8-08-Exhibit F 2026 Street Pres 26-3443.pdf
PDF 1 MB Posted
- Attached to
- 2026 Street Preservation
- Solicitation number
- 26-3443
- Issued by
- Deschutes County, Oregon
About this file
This document is the Technical and Supplemental Specifications for the 2026 Street Preservation City Project (ST26FA) issued by the City of Bend, Oregon, located at 710 NW Wall Street, Bend, Oregon 97703. The specifications govern the construction of 7.5 lane miles of asphalt concrete pavement restoration work involving 2-inch grind with 2-inch inlay and 4-inch grind with 4-inch inlay treatments. The project encompasses temporary features, roadwork, base preparation, wearing surfaces, pavement markings, electrical systems, and water supply systems. Key work includes mobilization, traffic control accommodations, cold plane pavement removal, aggregate base placement, asphalt concrete pavement installation with statistical acceptance testing, pavement markings installation, concrete sidewalks and curb ramps, and removal of abandoned electrical systems. Approximately 118 tons of emulsified asphalt tack coat will be required for the project. The specifications incorporate the 2021 Oregon Standard Specifications for Construction as baseline requirements, with special provisions modifying specific sections to address local conditions and project requirements.
The specifications establish comprehensive technical requirements for materials, construction methods, quality control, and payment procedures. Work zone traffic control is subject to strict lane closure restrictions, with most streets maintaining two-way traffic during non-work hours (6:30 p.m. to 7:00 a.m. on weekdays and 6:30 p.m. Friday to 7:00 a.m. Monday on weekends for day work; reverse hours for night work). The contractor must provide snow and ice removal for streets with traffic control devices or disturbed pavement when accumulations exceed 2 inches on arterial/collector streets. Asphalt concrete pavement is measured on a weight basis with no separate payment for asphalt cement in the mixture, and no bonus payments are available. Erosion and sediment control compliance with NPDES 1200-C permits and local agency requirements is mandatory, with wet season work defined as October 1 through June 30. ADA accessibility requirements for curb ramps and pedestrian facilities must conform to PROWAG standards, verified using smart levels. Contractor responsibility includes tree preservation plans for protected trees, proper vegetation handling during grubbing operations, and correction of deficient structures at no additional cost to the City.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2026 Street Preservation City Project No. ST26FA
Technical and Supplemental Specifications
City of Bend 710 NW Wall Street, Bend, Oregon 97703
Page | 1 January 2022
Table of Contents
PART 00200 – TEMPORARY FEATURES AND APPURTENANCE
Section 00210 - Mobilization
Section 00220 - Accommodations for Public Traffic
Section 00221 - Common Provisions for Work Zone Traffic Control
Section 00222 – Temporary Traffic Control Signs
Section 00223 - Work Zone Traffic Control Labor and Vehicles
Section 00224 - Temporary Traffic Channelizing Devices
Section 00225 - Temporary Pavement Markings
Section 00226 - Temporary Roadside Barriers and Impact Attenuators
Section 00228 - Temporary Pedestrian and Bicyclist Routing
Section 00231 - Temporary Access Road
Section 00270 - Temporary Fences
Section 00280 - Erosion and Sediment Control
Section 00290 - Environmental Protection
PART 00300 – ROADWORK
Section 00310 - Removal of Structures and Obstructions
Section 00320 - Clearing and Grubbing
Section 00330 - Earthwork
Section 00331 - Subgrade Stabilization
Section 00340 - Watering
Section 00440 - Commercial Grade Concrete
Section 00470 - Manholes, Catch Basins, and Inlets
Section 00480 - Drainage Curbs
Section 00490 - Work on Existing Sewers and Structures
PART 00600 – BASES 37
Section 00620 - Cold Plane Pavement Removal
Section 00640 - Aggregate Base and Shoulders
PART 00700 – WEARING SURFACES
Section 00730 - Emulsified Asphalt Tack Coat
Section 00745 - Asphalt Concrete Pavement - Statistical Acceptance
Section 00749 - Miscellaneous Asphalt Concrete Structures
Section 00759 - Miscellaneous Portland Cement Concrete Structures
Section 00850 - Common Provisions for Pavement Markings
Page | 2
Section 00855 - Pavement Markers
Section 00856 - Surface Mounted Tubular Markers
Section 00860 - Longitudinal Pavement Markings - Paint
Section 00865 - Longitudinal Pavement Markings - Durable
Section 00867 - Transverse Pavement Markings - Legends and Bars
Section 00950 - Removal of Electrical Systems
Section 00960 - Common Provisions for Electrical Systems
Section 00990 - Traffic Signals
PART 01100 – WATER SUPPLY SYSTEMS
Section 01150 - Potable Water Valves
Section 02910 – Sign Materials
Page | 3
TECHNICAL SPECIFICATIONS
Boiler Plate changes from ODOT to 2021 Oregon Standard Specifications for construction are considered Special provisions when Added to Volume II Bidding and Contract Documents.
2021 Oregon Standard Specifications for Construction
Available from the ODOT website:
https://www.oregon.gov/odot/Business/Pages/Standard_Specifications.aspx
Page | 4
EXHIBIT A
Special Provisions for the Technical Specifications for the 2021 Oregon Standard Specifications for the Construction (OSS) – Technical Specifications
Special Provisions to the 2021 OSS Section 00210 - Mobilization
Page | 5
SP00200 (Special Provisions for the 2021 Book) (Last updated: January 2022)
PART 00200 – TEMPORARY FEATURES AND APPURTENANCE
Section 00210 - Mobilization
Comply with Section 00210 of the Standard Specifications.
End of Section
Section 00220 - Accommodations for Public Traffic
Page | 6
Comply with Section 00220 of the Standard Specifications modified as follows:
00220.02(a) General Requirements –
Replace the bullet that begins “Do not stop or hold vehicles…” with the following:
• Do not stop or hold vehicles within the work zone for durations longer than allowed in the approved traffic control plan.
Add the following bullet(s) to the end of the bullet list:
• Notify the Engineer a minimum of 7 Calendar Days prior to activating any traffic control changes. Include contact information for the TCS and Site Manager in the notice.
• Temporary steel plating is not allowed between November 1st and March 1st. Removal all steel plates 24-hours prior to a forecasted snow event of greater than 1 inch.
• When performing trench excavation or other excavation across or adjacent to a Traffic Lane on a roadway having a pre-construction posted speed greater than 35 mph, backfill the excavation, install surfacing, and open the roadway to traffic by the end of each work shift. Install a "BUMP" (W8-1-48) sign approximately 100 feet before the backfilled area and a "ROUGH ROAD" (W8-8-48) sign approximately 500 feet ahead of the "BUMP" sign. If this requirement is not met, maintain all necessary lane or shoulder closures and provide additional TCM, including flagging, at no additional cost to the Agency. Do not use temporary steel plating to reopen the roadway.
• Before activating a modified traffic signal, revising lane usage, implementing new roadway geometry, or removing a "STOP" sign, protect traffic by installing "NEW TRAFFIC PATTERN AHEAD" (W23-2) signing according to 00222.40. Keep the signs in place for 30 Calendar Days after completing the modifications.
• When excavation or paving operations create an abrupt edge, protect traffic by installing "ABRUPT EDGE" (CW21-7) signs every 500 feet.
• When flagging operations may extend traffic queues onto the railroad crossing, protect traffic at the intersection of ________and_________by providing an additional flagger.
Position additional flagger signs according to the "Advance Flagger for Extended Traffic
Page | 7 January 2022
Queues" configuration shown on the Standard Drawings. Do not allow traffic to stop on the railroad crossing.
00220.02(b) Temporary Pedestrian Accessible Route Plan –
Delete the bullet that begins “For intersection Work…”
Replace the bullet that begins “Limit pedestrian detour…” with the following:
• Limit pedestrian detour lengths to the shortest available accessible route.
Add the following bullet:
• Limit closure of pedestrian facilities to the duration established in the pre con schedule.
00220.03(b) Closures - Add the following bullet(s) to the end of the bullet list:
• Floatable Natural Waterway - A minimum of 35 Calendar Days before restricting or closing the public access site(s), listed below:
• Public Access Location - _________________ (as shown).
Submit to the Engineer, in writing, when the closure(s) or restriction(s) have ended.
00220.03(b) Closures –
• Lanes – A minimum of 72 hours before a lane closure begins.
• Roads – A minimum of 72 hours before closure. Also, notify in writing, all affected emergency services, school districts, and US Postal Service a minimum of 72 hours before any closure.
Replace the bullet that begins “Pedestrian Facilities – A minimum of 14 Calendar Days…” with the following bullet:
• Pedestrian Facilities - A minimum of 72 hours before closing a sidewalk, Multi-Use Path, or other pedestrian facility. After receiving written approval, provide 48 hours’ public notification before the closure.
Replace the bullet that begins “Bicycle Facilities – A minimum of 14 Calendar Days…” with the following bullet:
Page | 8 January 2022
• Bicycle Facilities - A minimum of 72 hours before closing a bicycle lane. After receiving written approval, provide 48 hours’ public notification before the closure.
Add the following paragraph to the end of the subsection:
Provide a minimum of 48 hours’ notice to occupants of properties fronting a street where more than half the street will be closed to vehicular traffic. Coordinate street closure with all affected individuals and public agencies.
00220.40(e)(1) Closed Lanes - Replace this subsection, except for the subsection number and title, with the following:
One or more Traffic Lanes may be closed on _______ between _______ and _______ when allowed, shown, or directed during the following periods of time except as specified in 00220.40(e)(2):
00220.40(e)(2) Opened Lanes – Replace the sentence that begins “Keep all Traffic…” with the following paragraph:
Maintain two-way traffic at all times unless otherwise allowed. Streets shall remain open for two-way traffic at all times when the Contractor is not performing work unless otherwise allowed. Maintain access to approaches to all properties except for short periods necessary for the progress of the construction. Keep all Traffic Lanes and pedestrian facilities open during the following periods:
Day Work:
Schedule A Paula Dr.
Schedule B NE Williamson Blvd
Schedule E NE Monroe / Rock Chuck Dr
Schedule F Boyd Acres Rd.
Schedule H NW Stannium Rd.
Night Work
Schedule C NE Medical Center Dr.
Schedule D NE Cushing Dr.
Schedule G Robal Lane
Schedule I NW Skyliners Rd.
Page | 9
Schedule J NE 1st Street
Do not close any traffic lanes and remove all barricades and objects from the roadway during the following periods:
(1) Weekdays – Between 6:30 p.m. and 7:00 a.m. Monday through Friday
(2) Weekends – Between 6:30 p.m. on Friday and 7:00 a.m. on Monday
Night Work: for 2026 paving ST26FA
Do not close any traffic lanes and remove all barricades and objects from the roadway during the following periods:
(1) Weekdays – Between 6:00 a.m. and 6:30 p.m. Monday through Friday
(2) Weekends – Between 6:00 a.m. on Friday and 6:30 p.m. on Sunday
00220.40(e)(2)(b) Special Events - Add the following to the end of this subsection:
The following special events will occur during this Project:
• Downtown Events – every Friday, Saturday and Sunday for life of Contract , And or any events that would fall within the project.
Add the following subsection:
00220.60(a)(1) Contractor Responsibility – Add the following paragraph and bullets to the end of the subsection:
Provide snow and ice removal for all streets with traffic control or channeling devices deployed within a travel lane and all streets where the existing pavement has been disturbed according to the following:
• Maintain a map showing snow removal boundaries and submit the map to the Engineer a minimum of 24-hours prior to a forecast showing snow accumulation exceeding 2 inches.
• When directed, provide snow and ice removal when accumulations exceed 2 inches on arterial and collector streets and 6 inches on local streets.
Page | 10 January 2022
• Plow streets from curb to curb, or edge of pavement to edge of pavement where no curbs exist. Use equipment designed for such plowing including road graders, front end loaders, truck-mounted plows. Provide lights and beacons and appropriate signage for operating on public roads. Broadcast crushed basalt traction material on post-plowed surfaces in accordance with current City standards. Keep storm drains clear of snow and ice.
• Push the snow toward the side of the street. Minimize blocking of driveways and burying sidewalks. Do not push snow into natural surface bodies of water.
• Damage to public or private property caused by the Contractor’s snow removal will be repaired at the Contractor’s expense.
00220.90 Payment – Replace this subsection, except subsection number and title, with the following:
Section 00221 - Common Provisions for Work Zone Traffic Control
Page | 11
Section 00221 - Common Provisions for Work Zone Traffic Control
Comply with Section 00221 of the Standard Specifications modified as follows:
00221.06 Traffic Control Plan – Add the following sentences after the sentence that begins The Contractor will be allowed to use the Agency’s TCP, modify the Agency’s TCP, or use a different TCP. Submit the following, for approval, five calendar days before the preconstruction conference:
Traffic will be permitted to be stopped or held under flagging for ___ minutes within the work zone.
00221.40 General – Add the following paragraph to the end of the subsection:
In addition to the roles having authority per Section 00150, the City of Bend Street Maintenance Supervisor and uniformed police officers, have authority to orally temporarily suspend work for failure to maintain traffic control devices.
Section 00222 – Temporary Traffic Control Signs
Page | 12
00222.00 Scope - In addition to the requirements of Section 00221, this Work consists of furnishing, installing, moving, operating, maintaining, inspecting, and removing temporary signs.
Materials
00222.10 Temporary Signs - Furnish temporary signs meeting the requirements of the "Acceptable" category shown in the ATSSA Quality Guidelines for Temporary Traffic Control Devices and Features handbook, available from the ATSSA website. Use materials and fabricate signs conforming to Section 00940, Section 02910 and the following:
(a) Size and Shape - Use standard size and shape signs meeting the requirements of 00221.01(c) unless otherwise specified or ordered. Double-face signs will not be allowed except for the flagger "STOP/SLOW" paddle. For diamond shaped warning signs, use 48 by 48 inch signs unless otherwise shown or specified.
(b) Type - Use ASTM Type VIII or IX sheeting from the QPL for fluorescent orange retroreflective sheeting on temporary warning signs and ASTM Type III or IV sheeting from the QPL for all other fluorescent colored retroreflective sheeting on temporary signs, unless otherwise indicated in this Section or in the TCP. Fabricate these signs on one of the following materials: New sheet aluminum sign blanks. New extruded aluminum panels. Used sheet aluminum sign blanks that are without bends, tears, holes, or dents and that have been cleaned to bare metal. 3/4 inch high-density overlay plywood. 3/4 inch medium-density overlay plywood.
(c) Folding or Turning Signs - Temporary signs on posts may be the folding or turning type as long as they can be locked when not in use so the sign message is not visible to any traffic.
(d) Roll-up Signs - Use roll-up signs with retroreflective roll-up sign sheeting from the
QPL.
00222.11 Sign Supports:
(a) Wood Sign Posts - Use wood sign posts in the sizes and quantities as shown on the Standard Drawings and according to 02110.40, except posts may be untreated.
(b) Portable Sign Supports - Use portable sign supports from the QPL and conforming to the following:
• Free standing.
• Capable of supporting signs in vehicle-caused turbulence and in winds common to the area where they are used. If additional ballast is required to maintain the signs in an upright position, use sandbags to anchor the sign support legs. Place a sandbag filled with loose sand (approximately 25 pounds) across the bottom of each leg as needed.
(c) Temporary Barrier Sign Supports - Use concrete barrier sign supports that meet the
Page | 13 January 2022 following:
• Conform to the Standard Drawings.
• Attach securely to the top of the concrete barrier.
• Support a maximum 12 square feet of total sign area.
(d) Temporary Sign Supports - Fabricate and use TSS as shown on the Standard Drawings and according to 02110.40, except posts may be untreated.
(e) Perforated Steel Square Tube Sign Supports - Use perforated steel square tube (PSST) sign supports from the QPL and as shown on the Standard Drawings. For PSST sign supports mounted on portland cement concrete surfaces, use surface mounted post anchors according to the manufacturer's recommendations.
00222.12 Sign Covers:
(a) Temporary Signs - Use sign covers for temporary signs that meet the following requirements:
• From the QPL or made from one of the following materials:
• One-piece plywood.
• Geotextile fabric.
• Large enough to completely cover the sign and attached rider signs.
• Easy to attach to and remove from the sign without damaging the sign face.
• Black and non-reflective.
• Opaque to prevent message visibility under day and nighttime conditions.
(b) Permanent Signs - Sign covers for permanent signs shall conform to Section 00941.
00222.13 Sign Flags - Sign flags shall be:
• Fluorescent red-orange.
• Square 16 by 16 inches or larger.
• Made from an acceptable tightly woven fabric or plastic sheeting.
00222.14 Sign Flag Boards - Use sign flag boards as shown on the Standard Drawings.
00222.15 Temporary Electrical Signs - Furnish electrical signs meeting the following requirements:
(a) Sequential Arrow Signs - Use Type "C" sequential arrow signs from the QPL.
(b)Portable Changeable Message Signs - Use PCMS from the QPL.
Page | 14 January 2022
(b) Radar Speed Trailers - Use radar speed trailers with a Type 2 panel from the QPL, Conditional List, or as approved. Construction
00222.40 Temporary Signs - Once temporary signs have been accepted and paid for on the Project, do not remove them from the Project, until directed by the Engineer.
For all temporary warning signs use fluorescent orange retroreflective sheeting background.
Install all temporary signing according to the Plans, Section 00940, the MUTCD, the Sign Policy and Guidelines for the State Highway System, FHWA Standard Highway Sign manual and the following:
Speed Signs - Use speed signs as follows:
(1) Advisory Speed Signs - Install advisory speed warning signs or riders as shown or directed.
(2) Regulatory Speed Zone Signs - Install and maintain regulatory speed zone signs as directed and according to the "Temporary Speed Zone Order" signed by the State Traffic Engineer.
When regulatory speed zone signs are used, cover conflicting existing regulatory speed zone signs with sign covers according to Section 00941. Cover or remove temporary regulatory speed zone signs and restore the original speed zone signs according to the "Temporary Speed Zone Order" and when directed.
If an existing regulatory speed zone sign displaying the original speed is 1,000 feet or less beyond the limits of the temporary speed zone, additional temporary regulatory speed zone signs displaying the original speed are not required.
(b) Roll-up Signs - Roll-up signs may be used at a single location for no more than 48 consecutive hours. Place roll-up signs within the active Work Area on portable roll-up sign supports. Remove all inappropriate roll-up signs at the end of each shift.
(c) Inconsistent Temporary Signs - Ensure that all temporary signs are properly used and consistent with the work zone. Cover all inconsistent temporary signing until the sign messages are applicable to the Work that is beginning. When signage is no longer required for staging or shift Work, remove all temporary signs, sign flag boards, supports, sign covers, and ballast associated with the staging or shift Work.
When temporary sign messages conflict with work zone conditions, traffic patterns, or other staging configurations, but signs are needed later in Project, do the following:
• Turn or cover the signs so the message is not visible to any traffic.
• Remove or cover sign flag boards.
Page | 15 January 2022
• When covering signs and sign flag boards, use covers meeting the requirements of 00222.12.
When it is determined that only minor Work remains on the Project and the work area does not encroach on Traffic Lanes or Shoulders, do the following:
• Remove all temporary signs, including the advance construction and Project identification signs.
• Remove all sign flag boards and ballasts.
• Use roll up signs on portable sign supports for minor or short duration Work.
(d) Permanent Signing - When permanent sign messages conflict with adjacent temporary signing, work zone conditions, traffic patterns or other staging configurations, do the following:
• Turn or cover the signs so the message is not visible to any traffic.
• When covering signs, use sign covers meeting the requirements of 00222.12(b).
When work zone conditions change and permanent sign messages no longer conflict with temporary signing, uncover permanent signs. Install or uncover appropriate permanent signing as required, before changing traffic control staging.
(e) Temporary Sign Placement - Place temporary signs as shown, specified, and directed:
• Install a "TRUCKS" (W11-10) sign with an 18 inch "500 FEET" (W16-4P) plaque, approximately 500 feet before each point of access of all noncommercial stockpile sites, work zone staging area, material sources, waste areas, and plant set-up areas to a public Roadway.
• When a through road intersects the work zone, place a "ROAD WORK AHEAD" (W20-
1) sign in advance of the intersection at sign spacing "A" from the "TCD Spacing Table" shown on the Standard Drawings, or as shown in the TCP. These signs do not require sign flag boards, unless otherwise directed.
• When a cold planed Pavement surface is used by traffic, install the following temporary signs:
• "BUMP" (W8-1) sign approximately 100 feet in advance of the transverse paving edge.
• "GROOVED PAVEMENT" (W8-15) sign with a 24 inch "Motorcycle" (W8-15P) rider in advance of the “BUMP” sign at sign spacing "A" from the "TCD Spacing Table" shown on the Standard Drawings, or as shown in the TCP.
Face signs toward incoming traffic and install them before opening the cold planed surface area to Public Traffic. Protect exposed transverse and longitudinal cold planed Pavement edges according to 00221.07(c).
00222.41 Sign Supports:
Page | 16 January 2022
(a) Wood Sign Posts - Except as provided in the following (b) through (f), mount all temporary signs on wood sign posts as shown.
• When sign posts are installed in Rock, a shorter post may be used if the post is installed in a buried concrete footing at least 12 inches in diameter and 2 feet deep.
(b) Portable Sign Supports - Use portable sign supports as follows:
• When signs are needed at a single location for no more than 48 consecutive hours.
• Positioned so the lowest point of the sign is at least 1 foot above the Roadway surface.
• With roll-up signs.
• With ballast to prevent tipping of the signs in high wind.
Turn, cover, or remove signs at the end of each work shift when the condition is no longer in effect.
(c) Temporary Barrier Sign Supports - Mount signs on temporary barrier so the:
• Lowest point of the sign is at least 7 feet above the Roadway surface.
• Temporary sign and post are held securely to temporary barrier by an approved device.
• Sign can be turned and locked in a position parallel to the flow of traffic when not in use.
(d) Temporary Sign Supports - Use TSS as follows:
• When signs are needed at a single location for more than 48 consecutive hours.
• When not practicable to post mount due to location or when Utility conflicts exist.
• Provide reflective sheeting on TSS posts as shown in the Standard Drawings.
• Do not tip over any TSS that is exposed to traffic, unless approved by the Engineer or the TSS is protected from traffic by a barrier system. Position TSS as shown on the Standard Drawings or in the TCP.
• When not in use, locate TSS as far from Public Traffic as practicable and turn away from traffic, or cover the sign. Do not cover reflective sheeting on the TSS posts.
(e) Perforated Steel Square Tube Sign Supports - Perforated steel square tube sign supports may be used as a substitute for wood sign posts. Install perforated steel square tube sign supports as shown on the Standard Drawings. For PSST sign supports mounted on portland cement concrete surfaces, use surface mounted post anchors according to the manufacturer's recommendations.
(f) Existing Facility Sign Supports - When mounting temporary signs on existing facilities, install signs as shown on the Standard Drawings or other mounting methods approved by the Engineer.
Page | 17 January 2022
00222.45 Temporary Electrical Signs - Provide and install temporary electrical signs as follows:
(a) Sequential Arrow Signs - Use the sequential arrow signs as follows:
• To indicate a lane closure only. Use one sequential arrow sign for each lane being closed.
• Install where the sign is visible from 1/2 mile minimum.
• Mount at a height of 7 feet from bottom of sign to ground.
• Do not use on 2-Lane, 2-Way Roadway.
• For Shoulder Work use caution mode only.
• Provide a solar/battery power source.
(b) Portable Changeable Message Signs - Use PCMS according to the Oregon Portable Changeable Message Sign Handbook and as follows:
• Program concise accurate messages according to the Oregon Portable Changeable Message Sign Handbook.
• Install beyond the outside Shoulder, behind existing barrier or guardrail, as shown in the TCP, or as directed when conditions do not allow the PCMS to be located beyond the Traffic Lane.
• Install the PCMS device where it can be seen from 1/2 mile minimum. The PCMS message should be legible from 800 feet in the daytime and 600 feet at night.
• Mount so that the bottom of the sign is 7 feet above the ground.
• Program so that the entire message is displayed within 8 seconds.
• Use a maximum of two panels to display an entire message.
• Separate two PCMS used in sequence by 1,000 feet minimum.
• Messages shall not scroll horizontally or vertically across the face of the sign.
• When the PCMS is not being used to display any messages for more than 5 consecutive
Calendar Days, remove the PCMS from the Roadway and locate the device at least 30 feet from the edge of the nearest Traffic Lane, place behind a barrier system, or as directed.
• Provide a solar/battery power source.
• Obtain approval from the Engineer / Project Manager before displaying or altering messages.
• Type B, Mini PCMS use is limited to locations where the preconstruction posted speed is 40 mph or less.
Measurement
Work covered under this Section will be measured according to the following:
Method “B” – Lump Sum Basis – Under this method, no measurement of quantities will be made.
Payment
Page | 18 January 2022
00222.91 Payment, Lump Sum or Incidental Basis - When the Contract Schedule of Items does not indicate payment for Work performed under this Section, no separate or additional payment will be made. Payment will be included in payment according to 00221.98 or 00221.99.
Comply with Section 00222 of the Standard Specifications.
Comply with Section 00222 of the Standard Specifications modified as follows:
00222.40(e) Temporary Sign Placement - Add the following to the end of the bullet list:
• When the horizontal clearance for the Roadway is less than 19 feet, install horizontal clearance (CW21-12-48) signs, identifying the narrowest width of the Roadway. Locate these horizontal clearance signs as shown or as directed.
• When the vertical clearance is less than 15 feet 6 inches, install low clearance (W12-2-48) and (OW12-2-36) signs. The clearance shown on the signs shall be 4 inches less than the shortest height of the opening. Locate these low clearance signs as shown or as directed.
• When construction requires bicycles to use the Traffic Lanes, install a "Bicycle ON
ROADWAY" (CW11-1) symbol sign on 1/2 mile spacing through the affected area. Keep the signs in place until completion of the Shoulder or bikeway final surface.
Section 00223 - Work Zone Traffic Control Labor and Vehicles
Page | 19
Section 00223 - Work Zone Traffic Control Labor and Vehicles
Comply with Section 00223 of the Standard Specifications.
Comply with Section 00223 of the Standard Specifications modified as follows:
00223.23 Automated Flagger Assistance Device - In the sentence that begins "Submit the following information…", replace the words "21 Calendar Days" with the words "14 Calendar Days ".
00223.80(b)(1) Flaggers – Add the following paragraph to the end of the subsection:
Flaggers not approved by the Engineer or included on the approved traffic control plan and schedule will not be measured for payment.
Section 00224 - Temporary Traffic Channelizing Devices
Page | 20
Section 00224 - Temporary Traffic Channelizing Devices
Comply with Section 00224 of the Standard Specifications.
Comply with Section 00224 of the Standard Specifications modified as follows:
Section 00225 - Temporary Pavement Markings
Comply with Section 00225 of the Standard Specifications.
Section 00226 - Temporary Roadside Barriers and Impact Attenuators
Page | 21
Section 00226 - Temporary Roadside Barriers and Impact Attenuators
Comply with Section 00226 of the Standard Specifications.
Section 00228 - Temporary Pedestrian and Bicyclist Routing
Page | 22
Section 00228 - Temporary Pedestrian and Bicyclist Routing
Comply with Section 00228 of the Standard Specifications modified as follows:
Section 00231 - Temporary Access Road
Page | 23
Section 00231 - Temporary Access Road
Description
Maintenance
Section 00270 - Temporary Fences
Comply with Section 00270 of the Standard Specifications.
Section 00280 - Erosion and Sediment Control
Page | 24
Comply with Section 00280 of the Standard Specifications modified as follows:
00280.00 Scope - Add the following two paragraphs to the end of this subsection:
When applicable, obtain an NPDES 1200-C Permit from the authorizing local jurisdiction for the Project or phase.
When applicable, comply with the WPCF UIC Permit or rule authorization requirements in its absence. Copies of any local or state agency/government permit(s) are available from the permitted agency/government and may be more stringent than these Specifications.
00280.05 Erosion and Sediment Control Plan on Non-Agency Controlled Lands – Replace the bullet that begins “A Contractor-developed ESCP…” with the following bullet:
• A Contractor-developed ESCP for each unique site covered under applicable Federal, state, or local permits or regulations.
00280.16(a) Construction Entrances – Replace the “Aggregate” bullet with the following bullet:
• Aggregate – Furnish 3-6 inch aggregate for construction entrances. If tracking of aggregate onto the street is of concern, 6-8 inch stone can be used. Material will be visually accepted in the field.
00280.30 Erosion and Sediment Control Manager –
Replace the bullet that begins “Monitor water quality…” bullet with the following bullet:
• Monitor water quality in receiving streams and UICs in the vicinity of the Project Site.
Add the following paragraph after the paragraph that begins “Provide the ESCM name…”:
The ESCM, or designee, must be able to respond to the site within 90 minutes of notification during storm events. Include the storm response plan in the ESCP.
Page | 25 January 2022
00280.41(c) Wet Season Work and Temporary Work Suspension – Add the following paragraph to the end of the subsection:
Wet season work is defined as work between October 1 and June 30.
00280.42(a) Soil Exposure Limitations – Replace this subsection, except for the subsection number and title, with the following:
• East of the Cascades (October 1 through June 30) – Stabilize all other areas within 5 days of exposure.
• East of the Cascades (July 1 through September 30) – Stabilize construction areas within 10 days of exposure.
00280.42(b) Temporary Stabilization –
Replace the first bullet with the following:
• Every 5 days (October 1 through June 30), every 10 days (July 1 through September 30), or more frequently as needed or directed.
Delete the bullet that begins “Upon approval, active…”.
00280.63(c) Paved Areas – Add the following sentence to the end of the subsection:
Street washing is not permitted.
00280.70 Removal – Add the following paragraph to the end of the subsection:
The cost of damage to public right-of-way or private property resulting from not removing erosion control materials will be at the Contractor’s expense.
Section 00290 - Environmental Protection
Page | 26
Section 00290 - Environmental Protection
Comply with Section 00290 of the Standard Specifications.
Comply with Section 00290 of the Standard Specifications modified as follows:
00290.20(c)(2) Clean Fill - Add the following paragraph to the end of this subsection:
Manage all excavated soil that does not meet the definition of clean fill according to Section 00294.
00290.20(c)(3)(a) Burnable Materials – Delete this subsection.
00290.20(c)(3)(b) Woody Matter – Delete this subsection
00290.30(a)(1) General – Replace the bullet that begins “Comply with the…” with the following bullet:
• Comply with the erosion prevention and sediment control requirements of Section 00280, local requirements, and all applicable DEQ NPDES 1200 Permit requirements.
Section 00310 - Removal of Structures and Obstructions
Page | 27
SP00300 (Special Provisions for the 2021 Book) (Last updated: 12-10-2021)
PART 00300 – ROADWORK
Section 00310 - Removal of Structures and Obstructions
Comply with Section 00310 of the Standard Specifications.
00310.41 Removal Work: (a) General - Where an abutting Structure or part of a Structure is to be left in place, make clean, smooth, vertical cuts with a saw or other approved cutting device. Avoid operations that may damage any portion of the remaining Structure.
Section 00320 - Clearing and Grubbing
Comply with Section 00320 of the Standard Specifications modified as follows:
00320.40(b)(3) Vegetation and Materials to be Saved – Add the following to the end of this subsection:
Where the plans call for the preservation of trees, provide a tree preservation plan a minimum of 7 Calendar Days prior to beginning clearing and grubbing. Include, at a minimum, the following in the tree preservation plan:
Method of protecting each tree Trimming procedure Watering schedule Root cutting procedure
The Contractor shall routinely water the preservation zone to keep the area moist
As soon as possible, but not more than two weeks prior to any required construction in a preservation zone per the exceptions above, thoroughly saturate the preservation zone with water.
When necessary to excavate or trench through a preservation zone, trim all roots exposed by the excavation. Do not tear or pull roots from the ground with construction equipment but cleanly saw them immediately when exposed by the equipment. An exception shall be rock saws. However; however, rock saws shall be operated to minimize the shattering of roots.
Section 00320 - Clearing and Grubbing
Page | 28 January 2022
Backfill trenches in a preservation zone as soon as possible to minimize the drying of exposed roots. Where trenches need to be open longer than six hours, cover with burlap and keep moist exposed roots on the trench wall sides.
00320.42 Disposal of Matter - Replace this subsection, except for the subsection number and title, with the following:
Dispose of all matter and debris according to 00290.20. Open burning of materials is prohibited within the City limits.
00320.42 Ownership and Disposal of Matter - Vegetation and natural material designated for preservation and salvage are the property of the Agency. All other matter and debris accumulated from clearing and grubbing operations become the Contractor’s property at the place of origin. Dispose of all matter and debris according to 00290.20.
Section 00330 - Earthwork
Page | 29
Comply with Section 00330 of the Standard Specifications modified as follows:
00330.14 Selected Granular Backfill - Delete the sentence that begins “Reclaimed glass meeting the requirements of Section 02695…”
00330.15 Selected Stone Backfill - Delete the sentence that begins “Reclaimed glass meeting the requirements of Section 02695…”
00330.41(a)(4) Excess Materials - Replace this subsection, except for the subsection number and title, with the following:
If the quantities of excavated materials are greater than required to construct embankments and to do all filling and backfilling, the Contractor may use the remaining materials to uniformly widen embankments or to flatten slopes in a manner satisfactory to the Engineer.
00330.43(b) Moisture-Density Testable Materials – Add the following to the end of the subsection:
(3) Place moisture-density testable material in nearly horizontal layers with thickness as necessary to meet the requirements of Section 00330.43(b)(2)(b) but not more than 18 inches.
00330.80 Measurement – Add the following bullet:
• Lump sum basis, no measurement of quantities will be made. Approximately ____ Cubic Yards of earthwork will be required on this project.
00330.92 Kinds of Incidental Earthwork - Add the following bullet(s) to the end of the bullet list:
• Excess material used to widen embankments or flatten slopes according to 00330.41(a)(4).
• Earthwork required for driveways and road approaches. Earthwork for driveways and road approaches will be that which is outside the Neat Line limits shown on the typical sections.
Page | 30 January 2022
00330.95 Earthwork Lump Sum Basis Payment – Earthwork will be paid for at the Contract lump sum amount for the item “Earthwork”.
Section 00331 - Subgrade Stabilization
Page | 31
Section 00331 - Subgrade Stabilization
Comply with Section 00331 of the Standard Specifications.
Section 00340 - Watering
Page | 32
Section 00340 - Watering
Comply with Section 00340 of the Standard Specifications modified as follows:
00340.10 Water – Add the following to the end of this subsection:
For a charge, the City can provide water from a fire hydrant or similar source within the City’s water service area. Application for a hydrant meter permit is available through the City Permit Center.
Section 00440 - Commercial Grade Concrete
Comply with Section 00440 of the Standard Specifications modified as follows:
00440.11 Proportions – Add the following to the end of the bullet list:
• Fiber - ½ bag per yard for curb and flat work
00440.12 Properties of Commercial Grade Concrete –
In the bullet that begins “Entrained Air…” replace “4.0 to 7.0 percent” with “4.5 to 7.5 percent”.
In the bullet that begins “Compressive Strength…” replace “3,000 psi” with “4,000 psi”.
00440.40(b) Placing - Add the following bullet to the end of the bullet list:
• When haul time or placement conditions warrant exceeding the time of discharge, submit a detailed breakdown of the estimated time needed from batching to discharge of a load along with the measures that will be taken to ensure slump, temperature and uniformity will be maintained. Submit in advance to establish a new time limit at the Engineer’s discretion.
00440.40(d) Weather - Replace this subsection, except for the subsection number and title, with the following:
Do not place CGC when the air temperature is below 35 °F or above 100 °F without approval.
Section 00440 - Commercial Grade Concrete
Page | 33 January 2022
Protect CGC from freezing if the air temperature is expected to drop below 35 °F during the first 5 Calendar Days after placement.
When the air temperature exceeds 90 °F, place concrete in accordance with ACI 305R-10.
Section 00470 - Manholes, Catch Basins, and Inlets
Page | 34
Section 00470 - Manholes, Catch Basins, and Inlets
Comply with Section 00470 of the Standard Specifications modified as follows:
Section 00480 - Drainage Curbs
Comply with Section 00480 of the Standard Specifications.
Section 00490 - Work on Existing Sewers and Structures
Page | 35
Comply with Section 00490 of the Standard Specifications modified as follows:
00490.43 Abandoning Pipes in Place - Replace this subsection, except for the subsection number and title, with the following:
Abandoning pipe in place is not allowed. All abandoned utilities are required to be removed and disposed of properly, unless otherwise approved by the Engineer.
When pipe abandonment is approved, drain abandoned pipes and plug watertight. Plug abandoned pipes with gasketed mechanical plugs or grout seals, as directed. Where abandoned pipes connect to sewer manholes, install the plugs or seals from the inside of the manhole and reshape the channel to conform to the Standard Drawings.
Fill abandoned pipes greater than 12 inches diameter with sand, controlled low-strength material meeting the requirements of 00442, or other approved material.
00490.48 - Adjusting Boxes, Cleanout Lids and Similar Structures – DELETE this subsection and REPLACE with the following:
Raise or lower boxes, lids and similar structures by one of the following methods:
• Resetting the entire structure on a firm foundation.
• Adding extensions of like material below the original structure if raising the structure to a point where it would not enclose or protect its contents.
Page | 36
Section 00620 - Cold Plane Pavement Removal
Page | 37
PART 00600 – BASES
Section 00620 - Cold Plane Pavement Removal
Comply with Section 00620 of the Standard Specifications modified as follows:
00620.40(e) Warning Signs - Replace this subsection, except for the subsection number and title, with the following:
Provide warning signs as required where abrupt or sloped drop-offs occur at the edge of the existing or new surface according to Sections 00221 and 00222.
00620.43 Maintenance Under Traffic - Replace this subsection, except for the subsection number and title, with the following:
Traffic will be allowed on the cold planed surface up to _7__ Calendar Days after removing the existing surface. Sweep and clean the cold planed surface before opening to traffic.
Submit a plan describing how drainage will be maintained while traffic is on the cold planed surface at least 7 Calendar Days prior to cold planing.
00620.80 Measurement – ADD the following at the end of this subsection:
At the end of each shift, the Contractor is required to provide the quantities of Cold Plane Pavement Removal performed to the City. Documentation to be provided to inspector to verify finial quantities for billing. If Cold plane removal is not provided before paving is completed the quantities shown on the plans will be used for billing purposes. City of Bend project manager will provide excel cold plane removal spread sheet to be filled out at the end of each shift.
Section 00640 - Aggregate Base and Shoulders
Page | 38
Section 00640 - Aggregate Base and Shoulders
Comply with Section 00640 of the Standard Specifications modified as follows:
00640.41 Hauling and Placing - Add the following paragraph to the end of this subsection:
Prior to the placement of base rock, completely install, grout, seat, backfill, set to finish grade, and compact test around all structures (e.g. manholes, utilities, catch basins).
00640.90 Payment – Replace this subsection, except for the subsection number and title, The accepted quantities of Aggregates will be paid for at the Contract unit price, per unit of measurement, for the following items:
Pay Item Unit of Measurement
(a) Aggregate Base ................................................................ Ton
(b) Aggregate Shoulders........................................................ Ton
No separate or additional payment will be made for water used to obtain proper compaction and in the care of the Work.
When the Contract Schedule of Items does not indicate payment for Work performed under this Section, no separate or additional payment will be made. Payment will be included in payment made for the appropriate items under which this Work is required.
Section 00730 - Emulsified Asphalt Tack Coat
Page | 39
PART 00700 – WEARING SURFACES
Section 00730 - Emulsified Asphalt Tack Coat
Comply with Section 00730 of the Standard Specifications modified as follows:
00730.11 Emulsified Asphalt - In the paragraph that begins "Obtain samples according to AASHTO T 40…" replace the words “AASHTO T 40” with the words “AASHTO R 66”.
00730.90 Payment - Replace this subsection, except for the subsection number and title, with the following:
No separate or additional payment will be made for Emulsified Asphalt tack coat.
Approximately 118 Tons of Emulsified Asphalt in tack coat will be required on this Project.
Section 00745 - Asphalt Concrete Pavement - Statistical Acceptance
Page | 40
Comply with Section 00745 of the Standard Specifications modified as follows:
00745.14 Tolerances and Limits – REPLACE the tolerance list with the following:
Gradation Dense-Graded HMAC Type Open- Graded HMAC TYPE Constituent 1" 3/4" 1/2" 3/8" 3/4"
1/2" ATPB
1 1/2" JMF
1" 90 - 100% JMF 99 - 100% 99 - 100%
3/4" JMF ± 5% 90 - 100% JMF 85 - 96% 99 - 100% 85 - 95%
1/2" JMF ± 5% JMF ± 5% 90 - 100% JMF 55 - 71% 90 - 98% 35 - 68%
3/8"** – – – 90 - 100% –
No. 4 JMF ± 5% JMF ± 5% JMF ± 5% JMF ± 5% JMF ± 5% JMF ± 5% JMF ± 5% No. 8 JMF ± 4% JMF ± 4% JMF ± 4% JMF ± 4% JMF ± 4% JMF ± 4% JMF ± 4%
No. 16** – – – – –
No. 30 JMF ± 4% JMF ± 4% JMF ± 4% JMF ± 4% JMF ± 4% JMF ± 4% – No. 50** – – – – –
No. 100** – – – – – – –
JMF JMF JMF JMF JMF JMF JMF
No. 200 ± 2.0% ± 2.0% ± 2.0% ± 2.0% ± 2.0% ± 2.0% ± 2.0%
* Maximum not to exceed 100% ** Report percent passing sieve when no tolerance is listed
00745.16(a)(1) Personnel Requirements – ADD the following to the end of the bullet list:
• Providing at least one CAT-1 full-time at each plant site when producing mixture for the Project.
00745.16(a)(4) Testing Frequency – DELETE the paragraph that begins (“After the Mix Design...").
00745.16(a) Quality Control – ADD the following subsection:
Page | 41 January 2022
(5) Plant Calibration – Calibrate all meters and belt scales at the HMAC mixing plant according to ODOT TM 322 prior to beginning production.
00745.16(b)(1) MDV QUALITY CONTROL – DELETE in its entirety and REPLACE the following
a. General - Perform MDV testing on projects with Level 2, Level 3, or Level 4 dense graded HMAC. Perform MDV tests on every sublot and as required at start up according to 00745.16(b-1-c) and the MFTP. Perform gradation and asphalt content testing with each MDV test. Calculate the following values for each MDV test.
• Air Voids
• Voids in Mineral Aggregate (VMA)
• Voids Filled with Asphalt (VFA)
• P No. 200/Effective AC (Pbe) Ratio
The running averages of four MDV results shall be within the limits given below:
Average of Limit
Air Voids 4 samples JMF Target ± 1.0%
VMA 4 samples 11.5 - 17.0 (1" Mix)
12.5 - 17.0 (3/4" Mix)
13.5 - 17.0 (1/2" Mix)
14.5 - 17.0 (3/8" Mix)
VFA
4 samples
65 – 75
(3/4" and 1/2" Mix in Level 2, 3 and 4)
65 - 78
(3/8" Mix in Level 2, 3 and 4)
70 - 80
(1/2" and 3/8" Mix in Level 1)
Passing No. 200/Pbe 4 samples 0.8 - 1.6
The CDT shall provide the results from the initial control strip to the CAT II for evaluation and comparison with the MDV results. If the MDV and density test results are contradictory, initiate an investigation. The CAT II shall recommend a plan to the Engineer for resolving the discrepancy based on the results of the investigation.
Page | 42 January 2022
Take corrective action when required by the MDV start-up process of 00745.16(b-1-c). After the requirements of 00745.16(b-1-c) have been met, take corrective action if the MDV test results show that two consecutive running average of four samples are outside the above limits for air voids, VMA, VFA, or P No. 200/Pbe ratio. Document the corrective action and notify the Engineer. If test results continue to be outside the tolerance, stop production and make adjustments. Restart production only after the Engineer has approved the proposed adjustments. If the MDV test results are outside tolerance, but the mixture meets the current requirements for gradation and asphalt content, an adjustment to the JMF targets is required. Do not start a new lot as a result of the adjustment.
A request for an adjustment to the JMF targets may be made to the Engineer by the Contractor’s CAT-II. The requested change will be reviewed and documented by the Engineer. If acceptable, a revised JMF will be allowed. Clearly document the sublot test for which the adjusted targets are in effect. Adjustments for gradation shall not exceed the tolerances specified for the original JMF limits. Adjustments for AC content shall be within 0.5% of the original JMF. The JMF asphalt content may only be reduced if the production VMA meets or exceeds the above requirements. Adjustments for RAP content shall be within 5% of the original JMF, but shall not exceed the requirements of 00745.03. Regardless of these tolerances, the adjusted JMF shall be within the mixture specification control points of 00745.12. If a redesign of the mixture becomes necessary, submit a new JMF according to the requirements of these specifications.
Perform a Tensile Strength Ratio (TSR) test (AASHTO T 283) on a sample obtained during the first two days of production after QC test results verify that HMAC constituents with a weighting factor greater than one according to 00745.95 are in tolerance. Provide test results to the Engineer within four working days of obtaining the sample. Stop production and make adjustments if the TSR is less than 70. Restart production only after the Engineer has approved the proposed adjustments.
b. Laboratory Compactor Selection - Use a Gyratory compactor for MDV when a
Gyratory compactor is used to develop the JMF. For all other cases, use a Gyratory compactor or Marshall compactor, as selected by the Contractor.
c. MDV Requirements at Start-Up - Perform MDV testing at the start-up of the JMF production according to the following process:
1. Obtain a sample during the first 100 tons of production and immediately perform MDV testing.
2. If air voids and VMA are within tolerance, then continue remaining MDV testing at the established random QC sublot interval. If not, then go to step "3".
Page | 43
3. If air voids and/or VMA are out of tolerance according to 00745.16(b-1-a), then make adjustments and immediately obtain another sample and perform MDV testing. Go to step "4".
4. If air voids and VMA from the MDV testing in step "3" are within tolerance, then continue remaining MDV testing at the established random QC sublot interval.
If not, go to step "5".
5. If air voids from step "3" are more than 1.5% from the target, then stop production immediately and make adjustments. If they are not, then go to step "6". Obtain approval of the Engineer before restarting production. Begin MDV testing again at step "1".
6. If air voids from step "3" are out of tolerance and 1.5% or less from the target, or the VMA from step "3" is out of tolerance, then make adjustments and immediately obtain another sample and perform MDV testing. Go to step "4".
The initial MDV sample shall be used as the first random QC sublot test. Subsequent MDV samples required due to failure of start-up criteria will be used for a sublot QC test if the sample is taken within 100 tons of the scheduled random QC sample location. If not, the MDV testing shall be performed separate from, and not included in, the random QC testing program. Any required MDV testing will be completed at the Contractor’s expense.
00745.24(a) Steel-Wheeled Rollers – DELETE in its entirety and REPLACE with the following:
Provide steel-wheeled rollers with a minimum gross static weight as follows:
Level 1 Level 2 Level 3 Level 4
Breakdown and Intermediate 8 ton 10 ton 12 ton Finish 6 ton 8 ton 10 ton
00745.40 Season and Temperature Limitations – REPLACE "50 °F" with 40 °F" in the table, for Surface Temperature of Dense Graded Mixes 2 inches to 2 1/2 inches.
00745.42 Preparation of Underlying Surfaces - Add the following sentence to the end of the paragraph that begins “Treat all paved surfaces…”:
A tack coat is not required between lifts placed during the same shift provided the bottom lift is kept clean and free of dirt or debris.
Page | 44
00745.47(b) Drop-Offs - Replace the bullet that begins…
This is the start of the file's text. The full file is on GovTribe.