11-2-SB27007 - Ogden Juvenile Probation Elevator Maintenance - Cost Proposal Form (3 year).xlsx
XLSX spreadsheet 73 KB Posted
- Solicitation number
- SB27007
- Issued by
- Weber County, Utah
About this file
This file is a three-year cost proposal form for elevator maintenance services at the Ogden Juvenile Probation facility, prepared by the State of Utah's Division of Facilities Construction and Management (DFCM). The form is designed for contractors to submit pricing for maintenance services across multiple elevator system types, including traction elevators, hydraulic elevators, lifts, and other equipment categories. Contractors are required to propose monthly maintenance costs per unit, quarterly maintenance costs per unit, annual testing costs per unit, and hourly rates for repairs and overtime work across a three-year contract period. The form includes columns for calculating annual contract costs by year and total five-year testing costs, though five-year testing expenses are explicitly excluded from the total contract cost calculation and must be billed separately to DFCM.
The cost proposal form operates on a per-unit pricing structure with separate line items for each year of the three-year contract term. Contractors must enter all required information in yellow-highlighted cells and orange-highlighted cells where applicable, including monthly and quarterly maintenance rates, annual testing fees, hourly repair rates, and team-based repair rates for both regular and overtime work. The form notes that repair costs are not calculated into the base contract cost and that five-year testing, repairs, and work outside scheduled maintenance must be invoiced independently. The budget provided in the solicitation covers only scheduled maintenance costs, with no inclusion for five-year testing expenses or repairs that fall outside the maintenance agreement scope.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VBS Elevator Cost Proposal
DFCM ELEVATOR MAINTENANCE 3 YEAR COST PROPOSAL FORM
| All YELLOW cells are required fields / ORANGE cells are required when applicable | |
| Contractor Name: | |
| U3P Reference #: | SB27007 |
| Building Name: | Ogden Juvenile Probation |
| # of Traction Elevators: | |
| # of Hydraulic Elevators: | |
| # of Lifts: | |
| # of Other: | Description of 'Other': |
| Enter cost as a 'per unit' amount. | Five Year Testing* | Repair rates are not calculated into the Contract cost. | |||||||||||||
| Contract Year | System Type | # of Units | Monthly Maint / Unit | Annual Total | Quarterly Maint / Unit | Annual Total | Annual Testing / Unit | Annual Total | Annual Contract Cost by Year | 5 Year Test / Unit | Total 5 Year Test for Unit Type | Hourly Rate for Repairs | Overtime Rate for Repairs | Team Hourly Rate for Repairs | Team Overtime Rate for Repairs |
| 1 | Traction Elevators | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Hydraulic Elevators | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Lifts | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Other | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2 | Traction Elevators | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Hydraulic Elevators | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Lifts | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Other | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3 | Traction Elevators | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Hydraulic Elevators | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Lifts | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Other | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Five Year Testing Total for All Units* | Three Year Hourly Rate Averages | |||||
| Total Contract Cost: | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
*The cost of the five year testing is not included in the Total Contract Cost. The five year testing cost proposed shall be provided only if the testing requirement s scheduled to fall within the term of the Contract. The budget provided in the solicitation does not include the cost of the five year testing. The budget is inclusive of only the cost of scheduled maintenance. Five year testing, repairs, and work other than the scheduled maintenance must be billed to DFCM independently of the Contract billing for scheduled maintenance.
7.20.2026
Sheet1 isfCONTRACTs image1.png
File details come from the government source that posted it. Updated .