5-1 - SB27007 - Invitation to Bid - Ogden Elevator Maintenance.pdf
PDF 496 KB Posted
- Solicitation number
- SB27007
- Issued by
- Weber County, Utah
About this file
This invitation to bid is issued by the State of Utah Division of Facilities Construction and Management (DFCM) for elevator maintenance services at four Ogden facilities: Ogden Juvenile Court, Ogden Regional Center, Ogden Juvenile Probation, and Ogden 2nd District Courthouse. The contractor is responsible for providing full preventive maintenance services including cleaning, lubrication, adjusting, parts replacement, repair, and callback service for a total of 16 hydraulic elevators, 4 traction elevators, 1 dumb waiter, and 1 Terry Portable Chair Lift. The mandatory meeting and site visit is scheduled for December 8, 2026 at 9:00 AM at Ogden Regional Center; questions must be submitted by December 11, 2026; and bids are due electronically by December 28, 2026 at 3:00 PM. The contract award announcement is scheduled for December 30, 2026 at 5:00 PM. This is a three-year contract with an effective date of January 1, 2027 through December 31, 2030.
The contract budget for FY27 is not available. DFCM reserves the right to award to the responsive and responsible contractor with the lowest bid. All contractors must maintain Workers' Compensation Insurance at statutory limits, Commercial General Liability Insurance with minimum limits of $1,000,000 per occurrence and $3,000,000 aggregate, and Commercial Automobile Liability Insurance with minimum limits of $1,000,000 per occurrence if vehicles will be used. Certificates of insurance must be on file before contract commencement. Contractors must comply with Utah state license requirements and promptly respond to inquiries regarding financial responsibility. Monthly invoices must be submitted to DFCM via email at dfcmap@utah.gov. By submitting a bid, contractors certify that no products are forced labor products and that they are not restricted foreign entities as defined under Utah Code 63G-6a-121.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Division of Facilities Construction and Management Taylorsville State Office Building 4315 South 2700 West, 3rd Floor
Taylorsville, Utah 84129 dfcm.utah.gov | 801.957.7270
Invitation to Bid
Standard Low Bid Procurement for Elevator Maintenance Services
November 24, 2026
Ogden Juvenile Court Division of Facilities Construction and Management
165 West 20th Street
Ogden, Utah 84401
Ogden Regional Center Division of Facilities Construction and Management
2540 Washington Blvd
Ogden, Utah 84401
Ogden Juvenile Probation Division of Facilities Construction and Management
444 26th Street
Ogden, Utah 84401
Ogden 2nd District Courthouse Division of Facilities Construction and Management
2525 Grant Ave.
Ogden, Utah 84401
U3P Reference #SB27007
DFCM Invitation to Bid for Elevator Maintenance Services, 7.20.2026 2
Solicitation Summary The State of Utah Division of Facilities Construction and Management (DFCM) is requesting bids from Elevator Service Contractors for elevator maintenance at the service location(s) listed below:
Service Location:
Ogden Juvenile Court Division of Facilities Construction and Management 165 West 20th Street Ogden, Utah 84401
AND
Ogden Regional Center Division of Facilities Construction and Management 2540 Washington Blvd Ogden, Utah 84401
AND
Ogden Juvenile Probation Division of Facilities Construction and Management 444 26th Street Ogden, Utah 84401
AND
Ogden 2nd District Courthouse Division of Facilities Construction and Management 2525 Grant Ave.
Ogden, Utah 84401 U3P Reference #SB27007
Service Details:
As stated in the DFCM Elevator Maintenance Service Contract, Attachment C – Contract Service Requirements, the Contractor is responsible for furnishing all supplies, materials, parts, labor, labor supervision, tools, scaffolding, machinery, hoists, equipment (including employee safety equipment), lubricants, and technical information to provide proactive full preventive maintenance service including, but not limited to, cleaning, lubrication, adjusting, parts replacement, repair, and callback service. All work shall conform with the highest industry standards and best practices, and applicable laws for the complete vertical transportation systems detailed in the solicitation documents.
Equipment:
- Hydraulic Elevators:
o Ogden Juvenile Court: 5 o Ogden Juvenile Probation: 2 o Ogden Courthouse: 5, dumb waiter, and Terry Portable Chair Lift
- Traction Elevators:
o Ogden Regional Center: 4
- Other:
See photos of the elevator identification plates are included in the ‘Supporting Documents’ section of the U3P event.
Contact Information:
isfcontracts@utah.gov
Contract Information:
FY27 Contract Budget: $Unavailable Contract Period: 3 Contract Period Effective Date: January 1, 2027 Contract Period Termination Date: December 31, 2030 https://utah.bonfirehub.com/portal/?tab=openOpportunities mailto:isfcontracts@utah.gov
DFCM Invitation to Bid for Elevator Maintenance Services, 7.20.2026 3
Solicitation Schedule
Event Date Time Location
Solicitation Posting Tuesday, November 24, 2026 3:00 PM U3P
Mandatory Meeting Tuesday, December 8, 2026 9:00 AM
The Mandatory Meeting will be held at the service location. Please meet in the lobby of Ogden Regional Center.
Questions Deadline Friday, December 11, 2026 3:00 PM U3P
Addendum Deadline Tuesday, December 15, 2026 3:00 PM U3P
Bid Deadline Monday, December 28, 2026 3:00 PM U3P Announcement of Awarded Contractor
Wednesday, December 30, 2026 5:00 PM U3P https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities
DFCM Invitation to Bid for Elevator Maintenance Services, 7.20.2026 4
Solicitation Documents
Solicitation Documents and Forms The solicitation documents consist of all documents listed below and referenced within this solicitation. The following solicitation specific documents and forms can be accessed in the U3P project for this solicitation:
Solicitation specific documents:
- Invitation to Bid Solicitation
- Photos of Equipment Identification Plates Standard documents and forms:
- DFCM Elevator Maintenance Service Contract, including:
Attachment A, State of Utah Agency Standard Terms and Conditions for Goods and/or Services Attachment B, Contract Payment Schedule Attachment C, Contract Service Requirements
- All DFCM standard documents referenced in this solicitation can be accessed by visiting DFCM website.
https://dfcm.utah.gov/
DFCM Invitation to Bid for Elevator Maintenance Services, 7.20.2026 5
Procurement Process
1. Mandatory Meeting A mandatory meeting and site visit will be held at the service location on the time and date specified on the Solicitation Schedule. All Contractors wishing to bid on these services must attend this meeting.
2. Requests for Information, Questions and Addendum All solicitation related requests for information, clarifications, and questions must be submitted to DFCM via the U3P website no later than the time and date specified on the Solicitation Schedule. An addendum in response will be posted on the U3P website no later than the time and date specified on the Solicitation Schedule. All addenda issued shall become part of the solicitation, and any changes or additional requirements shall be incorporated into the Contractor’s bid.
3. Bid Deadline Bids are to be submitted electronically through the U3P website until the bid deadline listed in the Solicitation Schedule.
It is the sole responsibility of the Contractor to ensure their bid reaches U3P before the bid deadline.
Contractors attempting to submit bids through the U3P website after the bid deadline has passed will not be successful and therefore disqualified from consideration of award of this Contract.
Technical questions related to U3P should be directed to u3padmin@utah.gov.
4. Bidding Requirements Before submitting a bid, each Contractor shall carefully examine the solicitation documents and shall visit the site services will be provided for; shall fully inform themselves as to all existing conditions and limitations; and shall include in the their bid the cost of all work necessary to satisfactorily fulfill the requirements of the Contract.
If the Contractor observes that portions of the solicitation documents are incompliant with applicable laws, rules, and regulations or contain obvious erroneous or uncoordinated information, the Contractor shall promptly notify the DFCM Representative and the necessary changes shall be accomplished by addendum.
DFCM reserves the right to cancel any Contract in which the Contractor cannot meet the terms of the Contract and requirements for the amount of their bid.
6. Bid Evaluation and Contract Award Bids will be evaluated after the bid deadline specified on the Solicitation Schedule. DFCM will publicly post the bid tabulation document in U3P no later than the date and time specified on the Solicitation Schedule. DFCM intends to award the contract to the responsive and responsible Contractor with the lowest bid.
A copy of the Contract the successful Contractor will be required to sign can be accessed in the ‘Supporting Documentation’ section of the U3P solicitation and is part of this solicitation. The term of the Contract will be as indicated in this solicitation.
By submitting a cost proposal or bid, in any format, the Contractor / Bidder / Vendor certifies that: 1) no product to be supplied by the Contractor / Bidder / Vendor in connection with this solicitation is a “forced labor product” as that term is defined in Utah Code 63G-6a-121; and 2) to the extent, if any, that this solicitation involves technology, or technology services, networks or systems, the Contractor / Bidder / Vendor is not a “restricted foreign entity” as that term is defined in Utah Code 63G-6a-121.
7. Contractor’s Insurance Section 18 of the DFCM Elevator Maintenance Service Contract, Attachment A - State of Utah Agency Standard Terms and Conditions for Goods and/or Service requires Contractors to provide and maintain the insurance coverage stated below. The Certificate of Insurance, showing up-to-date coverage, shall be on file with DFCM before the Contract may commence.
- Workers’ compensation insurance during the term of this Contract for all its employees and any subcontractor employees related to this Contract. Workers’ compensation insurance shall cover full liability https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities https://utah.bonfirehub.com/portal/?tab=openOpportunities mailto:u3padmin@utah.gov
DFCM Invitation to Bid for Elevator Maintenance Services, 7.20.2026 6 under the workers’ compensation laws of the jurisdiction in which the work is performed at the statutory limits required by said jurisdiction.
- Commercial general liability [CGL] insurance from an insurance company authorized to do business in the State of Utah. The limits of the CGL insurance policy will be no less than one million dollars ($1,000,000.00) per person per occurrence and three million dollars ($3,000,000.00) aggregate.
- Commercial automobile liability [CAL] insurance from an insurance company authorized to do business in the State of Utah. The CAL insurance policy must cover bodily injury and property damage liability and be applicable to all vehicles used in your performance of services under this Contract whether owned, non-owned, leased, or hired. The minimum liability limit must be $1,000,000 per occurrence, combined single limit. The CAL insurance policy is required if Contractor will use a vehicle in the performance of this Contract.
The State reserves the right to require higher or lower insurance limits where warranted. Failure to provide proof of insurance as required will be deemed a material breach of this Contract. Contractor’s failure to maintain this insurance requirement for the term of this Contract will be grounds for immediate termination of this Contract.
8. Withdrawal of Bids Bids may be withdrawn on written request received by DFCM from the Contractor prior to the bid deadline. Negligence on the part of the Contractor in preparing the bid confers no right for withdrawal after it has been opened.
9. DFCM Reservation of Rights The Division of Facilities Construction and Management reserves the right to reject any or all bids or to waive any formality or technicality in any bid in the best interest of the State.
Any Contractor who is found to be incompliant with the requirements set forth in the solicitation or Contract may be debarred from consideration for award of any Contracts for a period of up to three years.
10. Licensure The Contractor shall comply with the license laws as required by the State of Utah.
11. Financial Responsibility of Contractors Contractors shall respond promptly to any inquiry by the DFCM to any concern of financial responsibility of the Contractor.
12. Monthly Invoicing Requirements Contractors are required to submit their monthly invoices to DFCM via email to dfcmap@utah.gov.
mailto:dfcmap@utah.gov
File details come from the government source that posted it. Updated .