanical Parts Management and Implementation Plan for Space Station Program�C 11 Sep 91�PSS-01-60�Issue 2 Nov 88�Yes *NOTE 2*�Aug 92��SSP 30423 Space Station Allowed Electrical, Electronic and Electromechanical Parts List� C 30 Jul 91�Columbus Preferred Parts List�Issue 3B�Yes *NOTE 2*�Aug-92��SSP 30595 Space Station Freedom Payload Safety Review Process�TBD�TBD �TBD�TBD���SSP 30599 Safety Review Process for Space Station Program�per BB003229B�ESA/Columbus Safety Review Process for Space Station Related Flight Configurations COL-PR-ESA-004 �Issue 1 9 Apr 92�TBD���

NASA �Rev.�ESA Tier 3�Rev.�Equivalency�Date ��SSP TBD Critical Item Control Plan�TBD�TBD�TBD�TBD���MIL-STD 105��-�-�Applicable to ESA���MIL-STD 414�� -� -�Applicable to ESA���MIL-STD 970�1-Oct-87�PSS-01-60�Issue 2 Nov 88�Yes *NOTE 2*�Aug-92��MIL-STD 975�Jan-92�ESA/SCC QPL��Yes *NOTE 2*�Aug-92��NSTS 1700.7B�13 Jan 89�-�-�Applicable by Section 3, JPDRD���NASA STD 3000 (Vol. 4)�Nov 86 �COL-RQ-ESA-013�Issue 2, Rev. C 8-Nov.-91�Yes, refer to JESA 30000 Section 3���NHB 5300.4(3A-1)�1 Dec 76�PSS-01-708�Issue 1 Mar 85�TBD�Aug. 92��NHB 5300.4(3F)�1 Jun 72�TBD��TBD���NHB 5300.4 (3G)�1 Apr 85�PSS-01-708�Issue 1 Mar 85�TBD�Aug. 92��NHB 5300.4(3H)�1 May 84�PSS-01-726�Issue 1 Dec 90�TBD�Aug. 92��NHB 5300.4(3I)�1 May 84�PSS-01-710 and

PSS-01-728�Issue 1 Oct 85

Issue 1 Feb 83�TBD�Aug. 92��NHB 5300.4(3J)�1 Apr 85�ESA Approved Industry Standards��TBD�Aug 92��NHB 5300.4(3K)�7 Jan 86�PSS-01-710 and PSS-01-728�Issue 1 Oct 85�TBD�Aug 92��KMI 1710.1�21 Apr 88�-�-�Applicable to ESA for KSC Operations��� *NOTE 1: ESA/NASA agree that the cross reference matrix for SSP 30309 as contained in the minutes of the 8/3-7/92 Meets/Exceeds coordination meeting and as enhanced by DSS-3 constitutes adequate rationale for meets or exceeds agreement. The minutes with the enhanced matrix will be kept on file by the SSPO Configuration Management Office within the BB003239 records.

* NOTE 2: Equivalency rationale/traceability per minutes of NASA/ESA Safety and Product Assurance Technical Interchange Meeting of August 3-7, 1992

(matrix - page 2)

TABLE 2 TRACEABILITY MATRIX

SSP 50038, Rev. B, Computer-Based Control System Safety…

This is the start of the file's text. The full file is on GovTribe.