FCLP Airfield Phase 8 Site Visit Instructions.pdf

PDF 137 KB Posted

Attached to
Airfield Repair & Paving at Wallops Flight Facility - FCLP Phase 8
Solicitation number
80GSFC21B0004
Issued by

About this file

This document provides instructions for a mandatory site visit related to a planned federal procurement for airfield repairs at Wallops Flight Facility. The site visit is scheduled for August 19, 2021 from 10:00 AM to 11:00 AM EST. Attendees must register by August 13, 2021 and have a picture ID. A maximum of two attendees per company is allowed.

The related federal contract opportunity is planned as an Invitation for Bids for the Wallops Airfield Repair Project, FCLP Phase 8. The scope of work includes demolition, site work, concrete repairs and construction, and concrete demolition and replacement. The contract type will be fixed-price for an estimated value between $1,000,000 to $5,000,000. The period of performance is 270 calendar days from notice to proceed. The NAICS code is 273310 for asphalt paving mixture and block manufacturing with a small business size standard of $36.5 million. The anticipated IFB release date is August 3, 2021 with bids due by September 3, 2021.

View the file

Other files

File Type Posted
80GSFC21B0004 Amendment 2.pdf PDF
FCLP 8 Q and A-2-4.pdf PDF
80GSFC21B0004_Attachment H.pdf PDF
Amendment 1.pdf PDF
Attachment F.pdf PDF
Attachment D.pdf PDF
COVID Health Screening and Badge Information for Site Visits.pdf PDF
Attachment G.pdf PDF
FCLP Phase 8 IFB 80GSFC21B0004.pdf PDF
Attachment B Specs.pdf PDF
Attachment E.pdf PDF
NoticeToBidders 80GSFC21B0004.pdf PDF
Attachment C Drawings.pdf PDF
Attachment A Final.pdf PDF
FCLP 8 Q and A-1.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SITE VISIT INSTRUCTIONS

WALLOPS AIRFIELD REPAIR PROJECT, FCLP PHASE 8, IFB 80GSFC21B0004

THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA), GODDARD SPACE FLIGHT

CENTER (GSFC), WALLOPS FLIGHT FACILITY (WFF) FACILITIES MANAGEMENT BRANCH INVITES ALL INTERESTED OFFERORS TO A SITE VISIT FOR THE WALLOPS AIRFIELD REPAIR PROJECT, FCLP

PHASE 8.

WHEN: THURSDAY, AUGUST 19, 2021

WHERE: NASA/GSFC/WFF, Wallops Island, VA 23337

TIME: 10:00 A.M. – 11:00 A.M. EST

REGISTRATION INSTRUCTIONS – (MANDATORY FOR ATTENDANCE DUE TO BADGING/SECURITY

REQUIREMENTS AND TO MAKE TRANSPORTATION ARRANGEMENTS FOR SITE VISIT):

Please email martin.e koerner@nasa.gov the following registration information:

1. Attendee’s full name as appears on picture ID and Citizenship Status

2. Attendee’s company name

NOTES:

LIMIT OF 2 ATTENDEES PER COMPANY. PLEASE INDICATE IF THE ATTENDEES HAVE A

CURRENT NASA BADGE. ATTENDEES WITHOUT CURRENT NASA BADGES MUST BE U.S.

CITIZENS WITH A PICTURE ID.

POLICIES AND PROCEDURES BASED ON CENTERS FOR DISEASE CONTROL AND PREVENTION

(CDC) GUIDELINES HAVE BEEN IMPLEMENTED, INCLUDING SOCIAL DISTANCING, WEARING

FACE COVERINGS WHEN BADGING AT THE GATES AND IN SHARED SPACES. PERSONAL FACE

COVERINGS ARE ACCEPTABLE FOR USE DURING BADGING AND WHILE ON CENTER IN

COMMON AREAS.

REGISTRATION DEADLINE: FRIDAY, AUGUST 13, 2021 BY 12:00 P.M. EST. DUE TO INCREASED

SECURITY REQUIREMENTS, LATE REGISTRATIONS WILL NOT BE ACCEPTED.

ALL ATTENDEES (INCLUDING BADGE HOLDERS) MUST BRING A PICTURE ID AND ARRIVE AT

WALLOPS FLIGHT FACILITY RECEPTION BUILDING (BUILDING N-1 BADGING OFFICE) PARKING

LOT, NO LATER THAN 9:45 A.M. TO COMPLETE PROCESSING FOR THIS EVENT AND BE

TRANSPORTED ONTO OUR FACILITY.

TENTATIVE ITINERARY:

Arrival at Building N-1 Parking Lot & Attendee Final Processing: 9:45 a m. EST

Site Inspection: 10:00 a.m. – 11:00 a m. EST

Note: All Attendees will be transported back to their vehicles upon completion of the Site Inspection.

If you have questions regarding the site visit, please email Martin Koerner at martin.e koerner@nasa.gov. For Directions to the Wallops Flight Facility, go to http://www.nasa.gov/centers/wallops/about/gettingtowallops.html