ADDENDUM NO. 1 – UPPER LEACOCK TOWNSHIP MUNICIPAL AUTHORITY NEW HOLLAND PIKE LOW-PRESSURE FORCE MAIN REPLACEMENT PROJECT

This addendum modifies contract documents for the New Holland Pike Low-Pressure Force Main Replacement Project issued by the Upper Leacock Township Municipal Authority. The project involves construction of a low-pressure force main sewer system with associated appurtenances including HDPE and PVC piping, gravity sewer line, precast sanitary sewer manholes, plug valves, ball valves, air release valves, lateral connections, and surface restoration work. The addendum, issued October 19, 2026, clarifies that manhole MH-621B will be installed as a standard precast concrete manhole rather than a doghouse manhole, eliminates the originally proposed force main alignment along the sidewalk in favor of an alignment within the roadway travel lane, and adds a new specification section requiring temporary bypass pumping systems to maintain continuous flow during manhole installation. The bid form reflects estimated quantities including 8,351 linear feet of 12-inch HDPE force main in improved areas, 1,472 linear feet of 10-inch HDPE force main, 1,250 linear feet of 1.5-inch service laterals, 16 vertical feet of precast sanitary sewer manholes, 180 lateral reconnections, and various valve installations. Online bid submission closes at 10:00 AM on November 5, 2026, with a voluntary pre-bid meeting scheduled for October 29, 2026 at 1:00 PM. Bidders must complete the work within 315 calendar days after contract commencement and achieve substantial completion within 14 days thereafter.

Bidders must submit a certified check or bid bond equal to 10 percent of the total bid amount, and the successful bidder must furnish performance and payment bonds totaling 100 percent of the contract price. All bidders must bid on every item listed on the bid form and complete a minimum of 50 percent of the work with their own forces. The project is subject to Pennsylvania Prevailing Wage Act requirements, Federal Occupational Safety and Health Act conditions, Pennsylvania Act 229 of 2002, the Pennsylvania One Call Act (Underground Utility Line Protection Law), and Pennsylvania Human Relations Act Section 222 non-discrimination provisions. One Call notification was submitted with a response due date of October 2, 2026, and responses were received from multiple utility providers including PPL Electric, Buckeye Partners (gas), UGI Utilities, Comcast, Frontier Communications, Verizon, and Upper Leacock Township Municipal Authority. Temporary bypass pumping system design, installation, and operation are the contractor's responsibility, requiring 24-hour daily monitoring and on-call repair services with a peak instantaneous pumping capacity of 1,650 gallons per minute. The contractor must employ a vendor with minimum five years of continuous specialization in temporary bypass pumping systems in wastewater applications and demonstrate service capability within four hours of a service call.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3020 Columbia Ave., Lancaster, PA 17603 ● Phone: (800) 738-8395

E-mail: rettew@rettew.com ● Web site: re)ew.com

ADDENDUM NO. 01

October 19, 2026

To: All Prospective Bidders

RE: Upper Leacock Township Municipal Authority

New Holland Pike Low-Pressure Force Main Replacement Project

Contract 2026-04

RETTEW Project No. 0571401439

Dear Bidders:

The following Addendum No. 01 is hereby made to the contract documents for the above-referenced project. Any additions, clarifications, or deletions described in this Addendum take precedence over any instructions at conflict herein. All items in this Addendum shall be considered in preparation of your proposal for the referenced project.

Receipt of this Addendum shall be acknowledged by inserting this number and date in the space provided on the Bid Form. Failure to do so may result in disqualification of the Bidder. The addendum consists of

3 pages and the following attachments:

Specification 004110 – Bid Form Unit Price

Specification Section 015728 – Temporary Bypass Pumping Systems (First Issue - 6 pages)

Sheet G-01 (1 page)

Sheet C-08 (1 page)

Sheet EC-04 (1 page)

PROJECT MANUAL MODIFICATIONS

The Project Manual shall be modified as follows:

SECTION 004110 – BID FORM UNIT PRICE (RE-ISSUED)

Doghouse manholes have been changed to a quantity of 0, and the corresponding VF has been added to standard precast manholes since MH-621B will no longer be a doghouse manhole.

SECTION 015728 – TEMPORARY BYPASS PUMPING SYSTEMS (FIRST ISSUE)

Add Section 015728 – Temporary Bypass Pumping Systems to the Project Manual. Since MH-621B will no longer be installed as a doghouse manhole, bypass pumping will be necessary to ensure continuous flow during manhole installation.

Addendum No. 01

Upper Leacock Township Municipal Authority/New Holland Pike Low-Pressure Force Main Replacement Project

RETTEW Project No. 0571404139

SECTION 330513 – MANHOLES AND STRUCTURES

The interior of the manholes, including the wall, cone, and base section shall be provided with a polypropylene liner. This does not pertain to Air Release Valve Vaults. ARV vaults will have interior PVC liner as currently specified in 2.1(A)(11)(b)(2). The base sections of the ARV vaults will be coated with a

100% solids epoxy, SW Duraplate 6100 or approved equal (Refer to Detail 1 – Combination Air

Release/Vacuum Valve Vault Detail on Sheet D-02).

In order to implement the required liners in the contract documents, Section 330513 – Manholes and

Structures is to be revised as follows:

Remove Section 2.1(A)(11)(a) in its entirety. The white epoxy coating will not be utilized as part of this project.

Remove Section 2.1(A)(11)(b) in its entirety and replace with the following language:

b.1 Precast Reinforced Concrete Manholes (MH-621A & MH-621B)

a) Manhole bases shall be furnished with factory-installed, corrosion resistant polypropylene liners designed to protect the concrete from corrosion due to the presence of hydrogen sulfide and other corrosive chemicals commonly present in wastewater atmospheres.

Liners shall provide continuous coverage of the manhole invert channels and benching and shall be securely anchored to the concrete to prevent separation or displacement.

Liners shall be molded to accommodate the specified pipe sizes, channels configurations, and flow directions. Connections to the influent and effluent piping shall be watertight and compatible with the liner system. Manhole base liners shall be PREDL Polypropylene

Manhole Base Liners, as manufactured by PREDL Systems, or approved equal.

b) Precast concrete manhole risers and cone sections shall be furnished with factory-installed polypropylene liners designed to protect the concrete from corrosion due to the presence of hydrogen sulfide and other corrosive chemicals commonly present in wastewater atmospheres. Liners shall provide continuous coverage of the interior manhole walls and cone surfaces and shall be securely anchored to the concrete to prevent separation or deformation. Liner joints shall be sealed in accordance with the manufacturer’s recommendations to provide a continuous, watertight, and corrosion-resistant barrier. All penetrations and transitions shall be sealed to prevent exposure of the concrete. Manhole wall and cone liners shall be PREDL polypropylene CORPROTECT lining system, as manufactured by PREDL Systems, or an approved equal.

3) Connections between the manholes base liner and riser liner shall be sealed to form a continuous, watertight, and corrosion-resistant barrier.

DRAWING MODIFICATIONS

The Contract Drawings shall be modified as follows:

SHEET NO. G-01 (RE-ISSUED)

Delete Sheet G-01 and replace it with the revised sheet, which includes an updated One Call Matrix.

Addendum No. 01

Upper Leacock Township Municipal Authority/New Holland Pike Low-Pressure Force Main Replacement Project

RETTEW Project No. 0571404139

SHEET NO. C-01

MH-621B, as shown on Sheet C-01, shall be installed as a precast concrete manhole rather than a doghouse manhole.

SHEET NO. C-08 (RE-ISSUED)

Delete Sheet C-08 and replace it with the revised sheet. The revised sheet eliminates the originally proposed force main alignment along the sidewalk and establishes the alternative alignment within the roadway travel lane as the required alignment for construction. The forcemain shall be installed in accordance with the revised Sheet C-08. Note that these changes were already reflected in the originally issued bid form quantities.

SHEET NO. EC-04 (RE-ISSUED)

Delete Sheet EC-04 and replace it with the revised sheet. The revised sheet eliminates the originally proposed force main alignment along the sidewalk and establishes the alternative alignment within the roadway travel lane as the required alignment for construction. The forcemain shall be installed in accordance with the revised Sheet EC-04. The Limit of Disturbance has been updated to indicate the changes.

SHEET NO. D-03

Detail 2/D-03, “Doghouse Sanitary Manhole Base,” on Sheet D-03 shall be disregarded. MH-621B shall not be installed as a doghouse manhole.

END OF ADDENDUM

ADDENDUM NO. 1 – ISSUED 10/19/2026

BID FORM 004110 - 1

RETTEW Project No.: 0571404139 Contract No. 2026-04

BID FORM

Project Identification: Contract No. 2026-04 – General Construction

RETTEW Project No.: 0571404139

Name of Bidder:

This Bid is submitted to: Upper Leacock Township Municipal Authority

161 Newport Road

Leola, PA 17540

1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an

Agreement with OWNER in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid price and within the Bid Times indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents.

2. Bidder accepts all of the terms and conditions of the Invitation to Bid and Instructions to

Bidders, including without limitation those dealing with the disposition of Bid Security.

This Bid will remain subject to acceptance for 60 days after the day of Bid opening unless award is delayed by a required approval of another government agency, the sale of bonds, or the award of a grant or grants, in which case this Bid shall remain subject to acceptance for 120 days after the bid opening date as provided by the Act of November 26, 1978 (P.L.

1309, No. 317), as amended by the Act of December 12, 1994 (P.L. 1042, No. 142). Bidder will sign and deliver the required number of counterparts of the Agreement with the Bonds and other documents required by the Bidding Requirements within 15 days after the date of OWNER'S Notice of Award.

3. In submitting this Bid, Bidder represents, as more fully set forth in the Agreement, that:

a. Bidder has examined and carefully studied the Contract Documents and the following Addenda receipt of all which is hereby acknowledged:

b. Bidder has visited the site and become familiar with and is satisfied as to the general, local and site conditions that may affect cost, progress, performance and furnishing of the Work.

c. Bidder is familiar with and is satisfied as to all federal, state and local laws and regulations that may affect cost, progress, performance and furnishing of the Work.

d. If applicable, Bidder has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site (except underground facilities) that have been identified in the

Supplementary Conditions as referenced in Article 4 of the General Conditions.

Bidder accepts the determination set forth in Paragraph SC-4.02 of the

BID FORM 004110 - 2

RETTEW Project No.: 0571404139 Contract No. 2026-04

Supplementary Conditions of the extent of the "technical data" contained in such reports and drawings upon which Bidder is entitled to rely as provided in Article 4 of the General Conditions. Bidder acknowledges that such reports and drawings are not Contract Documents and may not be complete for Bidder's purposes. Bidder acknowledges that OWNER and ENGINEER do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Contract

Documents with respect to underground facilities at or contiguous to the site. Bidder has obtained and carefully studied (or assumes responsibility for having done so) all such additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and underground facilities) at or contiguous to the site or otherwise that may affect cost, progress, performance or furnishing of the Work or that may relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by

Bidder and safety precautions and programs incident thereto. Bidder does not consider that any additional examinations, investigations, explorations, tests, studies or data are necessary for the determination of this Bid for performance and furnishing of the Work in accordance with the times, price and other terms and conditions of the Contract Documents.

e. Bidder is aware of the general nature of the Work to be performed by OWNER and others at the site that relates to work for which this Bid is submitted as indicated in the Contract Documents.

f. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the site, reports and drawings identified in the

Contract Documents and all additional examinations, investigations, explorations, tests, studies and data with the Contract Documents.

g. Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities or discrepancies that Bidder has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to Bidder, and the Contract

Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted.

h. This Bid is genuine and not made in the interest of or on the behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; Bidder has not solicited or induced any person, firm or corporation to refrain from bidding; and Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER. Bidder is aware that they must complete a minimum of fifty (50) percent of the work on the project with its own forces.

4. Bidder will complete the Work in accordance with the Contract documents for the prices entered into the electronic Bid Form on the PennBID website, which is located under the

“Bid” tab. (The electronic Bid Form may be downloaded and printed for the Bidder’s use.)

the unit price summation is identified as:

BID FORM 004110 - 3

CONTRACT NO. 2026-04

Item

Estimated

Quantity

Unit

Unit Price

Total Price

GENERAL CONDITIONS

1 Mobilization/Demobilization and Closeout 1 LS

2 Erosion and Sedimentation Control 1 LS

3 Maintenance and Protection of Traffic 1 LS

DEMOLITION

4 Small Tree/Shrub Removal 5 EA

5 Demolition of Existing Valve Vaults/Manholes 7 EA

HDPE LOW-PRESSURE SEWER LINE (OPEN CUT)

6A 3” HDPE DR-17 Force Main (Improved Area) 53 LF

6B 4” HDPE DR-17 Force Main (Improved Area) 18 LF

6C 6” HDPE DR-17 Force Main (Improved Area) 489 LF

6D 8” HDPE DR-17 Force Main (Improved Area) 68 LF

6E 8” HDPE DR-17 Force Main (Unimproved Area) 126 LF

6F 10” HDPE DR-17 Force Main (Improved Area) 1472 LF

6G 12” HDPE DR-17 Force Main (Improved Area) 8351 LF

6H 12” HDPE DR-17 Force Main (Unimproved Area) 760 LF

6I 1.5” HDPE DR-11 Service Lateral 1250 LF

PVC LOW-PRESSURE SEWER LINE (OPEN CUT)

7A 2” PVC SDR-21 Force Main (Improved Area) 26 LF

7B 2.5” PVC SDR-21 Force Main (Improved Area) 5 LF

PVC GRAVITY SEWER (OPEN CUT)

8 12” PVC SDR-35 Gravity Sewer Line (Improved Area, 0’-8’

Deep)

23 LF

9 4’ Pre-Cast Sanitary Sewer Manhole 16 VF

10 4’ Doghouse Sanitary Sewer Manhole 0 VF

11 Standard Manhole Frame and Cover 2 EA

FORCEMAIN VALVES

12A 3” Plug Valve & Box 1 EA

12B 4” Plug Valve & Box 4 EA

12C 6” Plug Valve & Box 2 EA

12D 8” Plug Valve & Box 1 EA

12E 12” Plug Valve & Box 5 EA

13A 2” Ball Valve & Box 4 EA

13B 2.5” Ball Valve & Box 1 EA

14 4” Insertion Valve 1 EA

15 3” Combination Air Release Valve & Vault 5 EA

MAINLINE CONNECTIONS

16 Mainline Interconnections 12 EA

17 Dart Interconnection & South Maple Vault Rehab 1 LS

LATERAL CONNECTIONS

18 Lateral Reconnection (Short Side) 98 EA

19 Lateral Reconnection (Long Side) 82 EA

MISCELLANEOUS

20 Unclassified Excavation (Contingent) 100 CY

BID FORM 004110 - 4

Item

Estimated

Quantity

Unit

Unit Price

Total Price

21A Unmarked Utility Repair (Contingent) - Telecom 3 EA

21B Unmarked Utility Repair (Contingent) – 6” Waterline 3 EA

21C Unmarked Utility Repair (Contingent) – 8” Waterline 3 EA

21D Unmarked Utility Repair (Contingent) – Water Lateral 3 EA

21E Unmarked Utility Repair (Contingent) – Gas Main 3 EA

21F Unmarked Utility Repair (Contingent) – Gas Lateral 3 EA

21G Unmarked Utility Repair (Contingent) – Sanitary Sewer

Lateral

3 EA

22A Line Stops/Mech Plugs (Additional, Contingent) – 2” 2 EA

22B Line Stops/Mech Plugs (Additional, Contingent) – 2.5” 2 EA

22C Line Stops/Mech Plugs (Additional, Contingent) – 3” 2 EA

22D Line Stops/Mech Plugs (Additional, Contingent) – 4” 2 EA

SURFACE RESTORATION

23 Unimproved Surface - Lawns/Field 1003 LF

24 Improved Surface - Gravel 150 LF

25 Improved Surface – Asphalt Driveway 50 LF

26 Improved Surface – Municipal Road 430 LF

27 Improved Surface – Concrete Sidewalk 420 LF

28 Improved Surface – Full Depth State Road Restoration 10744 LF

29 Improved Surface – Temporary Road Restoration (State &

Municipal)

11174 LF

30 Improved Surface – Concrete curb 250 LF

TOTAL UNIT PRICE BASE BID SUMMATION: (figures)

Dollars and Cents (written)

5. Bidder agrees that the Work will be substantially complete within 315 calendar days after the date when the contract time commences to run as provided in Paragraph 2.03 of the

General Conditions, and completed and ready for final payment within 14 calendar days after the date of Substantial Completion. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the times specified in the Agreement.

6. The following shall be submitted with the BID on the PennBID website: Bid Security, Bid

Form Certification, Non Collusion Affidavit, Workers Comp Affidavit, Public Works

Employment Verification, CFA Non Discrimination Sexual Harassment Affidavit, Experience Questionnaire

7. Communications concerning this Bid shall be addressed to the address of Bidder indicated below or the following address:

8. The terms used in this Bid that are defined in the General Conditions or Instructions will have the meanings assigned to them in the General Conditions or Instructions.

BID FORM 004110 - 5

SUBMITTED on .

If Bidder is:

An Individual

By: (SEAL)

(INDIVIDUAL’S NAME)

doing business as

Business Address:

Phone No.:

A Partnership

(FIRM’S NAME)

(GENERAL PARTNER)

A Corporation

(CORPORATION’S NAME)

(STATE OF INCORPORATION)

(NAME OF PERSON AUTHORIZED TO SIGN)

(TITLE)

(Corporate Seal)

Attest:

(SECRETARY)

BID FORM 004110 - 6

A Joint Venture

(NAME)

(ADDRESS)

(NAME)

(ADDRESS)

Phone Number and Address for Receipt of Official Communications.

(Each joint venturer must sign. The manner of signing for each individual, partnership and corporation that is a party to the joint venture should be in the manner indicated above.)

Upper Leacock Township Municipal Authority October 2026

TEMPORARY BYPASS PUMPING SYSTEMS 015728-1

RETTEW Project No.: 0571404139 Contract 2026-04

DIVISION 01 – GENERAL REQUIREMENTS

SECTION 015728 - TEMPORARY BYPASS PUMPING SYSTEMS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions, apply to this Section.

1.2 SUMMARY

A. Furnish all labor, materials, equipment and incidentals required and install, field test, and operate temporary by-pass pumping systems as proposed by the Contractor for the purpose of diverting flow around work areas as required for construction activities.

B. The design, installation and operation of temporary by-pass pumping systems shall be the

Contractor's responsibility. The Contractor shall demonstrate to the Owner and Engineer that the company is qualified for the design and operation of temporary by-pass pumping systems.

The by-pass system shall meet the requirements of all codes and regulatory agencies having jurisdiction.

C. Maintain temporary by-pass pumping systems so that they are completely functional throughout the required period of service.

D. Following the required period of service, remove temporary by-pass pumping systems from site.

E. Provide all maintenance including manufacturer recommended preventive maintenance and on-call repair services. Contractor shall provide full-time on-site monitoring of bypass pumping while in operation, 24 hours per day, 7 days per week, and shall also be capable of providing repair services and/or replacement equipment 24 hours per day, seven days per week.

F. Should the Contractor elect to use diesel fuel for temporary by-pass pumping, the total storage quantity of fuel allowable at the site to operate the temporary pumps shall not exceed the sum of the individual fuel tank capacities furnished with each pump's diesel engine drive. Provide a refueling service to maintain continuous 24-hours per day, 7 days per week pumping system operation.

1.3 ACTION SUBMITTALS

A. Submit the following:

• A detailed description of each proposed temporary by-pass pumping system including pumps, pump drives, piping, hoses, valves, fittings, controls, wiring and any other related

TEMPORARY BYPASS PUMPING SYSTEMS 015728-2

accessories required to provide a complete operating system in conformance with the requirements of this Section.

• Detailed plans and sections showing the proposed pumping system layout including dimensions and elevations. Plan shall include but not be limited to the following:

a. Staging area and access requirements for all pumps.

b. Number, size, material, location and method of installation of suction piping.

c. Number, size, material, location and method of installation of discharge piping.

d. Pump size, capacity, number of units, diesel engine specifications, fuel tank capacity, fuel consumption requirements, and method of refueling.

e. Calculations of static lift, pipe size selection, friction losses, flow velocity and pump selection.

f. Pump curves showing pump operating range.

g. Proposed number of intermediate manholes in the line and businesses that need bypass pumping.

h. Proposed method of freeze protection.

i. Proposed method of noise control for each pump.

j. Temporary pipe supports, anchorage, cover material and other accessories as required to stabilize the piping system.

k. Installation schedule and maintenance schedule.

l. List of personnel responsible for 24-hour on-site pump monitoring services and phone numbers.

m. A minimum of five reference installations of projects with similar size in wastewater pumping applications. Include contact names and phone numbers.

n. List of recommended spare parts to be stored on-site for emergency maintenance.

• Provide information on the vendor's service staff capabilities and replacement parts inventory to show that the vendor has sufficient resources to provide emergency service and replacement equipment and/or parts to the work site within 4 hours of a service call.

• A description of system operation and controls. Include a list of all alarm conditions and procedures for correcting problems including equipment replacement.

• A description and schedule for the proposed procedures for startup and testing of the facilities to demonstrate compliance with specified automatic operation and maintenance of a constant discharge pressure.

• A plan of operations for inclement weather including snowstorms. The plan shall demonstrate the ability to maintain pumping system operations throughout inclement weather events.

1.4 QUALITY ASSURANCE

A. The Contractor shall demonstrate his experience or employ the services of a vendor who can demonstrate 5 years of recent and continuous specialization in the design, installation, operation and removal of temporary by-pass pumping systems in wastewater applications. The complete system shall be furnished from a single vendor who shall be capable of providing service staff, repair parts and replacement of any deficient system component within 4 hours of a service call, twenty-four hours per day, seven days per week.

1.5 SYSTEM DESCRIPTION

TEMPORARY BYPASS PUMPING SYSTEMS 015728-3

A. Pumping system control panels shall be NEMA 4 and include flow indication, a flow totalizer, indicator lamps showing which pumps are operating, selector switch for auto or manual start and stop for each pump and visual and audible alarms for indication of operation failure and alarm conditions.

1.6 MANUFACTURER'S SERVICES

A. Provide the services of the manufacturer's representative as specified herein.

B. Provide the services of the manufacturer's representative for physical checkout field testing and operation and maintenance instruction for a minimum of 1 person day per pumping system. See requirements in PART 3.

C. Provide the services of the manufacturer's representative or designated alternative, who shall be

ON-SITE 24-hours per day during all bypass pumping operations. Provide list of these designated personnel with telephone numbers prior to the start of bypass pumping.

PART 2 - PRODUCTS

2.1 GENERAL PUMPING EQUIPMENT

A. Furnish pumping units and all accessories from a single vendor. Each temporary by-pass pumping system shall be complete including pumps, drives, piping, piping headers, valves, flow meter, controls and appurtenances as required for a complete system.

B. The pumps, drives and controls shall be designed and built for 24-hour continuous service at any and all points within the required range of operation, without overheating, without cavitation, and without excessive vibration or strain. All parts shall be so designed and proportioned as to have the strength, stability and stiffness and be constructed to meet the specified requirements. Methods shall be provided for inspection, repairs, and adjustment.

C. All necessary foundation bolts, nuts, and washers shall be furnished.

D. Each piece of equipment shall be furnished with a nameplate (with embossed data) securely mounted to the body of the equipment. As a minimum, the nameplate for the pumps shall include the manufacturer's name and model number, serial number, rated flow capacity, head, speed and all other pertinent data. As a minimum, nameplates for drives shall include the manufacturer's name and model number, serial number, horsepower, speed, input voltage, amps, number of cycles and power and service factors.

E. Provide sound attenuation if required by Owner and comply with applicable noise ordinances for the equipment.

F. All equipment shall be suitable for outdoor operation under adverse weather conditions. Provide protection from freezing as required to maintain system operation.

TEMPORARY BYPASS PUMPING SYSTEMS 015728-4

G. Pumps shall be manufactured by Flygt, Goodwin Pumps of America, Bridgeport NJ; Acme

Dynamics, Plant City, FL; Thompson Pump and Manufacturing Co., Port Orange FL, or equal.

2.2 CONDITIONS OF OPERATION

A. Each pump shall be designed for the conditions of service specified herein. All pumps shall have a rising head capacity curve for stable pump operation from the minimum head operating point to the shut-off head.

• Design Capacity

a. Average Daily Flow: 389 GPM

b. Peak Daily Flow: 973 GPM

c. Instantaneous flow conditions have potential to exceed the peak daily flow.

Provisions shall be in place such that a peak instantaneous capacity of 1,650 GPM can be accommodated if necessary.

2.3 PUMPING SYSTEM COMPONENTS

A. All pumps shall be centrifugal, submersible or end suction, fully automatic self-priming units that do not require the use of foot-valves, vacuum pumps, diaphragm pumps, or isolation valves or float apparatus in the priming system.

B. Pump seals shall be high pressure, mechanical self-adjusting type with solid carbide faces capable of withstanding suction pressures to 100 psi without the pump running. The mechanical seal shall be cooled and lubricated in an oil bath reservoir, requiring no maintenance or adjustment. The oil bath reservoir shall not come in contact with or leak into the pumped water.

Each pump shall be capable of running dry, with no damage for extended periods of time. All pump seal metal parts shall be stainless steel. All elastomers shall be Viton.

C. Each pump shall be driven by a diesel engine or electric motor. Diesel engine shall be water cooled. If the Contractor uses electric motor driven pumps, all power costs are the responsibility of the Contractor.

D. If using diesel driven pumps, each pump and diesel engine shall be skid mounted with integral fuel tank and skid lifting bracket.

E. Provide automatic start/stop controls for the pumping system to automatically maintain system flow at each location. Controls shall be contained in a local control panel with provision to manually operate each pump, provide indication of pump operation, and indicate the total flow being pumped.

F. Provide all required suction and discharge pipe and fittings, discharge manifold pipe and fittings, shutoff valves, check valves, flow meter, pressure regulating valves, insulation, freeze protection, and all required accessories. All pipe and fittings shall be steel with flanged or quick connect coupling connections, or high-density polyethylene pipe with fused joints. All joints must be 100 percent restrained. Suction piping shall be rated for 25-in Hg vacuum. Discharge piping, fittings, connections, valves, and other discharge piping accessories shall be rated for a minimum working pressure of 150 psi.

TEMPORARY BYPASS PUMPING SYSTEMS 015728-5

PART 3 - EXECUTION

3.1 INSTALLATION AND PHYSICAL CHECKOUT

A. Installation shall be in accordance with the system supplier's recommendations and approved shop drawing submittals.

B. Critically silenced packs shall be utilized on each diesel-driven pumpsets and shall reduce the sound of the diesel-driven engine to 69 dBA at a distance of 30 feet if required by Owner.

C. Install pumping units on a firm level surface.

D. Furnish the services of the pump system supplier's representative for a minimum of one day per temporary by-pass system to assist equipment installation and physical checkout.

3.2 FIELD TESTING

A. Provide field testing in accordance with the approved shop drawing submittal. Field tests shall demonstrate conformance with system requirements.

B. The Contractor shall require that field testing be conducted by the pump system supplier's representative in the presence of the Engineer. Furnish the services of the pump system supplier's representative for a minimum of one day per temporary by-pass system to conduct required testing.

C. Field testing shall demonstrate a minimum of 24 hours of continuous operation. During the 24 hours of continuous operation, the system shall demonstrate the ability to automatically start and stop pumps in response to changing flow conditions.

D. Remove and replace any system component that fails to perform in accordance with specified requirements.

3.3 SYSTEM OPERATION

A. Perform all required maintenance on the equipment to maintain the system integrity and capacity as specified.

B. Provide clean-up and disposal of contaminated material and reporting for all product spills.

3.4 EQUIPMENT REMOVAL

TEMPORARY BYPASS PUMPING SYSTEMS 015728-6

A. At the completion of the period of service, disconnect all temporary piping and remove all system components from the site. Restore the work site to its original condition.

END OF SECTION

PA ONE CALL UNDERGROUND UTILITY PROTECTION ACT

ONE CALL SYSTEM SERIAL NUMBER:

PURSUANT TO THE PROVISIONS OF ACT NO. 287 OF 1974, AS AMENDED BY ACT

187 OF 1996, ACT 181 OF 2006, ACT 160 OF 2016 AND ACT 50 OF 2017 OF THE

PENNSYLVANIA STATE LEGISLATURE, RETTEW ASSOCIATES, INC. HAS

PERFORMED THE FOLLOWING IN PREPARING THESE DRAWINGS REQUIRING

EXCAVATION OR DEMOLITION WORK AT SITES WITHIN THE POLITICAL

SUBDIVISION(S) SHOWN ON THE DRAWINGS:

1. PURSUANT TO SECTION 4, CLAUSE (2) OF SAID ACT, RETTEW

ASSOCIATES, INC. REQUESTED FROM EACH FACILITY OWNER

DESIGNATED ON SUCH LIST PROVIDED BY THE ONE CALL SYSTEM

NOTIFICATION, THE INFORMATION PRESCRIBED BY SECTION 2, CLAUSE

(4) OF SAID ACT, NOT LESS THAN TEN (10) NOR MORE THAN NINETY (90)

BUSINESS DAYS BEFORE FINAL DESIGN IS TO BE COMPLETED.

2. PURSUANT TO SECTION 4, CLAUSE (5) OF SAID ACT, RETTEW

ASSOCIATES, INC. HAS MET THEIR OBLIGATIONS OF CLAUSE (2) BY

CALLING THE PENNSYLVANIA ONE CALL SYSTEM SERVING THE

LOCATION WHERE THE WORK IS TO BE PERFORMED, AND SHOWING

THE ASSOCIATED SERIAL NUMBER(S) ON THIS/THESE DRAWING(S).

3. PURSUANT TO SECTION 4, CLAUSE (3) OF SAID ACT, RETTEW

ASSOCIATES, INC. HAS SHOWN UPON THIS/THESE DRAWING(S) THE

POSITION AND TYPE OF EACH FACILITY, AS DERIVED PURSUANT TO THE

REQUEST MADE AS REQUIRED BY CLAUSE (2),

4. PURSUANT TO SECTION 4, CLAUSE (5) OF SAID ACT, RETTEW

ASSOCIATES, INC. HAS SHOWN UPON THIS/THESE DRAWING(S) THE

TOLL-FREE NUMBER FOR THE ONE CALL SYSTEM AND THE SERIAL

NUMBER(S) FOR THE ASSOCIATED ONE CALL SYSTEM NOTIFICATION(S),

ADDITIONALLY, RETTEW ASSOCIATES, INC. DOES NOT MAKE ANY

REPRESENTATION, WARRANTY, ASSURANCE OR GUARANTEE THAT THE

INFORMATION RECEIVED PURSUANT TO SAID REQUEST, AND AS REFLECTED ON

THIS/THESE DRAWING(S), IS CORRECT OR ACCURATE. INFORMATION REFLECTED

ON THIS/THESE DRAWING(S) IS SHOWN AS REQUIRED BY SAID ACT NO. 160 OF

2016, AND AS PROVIDED BY THE FACILITY OWNER PURSUANT TO SECTION 2,

CLAUSE (4) OF SAID ACT.

DATE:

CALL BEFORE YOU DIG!

PENNSYLVANIA LAW REQUIRES THREE (3)

WORKING DAYS NOTICE FOR CONSTRCTION

PHASE AND TEN (10) WORKING DAYS IN

DESIGN STAGE - STOP CALL1-800-242-1776

Response Due Date: 10/02/26 Survey Review Completed by: Date:

UTILITY/COMPANY

RESPONSE RCVD

(select one) TICKET #

RETTEW ACTION

Map/No Map

CONTACT

NAME

CONTACT

EMAIL

CONTACT

PHONE

KARL Auto Response

Electric PPL Electric Utilities Corporation 10/3/26 Clear 20262612747 Pamela Seitzer pdseitzer@pplweb.com (570) 368-5394

Gas Buckeye Partners 9/18/26 20262612747 Brian Barr bbarr@buckeye.com (610) 904-4156

10/3/26 Clear UGI Utilities Inc 9/18/26 20262612747 Geoffrey Ferguson gferguson@UGI.com (610) 807-3118

9/24/26 Luke MacNair macnairl@ugi.com (717) 413-1080

10/3/26 Engineering Completed

Communication Comcast/Cable Protection Services Inc 9/18/26 20262612747 Debbie King debbie_king@cableps.com (804) 562-3409

10/3/26 Engineering Completed

Frontier Communications of PA Inc 10/3/26 Clear 20262612747 Michael Navich Michael.Navich@FTR.com (570) 208-3375 Verizon Pennsylvania 10/3/26 Clear 20262612747 Office Personnel 1Call-Verizon-PADE@verizon.com

Water/Sewer Upper Leacock Township Municipal Authority/Upper Leacock Township 9/22/26 20262612747

Robert Fricke rfricke@ultwp.com (717) 656-9755

10/3/26 Engineering Completed ext 532

USDI Utility Safety and Design Inc 10/3/26 Clear 20262612747 Jason Brangers jason@usdi.us (502) 819-1338 Upper Leacock TMA/Upper Leacock Twp 10/3/26

Engineering Completed 20262612747 Derek Martin Dmartrin@ultwp.com (717) 656-9755 ext 554

/1

9/

FM

FM

FM

FM

FM

FM

FM

FM

FMFMFMFMFMFMFMFM

FMFMFMFMFMFMFMFM

FM

FM

FM

FM

FM

FM

FM

/1

9/

LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LOD LOD LOD

LO

D LOD LOD LOD

LO

D

LO

D LOD LOD LOD LOD LO

D

LOD LOD LOD LOD LOD LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD LOD LO

D

LO

D

LOD LOD LOD LOD LOD LOD LOD LOD LOD

LO

D LODLODLOD

LO

D

LO

D

LODLOD

LO

D

LO

DLODLOD

LOD

LOD

LOD

LO

D LOD LOD LOD LOD LOD LOD LOD

LO

D LODLOD

LO

D

LODLOD

LO

DLOD

LO

DLODLOD

LOD

/1

9/

File details come from the government source that posted it. Updated .