B05 Amdnment A0002-75H70126R00034.pdf

PDF 311 KB Posted

Attached to
Pine Ridge Hospital Roof Replacement
Solicitation number
75H70126R00034
Issued by

About this file

This document is Amendment A0002 to Solicitation 75H70126R00034, issued by the Indian Health Service (IHS) - Design and Engineering Services (DES) Seattle on August 3, 2026, with an effective date matching the issue date.

The amendment serves two primary purposes: (1) to provide a Questions and Answers sheet as of August 3, 2026, along with a Site Visit Sign-in Sheet from the July 30, 2026 pre-proposal meeting, and (2) to replace Attachment J02 (Statement of Work Revision 1, July 2026) with Attachment J02 Statement of Work Revision 2 (dated August 3, 2026). Supporting attachments J02a (Roof Aerial) and J02c (Building Sections) have been updated concurrently. The Q&A responses address 16 technical questions submitted between July 17 and July 31, 2026, covering roof specifications for the Pine Ridge Hospital Roof Replacement project. Key clarifications include: PVC membrane compatibility requirements, R30 minimum insulation value, adhesion fastening for cover board and membrane with mechanical fastening for insulation, 1/2-inch cover board installation, mandatory replacement of metal coping cap and parapet flashing in burgundy color, 15-year Duro-Last warranty with consequential damage coverage, contractor responsibility for material disposal, work execution prioritized after spring snow melt for weather protection, 90 mph design wind speed with manufacturer warranty, Very Severe Hail (VSH) rating requirement, removal and replacement of expansion joint material over parapets, solar panel disposal without reinstallation, tapered insulation redesign approval requirements, new exhaust fan guy wire kit installation per manufacturer specifications, and lightning protection system reinstallation without recertification. All other terms and conditions remain unchanged. Contracting Officer Jong Kim issued the amendment, with no signature from the contractor required.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A0002

JONG KIM, Contracting Officer

A. The purpose of this amendment is to 1) Provide a Q&A sheet as of 8/3/2026 & Site Visit Sign-in Sheet, and 2) Replace Attachment J02 Statement of Work R1 July 2026 version with Attachment J02 Statement of Work R2 dated 3 August 2026. As a result of the SOW revisions, Attachments J02a (Roof Aerial) and J02c (Building Sections) have also been updated.

B. All other terms and conditions of this solicitation remain unchanged.

Indian Health Service - DES Seattle 701 5th Avenue, Suite 1600 Seattle, WA 98104

75H70126R00034

1 3

08/03/2026

07/15/2026

Amend No.

Item

Date Submitted

Question Type

(Technical or Admin)

Question Response Date Response Responded By

EXAMPLE 0 11/23/2020 Technical Please provide drawings or plans for ???

11/23/2020 IHS Response

IHS POC

A0001 1 7/17/2026 Technical

I’m reaching out to see if you can help answer a question regarding the roofing membrane for this project. We typically use GAF products and would like to confirm whether they are approved for use on this project.

07/21/2026

The membrane installed must be compatible with the existing roof pvc membrane to ensure a watertight tie in where it may meet portions of the roof that will not be replaced. The product used must be compatibal pvc membrane roofing and must not compromise performance or manufacturers warranty. See SOW paragraphs1.E.

and 2.E.

IHS COR

A0001 2 7/19/2026 Technical

The insulation is specified as both R30 and 7" minimum. R30 is equal to 2 layers of 2.6" ISO (total of 5.2") while 7" would equal R41. We just need to clarify what to install. 07/21/2026

The minimum R-value required is R30. The thinnest insullation over the roof shall meet this requirement.

IHS COR

A0001 3 7/19/2026 Technical

The scope states that the ISO should be mechanically fastened but doesn't clarify how to install the cover board and membrane. Both the cover board and the membrane can be installed by either mechanical fastening or adhesion. I recommend adhering them which provides a better hail resistant assembly.

07/21/2026

The cover board and membrane shall be fastened by adhesion and the insulation should be mechancially fastened. Pine Ridge experiences extremely high wind events and very severe hail.

IHS COR

A0001 4 7/19/2026 Technical

Cover board is readily available in both 1/4" and 1/2" thick boards but the spec does not specify a thickness. I recommend 1/2" as it provides better hail resistance at only a slightly higher cost. 07/21/2026

1/2" cover board shall be installed

IHS COR

A0001 5 7/19/2026 Technical

The spec calls for replacing the parapet flashings. Does this include the existing metal coping cap? The existing metal coping is in good condition and could be reinstalled once the new membrane is installed on the walls.

This would easily save $10,000 - $15,000 in material costs alone. 08/03/2026

The metal coping cap is to be replaced with new for the parapet flashing.

IHS COR

A0001 6 7/19/2026 Technical

Concerning the warranty, we offer various warranties including the 15 year specified in the specification. I recommend clarifying that the Duro-Last 15 Year NDL (No-Dollar-Limit) Supreme warranty is required. In addition to covering the material and labor for 15 years this warranty also covers consequential (interior) damages, all at no extra charge! (See attached warranty sample.)

07/21/2026

See revised SOW paragraph 2.B. for warranty requirements.

IHS COR

A0001 7 7/19/2026 Technical

Is there interest in sustainability? Duro-Last has a "Recycle Your Roof" program (see attached flyer) and the EPDM and ISO could be repurposed through a company called "Repurposed Materials" (repurposedMATERIALS - Largest Industrial Thrift Store in America )

07/21/2026

The contractor is responsible for the disposal of the roof membrane, insulation, and all other removed materials as required by this project.

The method of disposal is not specified. IHS COR

A0002 8 7/23/2026 Technical

Based on the timing situation for solicitation and award, we are concerned about the weather impacting this project. Is the government trying to get this done before winter, or would doing the work next Spring after snow melt be acceptable? 07/29/2026

Priority for this facility is patient safety. It is expected that work may not proceed until snow melt in the early spring. It is imperative that the roof is not exposed to the elements durring inclement weather. That should take priority over having the project complete before the middle of winter.

IHS COR

A0002 9 7/31/2026 Technical

The indication to both adhere and mechanically fasten the cover board is not a tested system for wind ratings. Normal commercial specifications indicate an FM rating such as 1-90. That however only relates to uplift and most manufactures only cover around 56 mph wind speed. Systems and warranties can cover wind speeds of 80 to 90MPH with attachment enhancements. Can you state what wind speed the system will need to be designed for?

08/03/2026

The ultimate design wind speed for Pine Ridge is 90mph based on ASCE wind maps. The system will need to be designed for 90 mph wind speed level and be covered through manufacturer warranty.

IHS COR

A0002 10 7/31/2026 Technical

The indication stated as a class 4 impact resistance is a shingle designation which is not related to commercial roofing. Some manufactures have not tested their products or systems and use class 4 impact resistance to hide that fact. Based on this being a commercial roof assembly can you please state a hail rating of either (SH – Sever Hail) or (VSH – Very Sever Hail).

08/03/2026

A hail rating of Very Sever Hail shall be what the roof assembly is rated and warrantied for.

IHS COR

A0002 11 7/31/2026 Technical

The lightning protection cabling will need to be removed and reinstalled.

Will it be required that the system be certified?

08/03/2026

The lighting protection system does not need to be certified after re-installation.

IHS COR

A0002 12 7/31/2026 Technical

The roof to roof parapet separation walls have an expansion joint provision on top. Will it be required to remove and replace the top wall expansion joint material or can it be left in place and new membrane applied over the top. 08/03/2026

The expansion joint material will be required to be removed and replaced where it occurs over the parapets.

IHS COR

A0002 13 7/31/2026 Technical

Are the solar panels to be reinstalled? It was stated that the existing solar panels currently do not function, will they be required to operate at completion. 08/03/2026

The solar panels do not have to be re-installed on the roof. The contractor is to properly dispose of the solar panels and their appurtences. The contractor is to give the facility an opportunity to keep the solar panel materials before disposing.

IHS COR

A0002 14 7/31/2026 Technical

The existing roof plan provided shows four way tapered insulation sloping to the roof drains. By modifying slopes the tapered insulation will be more cost effective. Can the tapered insulation be redesigned.

08/03/2026

A re-design of the tapered system must come at no additional cost to the project and must be approved by the CO and COR before implementation.

IHS COR

A0002 15 7/31/2026 Technical

The new exhaust fan with high tower air release extension have guy wire sanctions attached over the roof system. Will new sanctions be required? If so will there be a provided manufacture and type of product? What structural element will the sanctions be required to be attached to? 08/03/2026

The exhaust fan shall have a new guy wire kit installed per the manufacturers recommendation. The fan manufactuerer is provided.

The sanctions must attach to metal deck.

IHS COR

A0002 16 7/31/2026 Technical

The color and surface of existing parapet wall flashing is damaged. The color appears to be brown, originally the color would have been either Colonial Red or Burgundy. Please clarify. 08/03/2026

New parapet wall flashing shall be provided for this project by the contractor. Re-using the parapet wall flashing will not be allowed. The color of paint on the new parapet flashing shall be burgundy. IHS COR