This is a pricing sheet for the City of Temple, Texas's Parks Maintenance Storage Expansion project (CSP #41-01-23). The project encompasses construction of approximately 10,240 square yards of new paved parking areas, six parking structures, and a new storage facility at the City's Parks & Recreation Administration Office located at 1701 North General Bruce Drive, Temple, Texas. The scope of work includes site preparation, miscellaneous demolition, grading and earthwork, building construction, mechanical and electrical systems, concrete and limestone pavement, retaining walls, water main infrastructure, and associated site improvements. The project is estimated to be completed within 360 consecutive calendar days from the Notice to Proceed, with the City and selected contractor to establish a mutually acceptable contract term. The engineer's estimate of probable cost for the project is $3,833,604.
The pricing sheet contains 26 line items for bidders to complete, including lump sum items for site preparation, mobilization and permits, storm water pollution prevention, grading, building construction, mechanical and electrical systems, electrical service coordination, pavement striping, water main testing, and operations and maintenance manuals. Unit pricing items include concrete pavement replacement (15 square yards), new reinforced concrete pavement (8,552 square yards), crushed limestone base (10,424 square yards), subgrade preparation (10,424 square yards), concrete stem walls with chain link fencing (221 linear feet), limestone block retaining walls (324 linear feet), water main connections (4 each), PVC water main installation (570 linear feet), tapping sleeves and valves (2 each), pipe fittings (5 each for 45-degree bends), fire hydrant assemblies (2 each), and steel bollards (8 each). All prices in the submitted sheet show zero dollar amounts, indicating this is a blank template for contractor pricing submission.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CSP
PRICING SCHEDULE
CSP #41-01-23 Parks Maintenance Storage Expansion
| Item No. | Estimated Quantity | Unit | Description of Item | Unit Price | Extended |
| 1 | 100% | LS | Furnish and install all materials, labor, overhead, and profit required to provide Site Preparation, Miscellaneous Demolition, Haul Off, and Site Clearing, including but not limited to; existing utility and structure verification, potholing, bracing, and/or protection; construction staking; hydromulch grass seeding; per project specifications and details, complete in place per lump sum. | $ - 0 | $ - 0 |
| 2 | 100% | LS | Furnish and install all materials, labor, overhead, and profit required to provide Mobilization, Bonds, Permits and Insurance, per project specifications and details, complete in place per lump sum. | $ - 0 | $ - 0 |
| 3 | 100% | LS | Furnish and install all materials, labor, overhead, and profit required to provide and implement a Storm Water Pollution Prevention Plan (SWPPP), per project specifications and details, complete in place per lump sum. | $ - 0 | $ - 0 |
| 4 | 100% | LS | Furnish and install all materials, labor overhead, and profit required to provide all Grading and Earthwork (Cuts, Fills, and Stockpile), at locations shown on plans, per project specifications and details, complete in place per lump sum. | $ - 0 | $ - 0 |
| 5 | 100% | LS | Furnish and install all materials, labor, overhead, and profit required to provide New Buildings and Parking Structures; including but not limited to structural foundation and building pad; all structural members and reinforcement; all utilities including water service, electrical service and electrical permitting; all wiring, and building systems; roofing; masonry; and all miscellaneous appurtenances, per project plans, specifications, and details, complete in place per lump sum. | $ - 0 | $ - 0 |
| 6 | 100% | LS | Furnish and install all materials, labor, overhead, and profit required to provide New Mechanical & Electrical Systems; including but not limited to concrete pull boxes, electrical conduits, 2" and 4" pvc sleeves, connectors; lighting, cameras, wiring, etc. and all miscellaneous appurtenances, per project plans, specifications, and details, complete in place per lump sum. | $ - 0 | $ - 0 |
| 7 | 100% | LS | Furnish and install all materials, labor, overhead and profit required to provide, New Electrical Service and Coordination with ONCOR, at locations shown on plans, per project specifications and details, complete in place per lump sum. | $ - 0 | $ - 0 |
| 8 | 15 | SY | Furnish and install all materials, labor, overhead, and profit required to saw cut, remove, and replace existing Reinforced Concrete Pavement Section, at locations shown on plans, per project specifications, notes and details, complete in place per square yard. | $ - 0 | $ - 0 |
| 9 | 8,552 | SY | Furnish and install all materials, labor overhead, and profit required to provide New 6" Reinforced Concrete Pavement Section, at locations shown on plans, per project specifications and details, complete in place per square yard. | $ - 0 | $ - 0 |
| 10 | 10,424 | SY | Furnish and install all materials, labor, overhead and profit required to provide, New 6" Crushed Limestone Base, at locations shown on plans, per project specifications and details, complete in place per square yard. | $ - 0 | $ - 0 |
| 11 | 10,424 | SY | Furnish and install all materials, labor, overhead and profit required to provide Subgrade preprations, at locations shown on plans, per project specifications and details, complete in place per square yard. | $ - 0 | $ - 0 |
| 12 | 221 | LF | Furnish and install all materials, labor overhead, and profit required to provide New Reinforced Concrete Stem Wall with Chain Link Fencing, at locations shown on plans, per project specifications, notes and details, complete in place per linear foot. | $ - 0 | $ - 0 |
| 13 | 324 | LF | Furnish and install all materials, labor overhead, and profit required to provide New Limestone Block Retaining Wall, including but not limited to french drain, granular backfill, topsoil, etc. at locations shown on plans, per project specifications, notes and details, complete in place per linear foot. | $ - 0 | $ - 0 |
| 14 | 100% | LS | Furnish and install all materials, labor, overhead, and profit required to provide New Pavement Striping at locations shown on plans, per project specifications and details, complete in place per lump sum. | $ - 0 | $ - 0 |
| 15 | 4 | EA | Furnish and install all materials, labor, overhead, and profit required to provide Connection to Existing Water Main, including but not limited to; thrust blocking, Mega-Lug Joint Restraint, and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
| 16 | 570 | LF | Furnish and install all materials, labor, overhead, and profit required to provide New 6” PVC C900 DR14 Water Main, including but not limited to; trenching, embedment, backfill, miscellaneous fittings, and thrust blocking, at locations shown on plans, per project specifications and details, complete in place per linear foot. | $ - 0 | $ - 0 |
| 17 | 2 | EA | Furnish and install all materials, labor, overhead, and profit required to provide New 6"x6" MJ Tapping Sleeve and Valve Assembly, including but not limited to sawcut, removal, and replacement of existing paving; trenching; backfill and embedment; connections; fittings; valves; and all appurtenances, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
| 18 | 1 | EA | Furnish and install all materials, labor overhead, and profit required to provide new 6”x6” MJ Tee, including but not limited to; thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
| 19 | 1 | EA | Furnish and install all materials, labor overhead, and profit required to provide new 6” MJ Gate Valve, including but not limited to; thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
| 20 | 5 | EA | Furnish and install all materials, labor overhead, and profit required to provide new 6” MJ 45 degree bend, including but not limited to; thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
| 21 | 1 | EA | Furnish and install all materials, labor overhead, and profit required to provide new 6" MJ Plug, including but not limited to; thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equals, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
| 22 | 2 | EA | Furnish and install all materials, labor overhead, and profit required to provide new Standard Fire Hydrant Assembly, including but not limited to; saw cut, removal, and replacement of existing pavement sections, miscellaneous fittings, tees, gate valves, piping, trenching, backfill, and embedment, thrust blocking and Mega-Lug Joint Restraint and Foster Mechanical Joint Adaptors, or pre-approved equal, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
| 23 | 8 | EA | Furnish and install all materials, labor, overhead, and profit required to provide New 6" Steel Bollards, at locations shown on plans, per project specifications and details, complete in place per each. | $ - 0 | $ - 0 |
| 24 | 100% | LS | Furnish and install all materials, labor, overhead, and profit required to provide ALL WATER MAIN TESTING per TCEQ and City of Temple Requirements and Contract Documents, complete in place per lump sum. | $ - 0 | $ - 0 |
| 25 | 100% | LS | Furnish and install all materials, labor, overhead, and profit required to provide All Testing and Startup, at locations shown on plans, per project specifications and details, complete in place per lump sum. | $ - 0 | $ - 0 |
| 26 | 100% | LS | Furnish and install all materials, labor, overhead, and profit required to provide O&M Manuals, at locations shown on plans, per project specifications and details, complete in place per lump sum. | $ - 0 | $ - 0 |
| TOTAL | $ - 0 |