SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NO. 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NO.
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
RFQ IFB RFP
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF. OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NAICS:
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
8 (A)
EDWOSB
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
80JSC018R0007
Sophia Mo 281-792-7877
BH4 100
NASA-JSC, Attn: Transportation Office, Building 420 2101 NASA Parkway, Houston, TX 77058-3696 Mark for: Sophia Mo/281.792.7877
BH4
Sophia Mo NASA-Johnson Space Center 2101 NASA Parkway, Houston TX 77058-3696
NASA Shared Services Center (NSSC) Financial Management Division (FMD) Accounts Payable Building 1111, Jerry Hlass Road Stennis Space Center MS 39529-0001
See continuous pages
Sophia Mo
541990
$15M
See Block 31c. 11/16/2017
11/22/2017
4:00PM (CST)
BH4
Sophia Mo NASA-Johnson Space Center 2101 NASA Parkway, Houston TX 77058-3696
STANDARD FORM 1449 (REV. 2/2012) BACK
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
40. PAID BY
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
PARTIAL FINAL
37. CHECK NUMBER
38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER
36. PAYMENT
COMPLETE PARTIAL FINAL
80JSC018R0007
Table of Contents
Section 1 – Continuation of SF 1449
1.1 Clauses Incorporated By Reference 1-1
1.2 Place of Performance 1-1
1.3 Period of Performance 1-1
1.4 Phase-In 1-1
1.5 JSC Procurement Instruction (JPI) 52.216-90 IDIQ Minimum and Maximum Ordering
Limits (Aug 2013)
1-1
1.6 Cumulative Value for Firm-Fixed Price Task Orders (TOs) 1-2
1.7 Fully Burdened Rates for Pricing TOs 1-2
1.8 NASA FAR Supplement (NFS) 1852.232-77 Limitation of Funds (Fixed-Price Contract)
(Mar 1989)
1-3
Section 2 – Contract Clauses
2.1 Federal Acquisition Regulation (FAR) 52.212-4 Contract Terms and Conditions –
Commercial Items (Jan 2017)
2-1
Addendum to FAR 52.212-4:
2.2 FAR 52.204-1 Approval of Contract (Dec 1989) 2-7
2.3 FAR 52.216-18 Ordering (Oct 1995) 2-7
2.4 FAR 52.216-19 Order Limitations (Oct 1995) 2-7
2.5 FAR 52.216-22 Indefinite Quantity (Oct 1995) 2-8
2.6 FAR 52.252-6 Authorized Deviations in Clauses (Apr 1984) 2-8
2.7 NFS 1852.216-80 Task Ordering Procedure (Oct 1996) 2-9
2.8 JPI 52.204-91 Security/Badging Requirements for Foreign National Visitors and
Employees/Representatives of Foreign Contractors (May 2013)
2-10
2.9 JPI 52.223-93 Environmental and Energy Conservation Requirements (Feb 2011) 2-11
2.10 JPI 52.242-92 Identification of Employees (May 2013) 2-12
2.11 JPI 52.242-94 Administrative Leave (Sep 2008) 2-12
2.12 Submission of Invoices for Fixed-Price Services 2-13
2.13 FAR 52.217-8 Option to Extend Services (Nov 1999) 2-13
2.14 NFS 1852.242-72 Denied Access to NASA Facilities (Oct 2015) 2-14
2.15 JPI 52.242-90 JSC Super-Flex Work Schedule (Mar 2014) 2-15
2.16 NFS1852.245-71 Installation-accountable Government Property (Jan 2011) Alternative
(Jan 2011)
2-16
Section 3 – FAR 52.212-5
3.1 FAR 52.212-5 Contract Terms and Conditions – Commercial Items (Jan 2017) 3-1
Section 4 – Contract Documents, Exhibits or Attachments
4.1 Applicable Documents
4.2 Acronyms List
4.3 Statement of Work (SOW)
4.4 JSC Data Requirements List (DRL)
4.5 Data Requirements Documents (DRDs)
80JSC018R0007
DRD-HHIMS2 – 01 Management and Staffing Plan
DRD-HHIMS2 – 02 Phase-In Plan
DRD-HHIMS2 – 03 Contract Management Plan
DRD-HHIMS2 – 04 Safety and Health Plan
DRD-HHIMS2 – 05 OCI
DRD-HHIMS2 – 06 Reprocurement Data Package
DRD-HHIMS2 – 07 Data and Records Management
4.6 Management and Staffing Plan
4.7 Phase-In Plan
4.8 Safety and Health Plan
Section 5 – Addendum to FAR 52.212-1, Instructions to Offerors – Commercial Items
5.1 FAR 52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998) 5-1
5.2 FAR 52.216-1 Type of Contract (Apr 1984) 5-1
5.3 FAR 52.233-2 Service of Protest (Sep 2006) 5-2
5.4 FAR 52.252-5 Authorized Deviations in Provisions (Apr 1984) 5-2
5.5 NFS 1852.215-81 Proposal Page Limitations (Apr 2015) 5-2
5.6 JPI 52.215-109 Proposal Marking and Delivery (Aug 2012) 5-3
5.7 Reserved 5-4
5.8 Communications Regarding this Solicitation 5-4
5.9 Period Covered by Procurement 5-4
5.10 Instructions for Preparation of Technical Proposal 5-4
5.10.1 Introduction 5-4
5.10.2 Proposal Arrangement, Page Limitations, Copies and Due Dates 5-5
5.11 Proposal Requirements 5-8
5.11.1 Technical Acceptability – Volume I 5-8
5.11.2 Price– Volume II 5-9
5.11.3 Responsibility Considerations – Volume III 5-13
5.11.4 Model Contract – Volume IV 5-14
Attachment 5-1 Sample TOs 5-16
Attachment 5-2 Standard Labor Category Definitions 5-21
Section 5 Pricing Template
Section 5 Section 5 Government calculated Average Composite Direct Labor Rates and Seniority
Profile of Incumbent Employees
Section 6 – Evaluation Factors for Award
6.1 Evaluation 6-1
6.2 Evaluation Factors, Responsibility Considerations and Model Contract 6-1
6.2.1 Technical Acceptability – Volume I 6-1
6.2.2 Pricing – Volume II 6-2
6.2.3 Responsibility Considerations – Volume III 6-3
6.2.4 Model Contract – Volume IV 6-3
Section 7 – FAR 52.212-3
7.1 FAR 52.212-3 Offeror Representations and Certifications – Commercial Items (Jan 2017) 7-1
80JSC018R0007 Section 1
1-1
Section 1 – Continuation of SF 1449
1.1 Clauses Incorporated By Reference
This contract incorporates FAR and NASA FAR Supplement (NFS) clauses by reference, with the same force and effect as if they were given in full text. Clauses incorporated by reference which require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of a clause may be accessed electronically at these addresses:
FAR – http://farsite.hill.af.mil/vmfara.htm
NFS - http://farsite.hill.af.mil/vmnasaa.HTM
I. FAR Clauses (48 CFR Chapter 1)
Clause
Number Date Title
52.245-1 Jan 2017 Government Property
52.245-9 Apr 2012 Use and Charges
II. NFS Clauses (48 CFR Chapter 18) Clauses
Clause
Number Date Title
(End of Clause)
1.2 Place of Performance
The Contractor shall perform the work under this contract at the Government’s site, defined as the Johnson Space Center (JSC), including Government-maintained facilities in the immediate JSC area, including the Sonny Carter Training Facility and Ellington Field.
1.3 Period of Performance
The period of performance for the contract shall be from May 31, 2018 to May 30, 2023.
1.4 Phase-In
The 30-day phase-in period shall be from May 1, 2018 to May 30, 2018 at a firm-fixed price of $Offeror fill-in (OFI).
http://farsite.hill.af.mil/vmfara.htm http://farsite.hill.af.mil/vmnasaa.HTM
1-2
1.5 JPI 52.216-90 IDIQ Minimum and Maximum Ordering Limits (Aug 2013)
In accordance with FAR 52.216-22, Indefinite Quantity, the guaranteed minimum to be ordered under this contract is $250,000 and the maximum which may be ordered under this contract is $9,900,000. This value is based on price. The Government is not obligated to order more than the minimum specified, but may order up to the maximum. The Contractor is obligated to fulfill orders issued, up to the maximum quantity.
1-3
1.6 Cumulative Value for Firm-Fixed Price Task Orders
This clause identifies the total firm-fixed-price to be paid to the Contractor for acceptable performance of all services described in issued TOs. This clause will be updated on a periodic basis to reflect the value of issued TOs.
The total FFP of TOs issued under this contract is $TBD.
(Note: All “TBD”s will be filled out by the Government after award.)
1.7 Fully Burdened Rates for Pricing TOs
Table 1.7-1 Fully Burdened Rates for Pricing TOs
Materials, Equipment and Other Non-labor Costs
As applicable, include separate cost estimates for materials, equipment and other miscellaneous non-labor costs that are required for performance of the task order. All non-labor costs that are proposed must be allowable and allocable in accordance with the
Generally Accepted Accounting Principles (GAAP), FAR, NASA FAR Supplement, and any other applicable NASA procurement policy documents. The contractor shall include back-up information with their estimate that provides rationale for their proposed cost estimates for materials and other non-labor costs. No profit shall be applied to the cost of materials, equipment or other non-labor costs.
Standard Labor
Categories and Fully
Burdened Rates
Contract Year 1
5/31/2018 to
5/30/2019
Contract Year 2
5/31/2019 to
5/30/2020
Contract Year 3
5/31/2020 to
5/30/2021
Contract Year 4
5/31/2021 to
5/30/2022
Contract Year 5
5/31/2022 to
5/30/2023
Program Manager OFI OFI OFI OFI OFI
Facility Planner Specialist OFI OFI OFI OFI OFI
Business Specialist 2 OFI OFI OFI OFI OFI
Business Specialist 1 OFI OFI OFI OFI OFI
Information Technology 2 OFI OFI OFI OFI OFI
Information Technology 1 OFI OFI OFI OFI OFI
Configuration Management
Specialist 3
OFI OFI OFI OFI OFI
Configuration Management
Specialist 2
OFI OFI OFI OFI OFI
Configuration Management
Specialist 1
OFI OFI OFI OFI OFI
Indirect Rate applied to
Non-Labor Resources if required by a Task Order
OFI OFI OFI OFI OFI
1-4
1.8 NFS 1852.232-77 Limitation of Funds (Fixed-Price Contract) (Mar 1989)
(a) Of the total price of TOs 1 through TBD, the sum of $TBD is presently available for payment and allotted to this contract. It is anticipated that from time to time additional funds will be allocated to the contract in accordance with the following schedule, until the total price of said items is allotted:
SCHEDULE FOR ALLOTMENT OF FUNDS
Date Amounts
TBD TBD
Note: All “TBD”s will be filled out by the Government after award.
(b) The Contractor agrees to perform or have performed work on the items specified in paragraph (a) of this clause up to the point at which, if this contract is terminated pursuant to the Termination for Convenience of the Government clause of this contract, the total amount payable by the Government (including amounts payable for subcontracts and settlement costs) pursuant to paragraphs (f) and (g) of that clause would, in the exercise of reasonable judgment by the Contractor, approximate the total amount at the time allotted to the contract. The Contractor is not obligated to continue performance of the work beyond that point. The Government is not obligated in any event to pay or reimburse the Contractor more than the amount from time to time allotted to the contract, anything to the contrary in the Termination for Convenience of the Government clause notwithstanding.
(c) (1) It is contemplated that funds presently allotted to this contract will cover the work to be performed until TBD.
(2) If funds allotted are considered by the Contractor to be inadequate to cover the work to be performed until that date, or an agreed date substituted for it, the Contractor shall notify the Contracting Officer in writing when within the next 60 days the work will reach a point at which, if the contract is terminated pursuant to the Termination for Convenience of the
Government clause of this contract, the total amount payable by the Government (including amounts payable for subcontracts and settlement costs) pursuant to paragraphs (f) and (g) of that clause will approximate 75 percent of the total amount then allotted to the contract.
(3) (i) The notice shall state the estimate when the point referred to in paragraph (c)(2) of this clause will be reached and the estimated amount of additional funds required to continue performance to the date specified in paragraph (c)(1) of this clause, or an agreed date substituted for it.
(ii)The Contractor shall, 60 days in advance of the date specified in paragraph (c)(1) of this clause, or an agreed date substituted for it, advise the Contracting Officer in writing as to the estimated amount of additional funds required for the timely performance of the contract for a further period as may be specified in the contract or otherwise agreed to by the parties.
(4) If, after the notification referred to in paragraph (c)(3)(ii) of this clause, additional funds are not allotted by the date specified in paragraph (c)(1) of this clause, or an agreed date substituted for it, the Contracting Officer shall, upon the Contractor's written request, 1-5 terminate this contract on that date or on the date set forth in the request, whichever is later, pursuant to the Termination for Convenience of the Government clause.
(d) When additional funds are allotted from time to time for continued performance of the work under this contract, the parties shall agree on the applicable period of contract performance to be covered by these funds. The provisions of paragraphs (b) and (c) of this clause shall apply to these additional allotted funds and the substituted date pertaining to them, and the contract shall be modified accordingly.
(e) If, solely by reason of the Government's failure to allot additional funds in amounts sufficient for the timely performance of this contract, the Contractor incurs additional costs or is delayed in the performance of the work under this contract, and if additional funds are allotted, an equitable adjustment shall be made in the price or prices (including appropriate target, billing, and ceiling prices where applicable) of the items to be delivered, or in the time of delivery, or both.
(f) The Government may at any time before termination, and, with the consent of the
Contractor, after notice of termination, allot additional funds for this contract.
(g) The provisions of this clause with respect to termination shall in no way be deemed to limit the rights of the Government under the default clause of this contract. The provisions of this
Limitation of Funds clause are limited to the work on and allotment of funds for the items set forth in paragraph (a) of this clause. This clause shall become inoperative upon the allotment of funds for the total price of said work except for rights and obligations then existing under this clause.
(h) Nothing in this clause shall affect the right of the Government to terminate this contract pursuant to the Termination for Convenience of the Government clause of this contract.
[End of Section]
80JSC018R0007 Section 2
2-1
Section 2 – Contract Clauses
2.1 FAR 52.212-4 Contract Terms and Conditions – Commercial Items (Jan 2017)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The
Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights –
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of
Claims Act (31 U.S.C.3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The
Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
2-2
(g) Invoice.
(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices.
An invoice must include --
(i) Name and address of the Contractor;
(ii) Invoice date and number;
(iii)Contract number, line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;
(vi) Terms of any discount for prompt payment offered;
(vii) Name and address of official to whom payment is to be sent;
(viii) Name, title, and phone number of person to notify in event of defective invoice;
and
(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct
EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds
Transfer— System for Award Management, or 52.232-34, Payment by
Electronic Funds Transfer—Other Than System for Award Management), or applicable agency procedures.
(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.
(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C.
3903) and Office of Management and Budget (OMB) prompt payment regulations at
5 CFR part 1315.
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment.
(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt Payment. The Government will make payment in accordance with the Prompt
Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR Part 1315.
(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see
52.212-5(b) for the appropriate EFT clause.
2-3
(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
(C) Affected line item or subline item, if applicable; and
(D) Contractor point of contact.
(ii) Provide a copy of the remittance and supporting documentation to the Contracting
Officer.
(6) Interest.
(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within
30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period at fixed by the
Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.
(iii)Final decisions. The Contracting Officer will issue a final decision as required by
33.211 if—
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;
(B) The Contractor fails to liquidate a debt previously demanded by the
Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).
(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A) The date fixed under this contract.
(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.
(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—
2-4
(A) The date on which the designated office receives payment from the
Contractor;
(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or
(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.
(vii) The interest charge made under this clause may be reduced under the procedures prescribed in 32.608-2 of the Federal Acquisition Regulation in effect on the date of this contract.
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.
(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The
Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the
Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the
Government takes physical possession.
2-5
(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.
(p) Limitation of liability. Except as otherwise provided by an express warranty, the
Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.
(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.
(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C.
chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks;
41 U.S.C. 4712 and 10 U.S.C. 2409 relating to whistleblower protections; 49 U.S.C.
40118, Fly American; and 41 U.S.C. chapter 21 relating to procurement integrity.
(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The schedule of supplies/services.
(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, Compliance with
Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause.
(3) The clause at 52.212-5.
(4) Addenda to this solicitation or contract, including any license agreements for computer software.
(5) Solicitation provisions if this is a solicitation.
(6) Other paragraphs of this clause.
(7) The Standard Form 1449.
(8) Other documents, exhibits, and attachments.
(9) The specification.
(t) System for Award Management (SAM).
(1) Unless exempted by an addendum to this contract, the Contractor is responsible during performance and through final payment of any contract for the accuracy and completeness of the data within the SAM database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the SAM database to ensure it is current, accurate and complete.
Updating information in the SAM does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.
(2)
(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements
2-6 regarding novation and change-of-name agreements in Subpart 42.12, the
Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to:
(A) Change the name in the SAM database;
(B) Comply with the requirements of Subpart 42.12 of the FAR;
(C) Agree in writing to the timeline and procedures specified by the responsible
Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.
(ii) If the Contractor fails to comply with the requirements of paragraph (t)(2)(i) of this clause, or fails to perform the agreement at paragraph (t)(2)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the SAM information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer
(EFT) clause of this contract.
(3) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the SAM record to reflect an assignee for the purpose of assignment of claims (see FAR Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the SAM database. Information provided to the
Contractor’s SAM record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.
(4) Offerors and Contractors may obtain information on registration and annual confirmation requirements via SAM accessed through https://www.acquisition.gov.
(u) Unauthorized Obligations.
(1) Except as stated in paragraph (u)(2) of this clause, when any supply or service acquired under this contract is subject to any End Use License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-
Deficiency Act violation (31 U.S.C. 1341), the following shall govern:
(i) Any such clause is unenforceable against the Government.
(ii) Neither the Government nor any Government authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an “I agree” click box or other comparable mechanism (e.g., “click-wrap” or “browse-wrap” agreements), execution does not bind the Government or any Government authorized end user to such clause.
(iii)Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.
(2) Paragraph (u)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.
https://www.acquisition.gov/
2-7
(v) Incorporation by reference. The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.
Note: In accordance with paragraph(s) of FAR clause 52.212-4, any inconsistencies between
FAR Clause 52.212-4 and the Addendum to FAR 52.212-4 of this solicitation or contract shall be resolved by giving precedence to the Addendum to FAR 52.212-4, except for the paragraphs listed in (s)(2) of 52.212-4.
2.2 FAR 52.204-1 Approval of Contract (Dec 1989)
This contract is subject to the written approval of the JSC Procurement Officer and shall not be binding until so approved.
2.3 FAR 52.216-18 Ordering (Oct 1995)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the
Schedule. Such orders may be issued from May 31, 2018 through May 30, 2023.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract.
In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) If mailed, a delivery order or task order is considered “issued” when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.
2.4 FAR 52.216-19 Order Limitations (Oct 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $500, the Government is not obligated to purchase nor is the Contractor obligated to furnish those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor:
(1) Any order for a single item in excess of $2,000,000;
(2) Any order for a combination of items in excess of $9,900,000; or
(3) A series of orders from the same ordering office within 14 days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.
2-8
(c) If this is a requirements contract (i.e., includes the requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is (are) returned to the ordering office within 7 days after issuance with written notice stating the Contractor’s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
2.5 FAR 52.216-22 Indefinite Quantity (Oct 1995)
(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the “maximum.” The Government shall order at least the quantity of supplies or services designated in the Schedule as the “minimum.”
(c) Except for any limitations on quantities in the Order Limitations clause or in the
Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order.
The contract shall govern the Contractor’s and Government’s rights and obligations with respect to that order to the same extent as if the order were completed during the contract’s effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after 12 months after the period of performance ends.
2.6 FAR 52.252-6 Authorized Deviations in Clauses (Apr 1984)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR
Chapter 1) clause with an authorized deviation is indicated by the addition of
“(DEVIATION)” after the date of the clause.
(b) The use in this solicitation or contract of any NASA FAR Supplement Regulation https://acquisition.gov/far/current/html/52_216.html
2-9
(48 CFR 18) clause with an authorized deviation is indicated by the addition of
“(DEVIATION)” after the name of the regulation.
2.7 NFS 1852.216-80 Task Ordering Procedure (Oct 1996)
(a) Only the Contracting Officer may issue task orders to the Contractor, providing specific authorization or direction to perform work within the scope of the contract and as specified in the schedule. The Contractor may incur costs under this contract in performance of task orders and task order modifications issued in accordance with this clause. No other costs are authorized unless otherwise specified in the contract or expressly authorized by the Contracting Officer.
(b) Prior to issuing a task order, the Contracting Officer shall provide the Contractor with the following data:
(1) A functional description of the work identifying the objectives or results desired from the contemplated task order.
(2) Proposed performance standards to be used as criteria for determining whether the work requirements have been met.
(3) A request for a task plan from the Contractor to include the technical approach, period of performance, appropriate cost information, and any other information required to determine the reasonableness of the Contractor's proposal.
(c) Within 5 calendar days after receipt of the Contracting Officer's request, the Contractor shall submit a task plan conforming to the request.
(d) After review and any necessary discussions, the Contracting Officer may issue a task order to the Contractor containing, as a minimum, the following:
(1) Date of the order.
(2) Contract number and order number.
(3) Functional description of the work identifying the objectives or results desired from the task order, including special instructions or other information necessary for performance of the task.
(4) Performance standards, and where appropriate, quality assurance standards.
(5) Maximum dollar amount authorized (cost and fee or price). This includes allocation of award fee among award fee periods, if applicable.
(6) Any other resources (travel, materials, equipment, facilities, etc.) authorized.
(7) Delivery/performance schedule including start and end dates.
(8) If contract funding is by individual task order, accounting and appropriation data.
(e) The Contractor shall provide acknowledgment of receipt to the Contracting Officer within 5 calendar days after receipt of the task order.
(f) If time constraints do not permit issuance of a fully defined task order in accordance with the procedures described in paragraphs (a) through (d), a task order which includes a ceiling price may be issued.
2-10
(g) The Contracting Officer may amend tasks in the same manner in which they were issued.
(h) In the event of a conflict between the requirements of the task order and the Contractor's approved task plan, the task order shall prevail.
2.8 JPI 52.204-91 Security/Badging Requirements for Foreign National Visitors and
Employees/Representatives of Foreign Contractors (May 2013)
(a) An employee of a domestic Johnson Space Center (JSC) Contractor or its subcontractor who is not a U.S. citizen (foreign national) may not be admitted to the JSC site for purposes of performing work without special arrangements. In addition, all employees or representatives of a foreign JSC Contractor/subcontractor may not be admitted to the JSC site without special arrangements. For employees as described above, advance notice must be given to the Security Office of the host installation [JSC or White Sands Test
Facility (WSTF)] at least three weeks prior to the scheduled need for access to the site so that instructions on obtaining access may be provided. Contractors should be aware that approval for access to the site and issuance of a badge may take much longer than three weeks and sufficient lead time must be allowed to accommodate the approval process.
(b) All visit/badge requests for persons described in (a) above must be entered Identity
Management and Account Exchange (IdMAX) for acceptance, review, concurrence, and approval purposes. When an authorized company official requests a JSC or WSTF badge for site access, he/she is certifying that steps have been taken to ensure that its Contractor or subcontractor employees, visitors, or representatives will not be given access to export-controlled or classified information for which they are not authorized. These individuals shall serve as the Contractor’s representative(s) in certifying that all visit/badge request forms are processed in accordance with JSC and WSTF security and export control procedures. No foreign national, representative, or resident alien
Contractor/subcontractor employee shall be granted access into JSC or WSTF until approved and processed through the IdMAX. Unescorted access will not be granted unless a favorable National Agency Check (NAC) has been completed by the JSC
Security Office, and an approved NASA Foreign National Visitor Security/Technology
Control Plan (STTCP), (previously called the Access Control Plan) has been submitted and approved.
(c) The Contractor agrees that it will not employ for the performance of work onsite at JSC or WSTF any individuals who are not legally authorized to work in the United States. If the JSC International Visits Coordinator or the contracting officer has reason to believe that any employee of the Contractor may not be legally authorized to work in the United
States and/or on the contract, the Contractor may be required to furnish copies of Form I-
9 (Employment Eligibility Verification), U.S. Department of Labor Application for Alien
Employment Certification, and any other type of employment authorization document.
The Contractor agrees to provide the information requested by JSC or WSTF Security
Office in order to comply with NASA policy directives and guidelines related to foreign
2-11 visits to NASA facilities so that (1) the visitor/employee/ representative may be allowed access to JSC or other NASA centers for performance of this contract, (2) required investigations can be conducted, and (3) required annual or revalidation reports can be submitted to NASA Headquarters. All requested information must be submitted in a timely manner in accordance with instructions provided by JSC or any other center to be visited.
2.9 JPI 52.223-93 Environmental and Energy Conservation Requirements (Feb 2011)
(a) The Contractor shall ensure that all work performed and equipment used to fulfill the requirements of this contract are in compliance with all Federal, state, and local regulations and public laws, and the following NASA JSC directives: JPD 8500.1, JSC
Environmental Excellence Policy; JPR 8550.1, JSC Environmental Compliance
Procedural Requirements; JPR 8553.1, JSC Environmental Management System
Manual; JWI 8553.1, EMS Aspect/Impact Assessment and EMP Process; NPR 8570.1, Energy Efficiency and Water Conservation; and JWI 8570.1, Energy Conservation.
(a) The Government remains the owner and operator of record for all environmental activities conducted at NASA owned properties unless otherwise documented in a signed agreement between NASA and the Contractor. The Contractor is advised that activities performed at JSC and associated facilities are subject to Federal, state and local regulatory agency inspections to review compliance with environmental laws and regulations. For on-site issues, JSC's Environmental Office will be the single point of contact with Federal and state regulatory agencies and their representatives unless otherwise directed by the Contracting Officer or the Environmental Office. The
Contractor shall immediately notify the JSC Environmental Office when contacted by external regulatory agency representatives and shall cooperate fully. The Contractor shall complete, maintain, and make available to the Contracting Officer, JSC Environmental
Office, JSC Energy Manager, or regulatory agency personnel all documentation relating to environmental compliance matters under applicable laws. The Contractor shall immediately notify the JSC Environmental Office upon issuance of a Notice of Violation or noncompliance to the Contractor.
(b) Should a Notice of Violation, Notice of Noncompliance, Notice of Deficiency, or similar regulatory agency notice be issued to the Government as a facility owner/operator on account of the actions or inactions of the Contractor or one of its subcontractors in the performance of work under this contract, the Contractor shall fully cooperate with the
Government in correcting any problems and defending against regulatory assessment of any civil fines or penalties arising out of such actions or inactions.
2-12
2.10 JPI 52.242-92 Identification of Employees (May 2013)
At all times while on Government property, the Contractor, subcontractors, their employees, and agents shall wear badges. These Badges will be issued at the following locations: NASA Badging & Visitor Control Office, located in Building 110 at the
Johnson Space Center (JSC) 6:00 a.m. to 5:30 p.m. Monday through Friday excluding holidays; the Sonny Carter Training Facility (SCTF) and the Software Development
Integration Laboratory (SDIL) 7:00 a.m. to 3:30 p.m. Monday through Friday excluding holidays; Ellington Field, Building 265, 7:00 a.m. to 11:00 a.m. Monday through Friday excluding holidays; and the Main Gate at the White Sands Test Facility (WSTF) Monday through Friday from 8:00 a.m. to 4:00 p.m. excluding holidays and off every other Friday due to 9/80 hour scheduling. WSTF visitor badges will be issued on a 7-day-a-week, 24-hour-a-day basis. Resident aliens and foreign nationals/representatives shall be issued green foreign national badges.
Each individual who wears a badge shall be required to sign personally for the badge. The
Contractor shall be held accountable for issued badges and all other related items and must assure that they are returned to the NASA Badging & Visitor Control Offices upon completion of work under the contract in accordance with Security Management Directive
(SMD) 500-15, "Security Termination Procedures." Failure to comply with the NASA
Contractor termination procedures upon completion of the work (e.g., return of badges, decals, keys, Controlled Access Area cards, clearance terminations, JSC Public Key
Infrastructure (PKI)/special program deletions, etc.) may result in final payment being delayed.
2.11 JPI 52.242-94 Administrative Leave (Sep 2008)
(a) When the NASA installation grants administrative leave to its Government employees
(e.g., as a result of inclement weather, potentially hazardous conditions, or other special circumstances), the following personnel should also be dismissed upon notification of a center closure provided by the Contracting Officer:
1. Contractor personnel working on-site; and
2. Contractor personnel dedicated to the contract effort who are
A. working off-site within…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.