Repair Asphalt Pavements Center-Wide
Solicitation number
80AFRC18B0001
Issued by

About this file

Statement of Work

View the file

Other files

File Type Posted
80AFRC18B0001_-_Abstract_of_Offerors.pdf PDF
Bid-Opening_Sign_In_Sheet.pdf PDF
Amendment_00003.pdf PDF
Pre-proposal_Conference_Briefing.pdf PDF
Amendment_00002.pdf PDF
Response_to_RFIs.pdf PDF
Site_Visit_Sign_in_Sheet.pdf PDF
Amendment_00001.pdf PDF
80AFRC18B0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

Repair Asphalt Pavements Center-Wide – DR 626

7/11/2018

Prepared by

Facilities Engineering & Asset Management Office (FEAMO)

NASA Armstrong Flight Research Center PO Box 273, Edwards AFB, CA 93523-0273

STATEMENT OF WORK

1. PURPOSE

The purpose of this Statement of Work is to define the work involved with the Repair Asphalt Pavements Center-Wide project and to secure the services required to provide labor, materials, equipment, and supervision to repair cracks and gaps in bituminous pavement at various locations around the Armstrong Center, to demolish bituminous pavement in other areas, and to construct one new parking lot. Area outages and traffic control will be required for affected areas of this project.

2. SCOPE

Period of Performance:

o Period of performance shall be 364 days after receipt of the Notice to Proceed

(NTP).

BASE BID:

Provide labor, materials, equipment, and supervision required to remove and replace, repair and seal, remove, or construct priority 1 through priority 18. Upon completion of the repairs in all areas, new pavement markings will be put in place in the same locations as before the repair work was done. The contractor must make provisions as the work is being completed to ensure he has marked the locations of all striping that will be removed and will need to be replaced.

ADDITIVE BID ITEMS:

Additive 1: Provide labor, materials, equipment, and supervision required to construct building 4811 POV parking lot priority 19. The new parking lot will be constructed in accordance with drawings C10, C11, C12, & C13. This part of the project will involve demolition, earthwork, underground electrical, parking lot lighting, concrete placement, striping, and sidewalk reconfiguration.

Additive 2: Provide labor, materials, equipment, and supervision required for West Thompson Drive priority 20. One portion of West Thompson will require removal and replacement of the pavement; the other portion will require crack repair and seal.

Additive 3: Provide labor, materials, equipment, and supervision required for Central Thompson Drive priority 21. One portion of Central Thompson will require removal and replacement of the pavement; the other portion will require crack repair and seal.

Additive 4: Provide labor, materials, equipment, and supervision required to perform crack repair and seal Walker Ave interior priority 22.

Additive 5: Provide labor, materials, equipment, and supervision required to perform crack repair and seal Walker Ave exterior priority 23.

Additive 6: Provide labor, materials, equipment, and supervision required to perform crack repair and seal South McKay Ave priority 24.

Additive 7: Provide labor, materials, equipment, and supervision required to perform crack repair and seal North McKay Ave and Parking Lot priority 25.

Additive 8: Provide labor, materials, equipment, and supervision required to perform crack repair and seal Thompson Drive Shuttle Area priority 26. In addition, design and construct the ribbon gutter as shown on the drawing for this roadway section. The design must be reviewed and approved by the government prior to beginning construction.

Additive 9: Provide labor, materials, equipment, and supervision required to perform crack repair and seal Parking Lot 3 priority 27.

Additive 10: Provide labor, materials, equipment, and supervision required to perform crack repair and seal East Thompson Drive priority 28.

Additive 11: Provide labor, materials, equipment, and supervision required to perform crack repair and seal pavement near building 4876 priority 29.

Upon completion of the repairs in all areas, new pavement markings will be put in place in the same locations as before the repair work was done. The contractor must make provisions as the work is being completed to insure he has marked the locations of all striping that will be removed and will need to be replaced.

NOTE: Drawings and maps are not to scale. The contractor must field verify the location and size of all cracks to be repaired.

Attachment I “Priority List”

Attachment I Priority List

Priority Area # Name

1 AF Regulated Equipment Containment*

2 AE AGE Yard*

3 AD Tow Way Asphalt*

3 AD Tow Way Asphalt*

4 AC B4840*

4 AC B4840*

5 Z Taxiway Echo*

6 F Pavement near B4865 and B4856

7 AA B4823*

8 AB B4820*

9 V B4806*

9 V B4806*

10 R Grounding Grid*

11 B Parking Lot 2- in between B4800 and B4825*

12 E Loading dock area near B4825*

13 A Area between B4800, B4823, B4820*

13 A Area between B4800, B4823, B4820*

14 C Parking Lot 1*

15 D X-1E Circle*

16 H B4809*

17 I B4808*

18 J B4802 Parking*

19 G Parking Lot near B4811

20 L West Thompson

20 L West Thompson

21 O Central Thompson

21 O Central Thompson

22 M Walker Interior

23 N Walker Exterior

24 Q South McKay

25 P North McKay & Parking

26 Y Thompson A Area

27 T Parking Lot #3

28 X East Thompson

29 S Drive and Parking near B4876