8-2-SB27007 - Ogden Regional Center Elevator Maintenance - Cost Proposal Form (3 year).xlsx
XLSX spreadsheet 73 KB Posted
- Solicitation number
- SB27007
- Issued by
- Weber County, Utah
About this file
This is a Cost Proposal Form for elevator maintenance services submitted by VBS Elevator to the State of Utah's Division of Facilities Construction and Management (DFCM) for the Ogden Regional Center under reference number SB27007. The form is structured for a three-year contract and requires contractors to provide pricing for scheduled maintenance services across multiple elevator system types, including traction elevators, hydraulic elevators, lifts, and other equipment categories. The proposal format requires contractors to itemize monthly maintenance costs per unit, quarterly maintenance costs per unit, and annual testing costs per unit for each contract year, along with hourly rates for repairs, overtime rates, and team-based repair rates. The form explicitly notes that five-year testing costs, repair services beyond scheduled maintenance, and other non-maintenance work must be billed independently and are not included in the total contract cost or the budget estimate provided in the solicitation.
The Cost Proposal Form indicates that all yellow-highlighted cells are mandatory fields, with orange cells required only when applicable. The form contains calculation fields for annual contract costs by year and three-year hourly rate averages, with the total contract cost to be computed from the entered maintenance pricing data. The document is dated 7.20.2026 and serves as the standardized pricing template that all bidders must complete and submit. Notably, the current form submission shows zero units across all equipment categories and zero dollar amounts, indicating this is either a blank template or a preliminary submission. As noted in the related invitation to bid, the contract term is three years, and the FY26 budget estimate is unavailable, though the budget does not account for five-year testing expenses.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VBS Elevator Cost Proposal
DFCM ELEVATOR MAINTENANCE 3 YEAR COST PROPOSAL FORM
| All YELLOW cells are required fields / ORANGE cells are required when applicable | |
| Contractor Name: | |
| U3P Reference #: | SB27007 |
| Building Name: | Ogden Regional Center |
| # of Traction Elevators: | |
| # of Hydraulic Elevators: | |
| # of Lifts: | |
| # of Other: | Description of 'Other': |
| Enter cost as a 'per unit' amount. | Five Year Testing* | Repair rates are not calculated into the Contract cost. | |||||||||||||
| Contract Year | System Type | # of Units | Monthly Maint / Unit | Annual Total | Quarterly Maint / Unit | Annual Total | Annual Testing / Unit | Annual Total | Annual Contract Cost by Year | 5 Year Test / Unit | Total 5 Year Test for Unit Type | Hourly Rate for Repairs | Overtime Rate for Repairs | Team Hourly Rate for Repairs | Team Overtime Rate for Repairs |
| 1 | Traction Elevators | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Hydraulic Elevators | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Lifts | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Other | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2 | Traction Elevators | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Hydraulic Elevators | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Lifts | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Other | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3 | Traction Elevators | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Hydraulic Elevators | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Lifts | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Other | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Five Year Testing Total for All Units* | Three Year Hourly Rate Averages | |||||
| Total Contract Cost: | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
*The cost of the five year testing is not included in the Total Contract Cost. The five year testing cost proposed shall be provided only if the testing requirement s scheduled to fall within the term of the Contract. The budget provided in the solicitation does not include the cost of the five year testing. The budget is inclusive of only the cost of scheduled maintenance. Five year testing, repairs, and work other than the scheduled maintenance must be billed to DFCM independently of the Contract billing for scheduled maintenance.
7.20.2026
Sheet1 isfCONTRACTs image1.png
File details come from the government source that posted it. Updated .