Attachment R - CSBF FY20 Real Property Manual 05-15-20 TS.pdf
PDF 4 MB Posted
- Attached to
- NASA Balloon Operations Contract (NBOC) II
- Solicitation number
- 80GSFC20R0031
About this file
This pre-solicitation notice announces a follow-on NASA Balloon Operations Contract (NBOC II) to acquire services for the operation and maintenance of the Columbia Scientific Balloon Facility and overall management of launch operations, mission and engineering support, and potential hardware development to support the NASA Balloon Program. Services will be performed at multiple locations, including the CSBF in Palestine, Texas and Fort Sumner, New Mexico, as well as NASA WFF, contractor facilities, and other locations. The contract type will be CPFF Core with CPFF IDIQ, with a seven-year period of performance and $100.5M ordering ceiling plus 20% unilateral increase option. A draft RFP is expected in March 2020 followed by a preproposal conference. The final RFP is anticipated in April/May 2020. Interested parties should monitor the beta.sam.gov website for solicitation releases and amendments. The incumbent is responsible for balloon flight support including launching, tracking, recovery and engineering services.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COLUMBIA SCIENTIFIC BALLOON FACILITY
REAL PROPERTY MANUAL
CONTRACT NO. NNG15WA53C
Submitted to: National Aeronautics and Space Administration
Goddard Space Flight Center
Wallops Flight Facility
Wallops Island, VA 23337
Date Submitted: July 17, 2019
Submitted by: Columbia Scientific Balloon Facility
Northrop Grumman
Innovations Systems Sector, Space Systems Group
45101 Warp Drive
Dulles, VA 20166
NATIONAL AERONAUTICS AND
SPACE ADMINISTRATION
This page intentionally left blank.
PREFACE BACKGROUND
CSBF Real Property Manual July 17, 2019 Page i
PREFACE
BACKGROUND
The Columbia Scientific Balloon Facility (CSBF) in Palestine, Texas was established in the early 1960s under the sponsorship of the National Science Foundation (NSF). The purpose of the CSBF is to provide a permanent complex for scientific balloon flight operations. Since its inception in the early 1960s, the CSBF has been a Government-owned, contractor-operated institution. Originally named the Scientific Balloon Facility, it was renamed the National Scientific Balloon Facility (NSBF) on July 1, 1972.
In October 1982, sponsorship of the NSBF was transferred from the National Science Foundation to the National Aeronautics and Space Administration (NASA), and the NSBF became a separate entity under the University Corporation for Atmospheric Research (UCAR). At that time, the NSF issued NASA an indefinite user permit for all land and other real property at NSBF in Palestine, Texas. In October 1987, the NASA contract to operate the NSBF was awarded to the Physical Science Laboratory under the auspices of New Mexico State University in Las Cruces, New Mexico. On February 1, 2015 the contract was awarded to Orbital Sciences Corporation Technical Services Division. A few months later, Orbital Sciences merged with the Aerospace and Defense groups of Alliant Techsystems Inc. (ATK), creating Orbital ATK. Then in 2015, Orbital ATK was acquired by Northrop Grumman and renamed Northrop Grumman Innovation Systems. The contract is administered by the NASA Balloon Program Office located at Goddard Space Flight Center's (GSFC) Wallops Flight Facility in Wallops Island, Virginia.
On August 23, 2005, NASA signed off on a plan by U.S. Congressman Jeb Hensarling (R-Texas) to rename the NSBF to the Columbia Scientific Balloon Facility (CSBF) in honor of the seven astronauts who perished during the loss of the Space Shuttle Columbia.
SERVICES
The CSBF has the following threefold mission:
To plan and develop facilities and provide operations services to meet the approved ballooning requirements of the scientific community
To perform the necessary research and development to meet future scientific ballooning requirements
To provide consulting services in the field of scientific ballooning
The CSBF provides complete balloon operations services and engineering support to the United States and foreign scientific communities. The operational services include:
Balloon inflation
Launching
Tracking and recovering the balloon payload
Telecommanding and data retrieval with reliable electronics systems
Engineering support services include:
Balloon systems design
Balloon material research
Electronics design
Gondola design
Thermal analysis
PALESTINE, TEXAS FACILITY PREFACE
Page ii July 17, 2019 CSBF Real Property Manual
PALESTINE, TEXAS FACILITY
The CSBF is five miles northwest of the City of Palestine in Anderson County, Texas. The facility is west of the Palestine Municipal Airport, accessible from U.S. Highway 287 via Farm-to-Market Road 3224. Two sides of the property are defined by the north-south and east-west runways of the airport (see Figure 1). There are 19 buildings in the complex. The buildings and two paved launch areas are situated on 473.85 acres of land, of which
165.97 acres are leased from the City of Palestine and the remaining 307.88 acres are listed as NASA real property. On February 16, 2016 10 of the NSF owned buildings and 307.88 acres of NSF owned land were transferred to NASA, the entire facility is now NASA owned. The facility is used exclusively for scientific balloon flight operations and engineering. All properties are being fully used in support of the CSBF mission and are essential to program requirements.
Figure 1 - CSBF Base and Palestine Airport
FORT SUMNER, NEW MEXICO FACILITY
Remote site operations include a launch facility in Fort Sumner, New Mexico (see Figure 2). NASA purchased
8.15 acres of land from the City of Fort Sumner, New Mexico for use as a remote launch site at the Fort Sumner, New Mexico Municipal Airport. In 1991, an 80 x 80-ft building was erected on this acreage to serve as the staging facility for balloon missions launched from Fort Sumner. There is currently no permanent staff at the Fort Sumner location.
Two leases are in place in connection with the Fort Sumner facility. A hangar is leased from the Village of Fort Sumner, and a parcel of land used as a down-range facility at the Winslow-Lindbergh Regional Airport is leased from the City of Winslow, AZ. Starting in 2019 NASA is handling all procurement functions on all leases.
PREFACE FORT SUMNER, NEW MEXICO FACILITY
CSBF Real Property Manual July 17, 2019 Page iii
Figure 2 - Fort Sumner Launch Facility at the Fort Sumner Municipal Airport
Figure 3 - Leased hangar at Fort Sumner Airport
Figure 4 - Leased parcel of land at Winslow Airport
ADDITIONAL INFORMATION PREFACE
Page iv July 17, 2019 CSBF Real Property Manual
ADDITIONAL INFORMATION
CURRENT OUT-GRANTS
NOAA WIND PROFILER
Atmospheric profilers operated by NOAA's Office of Atmospheric Research (OAR) measure the wind and temperature variations with height over a large area of the central United States and Alaska. The National Weather Service terminated and defunded the project in 2015, and the NOAA Wind Profiler was removed from the CSBF facility.
U.S. CLIMATE REFERENCE NETWORK
NOAA has set up a U.S. Climate Reference Network (USCRN) data collection center at the CSBF. Its purpose is to provide future long-term high-quality observations of surface air temperature and precipitation that can be coupled to past long-term observations for the detection and attribution of present and future climate change. USCRN measures the following:
Air temperature
Ground surface temperature
Precipitation
Relative humidity
Soil moisture and temperature
Solar radiation
Wind speed
VERIZON CELLULAR SITE
To improve the quality of CSBF cellular signals, Alltel has placed an antenna on the NASA water tower. A small fenced building was erected at the base of the water tower to house the receiver and transmitters.
FLOODPLAINS OR WETLANDS
According to a survey dated September 18, 1972, which is available for review, the property is not in a floodplain or wetland area.
HISTORIC OR CULTURAL SIGNIFICANCE
None of the real property at the CSBF is listed in the National Register of Historic Places.
MINERAL ACTIVITY
Orbital Sciences/CSBF does not have records or information regarding the mineral rights or deposits of the NASA owned acreage.
UTILITIES
Table 1 lists companies currently providing utility services to CSBF.
Table 1 - Utility Providers
SERVICE COMPANY
Electricity TXU Energy
Telephone CenturyLink
Water City of Palestine
CONTENTS
CSBF Real Property Manual July 17, 2019 Page v
CONTENTS
Preface ...................................................................................................................... i
Background .......................................................................................................................................... i Services ............................................................................................................................................... i Palestine, Texas Facility ........................................................................................................................ ii Fort Sumner, New Mexico Facility ........................................................................................................... ii Additional Information .......................................................................................................................... iv
Current Out-Grants .................................................................................................................... iv Floodplains or Wetlands .............................................................................................................. iv Historic or Cultural Significance ................................................................................................... iv Mineral Activity ......................................................................................................................... iv Utilities..................................................................................................................................... iv
Contents ................................................................................................................... v
List of Tables ........................................................................................................... vii
List of Figures .......................................................................................................... vii
1 Introduction
1.1 Origin of Real Property Data
1.2 Chronological Listing of NSF Real Property
1.3 Chronological Listing of NASA Real Property
1.4 Summary of Real Property
2 Land: Owned and Leased
2.1 Palestine, TX
2.1.1 Summary
2.1.2 Chronological Listing
2.2 Ft. Sumner, NM and Winslow, AZ
2.2.1 Summary
2.2.2 Chronological Listing
3 Buildings and Structures
3.1 Administration – Building 1
3.2 Facilities/Battery Storage – Building 2
3.3 Facility Services/Equipment Maintenance –Building 3
3.4 Flight Operations – Building 4
3.5 Stratoport I – Building 5
3.6 Administration Storage – Building 6
3.7 Vehicle Storage I (Old Tim Shed) – Building 7
3.8 Monuments – Structure 8
3.9 Facilities Storage - Building 9
3.10 Visitor Center – Building 10
3.11 Staging – Building 11
3.12 Operations Control Center (OCC) – Building 12
3.13 Vehicle Storage II (New Tim Shed) – Building 13
3.14 Balloon Storage – Building 14
CONTENTS
Page vi July 17, 2019 CSBF Real Property Manual
3.15 Warehouse I – Building 15
3.16 Verizon Cellular Site – Structure 16
3.17 Tractor Shed – Building 17
3.18 Warehouse II – Building 18
3.19 Nonmagnetic A-Frame – Structure 19
3.20 NOAA Wind Profiling Site – Structure 20
3.21 Base Sign – Structure 22
3.22 Engineering Support – Building 23
3.23 Water Tower – Structure 24
3.24 Test and Evaluation (T&E) – Building 25
3.25 Loading Dock – Structure 26
3.26 Econo Vault Fuel Storage – Structure 27
3.27 Balloon Support – Building 28
3.28 East Pavilion – Structure 29
3.29 West Pavilion – Structure 30
3.30 NOAA Climate Reference Network– Structure 31
3.31 Engineering Support Storage – Building 32
4 OTHER INFRASTRUCTURE
4.1 East Launch Pad
4.2 West Launch Pad
4.3 Roads, Walks, and Parking Lots
4.4 Fire Protection Sprinkler System
5 Fort Sumner Flight Facility
5.1 Staging – Remote Building R1
5.2 Lithium Battery Storage – Remote Building R3
5.3 Kitchen – Remote Building R4
6 Alice Springs, Australia
6.1 Demountable Building – Remote Building R2
7 McMurdo Station, Antarctica
7.1 Payload Building 1
7.2 Payload Building 2
7.3 Rigging Shop
7.4 Electronics Shop (Telemetry)
7.5 Mechanical Building
Appendix A – CSBF Organization
Appendix B – CSBF Facility Map
Appendix C –Palestine, TX Vicinity Map
Appendix D – Map of Fort Sumner, NM
Appendix E – Fort Sumner, NM Vicinity Map
Appendix F – CSBF Site Diagram
LIST OF TABLES
CSBF Real Property Manual July 17, 2019 Page vii
LIST OF TABLES
Table 1 - Utility Providers ............................................................................................................................ iv Table 2 - NCAR Financial Statement of NSF Real Property Transferred on September 27, 1985 Table 3 - Chronological Listing of NSF Real Property Transferred to NASA 2016 Table 4 - Chronological Listing of NASA Real Property Table 5 - Total NSF and NASA Real Property Table 6 - NASA Owned and Leased Land Table 7 - CSBF Acreage and Land Values Table 8 - GSA Real Property Survey Results Table 9 - NASA Owned and Leased Land
LIST OF FIGURES
Figure 1 - CSBF Base and Palestine Airport .................................................................................................... ii Figure 2 - Fort Sumner Launch Facility at the Fort Sumner Municipal Airport ...................................................... iii
Figure 3 - Leased hangar at Fort Sumner Airport ............................................................................................ iii Figure 4 - Leased parcel of land at Winslow Airport......................................................................................... iii Figure 5 - Administration (Building 1)
Figure 6 - Administration (Building 1) Floor Plan Figure 7 - Facilities/Battery Storage (Building 2) Figure 8 - Facilities/Battery Storage (Building 2) Floor Plan Figure 9 - Facility Services/Equipment Maintenance (Building 3) Figure 10 - Facility Services/Equipment Maintenance (Building 3) Floor Plan Figure 11 - Flight Operations (Building 4)
Figure 12 - Flight Operations (Building 4) Floor Plan Figure 13 - Stratoport I (Building 5) Figure 14 - Stratoport I (Building 5) Floor Plan
Figure 15 - Facilities Storage (Building 6) Figure 16 - Facilities Storage (Building 6) Floor Plan
Figure 17 - Vehicle Storage I (Building 7) Figure 18 - Vehicle Storage I (Building 7) Floor Plan Figure 19 - Monument (Structure 8)
Figure 20 - Facilities Storage (Building 9) Figure 21 - Facilities Storage (Building 9) Floor Plan Figure 22 - Visitor Center (Building 10) Figure 23 - Visitor Center (Building 10) Floor Plan Figure 24 - Staging (Building 11) Figure 25 - Staging (Building 11) Floor Plan
Figure 26 - Operations Control Center (Building 12) Figure 27 - Operations Control Center (Building 12) Floor Plan Figure 28 - Vehicle Storage II (Building 13) Figure 29 - Vehicle Storage II (Building 13) Floor Plan
Page viii July 17, 2019 CSBF Real Property Manual
Figure 30 - Balloon Storage (Building 14) Figure 31 - Balloon Storage (Building 14) Floor Plan Figure 32 - Warehouse I (Building 15) Figure 33 - Warehouse I (Building 15) Floor Plan Figure 34 - Verizon Antenna (Structure 16) Figure 35 - Verizon Cellular Site (Structure 16) Figure 36 - Tractor Shed (Building 17) Figure 37 - Tractor Shed (Building 17) Floor Plan Figure 38 - Warehouse II (Building 18) Figure 39 - Warehouse II (Building 18) Floor Plan
Figure 40 - Nonmagnetic A-Frame (Structure 19) Figure 41 - Former location of NOAA Wind Profiler (Structure 20) Figure 42 - Base Sign (Structure 22)
Figure 43 - Engineering Support (Building 23) Figure 44 - Engineering Support (Building 23) Floor Plan Figure 45 - Water Tower (Structure 24) Figure 46 - Water Tower (Structure 24) Drawing Figure 47 - Test and Evaluation (Building 25) Figure 48 - Test and Evaluation (Building 25) Floor Plan Figure 49 - Loading Dock (Structure 26) Figure 50 - Econo Vault Fuel Storage (Structure 27) Figure 51 - Balloon Support (Building 28)
Figure 52 - Balloon Support (Building 28) Floor Plan Figure 53 - East Pavilion (Building 29) Figure 54 - West Pavilion (Building 30) Figure 55 - NOAA Climate Network (Structure 31) Figure 56 - Engineering Support Storage (Building 32)
Figure 57 - East Launch Pad Figure 58 - West Launch Pad Figure 59 – Resurfaced Parking Area in Front of Building 11
Figure 60 - Fort Sumner Staging (Building R1) Figure 61 - Fort Sumner Staging (Building R1) Floor Plan Figure 62 - Fort Sumner Lithium Battery Storage (Building R3) Figure 63 - Fort Sumner Lithium Battery Storage (Building R3) Floor Plan Figure 64 – Ft. Sumner Kitchen (Building R4) Figure 65 - Alice Springs Demountable Building (Building R2) Floor Plan
Figure 66 - Antarctica Payload Building 1 floor plan Figure 67 - Antarctica Payload Building 1 photograph
Figure 68 - Antarctica Payload Building 2 floor plan Figure 69 - Antarctica Payload Building 2 photograph Figure 70 - Antarctica Rigging Shop floor plan Figure 71 - Antarctica Rigging Building photo Figure 72 - Antarctica Electronics Shop (Telemetry) floor/roof plans Figure 73 - Antarctica Telemetry Building photo Figure 74 - Antarctica Mechanical Building floor and roof plan Figure 75 - Antarctica Mechanical Building photo Figure 76 - CSBF Organization Chart
CSBF Real Property Manual July 17, 2019 Page ix
Figure 77 - CSBF Facility Map Figure 78 - Palestine, Texas Vicinity Map Figure 79 - Map of Fort Sumner, NM Figure 80 - Fort Sumner, NM Vicinity Map Figure 81 - CSBF Site Diagram
Page x July 17, 2019 CSBF Real Property Manual
This page intentionally left blank.
INTRODUCTION ORIGIN OF REAL PROPERTY DATA
CSBF Real Property Manual July 17, 2019 Page 1
1 INTRODUCTION
1.1 ORIGIN OF REAL PROPERTY DATA
An Indefinite Use Permit, effective October 1, 1982, was issued by the NSF to NASA for all land and other real property at the Columbia Scientific Balloon Facility (CSBF) in Anderson County, Palestine, Texas.
The information compiled for the CSBF Real Property Manual resulted from extensive research. Information and assistance were received from the following sources:
National Science Foundation (NSF)
University Corporation for Atmospheric Research (UCAR)
National Center for Atmospheric Research
(NCAR)
Deloitte, Haskins, Sells – NCAR Accounting Firm
The July 1972 Master Plan Study for NCAR Scientific Balloon Facility compiled by Bernard Johnson Inc., Architects, Planners, Engineers
NCAR Financial Statement totals obtained
September 27, 1985 (see Table 2)
General Services Administration (GSA) Real Property Survey, June 1990
Anderson County Appraisal District
Drawings and plats
Existing property records
Purchase orders/vendor files
Building measurements
CSBF personnel
Local building contractors
Real estate agents
The values were determined by measuring the buildings; using drawings and plats along with a process of elimination using known values; comparing buildings of similar design, composition, and construction dates; and using historical information.
Table 2 - NCAR Financial Statement of NSF Real Property Transferred on September 27, 1985
PROPERTY COST TOTAL
Land $35,141.44
Buildings $152,472.34 555,820.24 37,413.44 10,202.54 8,914.74 764,823.30
Other Structures 1,809.81 999,762.79
4,565.14 1,006,137.74
New Launch Pad 30,000.00
Other Costs on NCAR General Ledger (New Pad) 245,991.22
TOTAL VALUE OF NSF REAL PROPERTY TRANSFERRED TO NASA 27 SEPTEMBER 1985 $2,082,092.70
CHRONOLOGICAL LISTING OF NSF REAL PROPERTY INTRODUCTION
Page 2 July 17, 2019 CSBF Real Property Manual
1.2 CHRONOLOGICAL LISTING OF NSF REAL PROPERTY
Table 3 - Chronological Listing of NSF Real Property Transferred to NASA 2016
YEAR
ACQUIRED DESCRIPTION
BUILDING
NUMBER COST/VALUE
1962 Land – 307.88 acres $ 35,141.44
Administration Transferred to NASA 1998
1 152,472.34 (152,472.34)
1963 Launch Pad – East (Leased) n/a
Facilities and Battery Storage 2 37,413.44
Stratoport I 5 52,779.90
Facilities Storage 6 4,564.14
Flight Operations
Front Shop $24,500.00 Parachute Pull Tunnel $10,202.54 New Addition $114,832.00
149,534.54
1965 Coronaport Disposition April 2000
8 41,469.92 (41,469.92)
1966/68/94 Facility Services/Equipment Maintenance 3 31,405.00
1966 Communications System 10,000.00
1968 Vehicle Storage I (Old Tim Shed) 7 25,000.00
1971 Portable Offices Disposition April 2000
1A, 1B 8,914.74 (8,914.74)
1974/78 Launch Pad – West 1,103,252.73
1974/94 Roads, Walkways, and Parking Lots 169,000.00
1975 Stratoport II Disposition 2002
13 20,132.80 (20,132.80)
1977 Guard House Disposition 1991
10 1,809.81 (1,809.81)
Staging 11 459,302.00
1979 Balloon Storage 14 42,070.00
Tractor Shed 17 7,257.00
1980 Office Trailer Disposition 2003
12 4,025.20 (4,025.20)
1982 Warehouse I 15 25,385.00
Security Disposition 2013
9 1,200.00 (1,200.00)
TOTAL NSF REAL PROPERTY $2,152,105.19
CSBF Real Property Manual July 17, 2019 Page 3
1.3 CHRONOLOGICAL LISTING OF NASA REAL PROPERTY
Table 4 - Chronological Listing of NASA Real Property
YEAR
ACQUIRED PROPERTY
BUILDING
NUMBER NASA CONTRACT COST/VALUE
1978 Scientist Workshop Disposition 2010
33 n/a $ 3,900.00 (3,900.00)
1985 Warehouse II 18 Original: NAS5-28218 Added: NAS5-31125
151,363.17
1988 Demountable Building – Alice Springs, Australia
R2 NAS5-29800 11,210.94
1989 Office Trailer 1C NAS5-29800 4,455.00
Disposition 2001 (4,455.00)
1990 Engineering Support 23 NAS5-29800 259,463.00
1991 Visitor Center – Winslow, AZ 10W NAS5-29800 12,241.11
1991/94 Staging– Fort Sumner, New Mexico R1 Phase I: NAS5-29800 Phase II: NAS5-31125
1,232,338.83
1992 Water Tower and Distribution System 24 NAS5-29800 432,995.00
Econo Vault Fuel Storage 27 NAS5-29800 34,662.00
1993 Test and Evaluation 25 NAS5-31125 459,061.00
Fire Protection Sprinkler System NAS5-31125 521,473.33
1995 Loading Dock 26 NAS5-31125 20,200.00
1997 Engineering Support 28 NAS5-31125 698,999.00
1998 Administration 1 NAS5-31125
NAS5-98005
623,885.93
West Side Sign-In NAS5-98009 595.00
No longer used as building.
Moved to Fort Sumner in 2001.
(595.00)
2003 East Pavilion 29 NAS5-98008 5,400.00
West Pavilion 30 NAS5-98008 5,400.00
Engineering Support Storage 32 NAS5-03003 5,217.51
Sign 22 NAS5-03003 3,900.00
2004 Operations Control Center 12 NAS5-03003 48,687.00
Vehicle Storage II (New Tim Shed) 13 NAS5-03003 334,025.00
Lithium Battery Storage (Fort Sumner, New Mexico)
R3 NAS5-03003 7,606.66
2009 Visitor Center 10 NAS5-03003 63,580.00
TOTAL NASA REAL PROPERTY $4,931,709.48
SUMMARY OF REAL PROPERTY INTRODUCTION
Page 4 July 17, 2019 CSBF Real Property Manual
1.4 SUMMARY OF REAL PROPERTY
Table 5 - Total NSF and NASA Real Property
DESCRIPTION COST/VALUE
NSF Real Property Transferred to NASA 2016 $2,152,105.19
NASA Real Property 4,931,709.48
TOTAL NASA $7,083,814.67
LAND: OWNED AND LEASED PALESTINE, TX
CSBF Real Property Manual July 17, 2019 Page 5
2 LAND: OWNED AND LEASED
2.1 PALESTINE, TX
2.1.1 SUMMARY
NASA has been transferred ownership of the land February 2016. Table 6 summarizes NASA owned and leased land.
Table 6 - NASA Owned and Leased Land
OWNED/LEASED DESCRIPTION DETAILS
Owned Transferred 2016
Acreage 307.88
Value $35,141.44
Leased Lease (25 years) 2012 to 2037
Acreage 165.97
2.1.2 CHRONOLOGICAL LISTING
The following is a chronology of NSF owned and leased land.
1962 NSF Leased 183.17 Acres (two parcels) from the City of Palestine
The first lease of 165.97 acres from the City of Palestine was for five years from April 26, 1962 through April 25, 1967 with a 20-year option. The second lease of 17.2 acres was also for five years with an option to purchase.
1963 NSF Purchased 307.88 Acres NSF purchased 307.88 acres in nine parcels of land. The $35,141.44 value of this land was provided by NCAR on September 27, 1985.
1967 NSF Exercised 20-Year Option On March 15, 1967 NSF exercised the option to lease the 165.97 acres from the City of Palestine for a period of 20 years, expiring March 15, 1987.
1973 NSF Conveyed 7.23 Acres to the State of Texas
NSF conveyed 4.52 acres and 2.71 acres (approximately 7.23 acres) to the State of Texas for a right-of-way easement for Farm-to-Market Road 3224.
PALESTINE, TX LAND: OWNED AND LEASED
Page 6 July 17, 2019 CSBF Real Property Manual
1985 CSBF Acreage and Land Value as provided by the Anderson County Appraisal District
Table 7 - CSBF Acreage and Land Values
ACRES VALUE
46.70 $ 46,230
14.00 13,860
16.42 14,780
35.00 31,500
60.00 54,000
40.00 36,000
0.78 700
17.20 15,480
1.24 1,120
55.53 49,980
29.76 26,780
316.63 $290,430
1987 PSL Renewed Lease Agreement for 25 Years
PSL renewed the lease agreement with the City of Palestine for 25 years commencing on April 27, 1987 to end on April 27, 2012 for the sum of $1.00 per year.
1990 Real Property Survey by GSA
Representative
The results of the Real Property Survey conducted by GSA revealed the following out-grants:
Table 8 - GSA Real Property Survey Results
ACRES DESCRIPTION
7.096 Conveyed an easement to the State of Texas for
Farm-to-Market Road 3224.
.230 Conveyed to the State of Texas for highway use.
7.326 Total conveyed to the State of Texas.
Upon the GSA Representative's recommendation, GSA Form 1166 Report of Real Property Owned by or Leased to the United States was updated to reflect the land grants shown in Table 8.
2012 NASA Renewed Lease Agreement for 25 Years
The lease of two parcels, one 165.97 acres and one 17.2 acres from the City of Palestine was extended for twenty-five years, beginning June 30, 2012 through June 29, 2037 at a cost of $5,000 per year.
2016 NSF Transfer to NASA February 16, 2016 NSF transferred 10 buildings and 307.88 acres of land to NASA at no cost. The facility is now owned entirely by NASA with the exception of the leased parcels.
LAND: OWNED AND LEASED FT. SUMNER, NM AND WINSLOW, AZ
CSBF Real Property Manual July 17, 2019 Page 7
2.2 FT. SUMNER, NM AND WINSLOW, AZ
2.2.1 SUMMARY
Table 9 summarizes NASA owned (see Section 5 on page 68) and leased land in Fort Sumner, New Mexico. For additional information contact NASA Wallops Flight Facility Property Office.
Table 9 - NASA Owned and Leased Land
OWNED/LEASED DESCRIPTION DETAILS
Owned Purchased 1992
Acreage 8.1499
Value $8,150.00
Leased n/a n/a
2.2.2 CHRONOLOGICAL LISTING
The following is a chronology of NASA owned and leased land.
1992 NASA Purchase from the City of Fort Sumner, New Mexico
A certified Corrected Warranty Deed for 8.1499 acres of land was signed by NASA’s Donald Satz on June 11, 1992. The tract is located within Section 16, Township 3 North, Range 26 East, New Mexico Prime Meridian (N.M.P.M.), DeBaca County, New Mexico. A check in the amount of $8,150.00 was transmitted by letter dated June 30, 1992. The deed was recorded in the DeBaca County, New Mexico Courthouse on June 17, 1992.
2009 NASA Leased Land at Winslow-Lindbergh Regional Airport
A 5-year lease agreement was signed with the City of Winslow for a parcel of land at Winslow Airport used as a down-range station for Ft. Sumner launches, commencing on March 5, 2009 and ending on February 28, 2015 for $6,000 annually.
2016 NASA Leased Land at
Winslow-Lindbergh Regional Airport
After the new contract with Orbital Sciences Corporation, a new lease agreement was signed commencing June 1, 2016 to May 31, 2017 for $6,567 annually.
2017 NASA Leased Hangar at Ft.
Sumner Municipal Airport
A one-year lease agreement was renewed with the Village of Ft.
Sumner for use of the hangar at the Ft. Sumner Municipal Airport.
The lease ends September 30, 2018 at an annual cost of $36,000.00.
2018 NASA Leased Land at Winslow-Lindbergh Regional Airport
A new lease agreement was signed commencing June 1, 2017 to May 31, 2019 for $6,852 annually.
2019 NASA leased land at In 2019 NASA began handling all leases from GSFC.
Winslow and Fort Sumner
ADMINISTRATION – BUILDING 1 BUILDINGS AND STRUCTURES
Page 8 July 17, 2019 CSBF Real Property Manual
3 BUILDINGS AND STRUCTURES
3.1 ADMINISTRATION – BUILDING 1
CONSTRUCTED: 1962
SQUARE FEET: 9,660
VALUE: $623,885.93
OWNERSHIP: NASA
NASA CONTRACT: NAS5-31125
NAS5-98005
PROPERTY ID: 3648
1962 Original Construction The value of Administration (building 1) as provided by NCAR on September 27, 1985 was $152,472.34. This value was part of the total value of $764,823.30 for all six buildings. By process of elimination this appears to be the original cost of the building.
1965 Expansion The building was enlarged by adding four offices and a briefing room.
1975 Expansion The upstairs control tower and the high bay expansion areas were completed.
1976 Expansion A loading ramp was constructed.
LOCATION
DIMENSIONS
(FT)
SQUARE FOOTAGE
(FT2)
Downstairs 180 x 40 7,200
Loading Ramp 10 x 20 200
Total Downstairs 7,400
Upstairs Expansion 20 x 113 2,260
Total 9,660
A value of $15.78/ft2 ($152,472.34 divided by 9,660-ft2) appears to be a fair value considering the dates of construction range from 1962 to 1976 (a period of fourteen years), and the square footage cost of other buildings and construction during these years.
1997-98 Major Rehabilitation The building underwent a major rehabilitation. The scope of work for the project included the following: demolition of miscellaneous architectural items such as existing metal siding panels, windows, personnel doors, overhead coiling doors, roof mounted structural platforms, and associated metal stairs gutters and down spouts, gypsum wallboard and plywood partitions, suspended ceiling system, resilient flooring, and associated mechanical and electrical equipment, the installation of new metal siding panels, gutters and down spouts, installation of new personnel doors, insulated aluminum windows, an overhead coiling door, repair of roof due to demolition of various items, installation of new metal studs and gypsum wallboard plywood partitions, installation of new suspended acoustical tile ceiling system, vinyl composition tile flooring, resilient stair treads, installation of a new exterior metal staircase, architectural painting, structural framing, new electrical lighting and power distribution, new mechanical systems, and the construction of new handicap accessible restroom facilities. The work included the extension of the existing sewage
BUILDINGS AND STRUCTURES ADMINISTRATION – BUILDING 1
CSBF Real Property Manual July 17, 2019 Page 9 drain field and the construction of a new retaining wall. Also included in the rehab was the installation of a new circuit panel, breakers, circuits, duplex receptacles, wire molds, uninterruptible power system, and accessories.
This work was accomplished by contractor Jacobe Brothers Construction of Tyler, Texas under NASA contract NAS5-31125.
This resulted in the building being deleted from the NSF Real Property Records and added to NASA Real Property Records.
1999 Awnings Striped aluminum awnings were added above five doorways. The work was done by Glenwood Blind and Awning of Tyler, Texas under NASA contract
NAS5-98005.
2017 Roof The roof of the building was replaced in July 2017. The work was performed by Sawyer Building Systems of Tyler, Texas, under NASA contract
NNG15WA53C.
Figure 5 - Administration (Building 1)
ADMINISTRATION – BUILDING 1 BUILDINGS AND STRUCTURES
Page 10 July 17, 2019 CSBF Real Property Manual
Figure 6 - Administration (Building 1) Floor Plan
WC
BUILDINGS AND STRUCTURES FACILITIES/BATTERY STORAGE – BUILDING 2
CSBF Real Property Manual July 17, 2019 Page 11
3.2 FACILITIES/BATTERY STORAGE – BUILDING 2
CONSTRUCTED: 1963
SQUARE FEET: 5,600
VALUE: $37,413.44
OWNERSHIP: NASA
PROPERTY ID: N/A
1963 Original Construction This single-story 140 x 40–ft building was originally constructed for balloon storage and later converted to the Electronics Shop (building 2), Facility Services (building 2A), and the Machine Shop (building 2B). As advised by NCAR on September 27, 1985, their records revealed the $37,413.44 as part of the total value given for six buildings. A value of $6.68/ft2 ($37,413.44 divided by 5,600-ft2) appears to be a fair value.
1989 Mezzanines and Office Space
A mezzanine was built in the Machine Shop (building 2B) by CSBF personnel. Two offices and a storage room with mezzanine above were also built in Facility Services (building 2A). This work was performed under NASA contract NAS5-29800.
1991 Electronics Shop Expansion
The Electronics Shop was expanded to include building 2A after Facility Services moved to building 3.
1993 HVAC An HVAC unit including ductwork was installed in building 2A by Palestine Air and Refrigeration of Palestine, Texas.
1994 HVAC An HVAC unit was installed in building 2 and a thermostat to control heat strips was installed in building 2B by Palestine Air and Refrigeration of Palestine, Texas.
1998 Electronics and Machine Shop relocated
The Electronics section and Machine Shop were moved to the newly constructed Engineering Support (building 28). The building is now being used as the Facility shop/storage and for climate-controlled battery storage.
2000 AC Unit A 3-ton AC unit was installed in the bay area where the lithium batteries are stored.
2012 Building Enclosed and
AC
The building was enclosed and a 4-ton AC unit was installed at a cost of $3,800.
Figure 7 - Facilities/Battery Storage (Building 2)
FACILITIES/BATTERY STORAGE – BUILDING 2 BUILDINGS AND STRUCTURES
Page 12 July 17, 2019 CSBF Real Property Manual
Figure 8 - Facilities/Battery Storage (Building 2) Floor Plan
AC
BUILDINGS AND STRUCTURES FACILITY SERVICES/EQUIPMENT MAINTENANCE –BUILDING 3
CSBF Real Property Manual July 17, 2019 Page 13
3.3 FACILITY SERVICES/EQUIPMENT MAINTENANCE –
BUILDING 3
CONSTRUCTED: 1966
SQUARE FEET: 3,600
VALUE: $31,405.00
OWNERSHIP: NASA
PROPERTY ID: N/A
1966 Original construction An open 60 x 60-ft shelter was added to the shop buildings referred to in Section 3.2 on page 11. A 40 x 20-ft area of this space was enclosed in 1968 to be used as the welding shop. The remaining space was used as a helium shed. The cost of the original shop buildings (2, 2A, and 2B) in 1963 was $6.68/ft2. Therefore, it is reasonable to use $7.00/ft2 for the 3,600-ft2 addition constructed in 1966 and 1968.
1984 Enclosure The 20 x 20-ft area behind the helium shed area was enclosed and converted to equipment maintenance under NASA contract NAS5-28218.
1990 Dirt Floor Covered with Concrete Slab
A 40 x 20-ft concrete slab was poured to cover the dirt floor of the equipment maintenance area. The work was performed under NASA contract NAS5-29800.
1991 New Facility Services Work Area
A 19 x 60-ft area was enclosed by CSBF personnel for a new facility services work area. A work area, three small offices, a mezzanine, and a storage area were added. One of CSBF's heating and air conditioning units and ductwork were installed and the system connected by Palestine Air and Refrigeration of Palestine, Texas. A new overhead door was installed by Athens Steel Building Corporation of Athens, Texas. The work was performed under NASA contract NAS5-29800.
1994 Equipment Maintenance Bay Enclosure/HVAC/ Insulation
The bay was enclosed, an overhead door was added, and the ceiling was insulated. Tiles and grid work were installed in the shop area. CSBF furnished the tiles and insulation and CSBF personnel furnished labor, tools, and grid work. Cost of the work was $4,140.00. This construction was done under NASA contract NAS5-31125. An HVAC unit including ductwork was installed in the middle bay by Palestine Air and Refrigeration of Palestine, Texas. The middle bay was insulated with 6-in vinyl-faced R19 insulation and an overhead door was installed by RPR Construction of Tyler, Texas.
2003 Air Conditioning The air conditioning (AC) unit was replaced in the welding shop on 7 July 2003 by Palestine Air and Refrigeration of Palestine, Texas at a cost of $7,130.00.
FACILITY SERVICES/EQUIPMENT MAINTENANCE –BUILDING 3 BUILDINGS AND STRUCTURES
Page 14 July 17, 2019 CSBF Real Property Manual
Figure 9 - Facility Services/Equipment Maintenance (Building 3)
Figure 10 - Facility Services/Equipment Maintenance (Building 3) Floor Plan
BUILDINGS AND STRUCTURES FLIGHT OPERATIONS – BUILDING 4
CSBF Real Property Manual July 17, 2019 Page 15
3.4 FLIGHT OPERATIONS – BUILDING 4
CONSTRUCTED: 1963
SQUARE FEET: 5,584.5
VALUE: $149,534.54
OWNERSHIP: NASA
PROPERTY ID: N/A
1963 Original Construction
This single-story 70 x 35-ft building was donated to the CSBF by Princeton University. The $10/ft2 cost of construction was estimated by considering fair market value and labor costs at the time of construction:
70 x 35-ft = 2,450-ft2 x $10 = $24,500
The dimensions of 70 x 35-ft were taken from the Floor Plan Rigging Building, page 69 of the Master Plan NCAR Scientific Balloon Facility, Palestine, Texas, dated July 1972.
1978 Parachute Pull Tunnel
A 74 x 15-ft covered concrete pad was added to the back of the building by CSBF personnel to facilitate stretching and rigging of parachutes. The material cost was estimated at $5,000. Labor costs were estimated for approximately 400 hours at $12.50/hr or $5,000.00. Therefore, the value of $10,203.00 appears reasonable and is one of the six values provided by NCAR on 27 September 1985.
1989 Parachute Pull Tunnel Removal
An addition to the mechanical rigging shop required the removal of the existing parachute pull tunnel and its foundation. The metal from this building was removed, stacked, and saved with plans to reconstruct the 74 x 15-ft building as an extension to this new addition.
1989 Addition to Flight
Operations
A firm fixed-price subcontract for $114,832.00 was awarded to Athens Steel
Building Corporation of Athens, Texas on 25 July 1988 for construction of a 40 x 80-ft building addition under NASA contract NAS5-29800. The new dimensions of the building are 153 x 36.5-ft (5,584.5-ft2). The building has a monorail hoist and is air conditioned and heated. The new addition is connected to the existing building by an overhead door and a walk door. NASA improvements to the building owned by NSF were an improvement to NSF Real Property. The increase in value of this building was reported to NSF on their Annual Report GSA Form 1166.
1994 Roof A new roof of urethane foam with white reflective coating was installed on the front portion of the building and existing roof box vents were removed by Pal-Tex Urethane of Palestine, Texas. A Lennox 7.5-ton heat pump was installed by Palestine Air and Refrigeration of Palestine, Texas.
Overhead Door
Bathroom Update
42’ x 42’ slab
Cubical
The south overhead door was replaced with an insulated door by Overhead Door Company of Tyler, Texas.
The small restroom was removed and replaced with a modern style Bathroom with a shower stall, a urinal and two toilets. The work was handled by David Harden Construction. The cost was $34,907.00.
One 42’ x 42’ slab was added to the back of this building to extend the area that was usable to ready parachutes for flight. Morris Construction was used for the project at a cost of $8,138.
Cubical space was built by CSBF Facilities to allow separate computer work space estimated cost $400.
2012 Break/Training Room
Break/training room was added. Construction was done by CSBF Facilities.
FLIGHT OPERATIONS – BUILDING 4 BUILDINGS AND STRUCTURES
Page 16 July 17, 2019 CSBF Real Property Manual
Figure 11 - Flight Operations (Building 4)
Figure 12 - Flight Operations (Building 4) Floor Plan
BUILDINGS AND STRUCTURES STRATOPORT I – BUILDING 5
CSBF Real Property Manual July 17, 2019 Page 17
3.5 STRATOPORT I – BUILDING 5
CONSTRUCTED: 1963
SQUARE FEET: 1,540
VALUE: $52,779.90
OWNERSHIP: NASA
PROPERTY ID: N/A
1963 Original Construction The main section of this building is hexagonal in shape, having an area of 1,020-ft2. Two storage areas, each 13 x 20-ft, were connected adding 520-ft2. Stratoport I was constructed by Princeton University and later donated to CSBF.
NCAR identified all real property except for the cost of Stratoport I and the Coronaport. The two buildings are very similar in design and composition and were built relatively close to the same time (1963 and 1965);
therefore, the cost allocation was based on square footage.
1989 Asbestos Removal Stratoport I was completely stripped of all asbestos cement sandwich panels which included all walls and the roof. A new girt system was connected onto the existing structural members. New sandwich panels consisting of urethane core insulation and a light-gage metal liner were connected to the new girt system. The building also received a new roof system. The work was performed by Red Eagle Construction Company of Manvel, Texas under NASA contract NAS5-29800.
1990 AC Installation A Sears 25,000-BTU window AC unit was installed by Palestine Air and Refrigeration of Palestine, Texas.
2013 Asbestos Testing/ Removal
Testing and assessment for the presence of asbestos was completed. Floor tiles were removed from the west and north rooms.
STRATOPORT I – BUILDING 5 BUILDINGS AND STRUCTURES
Page 18 July 17, 2019 CSBF Real Property Manual
Figure 13 - Stratoport I (Building 5)
Figure 14 - Stratoport I (Building 5) Floor Plan
BUILDINGS AND STRUCTURES ADMINISTRATION STORAGE – BUILDING 6
CSBF Real Property Manual July 17, 2019 Page 19
3.6 ADMINISTRATION STORAGE – BUILDING 6
CONSTRUCTED: 1963
SQUARE FEET: 1,500
VALUE: $4,564.14
OWNERSHIP: NASA
PROPERTY ID: N/A
1963 Original Construction The 30 x 50-ft building was constructed by Princeton University and later donated to the CSBF. Originally used as storage space, the building was converted to a test laboratory in 1979.
1985 Valve A valve valued at $4,564.14 was provided to CSBF by NCAR on 27 September 1985.
1988 Safety Exit Door A safety exit door was installed in the building and a 10 x 10-ft office area was enclosed for the Quality Assurance (QA)/Lab Supervisor. The work was performed by CSBF personnel under NASA contract NAS5-29800.
1995 Roof A 1-in urethane foam roof with white coating application was installed by Pal-Tex Urethane of Palestine, Texas.
1998 QA Lab Relocated The QA Laboratory was relocated to Balloon Support (building 28) upon its completion. This building is now being used for administration and purchasing storage.
Roof
HVAC
New roof installed by Reliable Roofing in Palestine, Tx for $15,500.00.
Leagueville Air replaced a 3-ton HVAC unit $4950.00
2018 New Doors CSBF Facilities installed one walk-up door and one roll up door as well as refurbished half of the inside in preparation for a Flight Operations Inventory stockroom.
ADMINISTRATION STORAGE – BUILDING 6 BUILDINGS AND STRUCTURES
Page 20 July 17, 2019 CSBF Real Property Manual
Figure 15 - Facilities Storage (Building 6)
Figure 16 - Facilities Storage (Building 6) Floor Plan
BUILDINGS AND STRUCTURES VEHICLE STORAGE I (OLD TIM SHED) – BUILDING 7
CSBF Real Property Manual July 17, 2019 Page 21
3.7 VEHICLE STORAGE I (OLD TIM SHED) – BUILDING 7
CONSTRUCTED: 1968
SQUARE FEET: 4,200
VALUE: $25,000
OWNERSHIP: NASA
PROPERTY ID: N/A
1968 Original Construction This 60 x 70-ft building is an open storage shelter for launch vehicles. The value of this building has been estimated to be $25,000.00. This is based upon a cost of $5.95/ft2. Since both the Electronic Shop and Vehicle Storage buildings were constructed at approximately the same time (1968), the cost for the 4,200-ft2 open shed appears reasonable.
1990 Floor Paving The dirt floor of the shed was paved with asphalt by L & L Asphalt of Tyler, Texas under NASA contract NAS5-29800.
Figure 17 - Vehicle Storage I (Building 7)
VEHICLE STORAGE I (OLD TIM SHED) – BUILDING 7 BUILDINGS AND STRUCTURES
Page 22 July 17, 2019 CSBF Real Property Manual
Figure 18 - Vehicle Storage I (Building 7) Floor Plan
BUILDINGS AND STRUCTURES MONUMENTS – STRUCTURE 8
CSBF Real Property Manual July 17, 2019 Page 23
3.8 MONUMENTS – STRUCTURE 8
CONSTRUCTED: 2004
SQUARE FEET: N/A
VALUE: N/A
OWNERSHIP: NASA
PROPERTY ID: N/A
1995 Three monuments (boundary/position markers) were placed on the facility during a mapping survey. The first is between building 1 and the fuel storage tank (structure 27). The second is between the old Coronaport site and the fence. The third is between the tractor shed (building 17) and the A-frame (structure 19).
Figure 19 - Monument (Structure 8)
FACILITIES STORAGE - BUILDING 9 BUILDINGS AND STRUCTURES
Page 24 July 17, 2019 CSBF Real Property Manual
3.9 FACILITIES STORAGE - BUILDING 9
CONSTRUCTED: 1982
SQUARE FEET: 144
VALUE: $1,200.00
OWNERSHIP: NASA
PROPERTY ID: N/A
1982 Original Construction This 12 x 12-ft building was built by CSBF personnel. The cost, estimated by the head of the Facility Services Department, is approximately $8.33/ft2. The building is currently used for lawn equipment storage.
Figure 20 - Facilities Storage (Building 9)
BUILDINGS AND STRUCTURES FACILITIES STORAGE - BUILDING 9
CSBF Real Property Manual July 17, 2019 Page 25
Figure 21 - Facilities Storage (Building 9) Floor Plan
VISITOR CENTER – BUILDING 10 BUILDINGS AND STRUCTURES
Page 26 July 17, 2019 CSBF Real Property Manual
3.10 VISITOR CENTER – BUILDING 10
CONSTRUCTED: 2009
SQUARE FEET: 1,200
VALUE: $63,580
OWNERSHIP: NASA
NASA CONTRACT: NAS5-03003
PROPERTY ID: 3065
1991 Original Construction The new modular Visitor Center replaced the old prefabricated Guard House at the CSBF entrance. This 14 x 20-ft standard modular office unit was purchased from Atlantic Trailer of Baltimore, Maryland and delivered to the CSBF in May 1991. CSBF personnel provided the electrical and water services. Palestine Air and Refrigeration of Palestine, Texas installed a heater, one of CSBF’s air conditioning units (NASA Tag 2758), provided the ductwork, and connected the system. In order to comply with government regulations, a new septic system was installed for the building by Septic King Co. of Palestine, Texas.
1995 Carpet Carpet was replaced by Sherwin Williams of Palestine, Texas.
2003 AC Replacement The heating and AC unit were replaced by Palestine Air and Refrigeration of Palestine, Texas.
Canopy
Building Replaced
An aluminum canopy was installed over the entrance by Glenwood Blind and Awning of Tyler, Texas.
This building was replaced again by a 30 x 40 Metal structure. This larger building was required to accommodate conference facilities conduct lager meeting and facility tours. The building was purchased from Athens Steal Buildings with all interior work being accomplished by CSBF personnel. The cost of the building was $63,580. The old 14 x 20 building was then moved to Winslow AZ in 2010 for CSBF and Science use as a downrange facility.
Figure 22 - Visitor Center (Building 10)
BUILDINGS AND STRUCTURES VISITOR CENTER – BUILDING 10
CSBF Real Property Manual July 17, 2019 Page 27
Figure 23 - Visitor Center (Building 10) Floor Plan
STAGING – BUILDING 11 BUILDINGS AND STRUCTURES
Page 28 July 17, 2019 CSBF Real Property Manual
3.11 STAGING – BUILDING 11
CONSTRUCTED: 1977
SQUARE FEET: 7,080
VALUE: $459,302.00
OWNERSHIP: NASA
PROPERTY ID: N/A
1977 Original Construction This building was constructed by Howard U. Freeman Inc., contractor. A firm fixed price of $459,302.00 was quoted in a copy of a letter dated 10 June 1985 to Dr. Georgio Tessi, Project Officer for NCAR, Division of Atmospheric Sciences, NSF.
Square footage, as stated by the head of the Facility Services Department in 1985, is as follows:
LOCATION
DIMENSIONS
(FT)
SQUARE FOOTAGE
(FT2)
Entrance 30 x 20 600
East Bay 60 x 30 1,800
West Bay 60 x 30 1,800
2nd Floor 30 x 32 960
3rd Floor 30 x 32 960
4th Floor 30 x 32 960
TOTAL 7,080
1989 Windows Two windows, one on the second floor and one on the third floor, were installed by CSBF personnel under NASA contract NAS5-29800.
1990 Pavement Resurfacing The parking lot and access road were resurfaced by L & L Asphalt of Tyler, Texas under NASA contract NAS5-29800.
1993 Building Rehabilitation An access road was constructed on the north side of the building. A wall was installed on the west side of the first floor room. Exterior stairs and metal walls were cleaned and painted. Interior concrete masonry walls were re-grouted and painted. Wooden walkways were removed and new roof overlay, gutters, and down spouts were installed on bay area roofs. Staging bay personnel doors were replaced. The existing auxiliary power generator was enclosed and roof mounted air conditioning units from the high bay roofs were removed and new air conditioning units were placed on the ground, north of the building. New air handling units and modified air supply ducts were installed. The existing uninterruptible power supply was replaced and flood lights were provided for the high bay areas.
Rehabilitation of the building was completed at a cost of $275,000.00 by RPR Construction of Tyler, Texas under NASA contract NAS5-29800 and awarded under NAS5-31125.
1996 Air Conditioning An air conditioner was added to the UPS battery room by CSBF personnel.
2011 Break room A break room/kitchen was built in existing space in the foyer area.
Door Expansion
Each of the two front bay doors were widened by 5 feet to match the door widths of the Antarctica payload buildings. The new openings are 20 feet wide.
BUILDINGS AND STRUCTURES STAGING – BUILDING 11
CSBF Real Property Manual July 17, 2019 Page 29
Maintenance Replaced Overhead cranes to handle larger payloads work performed by OMI cranes $103,149.00 Leagueville Air Installed 10 Ton HVAC unit for the fourth floor $11,200.00 Leagueville Air Installed 10 Ton HVAC unit for the third floor $11,200.00 Leagueville Air Installed 2 20 ton HVAC units for the high bays $38,380.00
2017 Elevator Thyssenkrupp Elevator Upgraded the elevator $50,586.00
2019 Elevator Thyssenkrupp elevator installed a battery backup system $861.00
Figure 24 - Staging (Building 11)
OPERATIONS CONTROL CENTER (OCC) – BUILDING 12 BUILDINGS AND STRUCTURES
Page 30 July 17, 2019 CSBF Real Property Manual
Figure 25 - Staging (Building 11) Floor Plan
3.12 OPERATIONS CONTROL CENTER (OCC) – BUILDING 12
CONSTRUCTED: 2004
SQUARE FEET: 2,000
VALUE: $48,687.00
OWNERSHIP: NASA
NASA CONTRACT: NAS5-03003
PROPERTY ID: 4341
2004 Original Construction This single-story 40 x 50-ft steel building with a total of 2,000-ft2 was constructed by Athens Steel Building Corporation of Athens, Texas and the interior finish-out was completed by CSBF personnel.
This building houses the operations control center (OCC) for long-duration ballooning (LDB) and ultra-long-duration ballooning (ULDB) flights launched from Sweden, Antarctica, Australia, New Zealand, and other locations around the world.
WC WC
BUILDINGS AND STRUCTURES OPERATIONS CONTROL CENTER (OCC) – BUILDING 12
CSBF Real Property Manual July 17, 2019 Page 31
Figure 26 - Operations Control Center (Building 12)
OPERATIONS CONTROL CENTER (OCC) – BUILDING 12 BUILDINGS AND STRUCTURES
Page 32 July 17, 2019 CSBF Real Property Manual
Figure 27 - Operations Control Center (Building 12) Floor Plan
BUILDINGS AND STRUCTURES VEHICLE STORAGE II (NEW TIM SHED) – BUILDING 13
CSBF Real Property Manual July 17, 2019 Page 33
3.13 VEHICLE STORAGE II (NEW TIM SHED) – BUILDING 13
CONSTRUCTED: 2004
SQUARE FEET: 4,800
VALUE: $334,025.00
OWNERSHIP: NASA
NASA CONTRACT: NAS5-03003
PROPERTY ID: 4387
2004 Original Construction This building replaced an NSF building that was deleted from NSF Real Property Records due to its size restraints and age. The replacement was due to a need for more storage for the large equipment used at CSBF. The value of this equipment precluded storing these items exposed to weather.
The new Tim Shed was constructed by Hughes Building Services of Dallas, Texas.
The new building’s close proximity to Science personnel and Electronics staff provides additional advantages.