This is an Addendum #001 to a Stage II Invitation to Bid issued by the State of Utah's Division of Facilities Construction and Management (DFCM) for Gunlock State Park Campground Improvements (Project #22225510). The project encompasses earthwork and site preparation including clearing, mass grading, and exposed rock face cutting; roadway and safety infrastructure construction with asphalt roadway, UTBC shoulders, pull-out areas, striping, signage, and guardrails; bridge construction including structure, riprap installation, and protective fencing; and comprehensive drainage and environmental restoration including culverts, catch basins, swales, check dams, erosion control, seed mix, retaining walls, bank stabilization, and native plantings. Only contractors prequalified under the DFCM Stage I Prequalification process and currently listed on the respective DFCM Prequalified Contractors list as of the solicitation date are eligible to submit bids. The addendum, dated July 29, 2026, requires bidders to acknowledge receipt of the addendum with their bid submission under penalty of disqualification. Solicitation schedule changes are documented in a Revised Solicitation document available in the U3P system.

The construction cost estimate for this project is $4,494,536.00. The addendum specifies that Payment and Performance Bonds are required for this work. No DFCM addendum items or Architect/Engineer addendum items are listed in this addendum. Bidders must include acknowledgment of addendum receipt with their proposals to remain eligible for consideration.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DFCM Addendum Cover Page, 2.26.2026

DFCM Addendum #001

Reference: Gunlock State Park Campground Improvements DFCM Project #22225510 U3P Event #CR27006

Date: July 29, 2026

To: Prequalified Site Civil contractors

From: The Division of Facilities Construction and Management

Note:

This

Addendum shall be included as part of the Contract Documents. Items in this Addendum apply to all drawings and specification sections whether referenced or not involving the portion of the work added, deleted, modified, or otherwise addressed in the Addendum. Bidders are required to acknowledge receipt of this Addendum when their bid is submitted. Failure to do so may subject the Bidder to disqualification.

Addendum Items

Solicitation Schedule Changes: See the ‘Revised Solicitation’ document attached under the ‘Supporting Documents’ in U3P. Changes have been made to the following events:

Payment & Performance Bonds are required.

DFCM Addendum Items: N/A

Click to enter text Click to enter text Click to enter text

A/E Addendum Items: N/A Click to enter text

Total Attached Pages: 0

File details come from the government source that posted it. Updated .