SSP_50191.DOC
DOC document 413 KB Posted
- Attached to
- Human Space Flight Technical Integration Contract (HSFTIC) Federal contract opportunity
- Solicitation number
- 80JSC019R0023
About this file
This solicitation requests proposals for the Human Space Flight Technical Integration Contract (HSFTIC). The contract is a total small business set-aside with a NAICS code of 541715 and size standard of 1,250. The National Aeronautics and Space Administration Johnson Space Center plans to release the request for proposal on November 1, 2019 with a proposal due date of December 11, 2019. The solicitation and any amendments will be available on the Johnson Space Center procurement website and Federal Business Opportunities website. Offerors must notify the issuing office of their intent to submit a proposal. All technical questions must be submitted in writing. The contract will provide technical integration services for human space flight programs.
SSP 50191
View the file
Other files for this federal contract opportunity
Show all 50
Human Space Flight Technical Integration Contract (HSFTIC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SSP 50191
NASA/ESA Bilateral Safety and Product Assurance Requirements
����International Space Station ��Program
��Baseline
��December 31, 1997��
National Aeronautics and Space Administration�International Space Station Program�Johnson Space Center�Houston, Texas�
REVISION AND HISTORY PAGE
Revision Letter�Description�Publication Date��-
�Initial Release�05-05-99�������PREFACE
The NASA/ESA Bilateral Safety and Product Assurance Requirements document is a joint National Aeronautics and Space Administration (NASA) and European Space Agency (ESA) document which describes all safety and product assurance requirements applicable to the ESA.
The contents of this document are derived from JESA 30000, section 9, Revision A, November 1993: NASA/STA Space Station Freedom Joint Program Definition and Requirements Document (JPDRD); Safety and Product Assurance Requirements, and SSP 30000, section 9, Revision F, September 1993; Space Station Program Definition and Requirements, section 9: Product Assurance Requirements.
The NASA/ESA Bilateral Safety and Product Assurance Requirements document is controlled after approval signatures, by the NASA Space Station Program Director and the ESA Program Manager. Both NASA and ESA herein mutually agree that the execution of this document is necessary for the effective and safe integration of the ESA Elements into the International Space Station.
| /s/ R. H. Brinkley | /s/ F. A. Longhurst 15 March 1999 | ||
| Randy H. Brinkley | F.A. Longhurst | ||
| Manager, | Manager, | ||
| Space Station Program | Head of Manned Spaceflight | ||
| Programme Dept, D/MSM, ESA |
INTERNATIONAL SPACE STATION PROGRAM
NASA/ESA BILATERAL SAFETY AND PRODUCT ASSURANCE REQUIREMENTS DOCUMENT
CONCURRENCE
May, 1997
| Prepared By: | Robert Hooi | NASA | |
| PRINT NAME | ORGN |
| /s/ Robert Hooi | 11/12/98 | |
| SIGNATURE | DATE |
| Concurred By: | Gladys Henderson | NASA | |
| (NASA S&MA, | PRINT NAME | ORGN |
International Partners Lead) /s/ Gladys Henderson 1/5/99 SIGNATURE DATE
| Concurred By: | Jerry Holsomback | NASA | |
| (NASA Manager, S&MA) | PRINT NAME | ORGN |
| /s/ Jerry Holsomback | 4/1/99 | |
| SIGNATURE | DATE |
| Concurred By: | Gregor Woop | ESA | |
| (ESA) | PRINT NAME | ORGN |
| /s/ Gregor Woop | 10-3-99 | |
| SIGNATURE | DATE |
| DQA | Richard D. Delgado | OL | |
| PRINT NAME | ORGN |
| /s/ Richard D. Delgado | 11-12-98 | |
| SIGNATURE | DATE |
INTERNATIONAL SPACE STATION PROGRAM
NASA/ESA BILATERAL SAFETY AND PRODUCT ASSURANCE REQUIREMENTS DOCUMENT
LIST OF CHANGES
May, 1997
All changes to paragraphs, tables, and figures in this document are shown below:
SSCBD ENTRY DATE CHANGE PARAGRAPH(S)
TABLE(S)
FIGURE(S)
APPENDIX(ES)
| ADDENDA | ||
| �PARAGRAPH | TABLE OF CONTENTS | PAGE |
| 1.0 | INTRODUCTION | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 1 - 1 | ||
| 1.1 | PURPOSE | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 1 - 1 | ||
| 1.2 | SCOPE | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 1 - 1 | ||
| 1.3 | MANAGEMENT APPROACH | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 1 - 1 | ||
| 1.3.A | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 1 - 1 | |||
| 1.3.B | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 1 - 1 | |||
| 1.3.C | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 1 - 1 | |||
| 1.3.D | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 1 - 1 | |||
| 1.4 | RELATION TO OTHER PROGRAM REQUIREMENTS | . . . . . . . . . . . . . . . | 1 - 1 | ||
| 1.4.1 | PROGRAM REQUIREMENTS | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 1 - 1 | ||
| 1.4.2 | GSE HARDWARE AND SOFTWARE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 1 - 2 | |||
| MOTIVATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 1 - 2 | ||||
| INDEPENDENT EVALUATIONS FOR NASA OR THE | |||||
| INTERNATIONAL | PARTNERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 1 - 2 | |||
| DATA EXCHANGE AGREEMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 1 - 2 | ||||
| SAFETY AND PRODUCT ASSURANCE DATABASE . . . . . . . . . . . . . . . . . | 1 - 2 | ||||
| MILESTONE REVIEWS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 1 - 2 | ||||
| DELEGATION OF AUTHORITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. | 1 - 2 | ||||
| APPLICABLE AND REFERENCE DOCUMENTS . . . . . . . . . . . . . . . . . . . .. | 2 - 1 | ||||
| APPLICABLE DOCUMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. | 2 - 1 | ||||
| REFERENCE DOCUMENTS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 2 - 1 | ||||
| EQUIVALENCY OF PROCESS DOCUMENTS. . . . . . . . . . . . . . . . . . . . . . . | 2 - 3 | ||||
| RELIABILITY AND MAINTAINABILITY. . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 1 | ||||
| MANAGEMENT. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 1 | ||||
| ORGANIZATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 1 | ||||
| PLANNING. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 1 | ||||
| RELIABILITY PLANS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 1 | ||||
| MAINTAINABILITY PLANS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 1 | ||||
| AUDITS AND SURVEYS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 1 | ||||
| SUPPLIER RELIABILITY AND MAINTAINABILITY CONTROL. . . . . . . . . | 3 - 2 | ||||
| NASA OR INTERNATIONAL PARTNER FURNISHED | |||||
| EQUIPMENT(GFE/IGFE) | RELIABILITY AND MAINTAINABILITY.. . . . . . | 3 - 2 | |||
| RELIABILITY AND MAINTAINABILITY ENGINEERING. . . . . . . . . . . . . . | 3 - 2 | ||||
| RELIABILITY AND MAINTAINABILITY DESIGN CRITERIA. . . . . . . . . . . | 3 - 3 | ||||
| RELIABILITY AND MAINTAINABILITY ANALYSES/TRADE STUDIES. . | 3 - 3 | ||||
| RELIABILITY ANALYSES/TRADE STUDIES. . . . . . . . . . . . . . . . . . . . . . . . | 3 - 3 | ||||
| 3.2.2.2 | MAINTAINABILITY ANALYSES/TRADE STUDIES. . . . . . . . . . . . . . . . . . . | 3 - 3 | |||
| HARDWARE FAILUE MODES AND EFFECTS ANALYSES (FMEA)s. . . . . | 3 - 3 | ||||
| FLIGHT HARDWARE FMECAs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 3 | ||||
| GSE FMECAs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 3 | ||||
| PAYLOAD FMECAs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 3 | ||||
| CRITICALITY CATEGORIES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 3 | ||||
| CRITICALITY CATEGORIES FOR ESA PROJECTS. . . . . . . . . . . . . . . . . . . | 3 - 3 | ||||
| CRITICALITY CATEGORY 1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 3 | ||||
| CRITICALITY CATEGORY 1R. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 3 | ||||
| CRITICALITY CATEGORY 1S. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 3 | ||||
| CRITICALITY CATEGORY 1SR. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 3 | ||||
| CRITICALITY CATEGORY 1P. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 4 | ||||
| CRITICALITY CATEGORY 2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 4 | ||||
| CRITICALITY CATEGORY 2R. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 4 | ||||
| CRITICALITY CATEGORY 3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 4 | ||||
| GSE CRITICALITY CATEGORY. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 4 | ||||
| GSE CRITICALITY CATEGORY 1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 4 | ||||
| GSE CRITICALITY CATEGORY 1R. . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 4 | ||||
| GSE CRITICALITY CATEGORY 1S. . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 4 | ||||
| GSE CRITICALITY CATEGORY 2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 4 | ||||
| 3.2.4.2.5 | GSE CRITICALITY CATEGORY 3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 4 | |||
| CRITICAL ITEM CONTROL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 4 | ||||
| CRITICAL ITEMS LIST(CIL) PREPARATION. . . . . . . . . . . . . . . . . . . . . | 3 - 4 | ||||
| 3.2.5.1.A | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 4 | |||
| 3.2.5.1.B | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 4 | |||
| 3.2.5.1.C | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 5 | |||
| RELIABILITY AND MAINTAINABILITY DATA. . . . . . . . . . . . . . . . . . | 3 - 5 | ||||
| LIMITED-LIFE ITEMS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 5 | ||||
| MILESTONE REVIEWS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 5 | ||||
| CONFIGURATION CONTROL BOARDS AND PANELS. . . . . . . . . . . . . | 3 - 5 | ||||
| PROBLEM REPORTING SYSTEM. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 5 | ||||
| 3.2.11 | VERIFICATION ASSURANCE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 5 | |||
| ELECTRICAL, ELECTRONIC, AND ELECTROMECHANICAL (EEE) | |||||
| AND MECHANICAL PARTS CONTROL. . . . . . . . . . . . . . . . . . . . . . . . . | 3 - 5 | ||||
| QUALITY ASSURANCE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 1 | ||||
| MANAGEMENT AND PLANNING. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 1 | ||||
| PLANNING. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 1 | ||||
| ORGANIZATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 1 | ||||
| QUALITY PROGRAM PLAN. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 1 | ||||
| PLANNING FOR ON-ORBIT ACTIVITIES . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 1 | ||||
| MANAGEMENT ASSESSMENT DATA . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 1 | ||||
| TRAINING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 2 | ||||
| INTERNAL QUALITY PROGRAM AUDITS AND SURVEYS . . . . . . . . . | 4 - 2 | ||||
| MILESTONE REVIEWS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 2 | ||||
| 4.2 | DESIGN AND DEVELOPMENT CONTROLS . . . . . . . . . . . . . . . . . . . . . | 4 - 2 | |||
| TECHNICAL DOCUMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 2 | ||||
| 4.2.1.A | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 2 | |||
| 4.2.1.B | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 3 | |||
| QUALITY SUPPORT TO DESIGN REVIEWS . . . . . . . . . . . . . . . . . . . . . | 4 - 3 | ||||
| CHANGE CONTROL VERIFICATION . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 3 | ||||
| PRODUCT/PROCESS DEVELOPMENT AND VALIDATION . . . . . . . . . | 4 - 3 | ||||
| IDENTIFICATION AND DATA RETRIEVAL . . . . . . . . . . . . . . . . . . . . . . | 4 - 3 | ||||
| GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 3 | ||||
| 4.3.1.A | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 4 | |||
| 4.3.1.A.1 | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 4 | |||
| 4.3.1.A.2 | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 4 | |||
| 4.3.1.A.3 | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 4 | |||
| 4.3.1.B | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. | 4 - 4 | |||
| 4.3.1.C | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 4 | |||
| 4.3.1.D | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 4 | |||
| 4.3.1.E | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 4 | |||
| 4.3.1.F | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 4 | |||
| RETENTION OF RECORDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 4 | ||||
| RECORD RETRIEVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 4 | ||||
| PROCUREMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 5 | ||||
| PROCUREMENT CONTROLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | . | 4 - 5 | |||
| SELECTION OF CONTRACTOR PROCUREMENT SOURCES . . . . . . . . | 4 - 5 | ||||
| 4.4.2.A | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 5 | |||
| 4.4.2.B | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 5 | |||
| 4.4.2.C | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 5 | |||
| 4.4.3 | PROCUREMENT DOCUMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 5 | |||
| 4.4.3.A | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 5 | |||
| 4.4.3.B | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 5 | |||
| 4.4.3.C | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 5 | |||
| 4.4.3.C.1 | CHANGES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 6 | |||
| 4.4.3.C.2 | TEST RESULTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 6 | |||
| 4.4.3.C.3 | ESA SOURCE INSPECTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 6 | |||
| REVIEW OF PROCUREMENT DOCUMENTS . . . . . . . . . . . . . . . . . . . . . | 4 - 6 | ||||
| NASA QUALITY ASSURANCE PERSONNEL AT SOURCE . . . . . . . . . . | 4 - 6 | ||||
| RECEIVING INSPECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 6 | ||||
| PROCUREMENT SOURCE DATA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 7 | ||||
| AUDITS AND SURVEYS OF PROCUREMENT SOURCE | |||||
| OPERATIONS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | . | 4 - 7 | |||
| 4.4.8.A | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 7 | |||
| 4.4.8.B | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 7 | |||
| 4.4.8.C | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 7 | |||
| FABRICATION CONTROLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 7 | ||||
| FABRICATIONS OPERATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 7 | ||||
| 4.5.1.A | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 8 | |||
| 4.5.1.B | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 8 | |||
| 4.5.1.C | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 8 | |||
| 4.5.1.D | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 8 | |||
| 4.5.1.E | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 8 | |||
| 4.5.1.F | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 8 | |||
| 4.5.1.G | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 8 | |||
| 4.5.1.H | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 8 | |||
| 4.5.1.I | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 8 | |||
| 4.5.1.J | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 8 | |||
| 4.5.1.K | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . .. . | 4 - 8 | |||
| 4.5.1.L | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 9 | |||
| 4.5.1.M | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 9 | |||
| 4.5.1.N | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 9 | |||
| ARTICLE AND MATERIAL CONTROLS . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 9 | ||||
| 4.5.2.A | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 9 | |||
| 4.5.2.B | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 9 | |||
| 4.5.2.C | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 9 | |||
| CLEANLINESS/CONTAMINATION CONTROL. . . . . . . . . . . . . . . . . . . . | 4 - 9 | ||||
| PROCESS CONTROLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 10 | ||||
| NONDESTRUCTIVE EVALUATION (NDE) . . . . . . . . . . . . . . . . . . . . . . . | 4 - 10 | ||||
| WORKMANSHIP STANDARDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 10 | ||||
| CONTROL OF TEMPORARY INSTALLATIONS AND REMOVALS . . . | 4 - 10 | ||||
| INSPECTION PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 10 | ||||
| TEST CONTROLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 10 | ||||
| VERIFICATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 11 | ||||
| TEST PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . | 4 - 11 | ||||
| 4.6.2.A | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 11 | |||
| 4.6.2.B | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 11 | |||
| 4.6.2.C | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 11 | |||
| 4.6.2.D | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 11 | |||
| 4.6.2.E | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 11 | |||
| 4.6.2.F | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 11 | |||
| 4.6.2.G | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 11 | |||
| 4.6.2.H | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 11 | |||
| 4.6.2.I | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 11 | |||
| 4.6.2.J | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 11 | |||
| 4.6.2.K | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 12 | |||
| 4.6.2.L | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 12 | |||
| 4.6.2.M | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 12 | |||
| 4.6.2.N | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 12 | |||
| 4.6.2.O | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 12 | |||
| 4.6.2.P | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 12 | |||
| 4.6.2.Q | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 12 | |||
| TEST PERFORMANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 12 | ||||
| 4.6.3.A | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 12 | |||
| 4.6.3.B | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 12 | |||
| 4.6.3.C | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 12 | |||
| 4.6.3.D | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 13 | |||
| 4.6.4 | INSPECTION AND TEST RECORDS AND DATA . . . . . . . . . . . . . . . . . | 4 - 13 | |||
| 4.6.4.1 | RECORDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 13 | |||
| END-ITEM ACCEPTANCE DATA PACKAGE(ADP) . . . . . . . . . . . . . | . . | 4 - 13 | |||
| 4.6.4.3.A | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 13 | |||
| 4.6.4.3.B | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 13 | |||
| 4.6.4.3.C | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 13 | |||
| 4.6.4.3.D | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 13 | |||
| 4.6.4.3.E | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 13 | |||
| 4.6.4.3.F | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 13 | |||
| 4.6.4.3.G | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 14 | |||
| 4.6.4.3.H | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 14 | |||
| 4.6.4.3.J | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 14 | |||
| 4.7 | NONCONFORMING ARTICLES AND MATERIALS . . . . . . . . . . . . . . . . | 4 - 14 | |||
| NONCONFORMANCE CONTROL SYSTEM . . . . . . . . . . . . . . . . . . . . . . | 4 - 14 | ||||
| IDENTIFICATION OF NONFORMANCES . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 14 | ||||
| NONCONFORMANCE EVALUATION . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 14 | ||||
| NONCONFORMANCE DISPOSITIONS . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 15 | ||||
| 4.7.4.A | RETURN TO SUPPLIER A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 15 | |||
| 4.7.4.B | RETURN FOR REWORK OR COMPLETION OF OPERATIONS A . . . . . | 4 - 15 | |||
| 4.7.4.C | SCRAP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 15 | |||
| 4.7.4.D | MATERIAL REVIEW BOARD(MRB) . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 15 | |||
| MATERIAL REVIEW BOARD (MRB) ACTION . . . . . . . . . . . . . . . . . . . . | 4 - 15 | ||||
| 4.7.5.A | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 15 | |||
| 4.7.5.B | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 15 | |||
| 4.7.5.B.1 | REPAIR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 16 | |||
| 4.7.5.B.2 | USE AS IS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 16 | |||
| 4.7.5.B.3 | SCRAP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 16 | |||
| 4.7.5.B.4 | WAIVERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 16 | |||
| 4.7.5.B.5 | ARTICLES OR MATERIALS RETURNED TO SOURCE . . . . . . . . . . . . | 4 - 16 | |||
| 4.7.5.C | MRB HOLDING AREA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 16 | |||
| 4.7.5.D | SUPPLIER MRB . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 16 | |||
| 4.7.5.E | RECURRENCE CONTROL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 17 | |||
| 4.7.6 | PROBLEM REPORTING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 17 | |||
| METROLOGY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 17 | ||||
| 4.8.1 | METROLOGY CONTROLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 17 | |||
| 4.8.2 | CALIBRATION RECORDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. | 4 - 17 | |||
| 4.8.2.A | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 17 | |||
| 4.8.2.B | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 17 | |||
| 4.8.2.C | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 17 | |||
| 4.8.2.D | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 17 | |||
| 4.8.2.E | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 17 | |||
| 4.8.2.F | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 18 | |||
| 4.8.2.G | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 18 | |||
| 4.8.2.H | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 18 | |||
| MEASUREMENT ACCURACY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 18 | ||||
| CALIBRATION CONTROLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 18 | ||||
| FACILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 18 | ||||
| TRACEABILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 18 | ||||
| HANDLING, STORAGE, AND TRANSPORTATION . . . . . . . . . . . . . . . . | 4 - 18 | ||||
| IDENTIFICATION AND LABELING . . . . . . . . . . . . . . . . . . . . . . . . . . . . | . | 4 - 18 | |||
| CALIBRATION INTERVALS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 18 | ||||
| RECALL SYSTEM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 19 | ||||
| ENVIRONMENTAL REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 19 | ||||
| 4.8.5 | REMEDIAL ACTION AND RECURRENCE CONTROL . . . . . . . . . . . . . | 4 - 19 | |||
| 4.9.A | STAMP AND MARKING MATERIALS . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 19 | |||
| 4.9.B | STAMP TRACEABILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 19 | |||
| 4.9.C | STAMP APPLICATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 19 | |||
| 4.9.D | ELECTRONIC DATA CONTROL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 19 | |||
| 4.9.E | STAMPING/MARKING APPLICATION . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 20 | |||
| 4.9.F | STATUS STAMPING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 20 | |||
| 4.9.G | STAMPING METHODS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 20 | |||
| 4.9.H | STAMP SIGNIFICANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 20 | |||
| CONTRACTOR STAMP DESIGNS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 20 | ||||
| HANDLING, STORAGE, PRESERVATION, MARKING LABELING, | |||||
| PACKING AND SHIPPING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 20 | ||||
| PROCEDURES AND INSTRUCTIONS CONTROL . . . . . . . . . . . . . . . . . | 4 - 20 | ||||
| HANDLING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 20 | ||||
| STORAGE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. | 4 - 20 | ||||
| 4.10.3.A | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 20 | |||
| 4.10.3.B | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 20 | |||
| 4.10.3.C | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 21 | |||
| 4.10.3.D | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 21 | |||
| 4.10.4 | PRESERVATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 21 | |||
| 4.10.5 | PACKAGING AND PACKING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 21 | |||
| 4.10.6 | MARKING AND LABELING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 21 | |||
| SHIPPING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 21 | ||||
| 4.10.7.1 | CONTROLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 21 | |||
| 4.10.7.1.A | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. | 4 - 21 | |||
| 4.10.7.1.B | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. | 4 - 21 | |||
| 4.10.7.2 | UNSCHEDULED REMOVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 22 | |||
| 4.11 | SAMPLING PLANS, STATISTICAL PLANNING, AND ANALYSES . . . | 4 - 22 | |||
| 4.11.1 | SAMPLING PLANS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 22 | |||
| 4.11.2 | STATISTICAL ANALYSES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 22 | |||
| 4.12 | CONTROL OF NASA AND INTERNATIONAL PARTNER PROPERTY. .4 - 22 | ||||
| 4.12.1 | CONTRACTOR RESPONSIBILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 22 | |||
| 4.12.1.A | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 22 | |||
| 4.12.1.B | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 22 | |||
| 4.12.1.C | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 22 | |||
| 4.12.1.D | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 23 | |||
| 4.12.1.E | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 4 - 23 | |||
| UNSUITABLE NASA OR INTERNATIONAL PARTNER PROPERTY . . | 4 - 23 | ||||
| SOFTWARE PRODUCT ASSURANCE. . . . . . . . . . . . . . . . . . . . . . . . . | . | 5 - 1 | |||
| MANAGEMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 1 | ||||
| ORGANIZATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 1 | ||||
| SOFTWARE PRODUCT ASSURANCE PLANNING . . . . . . . . . . . . . . . . . 5 - 1 | |||||
| 5.1.3 | FORMAL AND INTERNAL REVIEWS . . . . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 1 | |||
| 5.1.4 | SUBTLER REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 1 | |||
| 5.1.5 | NON-DEVELOPMENTAL SOFTWARE . . . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 1 | |||
| NASA OR ESA FURNISHED SOFTWARE . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 2 | ||||
| PROGRESS REPORTING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 2 | ||||
| CONTROL BOARDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 2 | ||||
| 5.1.9 | OPERATIONS AND MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . | . | 5 - 2 | ||
| TRAINING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 2 | ||||
| 5.1.11 | SPA TOOLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 2 | |||
| SOFTWARE QUALITY ASSURANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 2 | ||||
| AUDITS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . | 5 - 2 | ||||
| TOOLS, TECHNIQUES, AND METHODOLOGIES . . . . . . . . . . . . . . . . . | 5 - 3 | ||||
| SOFTWARE DOCUMENTATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 3 | ||||
| SOFTWARE CODE INSPECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 3 | ||||
| 5.25 | SOFTWARE TESTING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 3 | |||
| 5.2.6 | SOFTWARE LIFE-CYCLE PROCESS EVALUATION . . . . . . . . . . . . . . . | 5 - 4 | |||
| 5.3 | CONFIGURATION MANAGEMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 4 | |||
| 5.3.1 | CONFIGURATION IDENTIFICATION, STATUS ACCOUNTING AND | ||||
| VERIFICATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 4 | ||||
| 5.3.2 | CONFIGURATION CHANGE CONTROL . . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 4 | |||
| 5.3.3 | SOFTWARE DELIVERY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 4 | |||
| SOFTWARE LIBRARIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 5 | ||||
| 5.4 | NONCONFORMANCE REPORTING AND CORRECTIVE ACTION . . . | 5 - 5 | |||
| 5.4.1 | NONCONFORMANCE REPORTING . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 5 | |||
| 5.4.2 | CORRECTIVE ACTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 5 | |||
| 5.4.3 | ISS PROBLEM REPORTING AND CORRECTIVE ACTION . . . . . . . . . . | 5 - 5 | |||
| RELIABILITY AND MAINTAINABILITY ASSURANCE . . . . . . . . . . . . | 5 - 5 | ||||
| TRADE STUDIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 5 | ||||
| STANDARDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 5 | ||||
| 5.5.3 | FORMAL SOFTWARE REVIEWS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 5 | |||
| 5.5.4 | NONCONFORMANCE ANALYSIS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | . | 5 - 5 | ||
| 5.5.5 | REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 5 | |||
| 5.5.6 | DESIGN ANALYSIS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 6 | |||
| FAULT TOLERANCE ANALYSIS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 6 | ||||
| 5.5.8 | SOURCE CODE EVALUATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 6 | |||
| 5.5.9 | TEST . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 6 | |||
| 5.6 | SOFTWARE SAFETY ASSURANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 6 | |||
| 5.7 | INTEGRATION ASSURANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 6 | |||
| 5.8 | VERIFICATION AND VALIDATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 7 | |||
| INDEPENDENT VERIFICATION AND VALIDATION . . . . . . . . . . . . . . | 5 - 7 | ||||
| 5.10 | CERTIFICATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 7 | |||
| 5.11 | SECURITY AND PRIVACY ASSURANCE . . . . . . . . . . . . . . . . . . . . . . . . | 5 - 7 | |||
| 5.12 | IDENTIFICATION AND DATA RETRIEVAL . . . . . . . . . . . . . . . . . . . . .. | 5 - 7 | |||
| 6.0 | SAFETY. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 6 - 1 | |||
| 6.1 | SAFETY MANAGEMENT. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 6 - 1 | |||
| 6.1.1 | SAFETY APPROACH. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 6 - 1 | |||
| 6.1.2 | ORGANIZATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 6 - 1 | |||
| 6.1.3 | LAUNCH SITE SAFETY PLAN. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 6 - 1 | |||
| SAFETY REVIEW REQUIREMENTS. . . . . . . . . . . . . . . . . . . . . . . . . . . . | 6 - 1 | ||||
| 6.1.4.1 | SPACE STATION REVIEW AND CERTIFICATION. . . . . . . . . . . . . . . . | 6 - 1 | |||
| 6.1.4.2 | SPACE STATION USER PAYLOAD SAFETY REVIEWS. . . . . . . . . . . . | 6 - 2 | |||
| SAFETY AUDIT TEAMS AND SURVEYS. . . . . . . . . . . . . . . . . . . . . . . . | 6 - 2 | ||||
| 6.1.6 | MISHAP REPORTING AND INVESTIGATION. . . . . . . . . . . . . . . . . . . . | 6 - 2 | |||
| 6.1.7 | SAFETY TRAINING AND CERTIFICATION. . . . . . . . . . . . . . . . . . . . . . | 6 - 2 | |||
| 6.1.8 | WAIVERS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 6 - 2 | |||
| 6.2 | SYSTEM SAFETY. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. | 6 - 3 | |||
| SYSTEM SAFETY OBJECTIVES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 6 - 3 | ||||
| 6.2.1.A | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 6 - 3 | |||
| 6.2.1.B | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 6 - 3 | |||
| 6.2.1.C | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 6 - 3 | |||
| 6.2.1.D | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 6 - 3 | |||
| ESA PROJECTS SYSTEM SAFETY TECHNICAL REQUIREMENTS. . . | 6 - 3 | ||||
| 6.2.3 | SAFETY ANALYSES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 6 - 3 | |||
| 6.2.4 | HAZARD ELIMINATION AND CONTROL. . . . . . . . . . . . . . . . . . . . . . . . | 6 - 3 | |||
| 6.2.5 | HAZARD REPORT CLOSURE CONTROL. . . . . . . . . . . . . . . . . . . . . . . . | 6 - 3 | |||
| 6.2.6 | HUMAN ENGINEERING. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 6 - 4 | |||
| 6.2.7 | SPECIFICATIONS AND PROCEDURES REVIEW. . . . . . . . . . . . . . . . . . | 6 - 4 | |||
| NASA OR INTERNATIONAL PARTNER FURNISHED EQUIPMENT | |||||
| SAFETY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 6 - 4 | ||||
| 6.2.9 | GROUND SUPPORT EQUIPMENT (GSE) SAFETY. . . . . . . . . . . . . . . . . | 6 - 4 | |||
| 6.2.10 | REVIEW OF CHANGES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 6 - 4 | |||
| 6.2.11 | REVIEW OF FLIGHT AND GROUND HARDWARE FAILURES . . . . . . | 6 - 5 | |||
| 6.2.12 | EVALUATION OF GROUND AND FLIGHT TEST RESULTS . . . . . . . . | 6 - 5 | |||
| 6.2.13 | EVALUATION OF MISSION OPERATIONAL ACTIVITY . . . . . . . . . . . | 6 - 5 | |||
| INDUSTRIAL SAFETY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 6 - 5 |
| APPENDIX A ABBREVIATIONS AND ACRONYMS. . . . . . . . . . . . . . | A - 1 | |
| APPENDIX B GLOSSARY OF TERMS . . . . . . . . . . . . . . . . . . . . . . . . . | B - 1 �1.0 INTRODUCTION |
The ESA PA/Safety requirements are contained in the ESA project system requirements (e.g. COL-RQ-ESA-001, MS-RQ-ESA-004) and its associated ESA standards specification documents.
1.1 PURPOSE
This document establishes the joint hardware and software safety and product assurance (reliability, maintainability, and Quality Assurance) implementation requirements between NASA and ESA for the design, development, production, test, and operation of ESA vehicles, during the ISS program.
1.2 SCOPE
These safety and product assurance requirements are applicable to all flight equipment, Orbital Support Equipment (OSE), Flight Support Equipment (FSE), and certain Ground Support Equipment (GSE) (as specified herein) and related software supplied for the ESA projects.
1.3 MANAGEMENT APPROACH
The ESA Product Assurance implementation and Safety approach is covered by MS-RQ-ESA-004 and associated ESA standards specification documents.
Management of safety and product assurance shall include the following:
1.3.A Defining the major hardware and software safety and product assurance tasks and assuring that they are performed as integral parts of all phases of the program
1.3.B Evaluating the safety, reliability, maintainability, and quality of hardware, software, and operations through analyses, tests, reviews, and assessments
1.3.C Providing timely status reporting through periodic project reviews and as a part of overall project status reports
1.3.D Ensuring compatible safety and product assurance requirements for manufacturing, test, launch, and ground operations. For ESA, a safety and product assurance management plan shall be prepared by the project contractor. Safety and product assurance management shall have direct unimpeded access to the management level having full project responsibility.
1.4 RELATION TO OTHER PROGRAM REQUIREMENTS
1.4.1 PROGRAM REQUIREMENTS
The safety and product assurance analytical and verification requirements set forth in this document shall take precedence in cases of conflict with requirements contained in sub-tier documents. The safety and product assurance design requirements are contained in, for instance, in the applicable ESA segment specifications (e.g. SSP 41160, Segment Specification for the European Space Agency). The ESA requirements of MS-RQ-ESA-004 shall be the basis of the safety and product assurance program for the ESA projects and its interface to the ISS.
1.4.2 GSE HARDWARE AND SOFTWARE
NASA provided Safety and Mission Assurance (S&MA) analyses for GSE hardware and software used by ISS, but procured by other programs, need not be performed again when evaluation approved by the Product Groups and International Partners Project Office proposing the use of the GSE shows each analysis to be adequate to meet the intent of the applicable ISS analytical requirements document. All Critical Items and accepted risk hazards identified in these analyses must be baselined by the ISS.
1.5 MOTIVATION
Not Applicable.
1.6 INDEPENDENT EVALUATIONS FOR NASA OR THE INTERNATIONAL PARTNERS
ESA reserves the right to appoint independent representatives to assist in Safety and Product Assurance evaluation activities. These representatives will provide technical support to the applicable parent organization and determine effectiveness of and recommend improvements for Safety and Product Assurance activities.
NASA participation in such activities at ESA contractors will be subject to ESA agreement, on a case by case basis.
1.7 DATA EXCHANGE AGREEMENTS
All S&PA exchange data between NASA and ESA as agreed through the requirement of this document shall be identified in SSP 50127, NASA/ESA Data Exchange Agreement.
1.8 SAFETY AND PRODUCT ASSURANCE DATABASE
Safety and product assurance databases shall be established. The data transfer format will be defined in the SSP 50127, NASA/ESA Data Exchange Agreement.
1.9 MILESTONE REVIEWS
Safety and product assurance activities shall include supporting design reviews, and NASA and ESA design and readiness reviews. Participation in milestone reviews shall assure that safety and product assurance requirements are adequately considered.
1.10 DELEGATION OF AUTHORITY
This document will be revised as required. Revisions will be made according to the agreements in the NASA/ESA Joint Management Plan, SSP 50019. �2.0 APPLICABLE AND REFERENCE DOCUMENTS
2.1 APPLICABLE DOCUMENTS
The following documents of the date, issue, and revision shown form part of this document to the extent specified herein.
For NASA generated documents, “Current Issue" is shown in place of the specific date and issue when the document is under Program Office Space Station Control Board (SSCB) control
For ESA generated documents, “Current Issue” is shown in place of the specific date and issue, when the document is under ESA Configuration Control.
ESA DOCUMENT
“XXX”-RQ-ESA-001 “XXX” System Requirements Document by the (Current Issue) applicable (Current Issue) ESA project “XXX”(e.g. XXX = COL for APM/COF project)
MS-RQ-ESA-004 Product Assurance Requirements (Current Issue)
| MS-ESA-HB-13 | Manned Space Flight Human Factors Engineering | |
| (Current Issue) | Handbook |
MS-RQ-ESA-028 CPRACA Requirements for Columbus (Current Issue)
MS-ESA-PR-004 Safety Review Process for the Manned Spaceflight Projects (Current Issue)
2.2 REFERENCE DOCUMENTS
The following documents referred to herein may be utilized by ESA for information and guidance in implementing the requirements of this document.
ISS DOCUMENTS
| SSP 30309 | Safety Analysis and Risk Assessment Requirements | |
| (Current Issue) Document | ||
| Reference Paragraph 6.2.3 |
SSP 30459 Space Station Interface Development Process Requirements
SSP 30599 Safety Review Process Document Reference Paragraph 6.1.4.2
SSP 41160 Segment Specification for the European Space Agency Attached Pressurized Module
SSP 41170 Configuration Management Requirements
| SSP 41173 | Space Station Quality Assurance Requirements. | |
| (Current Issue) Reference Paragraph 4.0 |
SSP 50005 International Space Station Flight Crew Integration Standard (NASA-STD-3000/T)
SSP 50013 Information Systems Plan
SSP 50127 Bilateral Data Exchange Agreement
| TSS 30696, Volume 2 | Assembly and Maintenance Implementation Definition | Document (AMIDD) Volume II: | Maintenance | |
| Reference Paragraph 3.1.1.2 |
NASA-STD-3000 Man-Systems Integration Standards Reference Paragraph 6.2.6
NHB 1700.1 (V1-A) Basic Safety Manual Reference Paragraph 6.3
NHB 1700.1 (V3) System Safety
NHB 1700.1 (V9) NASA Safety Manual-Fire Protection Reference Paragraph 6.3
�2.3 EQUIVALENCY OF PROCESS DOCUMENTS
The following matrix delineates the correspondence between ESA documents and documents called out in SSP 30000, Section 9. The matrix shows the status of the determination of the Meet/Exceed equivalency of the documents (See Matrix Provided per JESA 30000) (matrix - page 1)
TABLE 1 TRACEABILITY MATRIX
NASA �Rev.�ESA Tier 3�Rev.�Equivalency�Date ��SSP 30223 Problem Reporting and Corrective Action System Requirements for the Space Station Program�D 29July 92�Columbus Problem Reporting and Corrective Action Requirements COL-RQ-ESA-028�Issue 4 30-Jan-92�YES Usage per paragraph 4.7.6�Aug-92��SSP 30233 Space Station Requirements for Materials and Processes� C 26 Sep 91�PSS-01-70�Issue 3 Oct 87�YES Per BB003255�Aug-92��SSP 30234 Instructions for Preparation of Failure Modes and Effects (FMEA) and Critical Items List (CIL) for Space Station�A 30 Jun 88 with SSCBD BB000658B�Document per ESA/NASA agreement���Dec-97��SSP 30309 Hazard Analysis and Risk Assessment Requirements�B 23 Oct 91 with SSCBD BB003134�Columbus System Requirements Document (SRD) COL-RQ-ESA-001 ESA/Columbus PA/Safety Requirements COL-RQ-ESA-004 System Safety requirements for ESA Space Systems Associated Equipment PSS-01-40�Issue 2 12 Aug 92
Issue 1, Rev E Dec 91
Issue 2 Sept 88�Yes with 3 exceptions: 1)SSP 30309 Para. 3.1.5 will be modified 2)Para 5.2 and Para 5.4.3 are pending approval of SSP 30599 in change Request BB003229B *NOTE 1*�Aug-92��SSP 30312 Electrical, Electronic, and Electromechanical Parts Management and Implementation Plan for Space Station Program�C 11 Sep 91�PSS-01-60�Issue 2 Nov 88�Yes *NOTE 2*�Aug 92��SSP 30423 Space Station Allowed Electrical, Electronic and Electromechanical Parts List� C 30 Jul 91�Columbus Preferred Parts List�Issue 3B�Yes *NOTE 2*�Aug-92��SSP 30595 Space Station Freedom Payload Safety Review Process�TBD�TBD �TBD�TBD���SSP 30599 Safety Review Process for Space Station Program�per BB003229B�ESA/Columbus Safety Review Process for Space Station Related Flight Configurations COL-PR-ESA-004 �Issue 1 9 Apr 92�TBD���
NASA �Rev.�ESA Tier 3�Rev.�Equivalency�Date ��SSP TBD Critical Item Control Plan�TBD�TBD�TBD�TBD���MIL-STD 105��-�-�Applicable to ESA���MIL-STD 414�� -� -�Applicable to ESA���MIL-STD 970�1-Oct-87�PSS-01-60�Issue 2 Nov 88�Yes *NOTE 2*�Aug-92��MIL-STD 975�Jan-92�ESA/SCC QPL��Yes *NOTE 2*�Aug-92��NSTS 1700.7B�13 Jan 89�-�-�Applicable by Section 3, JPDRD���NASA STD 3000 (Vol. 4)�Nov 86 �COL-RQ-ESA-013�Issue 2, Rev. C 8-Nov.-91�Yes, refer to JESA 30000 Section 3���NHB 5300.4(3A-1)�1 Dec 76�PSS-01-708�Issue 1 Mar 85�TBD�Aug. 92��NHB 5300.4(3F)�1 Jun 72�TBD��TBD���NHB 5300.4 (3G)�1 Apr 85�PSS-01-708�Issue 1 Mar 85�TBD�Aug. 92��NHB 5300.4(3H)�1 May 84�PSS-01-726�Issue 1 Dec 90�TBD�Aug. 92��NHB 5300.4(3I)�1 May 84�PSS-01-710 and
PSS-01-728�Issue 1 Oct 85
Issue 1 Feb 83�TBD�Aug. 92��NHB 5300.4(3J)�1 Apr 85�ESA Approved Industry Standards��TBD�Aug 92��NHB 5300.4(3K)�7 Jan 86�PSS-01-710 and PSS-01-728�Issue 1 Oct 85�TBD�Aug 92��KMI 1710.1�21 Apr 88�-�-�Applicable to ESA for KSC Operations��� *NOTE 1: ESA/NASA agree that the cross reference matrix for SSP 30309 as contained in the minutes of the 8/3-7/92 Meets/Exceeds coordination meeting and as enhanced by DSS-3 constitutes adequate rationale for meets or exceeds agreement. The minutes with the enhanced matrix will be kept on file by the SSPO Configuration Management Office within the BB003239 records.
* NOTE 2: Equivalency rationale/traceability per minutes of NASA/ESA Safety and Product Assurance Technical Interchange Meeting of August 3-7, 1992
(matrix - page 2)
TABLE 2 TRACEABILITY MATRIX
SSP 50038, Rev. B, Computer-Based Control System Safety…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .