Amendment_00002.pdf

PDF 7 MB Posted

Attached to
Repair Asphalt Pavements Center-Wide
Solicitation number
80AFRC18B0001
Issued by

About this file

Amendment 0002

View the file

Other files

File Type Posted
80AFRC18B0001_-_Abstract_of_Offerors.pdf PDF
Bid-Opening_Sign_In_Sheet.pdf PDF
Amendment_00003.pdf PDF
Pre-proposal_Conference_Briefing.pdf PDF
Response_to_RFIs.pdf PDF
Site_Visit_Sign_in_Sheet.pdf PDF
Amendment_00001.pdf PDF
Statement_of_Work.pdf PDF
80AFRC18B0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

000002

5YJ79

James G. Williams

The purpose of this amendment is to:

1. Replace Page 24 of the solicitation.

2. Replace FY18 Asphalt Drawings Sheets T1, T2, and C20.

3. Replace the Statement of Work

NASA/Armstrong Flight Research Ctr.

P.O. Box 273 M/S 4811 - 140 Edwards CA 93523 - 0273

80AFRC18B0001

1 2

09/14/2018

08/24/2018

4. The offer due date is hereby corrected to read 12:00 pm local time September 24, 2018.

5. Item 8 of the SF1442 is updated to read:

NASA Armstrong Flight Research Center MS 4811:140 Attn: James G. Williams Bldg 4876 Warehouse #6, Lilly Drive Edwards CA 93524

The bid opening is scheduled to occur 12:00 p.m. local time, September 24, 2018 at the NASA Armstrong Flight Research Center Bldg. 4811 Rm 101 Edwards, CA 93524.

6. Post the Responses to RFIs , Site Visit Sign in Sheet, and Presentation

80AFRC18B0001 Page 24 of 36

52.252-2 Clauses Incorporated by Reference (Feb 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

Federal Acquisition Regulation (FAR): https://www.acquisition.gov/browsefar

NASA FAR Supplement: https://www.hq.nasa.gov/office/procurement/regs/NFS.pdf

(End of clause)

1852.225-71 Restriction on Funding Activity With China (Feb 2012)

(a) Definition - "China" or "Chinese-owned company" means the People's Republic of China, any company owned by the People's Republic of China or any company incorporated under the laws of the People's Republic of China.

(b) Public Laws 112-10, Section 1340(a) and 112-55, Section 539, restrict NASA from contracting to participate, collaborate, coordinate bilaterally in any way with China or a Chinese-owned company using funds appropriated on or after April 25, 2011.

Contracts for commercial and non-developmental items are exempted from the prohibition because they constitute purchase of goods or services that would not involve participation, collaboration, or coordination between the parties.

(c) This contract may use restricted funding that was appropriated on or after April 25, 2011.

The contractor shall not contract with China or Chinese-owned companies for any effort related to this contract except for acquisition of commercial and non-developmental items. If the contractor anticipates making an award to China or Chinese-owned companies, the contractor must contact the contracting officer to determine if funding on this contract can be used for that purpose.

(d) Subcontracts - The contractor shall include the substance of this clause in all subcontracts made hereunder.

(End of clause)

SECTION J - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

Attachment Date Pages Statement of Work for Repair Asphalt Pavements Center-Wide Sep13, 2018 4 FY18 Repair Asphalt Paving Center-Wide Technical Specifications Aug 14, 2018 333 FY18 Asphalt Drawings Aug 14, 2018 22 Phasing Plan for Pre-Bid Presentation Jun 18, 2018 1 Construction Wage Rate Requirements Aug 17, 2018 26

A.C.

A.C.

CONC.

ASPH.DIRT

P.P.

GIANT VOICE

TOWER

CO

NC

AS

PH

EDM

-1

XFMR

8"

CO

NC

16" C

ONC

8" CONC.

16" CONC.

8" CONC.

16" CONC.

MOTORCYCLE ONLY

MO

TO

RC

YC

LE

O

NL

Y

NO

P

AR

KI

NG

NO

P

AR

KI

NG

SUB. 14

NB97

NO PARKING

RAMP

NO PARKING

16" CONC.

8" CONC.

FUT

. E

OC

AN

T.

NO PARKING

RA

IL

RO

AD

T

RA

C

KS

SUN

SH

ADE

4"

CO

NC

C

OL

GND

C

OL

C.O.

C

OL

C

OL

C

OL

C

OL

C

OL

C

OL

C

OL

C

OL

C

OL

C

OL

C

OL

C

OL

C

OL

C

OL

C

OL

UNIT-6

UN

IT

UN

IT-

UN

IT

UN

IT

UN

IT-

F7

F6

F5

5.5 " C

ONC

16" C

ON

C.

16" C

ONC

8"

CO

NC

PARKING LOT #3

PARKING LOT #2

PARKING LOT #1

PARKING LOT

#4

E

PHASE 1

PHASE 2

PHASE 3

PHASE 4 WKND

PHASE 5

PHASE 6

PHASE 7

PHASE 8 WKND

PHASE 9

PHASE 10

PHASE 11

PHASE 12

PHASE 13 WKND

PHASE 0

LEGEND:

PHASE 1

PHASE 2

PHASE 3

PHASE 4 WKND

PHASE 5

PHASE 6

PHASE 7

PHASE 8 WKND

PHASE 9

PHASE 10

PHASE 11

PHASE 12

PHASE 13 WKND

PHASE 0

V

F

F

F

P

J

V

I

H

R

G

O

C

Q M

L A

D A

O

B

O

L

E

T

F

N

Q

X

Y

Y

AD

AD

AD

AC

AC

AC

AC

AB

AA

AD

AD

AE

AF

C

S

S

Z

NORTH

SCALE: 1"=300'ARMSTRONG FLIGHT RESEARCH CENTER

REPAIR ASPHALT PAVEMENTS - PHASING PLAN

D W

G

I:\ C od e

F\ C od e

F\ Fa ci lit y P ro je ct s

(F P

)\F P

-C oF

\F Y

- S up pl em en ta l-

R ep ai r P av in g\ D

W G

's \C iv il\

D R

T1

-C

C

-C

.d w g

U

S E

R jz am or a1

D A

TE

S ep

0, :5 1p m

X R

E

FS

: T itl e B lo ck

-D tri pi ng

IM

A G

E S

D

W G

I:\

C od e F\

C od e F\

Fa ci lit y

P ro je ct s (F

P )\F

P -C oF \F

Y

- S up pl em en ta l- R ep ai r P av in g\

D W

G 's

\C iv il\ D

R

T1 -C

C

-C

.d

E R jz am or a1 D

A

TE

S ep

0, :5

1p

E

FS

: T itl e

B lo

G E

D W

G

I:\ C od e

F\ C od e

F\ Fa ci lit y P ro je ct s

(F P

)\F P

-C oF

\F Y

- S up pl em en ta l-

R ep ai r P av in g\ D

W G

's \C iv il\

D R

T1

-C

C

-C

.d

E

R jz am or a1

D A

TE

S ep

0, :4 8p

E

FS

: T itl e B lo

G

E S

D

W G

I:\

C od e F\

C od e F\

Fa ci lit y

P ro je ct s (F

P )\F

P -C oF \F

Y

- S up pl em en ta l- R ep ai r P av in g\

D W

G 's

\C iv il\ D

R

T1 -C

C

-C

.d

E R jz am or a1 D

A

TE

S ep

0, :4

8p

E

FS

: T itl e

B lo

G E

S

E

BUILDING 4876

AREA-S

BUILDING 4876S AREA-S SCALE:NONE

NORTH

SCALE: 1"=60'AREA-S

BUILDING 4876

NORTH

SCALE: NONE

KEYPLAN

REFERENCE NOTES:

SHEET NOTES:

BUILDING 4801A AREA-A SCALE:NONE

NORTH

SCALE: 1"=60'AREA-A

BUILDING 4801

STATEMENT OF WORK

FOR

Repair Asphalt Pavements Center-Wide – DR 626

9/13/2018

Prepared by

Facilities Engineering & Asset Management Office (FEAMO)

NASA Armstrong Flight Research Center PO Box 273, Edwards AFB, CA 93523-0273

STATEMENT OF WORK

1. PURPOSE

The purpose of this Statement of Work is to define the work involved with the Repair Asphalt Pavements Center-Wide project and to secure the services required to provide labor, materials, equipment, and supervision to repair cracks and gaps in bituminous pavement at various locations around the Armstrong Center, to demolish bituminous pavement in other areas, and to construct one new parking lot. Area outages and traffic control will be required for affected areas of this project.

2. SCOPE

Period of Performance:

o Period of performance shall be 364 days after receipt of the Notice to Proceed

(NTP).

BASE BID:

Provide labor, materials, equipment, and supervision required to remove and replace, repair and seal, remove, or construct priority 1 through priority 18. Upon completion of the repairs in all areas, new pavement markings will be put in place in the same locations as before the repair work was done. The contractor must make provisions as the work is being completed to ensure he has marked the locations of all striping that will be removed and will need to be replaced.

ADDITIVE BID ITEMS: Offerors are hereby notified that the Government may incorporate one or more additive bid items that were not included in the initial award at any time throughout the performance of the contract.

Additive 1: Provide labor, materials, equipment, and supervision required to construct building 4811 POV parking lot priority 19. The new parking lot will be constructed in accordance with drawings C10, C11, C12, & C13. This part of the project will involve demolition, earthwork, underground electrical, parking lot lighting, concrete placement, striping, and sidewalk reconfiguration.

Additive 2: Provide labor, materials, equipment, and supervision required for West Thompson Drive priority 20. One portion of West Thompson will require removal and replacement of the pavement; the other portion will require crack repair and seal.

Additive 3: Provide labor, materials, equipment, and supervision required for Central Thompson Drive priority 21. One portion of Central Thompson will require removal and replacement of the pavement; the other portion will require crack repair and seal.

Additive 4: Provide labor, materials, equipment, and supervision required to perform crack repair and seal Walker Ave interior priority 22.

Additive 5: Provide labor, materials, equipment, and supervision required to perform crack repair and seal Walker Ave exterior priority 23.

Additive 6: Provide labor, materials, equipment, and supervision required to perform crack repair and seal South McKay Ave priority 24.

Additive 7: Provide labor, materials, equipment, and supervision required to perform crack repair and seal North McKay Ave and Parking Lot priority 25.

Additive 8: Provide labor, materials, equipment, and supervision required to perform crack repair and seal Thompson Drive Shuttle Area priority 26. In addition, design and construct the ribbon gutter as shown on the drawing for this roadway section. The design must be reviewed and approved by the government prior to beginning construction.

Additive 9: Provide labor, materials, equipment, and supervision required to perform crack repair and seal Parking Lot 3 priority 27.

Additive 10: Provide labor, materials, equipment, and supervision required to perform crack repair and seal East Thompson Drive priority 28.

Additive 11: Provide labor, materials, equipment, and supervision required to perform crack repair and seal pavement near building 4876 priority 29.

Upon completion of the repairs in all areas, new pavement markings will be put in place in the same locations as before the repair work was done. The contractor must make provisions as the work is being completed to insure he has marked the locations of all striping that will be removed and will need to be replaced.

NOTE: Drawings and maps are not to scale. The contractor must field verify the location and size of all cracks to be repaired.

Attachment I “Priority List”

Priority List

Priority Area # Name

1 AF Regulated Equipment Containment*

2 AE AGE Yard*

3 AD Tow Way Asphalt*

3 AD Tow Way Asphalt*

4 AC B4840*

4 AC B4840*

5 Z Taxiway Echo*

6 F Pavement near B4865 and B4856

7 AA B4823*

8 AB B4820*

9 V B4806*

9 V B4806*

10 R Grounding Grid*

11 B Parking Lot 2- in between B4800 and B4825*

12 E Loading dock area near B4825*

13 A Area between B4800, B4823, B4820*

13 A Area between B4800, B4823, B4820*

14 C Parking Lot 1*

15 D X-1E Circle*

16 H B4809*

17 I B4808*

18 J B4802 Parking*

19 G Parking Lot near B4811

20 L West Thompson

20 L West Thompson

21 O Central Thompson

21 O Central Thompson

22 M Walker Interior

23 N Walker Exterior

24 Q South McKay

25 P North McKay & Parking

26 Y Thompson A Area

27 T Parking Lot #3

28 X East Thompson

29 S Drive and Parking near B4876