OCX ATTACHMENT A 418-XO-OCXSOW-0060_V_1_1 Updated.pdf
PDF 610 KB Posted
- Attached to
- GeoXO Ocean Color (OCX) Presolicitation
- Solicitation number
- 80GSFC21R0043
About this file
This pre-solicitation notice announces a forthcoming request for proposals for a definition-phase study of an Ocean Color Observations instrument to fly on the National Oceanic and Atmospheric Administration's Geostationary and Extended Orbits program series of geostationary satellites. The National Aeronautics and Space Administration Goddard Space Flight Center plans to award up to two firm fixed price contracts valued at approximately $5 million each for a 20-month study. Deliverables include a Final Report due 12 months after award and Risk Mitigation and Technology Development Reports due 20 months after award. Any proposed technology development or risk mitigation efforts would be included in the fixed price. The solicitation number is 80GSFC21R0043 and is anticipated for release in August 2021 as a full and open competition with a North American Industry Classification System code of 541330 and size standard of $15 million.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Effective Date: September 16, 2021 418-XO-OCXSOW-0060 Expiration Date: Five years from date of last signature Baseline Version 1.1 Responsible Organization: GeoXO Flight Project/Code 418
Geostationary Extended Observations (GeoXO) Ocean Color (OCX) Statement of Work (SOW)
Signature page
Prepared by:
Electronically approved by: 05/19/2021
Marc D. Rafal Date GeoXO Flight Project, Instrument Systems Engineer NASA GSFC, Code 418
Reviewed by:
Electronically approved by: 08/04/2021
Steven W. Bidwell Date GeoXO Flight Project, Mission Systems Engineer NASA GSFC, Code 418
Approved by:
Electronically approved by: 08/12/2021
Monica Todirita Date GeoXO Flight Project, Deputy Project Manager NOAA GSFC, Code 418
/GeoXO Flight Project OCX
OCXSOW
418-XO-OCXSOW-0060, RM Version, Geostationary Extended Observations (GeoXO) Ocean Color (OCX) Statement of Work (SOW)
Version: 1.1 Printed by: rkhoover Printed on: Monday, September 20, 2021
No filter applied.
No sort applied.
Generated from DOORS 9.6.1.11
Contents
1 1Introduction
1.1 1Top-Level Summary of Work Required
1.2 1Guiding Assumptions About the Eventual Flight Program
1.3 2Study Milestone Schedule
1.4 3Applicable and Reference Documents
2 4Tasks
2.1 4Trade Studies
2.1.1 4Revisit Time Trade Study
2.1.2 4Spectral Resolution Trade Study
2.1.3 4SNR Trade Study
2.1.4 4Reserved
2.1.5 4Data Compression Study
2.2 5OCX Design Concept Development and Related Analyses
2.3 6Technology Assessment and Demonstration
2.4 7Management Planning
3 9Reviews, Reporting, and Deliverable Products
3.1 9Status Meetings and Reviews
3.1.1 9Kickoff Meeting
3.1.2 9Monthly Progress Review (MPR)
3.1.3 9Midterm Review (MTR)
3.1.4 9Final Study Review (FSR)
3.1.5 9Final Report Package (FRP)
3.2 10Contract Data Requirements List (CDRL)
4 13Appendix A: Acronyms
Project: GeoXO Flight Project OCX Module: OCXSOW Baseline Version: 1.1
Contents ii
Page 1 of 13 Printed Monday, September 20, 2021
ID
OCXSOW1
OCXSOW2
OCXSOW3
OCXSOW4
OCXSOW5
OCXSOW6
OCXSOW7
OCXSOW8
Object Number
1.0-1
1.0-2
1.0-3
1.1
1.1.0-1
1.2
1.2.0-1
418-XO-OCXSOW-0060, RM Version, Geostationary Extended Observations (GeoXO) Ocean Color (OCX) Statement of Work
1 Introduction The Ocean Color GeoXO (OCX) is a hyperspectral, UV through infrared, passive imaging radiometer used to measure environmental data as part of a 3-axis stabilized, geostationary weather satellite system. The OCX remotely collects imagery of the Earth’s coastal waters for harmful algal blooms, water turbidity, general water quality, fisheries management, habitat quality/assessment/mapping, pollution tracking, and biogeochemical processing in coastal regions.
The OCX will meet, as a minimum, the National Aeronautics and Space Administration (NASA) requirements as defined in this Statement of Work (SOW), the OCX Performance and Operation Requirements Document (PORD), the OCX Unique Instrument Interface Document (UIID), the General Interface Requirements Document (GIRD), and the Instrument Mission Assurance Requirements (IMAR) over a ten year mission. For this procurement, in the case of any conflicting requirements, the SOW requirement takes precedence.
This SOW specifies the vendor requirements for performing definition-phase studies and design development as part of OCX formulation activities.
1.1 Top-Level Summary of Work Required
The details of the deliverables are described in later sections. At the top level, the Government requires:
a) An OCX Design that satisfies the baseline requirements defined in the PORD, UIID, GIRD, and IMAR Enhancements to the design beyond the baseline requirements are acceptable if can be implemented on the specified delivery timeline. The list of potential enhancements that the Government has identified are documented in the PORD Appendix.
b) An Assessment of OCX performance against requirements specified in the
PORD.
c) Trade Studies as specified in section 2.1
d) Technical Analysis as described in section 2.2
e) Notional Development Schedule as described in section 2.4
f) Cost Analysis as described in section 2.4
g) Technology Readiness Level (TRL) Assessment and a Technology
Development Plan as described in section 2.3
h) Identification of Development Risks as defined in section 2.4
i) As applicable, performance of any work awarded for Technology
Development and/or Risk Mitigation effort(s)
j) Identification of hardware and software heritage assumptions as defined in section 2.3
1.2 Guiding Assumptions About the Eventual Flight Program
The Flight hardware development cost and schedule estimates shall be based on the following assumptions:
a) 1 Engineering Development Unit (EDU).
Page 2 of 13 Printed Monday, September 20, 2021
ID
OCXSOW8
OCXSOW10
OCXSOW11
Object Number
1.2.0-1
1.3
1.3.0-1
418-XO-OCXSOW-0060, RM Version, Geostationary Extended Observations (GeoXO) Ocean Color (OCX) Statement of Work
b) 2 Flight Units and spare parts as per sparing philosophy plus options for 2 additional flight units.
c) Deliveries will be as shown in the following schedule (all dates are for the Government Fiscal Year)
MILESTONE DATE (assume 1st day of quarter)
Flight Contract Award Q4 FY23
Flight Model 1 Pre‐Ship
Review (PSR1)
Q1 FY29
Launch 1 Readiness Date Q3 FY32
Flight Model 2 PSR (PSR2) Q4 FY30
Launch 2 Readiness Date Q3 FY35
d) No Government Furnished Equipment (GFE) will be provided.
e) Mission durations: See the PORD. Requirements are to be met at end of operational life.
f) The following instrument-level reviews will be held for the first flight build: SRR, IBR, PDR, CDR, PER, PSR.
g) Subsequent flight builds will hold a PER and PSR. Review pre-requisites, content, and success criteria are documented in NPR 7123.1.
1.3 Study Milestone Schedule
The Contractor shall execute the study in accordance with the following milestone schedule. Requirements and deliverables for these milestones are described in Section 3.
Milestone Schedule
Kickoff Meeting Within two weeks of award
Monthly Progress Reviews Kickoff + 1, 2, 3, 4, 5, 7, 8, 9, 10 months
Mid‐Term Review Kickoff + 6 months
Final Study Review Kickoff + 11.5 months
Final Report Package Kickoff + 12 months
Risk Mitigation Report (as applicable) Kickoff + 20 months
Technology Development Report (as applicable)
Kickoff + 20 months
Page 3 of 13 Printed Monday, September 20, 2021
ID
OCXSOW12
OCXSOW13
Object Number
1.4
1.4.0-1
418-XO-OCXSOW-0060, RM Version, Geostationary Extended Observations (GeoXO) Ocean Color (OCX) Statement of Work
1.4 Applicable and Reference Documents
Reference Number Title
Applicable Documents
418‐XO‐OCXPORD‐0061 OCX Performance and Operational Requirements
Document
418‐XO‐OCXUIID‐0062 OCX Unique Instrument Interface Document
418‐XO‐GXIGIRD‐0025 GeoXO General Interface Requirements Document
418‐XO‐IMAR‐0026 GeoXO Instrument Mission Assurance Requirements
Reference Documents
NPR 7123.1 NASA Systems Engineering Process and
Requirements
SP‐2016‐6105 NASA Systems Engineering Handbook
GPR 7120.4D GSFC Guideline for Performing Risk Assesments
CCSDS 120.2‐G‐1 Report Concerning Space Data System Standards
GREEN BOOK: LOSSLESS MULTISPECTRAL AND
HYPERSPECTRAL IMAGE COMPRESSION
CCSDS 122.1‐B‐1 Recommendation for Space Data System Standards
BLUE BOOK: SPECTRAL PREPROCESSING
TRANSFORM FOR MULTISPECTRAL AND
HYPERSPECTRAL IMAGE COMPRESSION
CCSDS 123.0‐B‐2 Recommendation for Space Data System Standards
BLUE BOOK: LOW‐COMPLEXITY LOSSLESS AND
NEAR‐LOSSLESS MULTISPECTRAL AND
HYPERSPECTRAL IMAGE COMPRESSION
Page 4 of 13 Printed Monday, September 20, 2021
ID
OCXSOW14
OCXSOW15
OCXSOW16
OCXSOW17
OCXSOW18
OCXSOW19
OCXSOW20
OCXSOW21
OCXSOW22
OCXSOW23
OCXSOW24
OCXSOW25
OCXSOW26
OCXSOW27
OCXSOW28
OCXSOW29
OCXSOW30
OCXSOW31
OCXSOW32
Object Number
2.0-1
2.1
2.1.0-1
2.1.1
2.1.1.0-1
2.1.1.0-2
2.1.2
2.1.2.0-1
2.1.2.0-2
2.1.3
2.1.3.0-1
2.1.3.0-2
2.1.4
2.1.5
2.1.5.0-1
2.1.5.0-2
2.1.5.0-3
2.1.5.0-4
418-XO-OCXSOW-0060, RM Version, Geostationary Extended Observations (GeoXO) Ocean Color (OCX) Statement of Work
2 Tasks The Contractor shall analyze the OCX requirements, perform trade studies to justify design and a conceptual design for the OCX, and perform all other tasks as specified below.
2.1 Trade Studies
The Contractor shall perform the following trade studies and report on the results at the Midterm Review:
2.1.1 Revisit Time Trade Study
The Contractor shall conduct a trade study to determine the implications of increase the refresh rate beyond the baseline for the time enhancements listed in the PORD Appendix 1, while maintaining compliance to all other specifications defined in the PORD. (CDRL 1)
The Contractor shall document the associated cost, schedule, and risk relative to that of the baseline compliant design. (CDRL 1)
2.1.2 Spectral Resolution Trade Study
The Contractor shall conduct a trade study to augment the baseline OCX with any of the resolution enhancements listed in the PORD Appendix. (CDRL 2)
The Contractor shall document the associated cost, schedule, and risk weighed against predicted performance associated with each design enhancement beyond the baseline requirements. (CDRL 2)
2.1.3 SNR Trade Study
The Contractor shall conduct a trade study to determine the implications of increasing the SNR beyond the baseline for the SNR enhancement listed in the PORD Appendix, while maintaining compliance to all other specifications defined in the PORD. (CDRL 3)
The Contractor shall document the associated cost, schedule, and risk relative to that of the baseline compliant design. (CDRL 3)
2.1.4 Reserved
2.1.5 Data Compression Study
Should the projected data rate exceed the requirement in the UIID, the Contractor shall evaluate compression options to meet the data rate requirement.
Lossy compression algorithms will be considered if the requirements of the PORD are met. (CDRL 4)
In the trade study, the Contractor shall weigh the data quality against data rate and disclose any impact on performance. (CDRL 4)
The Contractor shall assess impacts to the electronics and/or software, cost, schedule, and development risk.
Page 5 of 13 Printed Monday, September 20, 2021
ID
OCXSOW33
OCXSOW34
OCXSOW35
OCXSOW36
OCXSOW37
OCXSOW38
OCXSOW40
OCXSOW43
OCXSOW44
OCXSOW46
OCXSOW47
OCXSOW48
OCXSOW49
Object Number
2.1.5.0-5
2.2
2.2.0-1
2.2.0-2
2.2.0-3
2.2.0-4
2.2.0-5
2.2.0-6
2.2.0-7
2.2.0-8
2.2.0-9
2.2.0-10
2.2.0-11
418-XO-OCXSOW-0060, RM Version, Geostationary Extended Observations (GeoXO) Ocean Color (OCX) Statement of Work
After the kickoff, the Government will provide standard scenes to be assessed in the trade study. The results of this trade study are due at the Midterm Review. (CDRL 4)
2.2 OCX Design Concept Development and Related Analyses
The Contractor shall develop an OCX design concept and perform associated engineering analyses to justify design parameters, tolerances, design/performance margins, and associated budgets. (CDRL 5)
The Contractor shall provide a quantitative comparison of the OCX performance against the performance requirements in Section 3 of the PORD. (CDRL 6)
The Contractor shall provide a summary of compliance to the Level 3 requirements (PORD, UIID, GIRD, and IMAR), including initial engineering analyses showing compliance to environmental requirements. (CDRL 7)
The Contractor shall review all requirements listed as "TBR" or “TBD” and either concur or suggest new requirement values. The Contractor will quantify potential cost, schedule, and risk impacts of any suggested requirements changes. (CDRL 8)
The Contractor shall define a calibration methodology (both pre-launch and on-orbit) and provide the associated accuracy (pre-launch and on-orbit). Included in this effort will be a description of planned observations, and an examination of calibration FOV impacts, as it is not possible to guarantee a clear FOV in any direction other than down the instrument optical axis (as described in the UIID).
This effort will identify the known spacecraft accommodation dependencies. (CDRL 9)
The Contractor shall analyze the radiometric performance of the instrument concept including the development of a preliminary radiometric model and a preliminary end-to-end radiometric accuracy budget and preliminary radiometric uncertainty budget (pre-launch and on-orbit). (CDRL 10)
The Contractor shall describe the systems approach to meeting all INR and coregistration requirements in the PORD. Such descriptions, including an preliminary error budget, will span relevant flight hardware characteristics, spacecraft motions, operational aspects, and ground processing. (CDRL 11)
The Contractor shall describe the algorithms to be used on the GeoXO ground system for decompression (if needed) and processing to data Level 1b, as described in the PORD. (CDRL 12)
The contractor shall describe the Level 1beta stopping point in the Level 1b OCX ground processing algorithm flow that would yield calibrated and navigated output that is not on the fixed grid (i.e. not resampled if resampling is needed to generate Level 1b on the fixed grid). Impacts to data rate or data processing to achieve L1beta instead of Level1b can be included. (CDRL 12)
The contractor shall review optical safe zones of operation, zones of reduced data quality (ZRDQ), and provide stray light mitigation concept. (CDRL 13)
The Contractor shall identify what operational scans are possible with the concept system. The Contractor will propose efficient combinations of EEZE and GL (as defined in the OCX PORD) that will be compatible with temporal refresh
Page 6 of 13 Printed Monday, September 20, 2021
ID
OCXSOW49
OCXSOW116
OCXSOW54
OCXSOW55
OCXSOW56
OCXSOW58
OCXSOW61
OCXSOW62
OCXSOW63
OCXSOW64
OCXSOW65
OCXSOW66
Object Number
2.2.0-11
2.2.0-12
2.2.0-13
2.2.0-14
2.2.0-15
2.2.0-16
2.2.0-17
2.2.0-18
2.2.0-19
2.3
2.3.0-1
2.3.0-2
418-XO-OCXSOW-0060, RM Version, Geostationary Extended Observations (GeoXO) Ocean Color (OCX) Statement of Work requirements. The Contractor will propose efficient combinations of subsections of EEZE (or EEZW) and regions of interest that will be compatible with temporal refresh requirements, especially for EEZW. Regions of interest are smaller, targeted regions that may be ~ 400 km x ~400 km, in a format which are more suitable to the instrument observing format. The complexity of commanding required to change coverage and the impact to data should be minimized. The Contractor will propose the ability to command observation of these regions N times in a flexible pattern in addition to the EEZE or EEZW (instead of repeating the EEZE+GL pattern or EEZW pattern in three hours) and suggest the dimensions and number of the smaller, targeted region of interest that can be covered during a three hour refresh time in additional to the EEZW coverage, using the nominal EEZ+GL coverage rate and meeting other performance requirements. (CDRL 14)
The Contractor shall develop a operation concept for an automated process that uses cloud conditions from GeoXO Imager data and knowledge of solar position to prioritize or optimize scan schedules to acquire the highest value scans within available resources. (CDRL 15)
The Contractor shall provide an initial analysis, and a detailed state diagram, of all use cases/modes for a concept of operations of the instrument and its ability to support engagement and disengagement of all cases/modes (as defined in the PORD) and delivery of telemetry. (CDRL 16)
The Contractor shall describe a reliability approach (planned redundancy, parts selection, etc.) to meet the PORD required reliability for the specified lifetime. (CDRL 17)
The Contractor shall identify single-point failures and fault critical elements. As part of this analysis the Contractor will describe the fault tolerant/graceful degradation features of the design. (CDRL 18)
The Contractor shall develop a Master Equipment List (MEL). The MEL will document the mass, power, and TRL of each major sub-component. A template for the MEL will be provided by the Government. (CDRL 19)
The Contractor shall study the best method for handling of dead pixels and other detector defects and damage. (CDRL 20)
Additionally, the contract shall develop operational or data processing methods to address detector degradation over life of mission. (CDRL 20)
The Contractor shall provide descriptions of any simulation and analytical tools used in the assessment of the design and/or performance, including the heritage and validation of the tools. (CDRL 21)
2.3 Technology Assessment and Demonstration
The Contractor shall assess the technology readiness of all components of the instrument design. (CDRL 22)
If applicable, the Contractor shall provide a detailed Technology Development Plan (TDP), including a schedule, explaining how all technologies will achieve TRL 6 by the instrument PDR. If the study effort includes Technology Development effort, the TDP and associated schedule will clearly identify all of the work covered by the Technology Development. (CDRL 23)
Page 7 of 13 Printed Monday, September 20, 2021
ID
OCXSOW68
OCXSOW69
OCXSOW70
OCXSOW71
OCXSOW74
OCXSOW75
OCXSOW76
OCXSOW80
OCXSOW81
Object Number
2.3.0-3
2.3.0-4
2.4
2.4.0-1
2.4.0-2
2.4.0-3
2.4.0-4
2.4.0-5
2.4.0-6
418-XO-OCXSOW-0060, RM Version, Geostationary Extended Observations (GeoXO) Ocean Color (OCX) Statement of Work
The Contractor shall develop a EDU Model Philosophy and Plan that describes test plans, schedule, and cost of development for an end-to-end Engineering Development Unit and a test regime proposed by the Contractor. (CDRL 24)
The Contractor shall document the flight hardware and software heritage as well as any relevant differences between the claimed heritage and the proposed design (for example, on-orbit environment, mission duration, requirements, etc.). (CDRL 25)
2.4 Management Planning
The Contractor shall identify and rank risks to the development of the OCX and describe associated mitigations. The likelihood and criticality of risks will be ranked on a 5x5 matrix per GPR 7120.4D. The Contractor will identify alternate implementation paths for all high-risk items. (CDRL 26)
If the study effort includes Risk Mitigation effort, the Contractor shall implement the Risk Mitigation effort under contract, brief the status of this effort at the reviews described in section 3, and provide a final report detailing the work completed, associated results, and the level to which the risk has been mitigated. (CDRL 27)
The Contractor shall define a Spare Philosophy approach for procuring and maintaining an adequate supply of spare parts and subassemblies to minimize cost, schedule, and performance risks caused by part damage or shortages. (CDRL 28)
The Contractor shall develop an implementation phase schedule. The Contractor will assume that the parts for the 4 Flight models and spares will be procured at the same time. The schedule will show the following major instrument reviews: SRR, IBR, PDR, CDR, MRRs, TRRs, PER, and PSR, achievement of TRL6, development of the instrument physical model(s), long-lead (> 1 year) procurements, I&T and V&V activities, and the top three critical paths. The schedule will identify any flight hardware procurements that are started ahead of the completion of the EDU (or equivalent).
The contractor shall suggest dates for the contract starts and other milestones that will minimize the overall cost and minimize the developmental risks. (CDRL 29)
The Contractor shall suggest dates for the FM3 and FM4 contract option starts, deliveries, and other milestones that will minimize the overall cost and minimize the developmental risks to FM1 and FM2. The nominal PSR dates and Launch Readiness Dates (LRDs) for these units are as follows: (CDRL 30)
Mission PSR (Gov. FY) LRD (Gov. FY)
FM3 Q2 FY32 Q3 FY39
FM4 Q2 FY33 Q1 FY43
Page 8 of 13 Printed Monday, September 20, 2021
ID
OCXSOW82
Object Number
2.4.0-7
418-XO-OCXSOW-0060, RM Version, Geostationary Extended Observations (GeoXO) Ocean Color (OCX) Statement of Work
The Contractor shall provide a parametric cost estimate for the development and production of four flight model instruments, any spare hardware needed for sparing philosophy, and the engineering model recommended in the EDU Model Philosophy & Plan (see section 2.3). The costs will be separately identified for each model, flight unit, required GSE (ground support equipment), and technology development(s) and organized by WBS element. The costs will be shown phased by Government fiscal year. The Contractor will state what parametric model was used in the analysis and provide any inputs to the model beyond the MEL (reference 2.2), describing the heritage of the model. (CDRL 31)
Page 9 of 13 Printed Monday, September 20, 2021
ID
OCXSOW86
OCXSOW87
OCXSOW88
OCXSOW89
OCXSOW90
OCXSOW91
OCXSOW94
OCXSOW95
OCXSOW98
OCXSOW99
OCXSOW103
OCXSOW104
OCXSOW108
OCXSOW109
Object Number
3.0-1
3.0-2
3.1
3.1.1
3.1.1.0-1
3.1.2
3.1.2.0-1
3.1.3
3.1.3.0-1
3.1.4
3.1.4.0-1
3.1.5
3.1.5.0-1
418-XO-OCXSOW-0060, RM Version, Geostationary Extended Observations (GeoXO) Ocean Color (OCX) Statement of Work
3 Reviews, Reporting, and Deliverable Products The Contractor shall perform the reviews and reporting tasks and provide deliverable products as specified below.
The Contracting Officer's written determination that Government requests for action (RFA's) or requests for information (RFI's) regarding the deliverable reviews and products have been closed out will constitute acceptance of the deliverable.
3.1 Status Meetings and Reviews
3.1.1 Kickoff Meeting
The Contractor shall support a kickoff meeting within 2 weeks of the Authorization to proceed to provide a team introduction, summary of the proposed work for the study, proposed study schedule, and a high-level introduction to the initial imager design concept. (CDRL 32) The Contractor will plan for a 2-hour virtual meeting.
The Contractor will deliver a soft copy of the Kickoff chart set 24 hours prior to the meeting. (CDRL 32) (CCR X00030)
3.1.2 Monthly Progress Review (MPR)
The Contractor shall present the results of the work performed since the previous MPR and discuss relevant technical and programmatic issues and findings. The topics expected to be covered are listed in the CDRLs table in section 3.2. The MPRs will be planned as 4-hour virtual meetings. The Contractor will deliver a soft copy of the MPR chart set 24 hours prior to the meeting. (CDRL 33)
3.1.3 Midterm Review (MTR)
The Contractor shall present a summary of the results of the work performed for the Midterm Review. This review will be held at the NASA Goddard Space Flight Center, pending travel restrictions. The Contractor will plan on a one and a half day review. The topics expected to be covered are listed in the CDRLs table in section
3.2. The Contractor will deliver a soft copy of the MTR chart set 72 hours prior to the meeting. (CDRL 34)
3.1.4 Final Study Review (FSR)
The Contractor shall present a summary of the results of the work performed for the Final Study Review. The Contractor will plan on a one and a half day review at the Contractor’s facility. If possible, the Government will travel to attend the review in-person, pending travel restrictions. The topics expected to be covered are listed in the CDRLs table in section 3.2. The Contractor will deliver a soft copy of the FSR chart set 72 hours prior to the meeting. (CDRL 35)
3.1.5 Final Report Package (FRP)
The Contractor shall deliver any CDRLs that were not delivered and approved by the Government Contracting Officer (CO) prior to the FSR or any CDRLs requiring updates in the Final Report Package. The Contractor will address any open action items remaining after the FSR in the Final Report Package. The FRP will be delivered within 2 weeks after the FSR. (CDRL 36)
Page 10 of 13 Printed Monday, September 20, 2021
ID
OCXSOW112
OCXSOW113
Object Number
3.2
3.2.0-1
418-XO-OCXSOW-0060, RM Version, Geostationary Extended Observations (GeoXO) Ocean Color (OCX) Statement of Work
3.2 Contract Data Requirements List (CDRL)
The Contractor shall deliver the data products specified in the following table.
Table 2: CDRLs SU – Status Updated, UAN Updates As Necessary
ID Deliverable/Task Deliverable format
Kickoff MPR MTR FSR FRP SOW
Ref
1 Revisit Time Trade Study
Report
Briefing
Charts
Status Final UAN UAN 2.1.1
2 Spectral Resolution Trade
Study Report
Briefing
Charts
Status Final UAN UAN 2.1.2
3 SNR Trade Study Report Briefing
Charts
Status Final UAN UAN 2.1.3
4 Data Compression Trade
Study Report
Briefing
Charts
Status Prelim Final UAN 2.1.5
OCX Design Briefing
Charts +
Models
Status Prelim Final UAN 2.2
6 Predicted performance vs.
PORD
Briefing
Charts
Status Prelim Final UAN 2.2
7 Level‐3 Requirement
Compliance
Spreadsheet Status Prelim Final UAN 2.2
8 Suggested values for TBRs Briefing
Charts
Status, final answer by 3rd
MPR
UAN UAN UAN 2.2
9 Calibration Methodology Briefing
Status Prelim Final UAN 2.2
Page 11 of 13 Printed Monday, September 20, 2021
ID
OCXSOW113
Object Number
3.2.0-1
418-XO-OCXSOW-0060, RM Version, Geostationary Extended Observations (GeoXO) Ocean Color (OCX) Statement of Work
10 Radiometric Math Model and
Radiometric budgets
Briefing
Charts +
Model + budget spreadsheets
Status Prelim Final UAN 2.2
11 INR and Coregistration
Approach
Briefing
Charts
Status Prelim Final UAN 2.2
12 Level 1b Algorithm Description Briefing
Charts
Status Prelim Final UAN 2.2
13 ZRDQ Review and Straylight
Mitigation Concept
Briefing
Charts
Status Prelim Final UAN 2.2
14 Plan for Commanding During
Operations and Regions of
Interest
Briefing
Charts
Status Prelim Final UAN 2.2
15 Scan Prioritization Concepts Briefing
Charts
Status Prelim Final UAN 2.2
16 Modes Analysis Briefing
Charts
Status Prelim Final UAN 2.2
17 Reliability Approach Briefing
Charts
Status Prelim Final UAN 2.2
18 Single‐Point Failures & Fault
Critical Elements
Briefing
Charts
Status Prelim Final UAN 2.2
19 MEL Spreadsheet Status Prelim Final UAN 2.2
20 Detector Management
Approach
Briefing
Charts
Status Prelim Final UAN 2.2
21 Analytical Tools Audit Briefing
Status Final UAN UAN 2.2
Page 12 of 13 Printed Monday, September 20, 2021
ID
OCXSOW113
Object Number
3.2.0-1
418-XO-OCXSOW-0060, RM Version, Geostationary Extended Observations (GeoXO) Ocean Color (OCX) Statement of Work
22 TRL Assessment Briefing
Charts
Status Final UAN UAN 2.3
23 Technology Development Plan Briefing
Charts
Status Prelim Final UAN 2.3
24 EDU Model Philosophy & Plan Briefing
Charts
Status Prelim Final UAN 2.3
25 Heritage Assessment Briefing
Charts
Status Final UAN UAN 2.3
26 Risk Assessment Briefing
Charts
Status Prelim Final UAN 2.4
27 Risk Mitigation Effort (if applicable)
Briefing
Charts
Status SU SU UAN 2.4
28 Spares Philosophy and Plan Briefing
Charts
SU Prelim Final UAN 2.4
29 Flight Implementation
Schedule
MS Project +
Briefing
Charts
Status Prelim Final UAN 2.4
30 Options Schedule MS Project +
Briefing
Status Prelim Final UAN 2.4
31 Flight Cost Estimate Spreadsheet Status Prelim Final UAN 2.4
32 Kickoff Meeting Briefing
Charts
Charts due 24 hours before
3.1.1
33 MPR Charts Briefing
Charts
24 hrs before
MPRs
3.1.2
34 MTR Charts Briefing
Charts
72 hrs before
MTR
3.1.3
35 FSR Charts Briefing
Charts
72 hrs before
FSR
3.1.4
36 FRP Charts NA 2 wks post
FSR
3.1.5
Page 13 of 13 Printed Monday, September 20, 2021
ID
OCXSOW114
OCXSOW115
Object Number
4.0-1
418-XO-OCXSOW-0060, RM Version, Geostationary Extended Observations (GeoXO) Ocean Color (OCX) Statement of Work
4 Appendix A: Acronyms CDR Critical Design Review CDRL Contract Data Requirement List CO Contracting Officer EDU Engineering Development Unit FM Flight Model FRP Final Report Package FSR Final Study Review GeoXO Geostationary Extended Observations GFE Government Furnished Equipment GIRD General Interface Requirements Document GPR Goddard Procedural Requirements GSE Ground Support Equipment GSFC Goddard Space Flight Center IBR Integrated Baseline Review IMAR Instrument Mission Assurance Requirements INR Image Navigation and Registration LRD Launch Readiness Date MEL Master Equipment List MPR Monthly Progress Review MRR Manufacturing Readiness Review MTR Mid-Term Review NASA National Aeronautics and Space Administration NOAA National Oceanic and Atmospheric Administration NPR NASA Procedural Requirements OCX GeoXO Ocean Color PDR Preliminary Design Review PER Pre-Environmental Review PORD Performance and Operation Requirements Document Qx FYz Quarter x of Fiscal Year z PSR Pre-Shipment Review RFA Request for Action RFI Request for Information SNR Signal to Noise Ratio SOW Statement of Work SRR System Requirements Review SU Status Update TBR To Be Reviewed TDP Technology Development Plan TRL Technology Readiness Level TRR Test Readiness Review UAN Update as Necessary UIID Unique Instrument Interface Document ZRDQ Zones of Reduced Data Quality
Effective Date: September 16, 2021 418-XO-OCXSOW-0060 Expiration Date: Five years from date of last signature Baseline Version 1.1 Responsible Organization: GeoXO Flight Project/Code 418
Document Change Record (DCR)
CCR GeoXO#: X00021 Rev: A Title: 418-XO-OCXSOW-0060 Baseline OCX SOW Contract # N/A GOES S/C: GeoXO Effectivity: Instruments CCB Status: Approved Doc #: 418-XO-OCXSOW-0060 CCB Date: 08/12/2021 Doc Version: 1.0 Contract Mod#: N/A DOORs Version: 1.0 Doc Change Date: August 12, 2021 DOORs ID #: All
CCR GeoXO#: X00030 Rev: Title: OCXSOW: for a typo in CDRL cross-reference Contract # N/A GOES S/C: GeoXO Effectivity: Instruments CCB Status: Approved Doc #: 418-XO-OCXSOW-0060 CCB Date: 09/11/2021 Doc Version: 1.1 Contract Mod#: N/A DOORs Version: 1.1 Doc Change Date: Sept 16, 2021 DOORs ID #: Modify: OCXSOW91 (3.1.1.0-1)
File details come from the government source that posted it. Updated .