8-001 Cover Page - (Sealed v2).pdf
PDF 34 KB Posted
- Attached to
- 26001315 U25-08 WRP 02 Project Manual
- Solicitation number
- 26001315
- Issued by
- Mason County, Texas
About this file
This is a Project Manual prepared by the City of Midland, Texas Engineering Services Division for the Water Rehab Program 02, with project number U25-08, dated October 2025. The document includes the city leadership details, with Lori Blong serving as Mayor and a city council comprising Brian Stubbs, John Norman, Robin Poole, Jack Ladd, Amy Stretcher Burkes, and John Burkholder representing various districts. Gabriel McClelland is listed as the Engineering Services Director, and the document is stamped with a professional engineering seal dated October 24, 2025.
The project manual appears to be a preparatory document for a water rehabilitation program, though specific technical details about the water infrastructure work are not provided on this cover page. The document is officially prepared by the City of Midland's Engineering Services Division, suggesting this is a municipal infrastructure improvement project focused on water system rehabilitation. The professional engineering seal and signature indicate the project has been reviewed and approved by a licensed professional engineer, which is typical for municipal infrastructure projects requiring technical oversight and compliance with engineering standards.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .