This document provides financial management reporting requirements for the NASA Balloon Operations Contract II opportunity. The contract is a cost-plus-fixed-fee arrangement between NASA Goddard Space Flight Facility and a contractor to operate and maintain the Columbia Scientific Balloon Facility in Palestine, Texas. The contractor will be responsible for balloon launch, tracking, recovery and payload support operations at multiple locations. Financial reporting requirements include submitting NASA form 533 reports by work breakdown structure level with cost data on direct labor, overhead, and other direct costs. Variance narratives are required for total direct labor or total cost variances exceeding 5% from the prior month's estimate. The initial report is due within 30 days of award with monthly reports due by the 10th day and quarterly reports the 15th day of the preceding month.

View the file

Other files for this federal contract opportunity

Other files attached to NASA Balloon Operations Contract (NBOC) II, newest first.
File Type Posted
Part 1 CSBF West Campus.mp4 MP4 file
Part 2 CSBF East Campus.mp4 MP4 file
NBOC 2 - Questions and Responses II final 9-22-20 LBH.pdf PDF
Questions and Responses I 7-28-20-Final.pdf PDF
Attachment R - CSBF FY20 Real Property Manual 05-15-20 TS.pdf PDF
Enclosure 1 NBOC II Scenarios 2-10-20 TS.pdf PDF
Attachment N - Personal Identiy Verification Issuance Procedures TS.pdf PDF
NBOC II Contract Clauses - Sections B-M posting doc 5-13-20 TS.pdf PDF
DRFP Cover Letter 5-13-20 TS.pdf PDF
Exhibit 18-NBOC 2 - PastPerfQuestionaire TS.pdf PDF
Attachment P - IT Security Applicable Documents List 1-8-2020 TS.pdf PDF
Attachment K - Work Breakdown Structure (Cover) TS.pdf PDF
Attachment C - Wage Determination Cover TS.pdf PDF
Attachment C Wage Determination 2015-5812 Rev 12 Texas TS.pdf PDF
SF33-14a 5-14-20.pdf PDF
Attachment M- Contract Historical Data TS.pdf PDF
Attachment K NBOC 2 - WBS - SOW Dictionary TS.pdf PDF
Cost Exh Cost Plus AF or FF Hybrid CORE-IDIQ RTOs Onsite and Offsite by GFY -Final Revised 5-12-20 pdf TS.pdf PDF
Enclosure 5 - Contractor Historical Data - NBOC 1 TS.pdf PDF
Attachment B - GOVERNMENT PROPERTY Cover TS.pdf PDF
Attachment G - Organizational Conflicts of Interest Avoidance Plan Cover TS.pdf PDF
Attachment B - CSBF FHW Inventory 1-9-2020 Sanitized TS.pdf PDF
Attachment A - NBOC 2 - DRAFT SOW TS.pdf PDF
Enclosure 4 - Information Technology Security Management Plan Template Sanitized TS.pdf PDF
Attachment K Work Breakdown Structure TS.pdf PDF
Attachment C Wage Determination 2015-5454 Rev 13 New Mexico TS.pdf PDF
Attachment B - Balloon Inventory 1.14.20 Sanitized TS.pdf PDF
Attachment H - IT Security Management Plan Cover TS.pdf PDF
Attachment Q Contractor Proposed Enhancements Attachment TS.pdf PDF
Attachment F - Direct Indirect Labor Rates TS.pdf PDF
Enclosure 3 - Balloon Phase-In SOW TS.pdf PDF
Attachment O -NBOC 2- Applicable Standards and Policy Documents 1-13-20 TS.pdf PDF
Attachment L - New Technology Reporting Plan (cover) TS.pdf PDF
Attachment I - Small Business Subcontracting Plan Cover TS.pdf PDF
Attachment D - Safety and Health Plan Cover TS.pdf PDF
Attachment B - Complete inventory 01-2020 Sanitized TS.pdf PDF
Attachment R - Real Property Manual (cover) TS.pdf PDF
Enclosure 2 - NBOC Surveillance Plan September 2019.pdf PDF
Attachment J - Reliability and Quality Assurance Plan Cover TS.pdf PDF
Attachment B - CSBF Real Property List Sanitized TS.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT E

FINANCIAL MANAGEMENT REPORTING

REQUIREMENTS

80GSFC20R0031

DRFP# 80GSFC20R0031

Attachment E

2/2020

FINANCIAL MANAGEMENT REPORTING REQUIREMENTS

Financial Management Reports shall be submitted by the Contractor on the NASA 533 series reports, in accordance with the instructions on the reverse of the forms, NASA Procedural Requirements NPR 9501.2E entitled "NASA Contractor Financial Management Reporting,” dated May 27, 2011, and additional instructions issued by the Contracting Officer.

a. Level of Detail

For the Core baseline portion of the contract, the Contractor’s 533 Reports shall contain a summary of total Core baseline contract costs at the total contract level and Task Orders in accordance with the Work Breakdown Structure (WBS) element of the Statement of Work below:

WBS Level 1 – Balloon Operations Contract Summary (Core & IDIQ) WBS Level 2 – Core Requirements Summary WBS Level 2 – IDIQ Requirements Summary WBS Level 3 – Technical, Business Management & Facilities Support WBS Level 3 – Flight Operations & Engineering Support WBS Level 3 – Task Order (For each individual task order)

WBS Level 4 – Flight Operations & Engineering NOT Directly Related to Individual Campaigns

WBS Level 4 – Flight Operations & Engineering for Campaigns WBS Level 5 – Individual Campaigns

The Contractor’s 533 Reports shall include Contract Values for Core Baseline, including the separate 533 sheets for each Work Breakdown Structure (WBS) Level and Campaigns, as well as the Task Order Levels.

An individual 533 Report shall be provided for each Task Order at the total Task Order level, in addition to a cumulative 533 Report summarizing all Task Orders issued.

The reports shall contain a breakdown of regular and overtime premium hours and costs by the elements of cost categories listed in Section d below.

For the Billing Section 5 of the 533, the Contractor will provide the current Invoiced Amounts and Total Payments Received as of the date of the Report. (NOT the reporting period)

b. Variance Narrative Reporting

In accordance with Section 3.6 of NPR 9501.2E, the Contractor shall include a narrative explanation for variances exceeding plus or minus 5 percent (+/- 5 %) between the Total Direct Labor Hours (prime and subcontractors) and/or Total Estimated Cost amount shown in the prior month and the Actual Total Direct Labor Hours and/or Actual Total Cost amount shown in the current month at WBS Level 2 for Core requirements summary and WBS Level 2 for IDIQ Requirements Summary. (For example, the Total Estimated Cost amount shown for June in column 8a in the May NF 533M and the Actual June Total Cost amount shown in column 7a in the June NF 533M.)

Each variance narrative shall explain the: (1) reason for the variance, (2) impact(s) on the Core baseline and/or each individual task order, and (3) specific corrective action(s) being taken or to be taken.

c. Distribution

The Contractor shall distribute 533 reports to each addressee indicated in the contract clause entitled, "Financial Management Reporting." The Contractor shall submit an initial report in the NF 533Q format within 30 working days after contract award.

After the initial report, the NF 533M reports shall be distributed not later than the tenth (10th) working day following the close of the contractors' monthly accounting period.

The 533Q reports shall be distributed not later than the fifteenth (15th) day of the month preceding the quarter being reported. The NF 533M need not be submitted in months in which an NF 533Q is submitted.

d. Reporting Requirements

Each individual report shall, at a minimum, provide cost data by the following elements of cost categories:

1. Prime Regular Direct Labor Hours:

Prime Regular Direct Labor Hours - Onsite (Wallops Flight Facility (WFF) & Columbia Scientific Balloon Facility (CSBF))

Prime Regular Direct Labor Hours – Offsite

(Contractor’s Facility)

Prime Regular Direct Labor Hours – Operations-Site

Total Prime Regular Direct Labor Hours

2. Prime Overtime Premium Direct Labor Hours:

Prime Overtime Premium Direct Labor Hours - Onsite (Wallops Flight Facility (WFF) & Columbia Scientific Balloon Facility (CSBF)

Prime Overtime Premium Direct Labor Hours – Offsite (Contractor’s Facility)

Prime Overtime Premium Direct Labor Hours – Operations-Site

Total Prime Overtime Premium Direct Labor Hours

3. Subcontractor Regular Direct Labor Hours:

Subcontractor A Regular Direct Labor Hours – Onsite

(WFF&CSBF)

Subcontractor A Regular Direct Labor Hours – Offsite (Contractor’s Facility)

Subcontractor A Regular Direct Labor Hours – Operation-Site

Total Subcontractors Regular Direct Labor Hours

4. Total Prime and Subcontractors Direct Labor Hours:

Total Prime and Subcontractors Hours – Onsite

Total Prime and Subcontractors Hours – Offsite

Total Prime and Subcontractors Hours – Operations-Site

Total Prime and Subcontractors Direct Labor Hours

5. Prime Regular Direct Labor Costs:

Prime Regular Direct Labor Costs - Onsite

Prime Regular Direct Labor Costs – Offsite

Prime Regular Direct Labor Costs – Operations-Site

Total Prime Regular Direct Labor Costs

6. Prime Overtime Premium Direct Labor Costs:

Prime Overtime Premium Direct Labor Costs - Onsite

Prime Overtime Premium Direct Labor Costs – Offsite

Prime Overtime Premium Direct Labor Costs – Operations-Site

Total Prime Overtime Premium Direct Labor Costs

7. Subcontractor Direct Labor Costs:

Subcontractor A Direct Labor Costs – Onsite

Subcontractor A Direct Labor Costs – Offsite (Contractor’s Facility)

Subcontractor A Direct Labor Costs – Operation-Site

Total Subcontractors Direct Labor Costs

8. Total Prime and Subcontractors Direct Labor Costs:

Total Prime and Subcontractors Costs – Onsite

Total Prime and Subcontractors Costs – Offsite

Total Prime and Subcontractors Costs – Operations-Site

Total Prime and Subcontractors Direct Labor Costs

9. Prime Overhead Expenses:

Onsite Overhead Offsite Overhead

Operations-Site Overhead Material Overhead

Total Prime Overhead

10. Other Direct Costs (ODCs):

a. Subcontracts (list separately, Subcontractor A, B, C, etc.)

b. Balloons

c. Travel

d. Helium IsoPaks

e. Expendable Gases

f. Aviation/Aircraft

g. Freight

h. Range Expenses

i. Flight H/E

j. Ground Support Equipment

k. Materials

l. Miscellaneous (ODCs)

m. Direct OT/Field Premium Pay

n. Subcontractor Travel

o. Subcontractor OT

p. Other (specify)

Total ODCs

11. Subtotal (Direct Labor, Overhead & ODCs)

12. G&A Expense

13. Total Estimated Cost

14. Fixed Fee %

15. Fixed Fee

16. Total Cost-Plus-Fixed-Fee (CPFF)

16. Total Cost-Plus-Award-Fee (CPAF)