Repair Asphalt Pavements Center-Wide
Solicitation number
80AFRC18B0001
Issued by

About this file

Responses to RFIs

View the file

Other files

File Type Posted
80AFRC18B0001_-_Abstract_of_Offerors.pdf PDF
Bid-Opening_Sign_In_Sheet.pdf PDF
Amendment_00003.pdf PDF
Pre-proposal_Conference_Briefing.pdf PDF
Amendment_00002.pdf PDF
Site_Visit_Sign_in_Sheet.pdf PDF
Amendment_00001.pdf PDF
Statement_of_Work.pdf PDF
80AFRC18B0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

80AFRC18B0001 Responses to RFIs

1. Please provide details of the existing concrete footings to be demolished on Drawing Sheet No.7 for B4806 Area-V.

The two concrete footings are approximately 30” X 30” X 24” in size.

2. Please provide the thickness of the existing asphalt pavement to be removed and replaced for various locations.

a. What's the thickness of existing pavement to be removed and replaced?

Existing pavement thickness is estimated as 4” thick.

b. What's the thickness of new asphalt Pavement?

New asphalt pavement will be 4” thick.

c. Should we replace existing base material or re-compact before placing new asphalt paving?

After removing the asphalt in the areas labeled “Remove and Replace,” only re-compaction of the base material is required, not replacement of the base material.

d. Can we apply Drawing C 13, Detail 1 to remove and replace asphalt for various locations?

Detail 1 on sheet C13 applies only to the new parking lot. The answer to c. above applies to all other areas of “Remove and Replace.”

3. Drawing C13 Detail 7 New Concrete Pavement shows 6" concrete pavement for parking lot. There is no class 2 base under it. Please confirm the detail which does not include class 2 base.

The detail is correct. There is no class 2 base under the concrete

4. Drawing C13 Detail 1 New Asphalt Pavement shows bituminous prime coat between Class 2 and asphalt pavement the prime coat is not allowed in California due to the environmental issue.

The detail is not correct. Delete the requirement for the prime coat between the base material and the asphalt.

5. There is no drawing available for Area A. Please provide the drawing for Area A.

Please see new Sheet C20 for the drawing of Area A and the revised Index on Sheet T1.

80AFRC18B0001 Responses to RFIs

6. According to the Contract drawing Sheet 2, Note 4.15, the job walk is mandatory for all bidders.

Only three companies attended the job walk. Therefore, they are the only companies who can bid on this job. Please confirm this.

Contract drawing Sheet 2, Note 4.15conflicts with the requirements of FAR 52.236-76 Site Visit (Construction) (Feb 1995) Alternate I (Feb 1995) and is therefore removed. Please see new sheet T2 deleting Note 4.15.

Offerors that did not attend the site visit but submit a proposal shall not attempt to hold the Government responsible for their misunderstanding or underestimating of the requirement. The restrictions and guidance of FAR 52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984) and FAR 52.214-19 Contract Award—Sealed Bidding—Construction (Aug 1996) apply and must be adhered to. Failure to attend the site visit does not justify authorization for exemptions to the FAR requirements.

7. Please provide photos of the existing switchgear to Install (1) New Breaker on Drawing Sht. No.

13, Keyed Notes 25.

Photos attached.