8.4 - Exhibit D Attachment FRM-0226 Transmittal Sheet.pdf

PDF 412 KB Posted

Attached to
444783-CC-25 Geophysical Logging Federal contract opportunity
Solicitation number
444783CC25
Issued by
Department of Energy

About this file

This is a transmittal sheet form (FRM-0226) used for subcontract documentation by Mission Support and Test Services LLC (MSTS) in Las Vegas, Nevada. The form is designed to track the submission, review, and approval process of subcontract documents.

The form includes four main sections: Subcontractor section for initial submission details, STR (Subcontract Technical Representative) section for forwarding documents, Engineering section for technical review with four possible status levels (from "Work may proceed" to "Review not required"), and a final STR section for returning processed documents. The form allows for tracking approval status, file copies, submission dates, and includes spaces for signatures from the Subcontractor POC, STR, and Project Engineer. This appears to be a standard template form dated 01/29/18 (Revision 02) that would be used in connection with the geophysical logging services contract opportunity referenced in the metadata.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Company Form

FRM-0226

POST OFFICE BOX 98521

LAS VEGAS, NV 89193-8521

TRANSMITTAL SHEET - SUBCONTRACT

01/29/18 Rev. 02

SUBMITTAL

REQUEST FOR CLARIFICATION TRANSMITTAL NO.:

SU

B

C O

N

TR

A C

TO

R

Name of Subcontractor:

Address:

PO. No.: MSTS Subcontract No.: Date:

1. copies of the following data are transmitted for: Approval File

Please return copies.

Description:

Subcontractor POC:

POC Signature:

ST

2. To: Date:

Attention:

Forwarded copies for Approval File

Please return copies within Days or by date: STR:

STR Signature:

EN

G

IN

EE

R

IN

G

3. To: Received Date:

Attention: Transmitted Date:

Work may proceed. (Status 1)

Revise and resubmit – Work may proceed subject to resolution of indicated comments. (Status 2)

Revise and resubmit – Work may not proceed. (Status 3)

Review not required – Work may proceed. (Status 4) Project Engineer:

Comments Attached PE Signature:

ST

4. To: Date:

Address:

Copies Returned With Action as Indicated in Item 3, Above. STR:

STR Signature:

File details come from the government source that posted it. Updated .