This Scope of Work document outlines a City of Des Moines cable relocation project in Polk County, Iowa (ICN OSP Project #77244807), managed by the Iowa Communications Network (ICN). The project requires the contractor to supply and install 3-inch HDPE conduit, armored single-mode OSP fiber optic cable, Type III and Type IV polymer concrete handholes, and all associated materials in compliance with ICN and City of Des Moines standards and Build America, Buy America Act (BABA) requirements. The scope includes installation of approximately 2,800 feet of fiber cable, exposure and raising of existing handholes (5 Type III handholes at 36" × 24" × 30" and 3 Type IV handholes at 48" × 30" × 36"), installation of tracer wire and pull rope in all ducts, and removal of old cables once traffic is spliced to new cables. Sealed bids must be received by Sheri Stephens, ICN Contracting, no later than 12:00 p.m. on November 23, 2026. Work may begin upon award and contract completion, with a completion deadline of no later than March 31, 2027, with a request that HDPE work be completed prior to winter frost conditions. The project is located on SE 14th Street from the Des Moines River to Viaduct Bridge in Des Moines, Iowa.

The contractor must provide all materials and secure necessary locates from Iowa One Call and identify private utilities. The ICN will manage the project, secure DOT Right-of-Way permits, and coordinate splicing through the Network Operations Center, while the City of Des Moines will provide survey stakes and secure local permits. Payment will not be issued until all work is completed to ICN's satisfaction, following a two-week punch list review period, a two-week correction period for identified issues, and a one-week verification period. Pricing terms require contractors to submit lump-sum bids with breakdowns of labor and materials. No set-asides are identified in this solicitation. The project is federally funded through infrastructure programs, requiring full BABA compliance for all iron, steel, manufactured products, and construction materials.

View the file

Other files

File Type Posted
77244807 - Typicals.pdf PDF
77244807 - ENGINEERING PLANS.pdf PDF
ITB - Construction Checklist 2025.pdf PDF
1471181-event.pdf PDF
26-032 ITB OSP #77244807 Polk Co - DSM fiber project.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Iowa Communications Network Statement of Work OSP Log #77244807, Link 2062E (36F) Polk County, SE 14th St from Des Moines River to Viaduct Bridge – Des Moines, IA

GPS coordinates: 41.581307 -93.596898

Project Overview:

OVERVIEW OF PROJECT

This is a City of Des Moines cable relocation project that will be managed by the ICN. The Contractor shall supply 3” HDPE conduit, armored single-mode OSP fiber optic cable, Type 3 / Type 4 polymer concrete handholes, and all material necessary to place per ICN and City of Des Moines standards (per 77244807 – ENGINEERING PLANS). The cable must be Build America, Buy America Act (BABA) compliant which requires that all iron, steel, manufactured products, and construction materials used in federally funded infrastructure projects are produced in the United States.

Please see the CONSTRUCTION DRAWING(S). All work to be completed per the attached STANDARD INSTALLATION REQUIREMENTS and TYPICALS except where noted within this STATEMENT OF WORK (SOW). Upon notification of completion, the ICN will perform a review using the attached PUNCHLIST.

Any corrections will need to be made prior to ICN issuing payment for work completed.

NOTE: With approaching weather conditions expected to introduce frost in the ground, boring will become difficult or impossible. Therefore, the ICN requests that the cable relocation be performed as soon as reasonably possible to avoid encountering frost.

SPLICING EXCLUDED FROM THIS CONSTRUCTION BID / SPLICING SHALL BE COORDINATED WITH NOC OSP ICN Responsibilities:

1. Project Management

2. ICN will secure all necessary DOT ROW permit

3. Arrange splicing

City of Des Moines Responsibilities:

1. Provide Survey stakes for proposed storm sewer structures, critical crossings, traffic signals, and other facilities prior to starting work. (Brett Lewis – City of Des Moines Engineer, 515-208-4024)

2. Secure City of Des Moines permit

Contractor Responsibilities:

1. Contractor Provided Materials per materials list:

2. Secure all necessary locates from “Iowa One Call”.

3. Locate all private utilities, as required or necessary.

Duct Installation:

1. Provide 3-IN HDPE, SDR 13.5 duct (See Engineering drawing)

2. It shall be the sole responsibility of the contractor to ensure that the fiber installation is in the public Right-of-Way

3. Ensure that a pull rope (Mule Tape) is left in all duct along with #10 or #12 Tracer Wire.

Handholes:

1. Expose and raise to grade existing handhole at the following locations per ICN Standard Practice/Typical Drawings:

2. Five (5) - Type III Handhole - (Length × Width × Depth): 36" × 24" × 30"

3. Three (3) - Type IV Handhole - (Length × Width × Depth): 48" × 30" × 36"

Fiber Installation:

1. See Engineering plans

2. Coil excess cable evenly in each handhole ensuring no less than 50-ft in each assist handholes and 100-ft in each splice location.

Fiber Removal:

1. Contractor to remove old cables from existing conduits once traffic is spliced over to new cables. Approximately 2800-Ft

Locate Facilities:

1. Station: All Conduits must have tracer wire installed for locating purposes.

NOTE: At the conclusion of the project, ensure that a pull rope is left in ALL pathways, both inside and outside, new and existing.

Contractor Provided Materials:

1. Contractor to supply all materials.

2. See Sheet N.17 on “77244807 - ENGINEERING PLANS”

Contractor shall supply all other materials required for proper installation, including but not limited to: HDPE, Grounding and Tracer Wires, Rock, Wire Mesh, etc.

ICN Point of Contact for this Project:

Engineering/Design:

Chris Harris 515-725-8925 office 515-380-3689 cell

Materials:

Paul Damge 515-725-4749 office 515-491-1429 cell

Splice Coordination: (typically a minimum of 2 weeks notification is required)

NOC OSP

Jason Akers 515-725-7423 Bid/Job Showing: N/A Work Start Date: Work may begin upon award of the bid and completion of the contract.

Completion Date: Not later than 3/31/2027, Due to tight ROW and other utilities relocation we would request the new HDPE work is completed prior to frost/winter (extension may be negotiated based upon weather and/or unforeseen construction problems in the ROW).

Only written modifications to this Scope of Work are binding - Verbal changes to this scope of work by any person or persons are not binding, unless confirmed in writing.

BIDS:

1. Bids must be received sealed by Sheri Stephens, ICN Contracting, NLT 12PM on November 23rd 2026.

2. Contractors must submit a bid for Construction Bid as outlined in the SOW and per the Engineering drawings. ICN requires a breakdown of lump sum bids into labor and materials.

BIDS may be delivered to:

Sheri Stephens ICN Contracting Grimes State Office Building 400 East 14th Street Des Moines, IA 50319 E-Mail: sheri.stephens@iowa.gov

Completion of Work:

1. Upon notification of construction completion, ICN will have 2 weeks to complete the Punch List.

2. Upon initial completion of Punch List, the Contractor will have 2 weeks to correct any issues identified on the Punch List.

3. Upon notification of corrections, the ICN will have 1 week to verify corrections were completed to the ICN’s satisfaction.

4. No payment will be made until all work is completed per the contract unless agreed upon by both parties.

Attachments: The following are included by reference and as provided within Bid Documents.

77244807 - STATEMENT OF WORK, this document 77244807 - ENGINEERING PLANS (includes Materials list)

77244807 - TYPICALS

77244807 - PUNCH LIST

File details come from the government source that posted it. Updated .