8 - Cost Estimate Worksheet.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- 36C78625B0015
About this file
The document is a Cost Estimate Worksheet for a construction project at Fort Custer National Cemetery, associated with Solicitation Number 36C78625B0015 issued by the Department of Veterans Affairs National Cemetery Administration. The worksheet provides a comprehensive template for contractors to detail project costs across multiple construction divisions, including general conditions, site investigation, and potential work in areas such as concrete, masonry, electrical, mechanical, and utility systems.
The worksheet requires contractors to break down costs by division, with sections for unit of measure, number of units, unit cost, and total extended cost. It includes line items for various construction aspects like mobilization, site investigation, and potential work in divisions ranging from general requirements to specialized areas like communications and electronic safety. The template also allows for additional cost calculations including insurance, bonding, overhead, and profit, enabling a comprehensive and detailed cost proposal for the cemetery improvement project involving renovation of Maintenance Building 3001 and repair/repaving of asphalt roads.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S02 Barrancas 36C78625B0015 0003.pdf | ||
| C03 Mod 00002 Barrancas RFI E 502.docx | DOCX document | |
| Amendment 00001 36C78625B0015 Barrancas RFI QA .docx | DOCX document | |
| 3-828CM3028_Barrancas_BidDocuments.pdf | ||
| 3-Barrancas NC_Combined Specifications-20250402.pdf | ||
| 4-828CM33028_SOW_Barrancas_GSEandCemImprove_20250402.docx | DOCX document | |
| P07 Escambia Building.txt | TXT text file | |
| 3-828CM3028_31 20 00_1 Geotechnical Report.pdf | ||
| 36C78625B0015_1.docx | DOCX document | |
| P07 Escambia Highway.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| IFB Contractor Cost Estimate Worksheet |
| Lump Sums are required for each Division that will be utilized in this project to total the Final Lump Sum number. |
If a Division is not being used put N/A in that field.
Additional lines/items can be added if needed or appropriate.
| Offeror shall use and edit to fit Task Order Project |
| Project Number: |
| Solicitation Number: |
| Project Title: |
| Division | Unit of Measure | # of Units | Unit Cost $ | Extended/Total Cost $ | Comments / Remarks |
| Division 0 - Special Sections | |||||
| General Conditions and Administration | JB | 1 | |||
| Division 01 - General Requirements | |||||
| Mobilization | JB | 1 |
| Division 02 - Existing Conditions | ||
| Site Investigation | JB | 1 |
| Division 03 - Concrete |
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastic, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings (Doors, Windows, etc...)
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12- Furnishings
Division 13 - Special Construction
Division 14 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heat, Ventilating, and Air Conditioning
Division 25 - Integrated Automation
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
| Mechanical, Electrical, Plumbing Subtotal | ||
| General Construction Subtotal | ||
| Total Base Construction Cost | ||
| Insurance (if applicable) | ||
| Bonding (if applicable) | ||
| Overhead | ________ % | $0.00 |
| Profit | ________ % | $0.00 |
| GRAND TOTALS | $ |