This document provides information about an upcoming federal contract opportunity for repair and paving work at Wallops Flight Facility. The scope of work includes demolition, site work, concrete repairs and construction, and concrete demolition and replacement. The contract value is estimated between $1 million to $5 million, and work must be completed within 270 calendar days of the notice to proceed. Bidders must provide bid, payment, and performance bonds. The solicitation is expected to be released on August 3, 2021, with bids due on September 3, 2021. The NAICS code is 273310 and the small business size standard is $36.5 million. The procuring agency is NASA Goddard Space Flight Center.

View the file

Other files

File Type Posted
80GSFC21B0004 Amendment 2.pdf PDF
FCLP 8 Q and A-2-4.pdf PDF
80GSFC21B0004_Attachment H.pdf PDF
Amendment 1.pdf PDF
FCLP Airfield Phase 8 Site Visit Instructions.pdf PDF
Attachment F.pdf PDF
Attachment D.pdf PDF
COVID Health Screening and Badge Information for Site Visits.pdf PDF
Attachment G.pdf PDF
Attachment B Specs.pdf PDF
Attachment E.pdf PDF
NoticeToBidders 80GSFC21B0004.pdf PDF
Attachment C Drawings.pdf PDF
Attachment A Final.pdf PDF
FCLP 8 Q and A-1.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER, 1. SOLICITATION NO. 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES

AND AWARD

(Construction, A lteration, or Repair)

80GSFC2180004

IMPORTANT - The "offer• section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

NASA

Goddard Space Flight Center Procurement Operations Division Greenbelt MD 20771

5. REQUISITION/ PURCHASE

4200766738

[K] SEALED BID (IFB)

1 of 89 • NEGOTIATED (RFP)

08/03/2021

REQUEST NUMBER 6. PROJECT NUMBER

8. ADDRESS OFFER TO

See Provision L.

9. FOR INFORMATION

CALL •

a . NAME

THERESE PATTERSON

b. TELEPHONE NO. (INCLUDE AREA CODE) (NO COLLECT CALLS)

757-824-1066

SOLICITATION

NOTE: IN SEALED BID SOLICITATIONS "OFFER" AND "OFFEROR" MEAN "BID" AND "BIDDER"

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (TITLE, IDENTIFYING NO., DATE):

NASA Specifications titled "Wallops Airfield Repair Project, Phase 8" dated June 28, 2021 and drawings 20014-20043 t it led "Wallops Airfield FCLP Phase 8 (Runway 10-28, TW-A, dated June 22, 2021

11. The contractor shall begin performance within 15 calendar days and complete within 270 calendar days after receiVing

D award, Q notice to proceed. This performance period is 0 mandatory D nego iable. (see

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(ff "Yes• indicate within how many calendar days after award in item 12b)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

12b. CALENDAR DAYS

a. Sealed offers in original and _ _ _ _ copies to perform the work required are due at the place specified in Item 8 by _ _ 1_3_3_0 _ __ (hour) local time 09/03/2021 (date). If his is a sealed bid solicitation. offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offerors name and address, the solicitation number, and the date and time offers are due.

b. An offer guarantee 0 is, D is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers provid ing less than 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1 (d)

FACILITY CODECODE

15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14)

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP code)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with he terms of this solicitation, if this offer is accepted by Government in writing within

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by government)

22. AMOUNT:

21. ITEMS ACCEPTED:

23. ACCOUNTING AND APPROPRIATION DATA

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 COPIES UNLESS OTHERWISE SPECIFIED)

ITEM

)10 U.S.C.2304(c) ( )41 U.S.C. 3304(a) (

27. PAYMENT WILL BE MADE BY26. ADMINISTERED BY CODE

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document) Your offer on this solicitation, is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the government solicitation and your offer, and (b) the contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN

(TYPE OR PRINT)

31A. NAME OF CONTRACTING OFFICER (TYPE OR PRINT)

STANDARD FORM 1442 (REV 8/2014)

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

30B. SIGNATURE 30C. DATE

See Continuation Sheet If Applicable

$0.00 See Continuation Sheet If Applicable

NASA

Goddard Space Flight Center Wallops Flight Facility Wallops Island VA 23337-5099 calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in requirement 13d. Failure to insert any number means the offeror accepts the minimum in item 13d ) https://www.nssc.nasa.gov/vendorpayment

NSSC-AccountsPayable@nasa.gov

I

I

I

(A)

ITEM NO

(F)

AMOUNT

(B)

SUPPLIES/SERVICES

(C)

QUANTITY

(D)

UNIT

(E)

UNIT PRICE

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED Page

NAME OF OFFEROR OR CONTRACTOR

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110 of

80GSFC21B0004

WALLOPS AIRFIELD REPAIR PROJECT, FCLP PHASE 8

(RUNWAY 10-28, TAXIWAY (TW)-A)

WALLOPS FLIGHT FACILITY

WALLOPS ISLAND, VA

EXHIBIT 1 TO STANDARD FORM 1442

SOLICITATION 80GSFC21B0004

BIDDING SCHEDULE

Bidder Name _______________________________________________ And Address _______________________________________________ (Fill In ) _______________________________________________

BID ITEM 0001: Firm Fixed Price for entire work, complete in accordance with the drawings and specifications, excluding work described in Bid Option 1 and Bid Option 2

(Bid price expressed in words and numbers)

BID OPTION 1: Firm Fixed Price for all work in connection with east Taxiway Alpha concrete and joint repairs per the repair schedule, complete in accordance with Option 1, as defined in the drawings and specifications.

BID OPTION 2: Firm Fixed Price for all work in connection with Runway 10/28 concrete and joint repairs per the repair schedule, complete in accordance with Option 2, as defined in the drawings and specifications.

SUM TOTAL BID: (BID ITEM 0001 and BID OPTIONs 1 and 2):

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 1852.216-78 FIRM FIXED PRICE (DEC 1988)

The total firm fixed price of this contract is: Basic Requirement ($0001 To Be Bid)

0001: Firm Fixed Price for entire work, complete in accordance with the drawings and specifications, excluding work described in Bid Option 1, and Bid Option 2.

Note: Bidder shall also complete Price Proposal Schedule SF1442, Block 17

(End of clause)

B.2 GSFC 52.211-90 SUPPLIES AND/OR SERVICES TO BE PROVIDED (SEP

2017)

The Contractor shall provide all resources (except as may be expressly stated in the contract as furnished by the Government) necessary to deliver and/or perform the items below in accordance with the Specifications and Drawings, incorporated as Attachments B and C.

Item Description Reference Schedule Delivery Method/Addressee(s)

Services, Deliverables, & Material Submittals in accordance with Attachments B and C, Specifications and Drawings

As Defined in Attachments B and C, Specifications and Drawings

As Defined in Attachments B and C, Specifications and Drawings

As Defined in Attachment B, Specifications

Standard Form 25 - Performance Bond or Irrevocable Letter of Credit

Section I 52.228-15

Within 15 days after notice of award or actual contract award

Original Hard Copy/Contracting Officer

(CO)

Standard Form 25A - Payment Bond or Irrevocable Letter of Credit

Section I 52.228-15

Within 15 days after notice of award or actual contract award

Original Hard Copy/CO

4 Contractor’s Daily Reports

Section H Special Instructions and Information for Construction Contractors Attachment D

Daily, beginning on the first day of performance

Hard Copy/NASA Inspector

5 Certified Payrolls Section I 52.222-8

Weekly (within 7 days after the

Electronic or Hard Copy/CO, COR regular payment date of the payroll week covered)

6 Price Breakdown

Section H Price Breakdown Section I 52.232-5

15 days after contract award date

Electronic and three (3) hard copies/CO, COR

7 Progress Schedule Section I 52.236-15

15 days after Notice to Proceed Electronic Format/CO, COR

Standard Form 1413 - Subcontractor Statement and Acknowledgement

Section I 52.222-11

Within 14 days of award of contract and subsequent awarded subcontracts

Electronic Format/CO

9 Test Reports

Section H Quality Control Testing Supplied by the Contractor

Close of business on the day of the test

As specified in clause/COR

Government Real Property Maintenance Plan

Section G

NFS 1852.245-83

30 Days after Contract Effective Date

Electronic Format/CO and

COR

Contractor Acquired Government Property Reporting

Section G

GSFC 52.245-93

Quarterly by Jan 30, Apr 30, July 30, and Oct 30

Electronic and Hard Copy Format/CO and Supply and Equipment Management Officer (SEMO), Code 273

12 Safety & Health Plan Section H

FAR 52.236-13-

Alternate I

30 days after contract award

Electronic Format Prior to Approval, 3 hard Copies of Approved Plan/CO

Safety & Health Reporting

Section H

NFS 1852.223-70

Section H

NFS 1852.223-75

Section H

GSFC 52.223-91

Monthly/Quarterly Reports and As Required

NASA Mishap Information System (NMIS)

Personal Identity Verification (PIV) Documentation and Reporting

Section H

GSFC 52.204-99

Attachment F

10th Calendar Day of the Month and As Required

Electronic Format and Hard Copy/COR & Code 240

Certificate of Insurance

Section I

FAR 52.228-5

Section I

NFS 1852.228-75

As Specified by

FAR 52.228-5

Electronic Format/CO

Affirmative Procurement of Biobased Products

Section I

FAR 52.223-2

Annually by October 31 and Final Report http://netsdata.grc.nasa.gov/

17 Material and Data Safety Sheets

Section I 52.223-3

As Specified by 52.223-3

As Specified by 52.223-3

Estimate of Recovered Material Content

Section I

FAR 52.223-9

Upon Contract Completion

Electronic Format/CO and

COR

Service Contract Reporting

Section I

FAR 52.204-14

Annually by October 31 and Revisions, if needed, by November 30 https://www.acquisition.gov

20 Equal Opportunity Reports

Section I

FAR 52.222-26

As Specified by

FAR 52.222-26

Electronic Format/CO and Code 120

NOTE: Unless otherwise specified, “day” means “calendar day.”

No work shall begin on this contract until notice given in writing by the Contracting Officer to proceed.

Failure by the Contractor to submit all of the required submittals may be cause for termination of the contract in accordance with Clause 52.249-10, Default-(Fixed Price Construction).

B.3 GSFC 52.217-91 OPTION FOR INCREASED QUANTITY (SEP 2013)

In accordance with the Option for Increased Quantity--Separately Priced Line Item clause of this contract, the Government may increase the quantity of items as follows:

Option Description Period of Performance

Firm Fixed Price Amount

All work in connection with Option 1, complete in accordance with the drawings and specifications.

Includes east Taxiway Alpha concrete and joint repairs per the repair schedule in the plans.

Within the 270 days of the basic contract performance period

$To Be Bid

All work in connection with Option 2, complete in accordance with the drawings and specifications.

Includes Runway 10/28 concrete and joint repairs per the repair schedule in the plans.

Within the 270 days of the basic contract performance period

$To Be Bid

This option may be exercised by the Contracting Officer by written notice to the Contractor within the time period specified in FAR clause 52.217-7, "Option for Increased Quantity--Separately Priced Line Item" of this contract.

SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 GSFC 52.211-91 SCOPE OF WORK (FEB 2016)

The Contractor shall provide the personnel, materials, and facilities, except as otherwise specified in this contract, necessary to perform the work and to furnish the items specified in the SUPPLIES AND/OR SERVICES TO BE PROVIDED clause of this contract in accordance with the various sections of the NASA Specifications titled “Wallops Airfield Repair Project, Phase 8”, dated June 28, 2021, and Drawing Nos.

20014 through 20043 titled “Wallops Airfield Repair Project, FCLP Phase 8 (RUNWAY 10-28, TW-A)”, dated June 28, 2021, incorporated in Section J as Attachments B and C, respectively; and the Safety and Health Plan, incorporated in Section J as Attachment E.

SECTION D – PACKAGING AND MARKING

D.1 1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT

EQUIPMENT (JAN 2011)

(a) The Contractor shall identify all equipment to be delivered to the Government using NASA Technical Handbook (NASA-HDBK) 6003, Application of Data Matrix Identification Symbols to Aerospace Parts Using Direct Part Marking Methods/Techniques, and NASA Standard (NASA-STD) 6002, Applying Data Matrix Identification Symbols on Aerospace Parts or through the use of commercial marking techniques that: (1) are sufficiently durable to remain intact through the typical lifespan of the property: and, (2) contain the data and data format required by the standards. This requirement includes deliverable equipment listed in the schedule and other equipment when no longer required for contract performance and NASA directs physical transfer to NASA or a third party. The Contractor shall identify property in both machine and human readable form unless the use of a machine readable-only format is approved by the NASA Industrial Property Officer.

(b) Equipment shall be marked in a location that will be human readable, without disassembly or movement of the equipment, when the items are placed in service unless such placement would have a deleterious effect on safety or on the item's operation.

(c) Concurrent with equipment delivery or transfer, the Contractor shall provide the following data in an electronic spreadsheet format:

(1) Item Description.

(2) Unique Identification Number (License Tag).

(3) Unit Price.

(4) An explanation of the data used to make the unique identification number.

(d) For equipment no longer needed for contract performance and physically transferred under paragraph (a) of this clause, the following additional data is required:

(1) Date originally placed in service.

(2) Item condition.

(e) The data required in paragraphs (c) and (d) of this clause shall be delivered to the NASA center receiving activity listed below:

Goddard Space Flight Center Wallops Flight Facility Building F-19, Code 200C Wallops Island, VA 23337

(f) The contractor shall include the substance of this clause, including this paragraph (f), in all subcontracts that require delivery of equipment.

SECTION E – INSPECTION AND ACCEPTANCE

E.1 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)

(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not --

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price.

The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may --

(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or

(2) Terminate for default the Contractor’s right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately.

Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.

E.2 GSFC 52.246-93 ACCEPTANCE--LOCATION(S) (SEP 2013)

The Contracting Officer or authorized representative will accomplish acceptance at the following location(s):

Deliverable Item No. Location Authorized Representative

1 through 20 As specified in B.2 As specified in B.2

The Contracting Officer reserves the right to designate other Government agents as authorized representatives. The Contractor will be notified by a written notice or by a copy of the delegation letter if other agents are authorized.

If this is a fixed price type contract, acceptance shall be deemed to have occurred constructively--for the sole purpose of computing an interest penalty that might be due the Contractor under the Prompt Payment Act--on the 15th day after the Contractor has delivered the supplies or services in accordance with the terms and conditions of the contract. In the event that actual acceptance occurs within the constructive acceptance period, the determination of an interest penalty shall be based on the date of the actual acceptance.

E.3 GSFC 52.246-102 INSPECTION SYSTEM RECORDS (APR 2013)

The Contractor shall maintain records evidencing inspections in accordance with the Inspection clause of this contract for six (6) years after delivery of all items and/or completion of all services called for by the contract.

SECTION F – DELIVERIES OR PERFORMANCE

F.1 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF

WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work, ready for use within 270 days after notice to proceed. The time stated for completion shall include final cleanup of the premises.

F.2 52.211-12 LIQUIDATED DAMAGES-CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,004 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

F.3 PLACE OF PERFORMANCE

The construction services to be performed under this contact shall be performed at the Wallops Flight Facility, Wallops Island, VA.

(End of text)

SECTION G – CONTRACT ADMINISTRATION DATA

G.1 1852.245-71 INSTALLATION-ACCOUNTABLE GOVERNMENT

PROPERTY (JUN 2018) – ALTERNATE I (JAN 2011)

(a) The Government property described in paragraph (c) of this clause may be made available to the Contractor on a no-charge basis for use in performance of this contract.

This property shall be utilized only within the physical confines of the NASA installation that provided the property unless authorized by the Contracting Officer under (b)(1)(iv).

Under this clause, the Government retains accountability for, and title to, the property, and the Contractor shall comply with the following:

NASA Procedural Requirements (NPR) 4100.1, NASA Materials Inventory Management Manual;

NASA Procedural Requirements (NPR) 4200.1, NASA Equipment Management Procedural Requirements;

NASA Procedural Requirement (NPR) 4300.1, NASA Personal Property Disposal Procedural Requirements;

Property not recorded in NASA property systems must be managed in accordance with the requirements of the clause at FAR 52.245-1, as incorporated in this contract.

The Contractor shall establish and adhere to a system of written procedures to assure continued, effective management control and compliance with these user responsibilities.

In accordance with FAR 52.245-1(h)(1) the contractor shall be liable for property lost, damaged, destroyed or stolen by the contractor or their employees when determined responsible by a NASA Property Survey Board, in accordance with the NASA guidance in this clause.

(b)(1) The official accountable recordkeeping, financial control, and reporting of the property subject to this clause shall be retained by the Government and accomplished within NASA management information systems prescribed by the installation Supply and Equipment Management Officer (SEMO) and Financial Management Officer. If this contract provides for the Contractor to acquire property, title to which will vest in the Government, the following additional procedures apply:

(i) The Contractor shall not utilize the installation’s central receiving facility for receipt of contractor-acquired property. However, the Contractor shall provide listings suitable for establishing accountable records of all such property received, on a monthly basis, to the SEMO.

(ii) The Contractor shall furnish a copy of each purchase order, prior to delivery by the vendor, to the installation central receiving area.

(iii) The Contractor shall establish a record for Government titled property as required by FAR 52.245-1, as incorporated in this contract, and shall maintain that record until accountability is accepted by the Government.

(iv) Contractor use of Government property at an off-site location and off-site subcontractor use requires advance approval of the Contracting Officer and notification of the Industrial Property Officer. The property shall be considered Government furnished and the Contractor shall assume accountability and financial reporting responsibility. The Contractor shall establish records and property control procedures and maintain the property in accordance with the requirements of FAR 52.245-1, Government Property (as incorporated in this contract), until its return to the installation. NASA Procedural Requirements related to property loans shall not apply to offsite use of property by contractors.

(2) After transfer of accountability to the Government, the Contractor shall continue to maintain such internal records as are necessary to execute the user responsibilities identified in paragraph (a) of this clause and document the acquisition, billing, and disposition of the property. These records and supporting documentation shall be made available, upon request, to the SEMO and any other authorized representatives of the Contracting Officer.

(c) The following property and services are provided if checked:

(1) Office space, work area space, and utilities. Government telephones are available for official purposes only.

(2) Office furniture.

(3) Property listed in N/A

(i) If the Contractor acquires property, title to which vests in the Government pursuant to other provisions of this contract, this property also shall become accountable to the Government upon its entry into Government records.

(ii) The Contractor shall not bring to the installation for use under this contract any property owned or leased by the Contractor, or other property that the Contractor is accountable for under any other Government contract, without the Contracting Officer's prior written approval.

(4) Supplies from stores stock.

(5) Publications and blank forms stocked by the installation.

x(6) Safety and fire protection for Contractor personnel and facilities.

(7) Installation service facilities: None x(8) Medical treatment of a first-aid nature for Contractor personnel injuries or illnesses sustained during on-site duty.

x(9) Cafeteria privileges for Contractor employees during normal operating hours.

(10) Building maintenance for facilities occupied by Contractor personnel.

(11) Moving and hauling for office moves, movement of large equipment, and delivery of supplies. Moving services may be provided on-site, as approved by the Contracting Officer.

G.2 1852.245-75 PROPERTY MANAGEMENT CHANGES (JAN 2011)

(a) The Contractor shall submit any changes to standards and practices used for management and control of Government property under this contract to the assigned property administrator prior to making the change whenever the change —

(1) Employs a standard that allows increase in thresholds or changes the timing for reporting loss, damage, or destruction of property;

(2) Alters physical inventory timing or procedures;

(3) Alters recordkeeping practices;

(4) Alters practices for recording the transport or delivery of Government property;

or

(5) Alters practices for disposition of Government property.

G.3 1852.245-82 OCCUPANCY MANAGEMENT REQUIREMENTS (SEP 2017)

(a) In addition to the requirements of the clause at FAR 52.245-1, Government Property, as included in this contract, the Contractor shall comply with the following in performance of work in and around Government real property:

(1) NPD 8800.14, Policy for Real Estate Management.

(2) NPD 8831.2, Facilities Maintenance and Operations Management.

(b) The Contractor shall obtain the written approval of the Contracting Officer before installing or removing Contractor-owned property onto or into any Government real property or when movement of Contractor-owned property may damage or destroy Government-owned property. The Contractor shall restore damaged property to its original condition at the Contractor's expense.

(c) The Contractor shall not acquire, construct or install any fixed improvement or structural alterations in Government buildings or other real property without the advance, written approval of the Contracting Officer. Fixed improvement or structural alterations, as used herein, means any alteration or improvement in the nature of the building or other real property that, after completion, cannot be removed without substantial loss of value or damage to the premises. Title to such property shall vest in the Government.

(d) The Contractor shall report any real property or any portion thereof when it is no longer required for performance under the contract, as directed by the Contracting Officer.

G.4 1852.245-83 REAL PROPERTY MANAGEMENT REQUIREMENTS (JAN

2011)

(a) In addition to the requirements of the FAR Government Property Clause incorporated in this contract (FAR 52.245–1), the Contractor shall comply with the following in performance of any maintenance, construction, modification, demolition, or management activities of any Government real property:

(1) NPD 8800.14, Policy for Real Property Management.

(2) NPR 8831.2, Facility Maintenance Management.

(b) Within 30 calendar days following award, the Contractor shall provide a plan for maintenance of Government real property provided for use under this contract. The Contractor’s maintenance program shall enable the identification, disclosure, and performance of normal and routine preventative maintenance and repair. The Contractor shall disclose and report to the Contracting Officer the need for replacement and/or capital rehabilitation. Upon acceptance by the Contracting Officer, the program shall become a requirement under this contract.

(c) Title to parts replaced by the Contractor in carrying out its normal maintenance obligations shall pass to and vest in the Government upon completion of their installation in the facilities. The Contractor shall keep the property free and clear of all liens and encumbrances.

(d) The Contractor shall keep records of all work done to real property, including plans, drawings, charts, warranties, and manuals. Records shall be complete and current. Record of all transactions shall be auditable. The Government shall have access to these records at all reasonable times, for the purposes of reviewing, inspecting, and evaluating the Contractor’s real property management effectiveness. When real property is disposed of under this contract, the Contractor shall deliver the related records to the Government.

(e) The Contracting Officer may direct the Contractor in writing to reduce the work required by the maintenance program authorized in paragraph (b) of this clause at any time.

G.5 GSFC 52.232-90 INVOICES FOR CONSTRUCTION CONTRACTS (MAY

2018)

(a) Payment Office. The designated payment office is the NASA Shared Services Center (NSSC) located at FMD Accounts Payable, Bldg. 1111, Jerry Hlass Road, Stennis Space Center, MS 39529. Please contact the NSSC Customer Contact Center at 1-877- NSSC123 (1-877-677-2123) with any additional questions or comments.

(b) Invoices. Invoices shall be prepared in accordance with the Prompt Payment for Construction Contracts clause (FAR 52.232-27) and contain the certification and all information required by the Payments under Fixed-Price Construction Contracts clause (FAR 52.232-5) of this contract. In addition, invoices shall be submitted using the steps described at the NSSC’s Vendor Payment information web site at https://www.nssc.nasa.gov/vendorpayment.

(c) At the time of submittal to the payment office, an information copy of each invoice and supporting documents shall be submitted to:

Contracting Officer: Therese L. Patterson Code: 210.I Email: Therese.L.Patterson@nasa.gov

Contracting Officer’s Representative: Nicholas Shaffer Code: 228 Email: Nicholas.J.Shaffer@nasa.gov

(c) Improper invoices. The NSSC Payment Office will notify the contractor of any apparent error, defect, or impropriety in an invoices within seven calendar days of receipt by the NSSC Payment Office. Inquiries regarding requests for payment should be directed to the NSSC as specified in paragraph (b) of this section.

(d) In the event that amounts are withheld from payment in accordance with provisions of this award, a separate payment request for the amount withheld will be required before payment for that amount may be made.

G.6 1852.232-80 SUBMISSION OF VOUCHERS/INVOICES FOR PAYMENT

(APR 2018)

(a) The designated payment office is the NASA Shared Services Center (NSSC) located at FMD Accounts Payable, Bldg. 1111, Jerry Hlass Road, Stennis Space Center, MS 39529.

(b) Except for classified vouchers, the Contractor shall submit all vouchers and invoices using the steps described at NSSC's Vendor Payment information Web site at:

https://www.nssc.nasa.gov/vendorpayment. Please contact the NSSC Customer Contact Center at 1-877-NSSC123 (1-877-677-2123) with any additional questions or comments.

(c) Payment requests.

(1) The payment periods are stipulated in the payment clause(s) contained in this contract.

(2) Vouchers submitted under cost type contracts and invoices submitted under fixed-price contracts shall include the items delineated in FAR 32.905(b) supported by relevant back-up documentation. Back-up documentation shall include at a minimum, the following information:

(i) Vouchers.

(A) Breakdown of billed labor costs and associated contractor generated supporting documentation for billed direct labor costs to include rates used and number of hours incurred.

(B) Breakdown of billed other direct costs (ODCs) and associated contractor generated supporting documentation for billed ODCs.

(C) Indirect rate(s) used to calculate the amount of billed indirect expenses.

(D) Progress reports, as required.

(ii) Invoices.

(A) Description of goods and services delivered as part of the contract's terms and conditions, including the dates of delivery/performance.

(B) Progress reports, as required.

(C) Date goods and services were performed.

(iii) Fee vouchers.

(A) Listing of all provisionally-billed fee by period or date earned since contract award.

(B) A reconciliation of all billed and earned fee.

(C) A clear explanation of the fee calculations.

(d) Non-electronic payment requests. The Contractor may submit a non-electronic voucher/invoice using the steps for non-electronic payment requests described at https://www.nssc.nasa.gov/vendorpayment, when any of the following conditions are met:

(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor.

(2) The contract includes provisions allowing the contractor to submit vouchers or invoices using the steps for non-electronic payment. In such instances the Contractor agrees to submit non-electronic payment requests using the method or methods specified in Section G of the contract.

(e) Improper vouchers/invoices. The NSSC Payment Office will notify the contractor of any apparent error, defect, or impropriety in a voucher/invoice within seven calendar days of receipt by the NSSC Payment Office. Inquiries regarding requests for payment should be directed to the NSSC as specified in paragraph (b) of this section.

(f) Other payment clauses. In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.

(g) In the event that amounts are withheld from payment in accordance with provisions of this contract, a separate payment request for the amount withheld will be required before payment for that amount may be made.

G.7 GSFC 52.245-93 REPORTS OF CONTRACTOR ACQUIRED

GOVERNMENT PROPERTY (MAR 2014)

Refer to subparagraph (b)(1)(i) of NASA FAR Supplement clause 1852.245-71, "Installation Accountable Government Property--Alternate I" of this contract.

(a) Definition. "Controlled equipment" means all equipment with an acquisition cost of $5,000 or more, that has an estimated service life of 2 years or more, which will not be consumed or expended in an experiment, and selected items of equipment with an acquisition cost less than $5,000 that are designated, and identified as sensitive by Appendix C of NPR 4200.1 and by the GSFC Information and Logistics Management Division, Supply and Equipment Management Branch, Code 273.

(b) Property, regardless of value, shall not be purchased on the account of the Government unless authorized by the terms of the contract or approved by the Contracting Officer, including compliance by the contractor with the Subcontracts clause of this contract. Further, any purchase of equipment shall not be made until the equipment has been screened through NASA inventories and other authorized Federal excess sources for item availability in accordance with NASA FAR Supplement clause 1852.245-70.

(c) Immediately after the purchase of any controlled equipment, the Contractor shall submit a GSFC Form 20 4, Shipping Document, to the GSFC Supply and Equipment Management Branch, Code 273, for the purpose of entry of the controlled equipment data into the NASA Property, Plant and Equipment System (NASA PP&E). A copy of the GSFC Form 20-4 shall also be provided to the GSFC General Accounting Department, General Ledger Section, Code 157, within 5 working days. The GSFC Form 20 4, or other form acceptable to the GSFC Supply and Equipment Management Branch, must contain all of the data elements necessary to establish accountability, including both the contract number and the Contractor's purchase order number under which the equipment was purchased.

(d) The Contractor shall submit, on a quarterly basis, a report of all property acquired by the Contractor under the contract during the reporting period and to which the Government has title, regardless of acquisition value. This report must be submitted within 30 calendar days after the end of each calendar year quarter; i.e., January 30, April 30, July 30, and October 30. Submittal shall be to the Contracting Officer and to the Supply and Equipment Management Officer, Code 273. For acquisitions of controlled equipment, the list shall include item description, acquisition date, acquisition value, manufacturer, model, serial number, location of the items, and GSFC property number.

For all other acquisitions, the list shall include item description, quantity, cost, and location of the items. Controlled equipment previously reported on GSFC Form 20 4s, or on other forms, shall be included in the quarterly reports. Negative reports shall be submitted, if applicable.

(e) If the contractor maintains a stock inventory of Installation-Accountable Government Property with a minimum average value of $75,000, the Contractor shall comply with NPR 4100.1. The Contractor shall submit a monthly NASA Form 1489, Analysis of Physical Inventory Report; NASA Form 1324, Semi-annual Report of Personal Property Operations (for which periods end March 31 and September 30) and NASA Form 1619, Physical Inventory of Materials Annual Report (for which period ends September 30), within 5 working days of the end of the reporting period. The NASA Forms 1489, 1324 and 1619, should be submitted to the Supply and Equipment Management Officer, Code 273, with a copy to the Contracting Officer. A copy of NASA Form 1489 should be submitted to Code 157.2, General Ledger.

SECTION H – SPECIAL CONTRACT REQUIREMENTS

SECTION H CLAUSES INCORPORATED BY REFERENCE

H.1 1852.223-70 SAFETY AND HEALTH MEASURES AND MISHAP

REPORTING (DEC 2015)

H.2 1852.223-75 MAJOR BREACH OF SAFETY OR SECURITY (FEB 2002)

H.3 1852.225-70 EXPORT LICENSES (FEB 2000)

(a) The Contractor shall comply with all U.S. export control laws and regulations, including the International Traffic in Arms Regulations (ITAR), 22 CFR Parts 120 through 130, and the Export Administration Regulations (EAR), 15 CFR Parts 730 through 799, in the performance of this contract. In the absence of available license exemptions/exceptions, the Contractor shall be responsible for obtaining the appropriate licenses or other approvals, if required, for exports of hardware, technical data, and software, or for the provision of technical assistance.

(b) The Contractor shall be responsible for obtaining export licenses, if required, before utilizing foreign persons in the performance of this contract, including instances where the work is to be performed on-site at Wallops Flight Facility, Wallops Island, Virginia where the foreign person will have access to export-controlled technical data or software.

(c) The Contractor shall be responsible for all regulatory record keeping requirements associated with the use of licenses and license exemptions/exceptions.

(d) The Contractor shall be responsible for ensuring that the provisions of this clause apply to its subcontractors.

H.4 1852.242-72 DENIED ACCESS TO NASA FACILITIES (OCT 2015)

(a)(1) The performance of this contract requires contractor employees of the prime contractor or any subcontractor, affiliate, partner, joint venture, or team member with which the contractor is associated, including consultants engaged by any of these entities, to have access to, physical entry into, and to the extent authorized, mobility within, a NASA facility.

(2) NASA may close and or deny contractor access to a NASA facility for a portion of a business day or longer due to any one of the following events:

(i) Federal public holidays for federal employees in accordance with 5 U.S.C. 6103.

(ii) Fires, floods, earthquakes, unusually severe weather to include snow storms, tornadoes and hurricanes.

(iii) Occupational safety or health hazards.

(iv) Non-appropriation of funds by Congress.

(v) Any other reason.

(3) In such events, the contractor employees may be denied access to a NASA facility, in part or in whole, to perform work required by the contract. Contractor personnel already present at a NASA facility during such events may be required to leave the facility.

(b) In all instances where contractor employees are denied access or required to vacate a NASA facility, in part or in whole, the contractor shall be responsible to ensure contractor personnel working under the contract comply. If the circumstances permit, the contracting officer will provide direction to the contractor, which could include continuing on-site performance during the NASA facility closure period. In the absence of such direction, the contractor shall exercise sound judgment to minimize unnecessary contract costs and performance impacts by, for example, performing required work off-site if possible or reassigning personnel to other activities if appropriate.

(c) The contractor shall be responsible for monitoring the local radio, television stations, NASA Web sites, other communications channels, for example contracting officer notification, that the NASA facility is accessible. Once accessible the contractor shall resume contract performance as required by the contract.

(d) For the period that NASA facilities were not accessible to contractor employees, the contracting officer may—

(1) Adjust the contract performance or delivery schedule for a period equivalent to the period the NASA facility was not accessible;

(2) Forego the work;

(3) Reschedule the work by mutual agreement of the parties; or

(4) Consider properly documented requests for equitable adjustment, claim, or any other remedy pursuant to the terms and conditions of the contract.

(e) Notification procedures of a NASA facility closure, including contractor denial of access, as follows:

(1) The contractor shall be responsible for monitoring the local radio, television stations, NASA Web sites, other communications channels, for example contracting officer notification, for announcement of a NASA facility closure to include denial of access to the NASA facility. The contractor shall be responsible for notification of its employees of the NASA facility closure to include denial of access to the NASA facility. The dismissal of NASA employees in accordance with statute and regulations providing for such dismissals shall not, in itself, equate to a NASA facility closure in which contractor employees are denied access. Moreover, the leave status of NASA employees shall not be conveyed or imputed to contractor personnel. Accordingly, unless a NASA facility is closed and the contractor is denied access to the facility, the contractor shall continue performance in accordance with the contract.

(2) NASA's Emergency Notification System (ENS). ENS is a NASA-wide Emergency Notification and Accountability System that provides NASA the ability to send messages, both Agency-related and/or Center-related, in the event of an emergency or emerging situation at a NASA facility. Notification is provided via multiple communication devices, e.g. Email, text, cellular, home/office numbers. The ENS provides the capability to respond to notifications and provide the safety status. Contractor employees may register for these notifications at the ENS Web site:

http://www.hq.nasa.gov/office/ops/nasaonly/ENSinformation.html.

H.5 GSFC 52.204-99 CONTRACTOR PERSONNEL – IDENTIFICATION,

REPORTING, AND CHECKOUT PROCEDURES (APR 2013)

(a) In accordance with FAR 52.204-9, Personal Identity Verification of Contractor Personnel, the Contractor shall follow Steps 1 through 7 described in Attachment F, Personal Identity Verification (PIV) Card Issuance Procedures, for each contract employee (prime and subcontractor) who will have physical access to a NASA-controlled facility (also referred to as “onsite”). The Contractor must apply for permanent NASA/GSFC PIV cards for those contract employees who will be employed by the Contractor onsite for at least six months. The GSFC Security Division will consider permanent PIV cards for other employees of the Contractor on a case-by-case basis, such as employees that are not resident onsite, but must frequently visit. In the future, upon written notice from the Contracting Officer, the Contractor shall follow Steps 1 through 7 in Attachment F for each offsite contract employee (prime and subcontractor) who require remote access to a NASA information system for contract performance.

(b) The Contractor shall notify the GSFC Security Division, Code 240, Attention: PIV Manager, and the Contracting Officer’s Representative (COR) of the contractor’s designated PIV Requester within 15 calendar days after award of this contract. The NASA maintained PIV system contains work and home location and contact information for personnel that have permanent NASA PIV cards. The Contractor may contact the PIV Manager, Tel 301-286-2306 for assistance regarding the PIV system.

(c) Each contract employee shall provide to the Contractor’s designated PIV Requester the basic identifying information required for a PIV Request to be initiated in the PIV System. The PIV Request must be approved by the PIV Sponsor (COR or the Contracting Officer). The COR will resolve any housing or access issues, and review the request for accuracy and completeness. Requests that are approved by the PIV Sponsor will be forwarded to the GSFC Security Division, Code 240, PIV Authorization, Badge enrollment, and Badge issuance.

(d) The Contractor shall submit an annotated PIV Report each month. The GSFC PIV Manager will furnish a PIV print-out to the Contractor no later than the end of each month. The Contractor shall annotate this provided report monthly to correct and update the information as follows:

(1) Draw a line through the names of employees who are no longer employed by the contractor or that no longer work onsite under the contract, and;

(2) Make handwritten changes to any other incorrect data.

The annotated PIV Report shall be separately submitted to the GSFC Security Division, Code 240, Attention: PIV Manager, and to the COR by the 10th calendar day of the month.

For the final PIV Report under the contract, the GSFC PIV Manager will furnish a PIV print-out to the Contractor no later than two weeks prior to the end of the contract. The Contractor shall submit its annotated final PIV Report no later than 3 days prior to the end of the contract.

If this is a follow-on contract, at the end of the phase-in period (if any)/start of the basic contract period, the GSFC Security Division will provide the Contractor a copy of the final PIV Report from the previous contract. The Contractor shall review the list and redline it as necessary to reflect its employees requiring PIV cards. The redlined list shall be provided the GSFC Security Division within 30 days after the start of the contract.

(e) The Contractor shall ensure that all personnel who have NASA/GSFC issued PIV cards, keys or other property who leave its employment or that no longer work onsite, process out through the GSFC Security Division, Code 240. Employees must return all GSFC issued identification and any Government property no later than the last day of their employment or the last day they work onsite under this contract. The Contractor shall establish appropriate procedures and controls to ensure this is accomplished.

Failure to comply may result in the exercise of Government rights to limit and control access to Government premises, including denial of access and invalidation of NASA issued PIV cards and identification.

H.6 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS

AND CERTIFICATIONS (DEC 2014)

The Contractor's representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.

H.7 52.236-13 ACCIDENT PREVENTION (NOV 1991) - ALTERNATE I (NOV

1991)

(a) The Contractor shall provide and maintain work environments and procedures which will—

(1) Safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities;

(2) Avoid interruptions of Government operations and delays in project completion dates;

and

(3) Control costs in the performance of this contract.

(b) For these purposes on contracts for construction or dismantling, demolition, or removal of improvements, the Contractor shall—

(1) Provide appropriate safety barricades, signs, and signal lights;

(2) Comply with the standards issued by the Secretary of Labor at 29 CFR Part 1926 and 29 CFR Part 1910; and

(3) Ensure that any additional measures the Contracting Officer determines to be reasonably necessary for the purposes are taken.

(c) If this…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .