ESES IV Amendment 0001 SF30 pg.2.pdf

PDF 88 KB Posted

Attached to
NASA/ GSFC Electrical Systems Engineering Services (ESES) IV
Solicitation number
80GSFC21R0051
Issued by

View the file

Other files

File Type Posted
Attachment A - Statement of Work (Amend 0002).pdf PDF
ESES IV Amendment 0002 SF30.pdf PDF
ESES IV RFP SF33 (Amend 0001).pdf PDF
ESES IV Amendment 0001 SF30.pdf PDF
ESES IV RFP Questions and Answers (Amend 002).pdf PDF
ESES IV Amendment 0002 SF30 pg.2.pdf PDF
ESES IV Final Request for Proposal (Sections B-M) (Amendment 002).pdf PDF
Attachment A - Statement of Work (Updated 5-11-2023).pdf PDF
ESES IV RFP Questions and Answers (Final) 5-11-23.pdf PDF
ESES IV Final Request for Proposal (Sections B-M) (Updated 5-11-2023).pdf PDF
Attachment G.1 - Organizational Conflict of Interest (OCI) Data Requirements Description (DRD).pdf PDF
ESES IV Final Request for Proposal (RFP) Cover Letter.pdf PDF
ESES IV Final Request for Proposal (Sections B-M).pdf PDF
ESES IV RFP SF33.pdf PDF
ESES IV RFP Attachments.zip ZIP file
ESES IV RFP Exhibits.zip ZIP file
ESES IV RFP Enclosures.zip ZIP file
ESES IV DRFP Questions and Answers (Final) 3-20-23.pdf PDF
ESES IV DRFP Enclosures AA - FF.zip ZIP file
ESES IV DRFP Attachments A-N.zip ZIP file
ESES IV Draft Request For Proposal (DRFP) Cover Letter.pdf PDF
ESES IV DRFP Exhibits 1A - 12.zip ZIP file
ESES IV DRFP SF33.pdf PDF
ESES IV Draft Request for Proposal (Sections B-M).pdf PDF
ESES IV E-Library Documents.zip ZIP file
DRFP Update (12-19-22).pdf PDF
DRFP Update (11-21-22).pdf PDF
DRFP Update (10-27-22).docx DOCX document
DRFP Update.docx DOCX document
ESES-IV Draft SOW.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP 80GSFC21R0051 (ESES IV)

Amendment 0001

1) ESES IV Final RFP Questions and Answers dtd May 12, 2023 are hereby posted.

2) The proposal due date is hereby changed as follows:

FROM: no later than May 19, 2023, at 5:00 PM Eastern Time (ET)

TO: no later than June 2, 2023, at 5:00 PM Eastern Time (ET).

3) Clause G.10(c)(3) has been updated to provide the full text of the clause.

4) Attachment G.1 that was omitted from the original RFP has been provided.

5) Clause L.30 GSFC 52.215-223 COST VOLUME INSTRUCTIONS (SEP 2021)(b)(4) is hereby updated to read as follows:

FROM: “Significant Subcontractors that are being proposed as non-cost fixed rate type contract (FFP, T&M, etc.) shall complete Exhibit 2C and include the Significant

Subcontractors Quote/Proposal that was provided to the Prime offeror.”

TO: “Significant Subcontractors that are being proposed as non-cost fixed rate type contract (FFP, T&M, etc.) shall complete Exhibit 2A and include the Significant

Subcontractors Quote/Proposal that was provided to the Prime offeror.”

6) Clause K.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR

2023)(a)(2) has been updated to state a small business size standard of 1,000.

7) Clause L.26 GSFC 52.215-201 (ALT I) PROPOSAL PREPARATION – GENERAL

INSTRUCTIONS (ELECTRONIC PROPOSAL DELIVERY) (MAR 2020)(b)(1) has been updated to increase the Page Limitations for the Mission Suitability Volume from

75 pages to 85 pages.

8) Updated Sections B-M as well as an updated SOW with page numbers incorporated have been provided.

9) All other terms and conditions remain unchanged

—End of Amendment 0001—

File details come from the government source that posted it. Updated .