This is an Amendment to a solicitation (A0001) issued by the Indian Health Service (IHS) - DES Seattle on July 21, 2026, for solicitation number 75H70126R00034. The amendment provides a Questions and Answers (Q&A) sheet dated July 21, 2026, and replaces the March 2026 version of Attachment J02 Statement of Work with Revision 1 (July 2026 version).

The Q&A section addresses seven technical questions related to a roof replacement project, all submitted between July 17-19, 2026, with responses issued July 21, 2026 by the IHS Contracting Officer's Representative (COR). Key clarifications include: the roofing membrane must be compatible PVC membrane that does not compromise performance or manufacturer warranty; the minimum insulation requirement is R30; both adhesion and mechanical fastening are required for cover board and membrane installation due to extreme wind events at the project location; 1/2" cover board thickness shall be installed; existing metal coping caps may be reused if the contractor guarantees replacement of any damaged caps; warranty requirements are specified in revised SOW paragraph 2.B; and the contractor is responsible for disposal of removed materials by methods not specified in the project documents. All other terms and conditions of the solicitation remain unchanged.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A0001

JONG KIM, Contracting Officer

A. The purpose of this amendment is to 1) Provide a Q&A sheet as of 7/21/2026, and 2) Replace Attachment J02 Statement of Work, March 2026 version with Attachment J02 Statement of Work R1 July 2026 version. See attached B01 Attachment J02 Statement of Work R1.

B. All other terms and conditions of this solicitation remain unchanged.

Indian Health Service - DES Seattle 701 5th Avenue, Suite 1600 Seattle, WA 98104

75H70126R00034

1 2

07/21/2026

07/15/2026

Amend No.

Item

Date Submitted

Question Type

(Technical or Admin)

Question Response Date Response Responded By

EXAMPLE 0 11/23/2020 Technical Please provide drawings or plans for ??? 11/23/2020 IHS Response IHS POC

A0001 1 7/17/2026 Technical

I’m reaching out to see if you can help answer a question regarding the roofing membrane for this project. We typically use GAF products and would like to confirm whether they are approved for use on this project.

07/21/2026

The membrane installed must be compatible with the existing roof pvc membrane to ensure a watertight tie in where it may meet portions of the roof that will not be replaced. The product used must be compatibal pvc membrane roofing and must not compromise performance or manufacturers warranty. See SOW paragraphs1.E.

and 2.E.

IHS COR

A0001 2 7/19/2026 Technical

The insulation is specified as both R30 and 7" minimum. R30 is equal to 2 layers of 2.6" ISO (total of 5.2") while 7" would equal R41. We just need to clarify what to install. 07/21/2026

The minimum R-value required is R30. The thinnest insullation over the roof shall meet this requirement.

IHS COR

A0001 3 7/19/2026 Technical

The scope states that the ISO should be mechanically fastened but doesn't clarify how to install the cover board and membrane. Both the cover board and the membrane can be installed by either mechanical fastening or adhesion. I recommend adhering them which provides a better hail resistant assembly.

07/21/2026

The cover board and membrane shall be fastened by both adhesion and mechanically. Pine Ridge experiences extremely high wind events.

IHS COR

A0001 4 7/19/2026 Technical

Cover board is readily available in both 1/4" and 1/2" thick boards but the spec does not specify a thickness. I recommend 1/2" as it provides better hail resistance at only a slightly higher cost. 07/21/2026

1/2" cover board shall be installed

IHS COR

A0001 5 7/19/2026 Technical

The spec calls for replacing the parapet flashings. Does this include the existing metal coping cap? The existing metal coping is in good condition and could be reinstalled once the new membrane is installed on the walls.

This would easily save $10,000 - $15,000 in material costs alone. 07/21/2026

If the contractor can guarantee replacement of any metal coping cap that is bent or damaged as a result of its removal and re-installation, then re-using the coping cap will be acceptable.

IHS COR

A0001 6 7/19/2026 Technical

Concerning the warranty, we offer various warranties including the 15 year specified in the specification. I recommend clarifying that the Duro-Last 15 Year NDL (No-Dollar-Limit) Supreme warranty is required. In addition to covering the material and labor for 15 years this warranty also covers consequential (interior) damages, all at no extra charge! (See attached warranty sample.)

07/21/2026

See revised SOW paragraph 2.B. for warranty requirements.

IHS COR

A0001 7 7/19/2026 Technical

Is there interest in sustainability? Duro-Last has a "Recycle Your Roof" program (see attached flyer) and the EPDM and ISO could be repurposed through a company called "Repurposed Materials" (repurposedMATERIALS - Largest Industrial Thrift Store in America )

07/21/2026

The contractor is responsible for the disposal of the roof membrane, insulation, and all other removed materials as required by this project.

The method of disposal is not specified. IHS COR