This notice provides details for an upcoming invitation for bids for airfield repair and paving services at Wallops Flight Facility. The National Aeronautics and Space Administration Goddard Space Center plans to issue an IFB for work including demolition, site work, concrete repairs and construction, and concrete demolition and replacement at Wallops Island, Virginia. The effort is estimated between $1,000,000 to $5,000,000 and shall be completed within 270 calendar days after notice to proceed. A bid guarantee, performance and payment bond will be required. The NAICS code is 273310 and the small business size standard is $36.5 million. The anticipated IFB release date is August 3, 2021 with offers due by September 3, 2021. All responsible sources may submit bids to be considered. This will be a full and open competition solicited under FAR 52.236-27 for organized site visits. Questions must be submitted in writing and amendments, if any, will be posted to beta.sam.gov.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT D
80GSFC21B0004
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
GODDARD SPACE FLIGHT CENTER
WALLOPS FLIGHT FACILITY
WALLOPS ISLAND, VA 23337
CONTRACTORS DAILY REPORT
FORM WI 452
FOR
Wallops Airfield Repair Project, FCLP Phase 8
LOCATED
AT
NASA GSFC/WALLOPS FLIGHT FACILITY
WALLOPS ISLAND, VIRGINIA
NASA WI-452
DAILY CONSTRUCTION REPORT
Contract No. ___________ Date: ______________ Report No. ____________
Description and Location of Work: ________________________________________________
Weather: (Clear) (P. Cloudy) (Cloudy) Temperature ______ Min: ______ Max: _______ Rainfall: __________ inches.
Contractor/Subcontractors and Area of Responsibility with Labor Count for Each:
a. __________________________________ d. __________________________________
b. __________________________________ e. __________________________________
c. __________________________________ f. __________________________________
Equipment Data: (Indicate items of construction equipment, other than hand tools, at the job site, and whether or not used.)
1. Work Performed Today: (Indicate location and description or work performed. Refer to work performed by prime and/or subcontractors by letter in Table above.)
NASA WI-452
2. Result of Surveillance: (Include satisfactory work completed, or deficiencies with action to be taken.)
3. Test Required by Plans and/or Specifications Performed and Results of Tests:
4. Verbal Instruction Received: (List any instructions given by Government personnel on construction deficiencies, retesting required, etc., with action to be taken.)
5. Remarks: (Cover any conflicts in plans, specifications, or instructions on any delay to the job attributable to weather conditions.)
6. Results of Safety Inspections: (Include safety violations and corrective actions taken.)
CONTRACTOR’S VERIFICATION: The above report is complete and correct and all material and equipment used and work performed during this reporting period are in compliance with the contract plans and specifications except as noted above.
(Contractor’s Approved Authorized Representative)